Skip to content

GCRI · Advanced Industry and Robotics

Reviewed models and scenarios

Model descriptions for Advanced Industry and Robotics are published here once reviewed, with their assumptions, evidence and validation. They describe models; they are not live simulations.

02What is shown

Released, referenced and rights-cleared.

  • Time and space reference for every view.
  • Sources and licence.
  • Uncertainty and known limits.
  • Version and date of release.
03Model classes

The kinds of model industrial work relies on.

Model classOpen examplesQuestion it answersValidation
Consequence modelsOpen dispersion and fire modelsAccident consequencesPast incidents
Barrier modelsBow-tieBarrier effectivenessIncident data
Fleet reliabilityReliability modelsCommon-mode failureField data
04Mchakato

How the process runs.

Process explorer · Process

Reviewed models and scenarios: Hazard, exposure, vulnerability

10 steps4 stages

Mchakato

Reviewed models and scenarios: Hazard, exposure, vulnerability

In IPCC AR6 Working Group II, climate risk results from interactions between hazards and a system’s exposure and vulnerability, and responses can add risk.

  1. 01 Drivers

    1. 01HazardDataset · OT security leadThe potential occurrence of a natural or human-induced physical event or trend that may harm people, property, services or ecosystems.
    2. 02ExposureDataset · OT security leadThe presence of people, livelihoods, species, ecosystems, infrastructure or assets in places and settings that could be adversely affected.
    3. 03SensitivityDataset · OT security leadThe degree to which a system or species is affected, either adversely or beneficially, by climate variability or change.
    4. 04Capacity to cope and adaptDataset · OT security leadThe ability of systems, institutions, humans and other organisms to adjust to damage, take opportunities or respond to consequences.
  2. 02 Assessment

    1. 05Risk from responsesComponent · OT security leadRisks from climate responses arise when responses miss their objectives, or from trade-offs or negative side effects.
    2. 06VulnerabilityComponent · OT security leadThe propensity or predisposition to be adversely affected. It includes sensitivity to harm and lack of capacity to cope and adapt.
    3. 07RiskModel · Advanced Industry and RoboticsRisk results from dynamic interactions between hazards and the system’s exposure and vulnerability. Each may be uncertain and change.
  3. 03 Response

    1. 08Risk management and responseStep · OT security leadRisk management is plans, actions, strategies or policies that reduce the likelihood or size of adverse consequences.
    2. 09Residual riskRecord · OT security leadThe climate impact risk that remains after adaptation and mitigation efforts. Adaptation can redistribute risk between areas and groups.
  4. 04 Decision

    1. 10Decision by the responsible partyDecision · OT security leadThe framing names no single decision maker. Decisions on responses rest with the responsible party under its own rules.

Outline of an external standard or method, from its public sources. It describes what the framework says, not a record of any run. It does not show that Nexus or any partner performs, certifies or approves a step. A gate is a step of the method, never a Nexus approval.

05Hali

Releases appear as they are reviewed.

Analysis runs in Foundry; reviewed releases are listed here.

07Maswali

Questions and answers.

Can I request a map or model?
Write to the contact form with what you need and why.
RipotiChangia

Changia ushahidi kutoka ukurasa huu.

Reports ni chapisho la kila robo mwaka la Muungano. Unachojua kuhusu somo hili kinaweza kuwa ushahidi, kisa au sahihisho katika toleo lijalo, kikitajwa kwa jina lako na kuchapishwa chini ya CC BY 4.0 pale ambapo ni kazi yako mwenyewe.

GCRIViwanda vya Hali ya Juu na RobotiTeknolojia Inayokua kwa KasiHatari na Ustahimilivu wa Sekta Duniani
Viwanda vya Hali ya Juu na Roboti

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.