Skip to content

GCRI · Advanced Industry and Robotics

Process safety engineering

Process and industrial safety engineering is the second method this platform stewards. It prevents major accidents through hazard identification, layers of protection, safety instrumented systems, management of change and learning from incidents.

01Register

Process safety engineering on the record.

Method recordSTEM method
  1. MethodProcess and industrial safety engineering
  2. StewardAdvanced Industry and Robotics
  3. Applied inAdvanced Industry and Robotics
  4. Canonical pageSTEM Commons
02Application

What process and industrial safety engineering does here.

Process and industrial safety engineering prevents and mitigates fires, explosions and toxic releases in industrial facilities. It addresses hazards that can affect workers, surrounding communities and connected supply chains. In industry and robotics, work and skills and trade, resources and supply chains, process safety analysis shows how industrial failures affect health, environment and supply of essential goods. It informs land use planning around hazardous sites. The canonical description is on the STEM Commons.

Hazard and operability studies

Teams examine each part of a process for deviations such as high pressure or no flow, identifying causes, consequences and needed safeguards.

Layer of protection analysis

The independence and reliability of safeguards against each hazardous scenario are assessed to decide whether more protection is needed.

Management of change

Modifications to plant, procedures and staffing are reviewed for safety effects before they are made, preventing drift.

03Geography

Infrastructure exposure in Germany.

Night lights, population density and flood water over Germany, from NASA GIBS. Each layer carries its own date.

Ramani shirikishi inahitaji JavaScript. Orodha ya tabaka na vyanzo imetolewa hapa chini.

Tabaka 3

Infrastructure exposure, for this page

Kuhusu tabaka hili
Ushahidi
Imeonekana
Chanzo
VIIRS Black Marble (VNP46A2) (NASA LAADS DAAC)
Mtoaji
NASA LAADS DAAC
Leseni
Data huria ya NASA
Tarehe ya data
kila siku; Mng'ao wa setilaiti, uliorekebishwa kwa mwanga wa mwezi na angahewa
Ya hivi karibuni wakati wa ujenzi
2026-10-12
Ubora wa picha
gridi ya takriban mita 500
Kutokuwa na uhakika
Mng'ao wa usiku kutoka setilaiti kwa tarehe iliyoonyeshwa; taa ni kiashiria cha matumizi na kukatika kwa umeme, si kipimo cha usambazaji au upatikanaji.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov
Kuhusu tabaka hili
Ushahidi
Imekadiriwa
Chanzo
Gridded Population of the World v4.11 (NASA SEDAC (CIESIN, Chuo Kikuu cha Columbia))
Mtoaji
NASA SEDAC (CIESIN, Chuo Kikuu cha Columbia)
Leseni
CC BY 4.0
Tarehe ya data
null; Makadirio yanayotokana na sensa, isiyobadilika (2020)
Ubora wa picha
gridi ya takriban kilomita 1
Kutokuwa na uhakika
Makadirio yanayotokana na sensa ya watu kwa kila kilomita ya mraba mwaka 2020, yanayoonyeshwa kama muktadha wa mfiduo; si hesabu ya watu walioathiriwa na janga lolote.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov
Kuhusu tabaka hili
Ushahidi
Imeonekana (mawingu huacha mapengo)
Chanzo
Bidhaa ya Mafuriko ya Kimataifa ya VIIRS (NASA LANCE)
Mtoaji
NASA LANCE
Leseni
Data huria ya NASA
Tarehe ya data
kila siku; Ugunduzi wa setilaiti; mawingu huacha mapengo
Ya hivi karibuni wakati wa ujenzi
2026-10-14
Ubora wa picha
gridi ya takriban mita 250
Kutokuwa na uhakika
Ugunduzi wa setilaiti; mawingu huacha mapengo. Raster ya setilaiti au modeli kama mtoaji anavyoichapisha. Mawingu, mapengo ya mkondo wa setilaiti na makosa ya upimaji huacha mapengo na kelele; thamani ni viashiria, si vipimo mahali fulani.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov
Kuhusu tabaka hili
Ushahidi
Imeonekana
Chanzo
Mwangaza uliorekebishwa wa VIIRS NOAA-20 (NASA LANCE)
Mtoaji
NASA LANCE
Leseni
Data huria ya NASA
Tarehe ya data
kila siku; Picha ya satelaiti
Ya hivi karibuni wakati wa ujenzi
2026-10-14
Ubora wa picha
gridi ya takriban mita 250
Kutokuwa na uhakika
Picha ya satelaiti. Raster ya satelaiti au ya muundo kama mtoa huduma anavyoichapisha. Mawingu, mapengo ya ukanda na makosa ya upatikanaji huacha mapengo na kelele; thamani ni viashiria, si vipimo mahali fulani.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov
Kuhusu tabaka hili
Ushahidi
Modelled (latest year GIBS publishes)
Chanzo
MODIS Terra and Aqua land cover (MCD12Q1) (NASA LP DAAC)
Mtoaji
NASA LP DAAC
Leseni
Data huria ya NASA
Tarehe ya data
yearly; Satellite classification; latest year GIBS publishes
Ya hivi karibuni wakati wa ujenzi
2024-01-01
Ubora wa picha
gridi ya takriban mita 500
Kutokuwa na uhakika
Satellite land cover classes for the year shown, including croplands; a classification with known errors, not a farm register.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov
Kuhusu tabaka hili
Ushahidi
Imeonekana (mawingu huacha mapengo)
Chanzo
MODIS Terra EVI (NASA LANCE)
Mtoaji
NASA LANCE
Leseni
Data huria ya NASA
Tarehe ya data
daily; Satellite index; clouds leave gaps
Ya hivi karibuni wakati wa ujenzi
2026-10-13
Ubora wa picha
gridi ya takriban mita 250
Kutokuwa na uhakika
Satellite vegetation index for the 8 days to the date shown, a habitat condition indicator; not a measure of species or biodiversity.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov

Ya karibuni zaidi inayopatikana

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © wachangiaji wa OpenStreetMap (ODbL) · Natural Earth

Inapakia picha za hivi karibuni za NASA.

Buruta ili kusogeza. Ctrl au ⌘ na usogeze, bana au tumia vitufe ili kukuza; elea juu ili kuona thamani zilizo chini ya kiashiria; weka upya hurudisha kwenye eneo.

Infrastructure exposure, framed on Germany.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.

Data: NASA GIBS · ASTER GDEM · Blue Marble · © OpenStreetMap contributors · Natural Earth · NASA EONET · U.S. Geological Survey · NASA JPL OPERA DIST-ALERTSources and licences

  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • VIIRS Black Marble night-time lights, NASA Goddard Space Flight Center; distributed by the NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Licensed under CC BY 4.0. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). doi:10.7927/H49C6VHW. CC BY 4.0
  • VIIRS near-real-time products (flood, land surface temperature, snow cover, corrected reflectance), NASA LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • MODIS land products (vegetation indices, gross primary production, land cover), NASA LP DAAC and LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • ASTER GDEM is a product of METI and NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Cite as: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019). ASTER Global Digital Elevation Model V003. doi:10.5067/ASTER/ASTGTM.003. NASA open data
  • Imetengenezwa kwa Natural Earth. Data huria za ramani za vekta na rasta @ naturalearthdata.com. Kikoa cha umma
  • © OpenStreetMap contributors (ODbL), via NASA GIBS (coastlines, boundaries, roads and place names). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). ODbL
  • Blue Marble, NASA Earth Observatory; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Muktadha kwenye tufe na ramani bapa: mwambao, mipaka, barabara na majina ya mahali kutoka tabaka za marejeo za NASA GIBS (data ya OpenStreetMap, ODbL, © wachangiaji wa OpenStreetMap); picha za Blue Marble kama msingi wa hiari; ardhi ya 3D na usomaji wa mwinuko kutoka faharasa ya rangi ya mwinuko ya ASTER GDEM (madaraja ya 5 m hadi 200 m, yaliyokuzwa ili yasomeke). Mipaka imechorwa kama ilivyochapishwa na haimaanishi msimamo wowote kuhusu eneo lolote.
  • Matukio ya moja kwa moja: NASA Earth Observatory Natural Event Tracker (EONET); matukio ni ya kuashiria tu na yanabaki na viungo vya vyanzo vyao asili.
  • Moja kwa moja: NASA EONET. Matukio ni ya kuashiria tu, si tahadhari rasmi za mamlaka.
  • Moja kwa moja: U.S. Geological Survey. Matukio ni ya kuashiria tu, si tahadhari rasmi za mamlaka.
  • Observed (EO): NASA JPL OPERA DIST-ALERT (contains modified Copernicus Sentinel data 2026). We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS).
  • NASA GIBS: Tunatambua matumizi ya picha zinazotolewa na huduma za Global Imagery Browse Services (GIBS) za NASA, sehemu ya Earth Science Data and Information System (ESDIS) ya NASA.
  • Utabiri wa mtiririko wa mito, siku 30 pamoja na masafa (GloFAS kupitia Open-Meteo): Una taarifa za Copernicus Emergency Management Service zilizorekebishwa za 2026. Si onyo la mafuriko.
  • Data ya hali ya hewa kutoka Open-Meteo.com (https://open-meteo.com/), chini ya leseni ya CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/).
  • Optional layers (12 sources in the layer list: live, forecast, observed and context) print their provider credit on the map and here when switched on; forecasts are model output and derived indices are estimates.

Tabaka na tarehe

  • Taa za usiku, kila siku: VIIRS Black Marble (VNP46A2), NASA LAADS DAAC · 12 Okt 2026
  • Population density, 2020: Population: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · static
  • Maji ya mafuriko, mchanganyiko wa siku 3: VIIRS Global Flood Product, NASA LANCE · 14 Okt 2026
  • Rangi halisi: VIIRS NOAA-20 mng'ao uliosahihishwa, NASA LANCE · 13 Okt 2026
  • Land cover type (IGBP), yearly: MODIS Terra and Aqua land cover (MCD12Q1), NASA LP DAAC · 2024
  • Enhanced vegetation index, rolling 8 days: MODIS Terra EVI, NASA LANCE · 13 Oct 2026

04Data

What the method consumes.

Datasets and records used by process and industrial safety engineering on this platform, with the role each plays and the label its values carry. Sources are listed in the source register.

DataJukumuLabel
Process design documentsHazard studiesDECLARED
Safety system test recordsReliabilityIMEONEKANA
Incident investigationsMafunzoIMERIPOTIWA
05Monitor

Hazard study.

The screen a team would use to follow this method: its measures, states and decisions. Names are examples and values are illustrative.

Hazard study

Industry and robotics · Process safety engineering · Run R-7113

6 actions openGCRI · Advanced Industry and Robotics

Deviations

Feed lineNo flowPump dry-runLow-flow tripWastani
ReactorMore temperatureRunawayHigh-temp interlockJuu
StorageLess levelSupply lossLevel alarmChini

Method card

Mbinu
Process and industrial safety engineering
Kiwango
guide-word method
Reviewer
independent
Label
IMEUNDWA KIMUUNDO

Findings by severity

050100count, illustrativeChiniWastaniJuuCritical
Hazard study: the screen’s structure, terms and states for Industry and robotics.Example names and illustrative values; a design, not a record or a live system.
06Validation

How results are checked.

Safety measures are verified through audits, inspection and proof testing. Incident investigations test whether barriers performed as intended.

CheckHow it is done
Study team competenceHazard studies are led by qualified facilitators
Independence of layersSafeguards are checked for shared failure causes
Action closureStudy recommendations are tracked to completion

Natural hazards triggering industrial accidents are often not considered in design. Organisational drift can erode barriers over time.

07Twin and cascade simulator

Model process safety engineering as a system. Run the cascade.

Assembled from the Nexus Standards area profile Industry and manufacturing: the hazards it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Choose the components, pick an initiating hazard and step through the cascade. The Map view places the run on an example geography with open data. Every coupling weight is a stated assumption you can change. A teaching model, not a forecast, an assessment or a certification. To model a place of your own choosing, open the full System Builder.

Majanga

  • Natech event
  • Dam failure
  • River flood (set off downstream)
  • Flash flood (set off downstream)
  • Mass displacement (set off downstream)
  • Chemical spill or leak (set off downstream)
  • Emergency-response overload (set off downstream)
  • Widespread power outage (set off downstream)
  • Water supply shortfall (set off downstream)
  • Toxic gas release (set off downstream)
  • Industrial fire (set off downstream)

Controls

  • NS-0 Katiba na kanuni
  • NS-9 UNI za kimuktadha (utekelezaji, matukio, matukio ya programu)
  • NS-11 Uthibitishaji na ufuatiliaji (ushahidi, uthibitisho, uchunguzi wa ulinganifu usio na imani)
  • NS-12 Vitu vya programu, miundo na AI/ML (mnyororo wa ugavi, kadi za miundo, karatasi za seti za data)
  • NRS-H60 Familia ya majanga: Kukatizwa kwa mnyororo wa ugavi na mitiririko (NHS-1 sys.supply-chain)
  • NRS-H50 Familia ya majanga: Ajali za viwandani na za michakato (NHS-1 infra.industrial)
  • NRS-H109 Familia ya majanga: Kushindwa kwa teknolojia za mpito wa nishati (NHS-1 tech.energy-transition)
  • NRS-X10 Usalama wa kemikali, viwanda, nyuklia na mionzi
  • NRS-H54 Familia ya majanga: Usumbufu wa ishara na majukwaa (NHS-1 cyber.platform)
  • NRS-K14 Wasifu wa kifurushi cha nyanja: Utengenezaji na viwanda (DOMAIN-014)

Observation

  • eMARS Major Accident Reporting System (listed for reference)
  • World Development Indicators (listed for reference)
  • ILOSTAT (listed for reference)
  • Manufacturing value added as a proportion of GDP and per capita
  • CO2 emission per unit of value added
  • Manufacturing, value added (% of GDP)
  • Direct economic loss to all other damaged or destroyed productive assets attributed to disasters

Example geography

  • The Strait of Malacca: 227 hexagonal cells
  • Night lights tonight, outages (VIIRS Day/Night Band), NASA GIBS
  • Surface water through cloud, 30 m (OPERA DSWx-S1 radar), NASA GIBS
  • Rain rate, last half hour (IMERG), NASA GIBS
  • Surface soil moisture (SMAP), NASA GIBS
09Methods and evidence

How process safety engineering is modelled, measured and tested.

The model, its assumptions, its data and its uncertainty, in the form a scientist or engineer would check. Structures follow published methods. The values drawn are illustrative, not findings.

System model

The couplings between the systems in process safety engineering: signs of influence, a reinforcing and a balancing loop, and cross-links where stress jumps.

++−++ViwandaWorkBiasharaJamiiUchumiR reinforcingB balancing
Causal loop diagram from the page’s systems; signs show the direction of influence. Illustrative structure for a system dynamics or network model, not estimated couplings.
FAIR guiding principles · GO FAIR and FORCE11W3C PROV · World Wide Web ConsortiumGuidance on consistent treatment of uncertainties · IPCCCEOS Analysis Ready Data · Committee on Earth Observation Satellites
10Usimamizi

Who maintains the method.

Advanced Industry and Robotics stewards process and industrial safety engineering for the Consortium and reviews how it is applied across platforms.

11Mchakato

How the process runs.

Process explorer · Process

Process safety engineering: Risk management process

Hatua 8Awamu 5

Mchakato

Process safety engineering: Risk management process

ISO 31000:2018 sets out an iterative risk management process, from scope, context and criteria through assessment and treatment to monitoring, review and reporting.

  1. 01 Frame

    1. 01Scope, context and criteriaDataset · Automation engineerThe frame for the process: the scope, the external and internal context, and the risk criteria. Later steps are read against this frame.
  2. 02 Risk assessment

    1. 04Risk identificationStep · Automation engineerThe first part of risk assessment. Risk is usually expressed by risk sources, potential events, their consequences and likelihood.
    2. 05Risk analysisModel · Automation engineerThe second part of risk assessment. It considers consequences and likelihood of the identified risks, with guidelines, not a formula.
    3. 06Risk evaluationStep · Automation engineerThe last part of risk assessment. Results of the analysis are compared with the risk criteria to see where more action is needed.
  3. 03 Treatment

    1. 07Risk treatmentStep · Automation engineerTreatment options are selected, then plans are prepared and implemented. Residual risk is documented and goes to monitoring and review.
  4. 04 Across the process

    1. 02Communication and consultationStep · Automation engineerCommunication and consultation with stakeholders is its own process element. The standard draws it alongside the others, not in sequence.
    2. 03Monitoring and reviewStep · Automation engineerMonitoring and review take place at every stage. New experience, knowledge and analysis can revise elements, actions and controls.
  5. 05 Record and report

    1. 08Recording and reportingRecord · Automation engineerThe process and its outcomes are documented and reported. The standard does not name who receives the report in the clauses read.

Outline of an external standard or method, from its public sources. It describes what the framework says, not a record of any run. It does not show that Nexus or any partner performs, certifies or approves a step. A gate is a step of the method, never a Nexus approval.

12Maswali

Questions and answers.

What are the limits of process and industrial safety engineering in this field?
Natural hazards triggering industrial accidents are often not considered in design. Organisational drift can erode barriers over time.
How are results checked?
Safety measures are verified through audits, inspection and proof testing. Incident investigations test whether barriers performed as intended.
Are the values on this page real?
The data names, roles and checks are real descriptions of practice. The canvas shows a design of the method’s use, not a run; no result is reported here.
Where else is this method applied?
The canonical method page lists every platform that applies it.
RipotiChangia

Changia ushahidi kutoka ukurasa huu.

Reports ni chapisho la kila robo mwaka la Muungano. Unachojua kuhusu somo hili kinaweza kuwa ushahidi, kisa au sahihisho katika toleo lijalo, kikitajwa kwa jina lako na kuchapishwa chini ya CC BY 4.0 pale ambapo ni kazi yako mwenyewe.

GCRIViwanda vya Hali ya Juu na RobotiTeknolojia Inayokua kwa KasiHatari na Ustahimilivu wa Sekta Duniani
Viwanda vya Hali ya Juu na Roboti

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.