Post-disaster safety evaluation
Buildings are tagged as safe, restricted or unsafe using rapid evaluation procedures, so people can return or stay away.
GCRI · Disaster Resilience and Recovery
Structural and earthquake engineering decide whether buildings and infrastructure stand through hazards and whether reconstruction is safer than what it replaces. In this field it supports damage assessment, retrofit priorities and reconstruction standards.
Structural and earthquake engineering designs buildings, bridges and other structures to carry loads safely, including those from earthquakes, wind and floods. It determines how much damage the built environment suffers when hazards occur. In disaster and crisis and climate and hazards, structural engineering supplies vulnerability functions for loss models and guides retrofit priorities. It links hazard intensity to disruption of housing, services and supply chains. The canonical description is on the STEM Commons.
Buildings are tagged as safe, restricted or unsafe using rapid evaluation procedures, so people can return or stay away.
Schools, hospitals and other critical buildings are screened for vulnerability and ranked for retrofit by occupancy, hazard and function.
Housing designs and construction practice are reviewed against hazard-resistant standards, with guidance suited to local materials and builders.
Population density, flood water, night lights and true-colour imagery over the Philippines, from NASA GIBS. Each layer carries its own date.
Imephu esebenzisanayo idinga i-JavaScript; uhlu lwezendlalelo nemithombo luphansi.
Izendlalelo 4
Hazards now, for this page
Ikhibhodi, kugxilwe emephini
Bamba u-Ctrl noma u-⌘ bese uskrola ukuze usondeze
Okutholakala kwakamuva
NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © abanikele ku-OpenStreetMap (ODbL) · Natural Earth
Iyalayisha izithombe zakamuva ze-NASA.
Donsa ukuze unyakazise. U-Ctrl noma u-⌘ bese uskrola, ucindezele ngeminwe emibili noma izinkinobho ukuze usondeze; beka isikhombi ukuze ubone amanani aphansi kwaso; ukusetha kabusha kubuyisela esifundeni.
Hazards now, framed on the Philippines.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.
Izendlalelo nezinsuku
Datasets and records used by structural and earthquake engineering on this platform, with the role each plays and the label its values carry. Sources are listed in the source register.
| Idatha | Indima | Label |
|---|---|---|
| Building inventories | Exposure | Published statistics |
| Damage assessment records | Vulnerability evidence | OBSERVED |
| Building codes and standards | Design requirements | Published statistics |
| Inspection records | Ukuthobela imithetho | OBSERVED |
The screen a team would use to follow this method: its measures, states and decisions. Names are examples and values are illustrative.
Disaster resilience · Structural engineering · Run R-4411
| Slight | 0.20 | 0.4 | Cosmetic |
| Maphakathi | 0.36 | 0.6 | Repairable |
| Extensive | 0.70 | 0.7 | Major |
| Complete | 0.9 | 0.8 | Replace |
Designs are checked against codes, laboratory and shake-table tests, and observed performance after events. Peer review is used for unusual structures.
| Check | How it is done |
|---|---|
| Evaluator calibration | Damage evaluators use common procedures and are checked for consistency |
| Fragility function validation | Vulnerability models are compared with observed damage |
| Construction quality sampling | Reconstruction is inspected on a sample basis |
Existing building stock is often poorly documented. Interaction of multiple hazards and degradation over time is incompletely represented.
Assembled from the Nexus Standards area profile Compound and cascading hazard standards: the hazards it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Choose the components, pick an initiating hazard and step through the cascade. The Map view places the run on an example geography with open data. Every coupling weight is a stated assumption you can change. A teaching model, not a forecast, an assessment or a certification. To model a place of your own choosing, open the full System Builder.
Izingozi
Systems and couplings
Controls
NS-0 Umthethosisekelo nezimisoNS-3 Ama-UNI amarekhodi obungozi (uhlelo lolimi, ukuqhathanisa nezinhlelo ezindala, igunya lokwabela)NS-9 Ama-UNI omongo (ukufakwa, izibonelo, izibonelo zohlelo)NS-11 Ukuqinisekisa nokuqapha (ubufakazi, izifakazelo, ukuqapha ukuhambisana ngaphandle kokwethembana)NRS-H61 Umndeni wezingozi: Ukwehluleka okulandelanayo (NHS-1 sys.cascade)NRS-H62 Umndeni wezingozi: Izehlakalo ezihlangene nezezingozi eziningi (NHS-1 sys.compound)NRS-H60 Umndeni wezingozi: Ukuphazamiseka kochungechunge lokuhlinzeka nokugeleza (NHS-1 sys.supply-chain)NRS-H94 Umndeni wezingozi: Izehlakalo ze-inthanethi zesistimu (NHS-1 cyber.systemic-cyber)NRS-H107 Umndeni wezingozi: Ukugxila nokufana kwengqalasizinda yedijithali (NHS-1 tech.digital-concentration)NRS-H7 Umndeni wezingozi: Ukungajwayeleki kokujikeleza okukhulu komoya (NHS-1 atmo.climate-mode)Observation
Example geography
The model, its assumptions, its data and its uncertainty, in the form a scientist or engineer would check. Structures follow published methods. The values drawn are illustrative, not findings.
How far the outlook for structural engineering for recovery could spread, shown as ranges rather than a single line.
Cities and Built Environment stewards structural and earthquake engineering for the Consortium and reviews how it is applied across platforms.
Process explorer · Process
8 steps·3 stages
Inqubo
A generic method sketch using standard hazard, exposure and vulnerability vocabulary; no single body publishes this chain, so it is not a standard.
Neutral outline of a published external standard or method, from its issuing body. Not a record of operation. Nexus does not perform, certify or approve any step shown. A gate or decision belongs to the party the source names. No authoritative public source for this exact chain was found.
I-Reports iyincwadi yekota ye-Consortium. Lokho oakwaziyo ngalesi sihloko kungaba ubufakazi, icala noma ukulungisa kuhlelo olulandelayo, kubongwe wena futhi kushicilelwe ngaphansi kwe-CC BY 4.0 lapho kungumsebenzi wakho.
Ungalokothi uthumele idatha yomuntu siqu, imininingwane ebucayi yengqalasizinda noma noma yini ongenalo ilungelo lokuyabelana ngayo. Umnikelo ubuyekezwa ngaphambi kokusetshenziswa; ukuwuthumela akunikezi ubuqambi noma amalungelo okuhlela, futhi ukusekela akuthengi muphumela.
Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.
Maps, data and figures on this site are shown for context and general information. They are not advice, forecasts or warnings; the limits of the information are set out in the Disclaimers and Data Notices.
This site uses only strictly necessary cookies to work and to remember your privacy choices. Nothing loads from other companies, and we never sell or share your personal information.
This site uses only strictly necessary cookies to work and to remember your privacy choices. Nothing loads from other companies, and we never sell or share your personal information. We run no advertising. You can review your choices at any time through Privacy choices at the foot of every page.