AI compute is physical infrastructure built on a few chips and a few places

Part I describes systems and their couplings. It ranks no country or operator and assesses no authority.

7 min read2 figures1 table12 notesNR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE

ناوەڕۆک
  1. ·Edition home
  2. ·Executive summary
  3. 1AI compute is physical infrastructure built on a few chips and a few places
    1. 1.1 The questions this part answers
    2. 1.2 The argument
    3. 1.3 The six-sector nexus: twenty couplings across five assessed sectors
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Compute build-out meets local power, water and packaging limits
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. Aمیتۆدۆلۆژی
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

1.1The questions this part answers

Key questions

  • Where is semiconductor and compute risk concentrated?
  • Which couplings carry semiconductor and compute shocks into other systems?
  • Which semiconductor and compute capabilities hold under compound stress?
  • What must 2027 evidence measure first?

In this part

  • Narrative
  • Headline finding
  • Lead figure
  • Five footprint and governance chapters
  • Twelve-domain reading
  • Sector screens
  • Dependency matrix
  • Risk objects
  • Capability ladder
  • سیناریۆ
  • Three lenses
  • پۆرتفۆلیۆ

1.2The argument

AI compute is usually discussed as software. The 2026 evidence reads it as a physical build: chips from a handful of fabrication clusters, machines from specialised equipment, memory and packaging, and sites that need electricity and cooling189.

Demand grows fast. Leading AI supercomputers doubled in performance about every nine months from 2019 to 2025, while their power needs doubled about every year1. Epoch AI estimates that training compute grows about four times a year and that power binds first3. Earlier work finds a doubling time of about six months in the deep learning era2.

Supply follows money. Chip sales rose 25.6% in 20258, equipment billings reached USD 135.1 billion9, and governments added the CHIPS and Science Act and the EU Chips Act4412. Export controls shape who can buy advanced computing items13.

The footprint is the least measured part. US data centres used 176 TWh in 2023 and may use 325 to 580 TWh in 202815. Water use of fabrication plants is reported by single companies, not on a common basis23. Peer-reviewed work shows large gaps between models, sites and hardware67.

Figure 1.1How fast do compute measures double? Doubling time, months

Two sources report the speed of growth. The AI supercomputer dataset shows performance doubling about every nine months, while power and cost double about every year1. An earlier study finds training compute doubling about every six months in the deep learning era and about every twenty months before it2. These are historical fits, not forecasts.

بابەتBar, scaled to the largest valueبەها
AI supercomputer performance, 2019 to 20259
AI supercomputer power need and hardware cost12
Training compute, deep learning era6
Training compute, before deep learning20

Source: as cited in the note to this figure. Year 2025.

Figure ID FIG-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE-01-003

9months

AI supercomputer performance doubling1

12months

power and cost doubling, about a year1

6months

training compute, deep learning era2

20months

training compute, earlier era2

1.3The six-sector nexus: twenty couplings across five assessed sectors

The semiconductor and compute-centred matrix types the twenty couplings between the five core systems, read for their semiconductor and compute content. Strengths are Nexus estimates (ESTIMATED) from the cited evidence and analogue events; they set the graph that 2027 evidence will test.

Figure 1.2Couplings across the six sectors

Each line is one coupling from one sector to another, drawn by the strength the edition assigns. Strengths are Nexus estimates from the cited evidence and analogue events. Infrastructure: not assessed in this edition’s coupling matrix, so it is drawn hollow with no couplings. The hexagon is the estate doctrine: six sectors and fifteen relations.

  • Strong
  • مامناوەند
  • Weak
  • Not assessed in this edition

Source: this edition’s coupling matrix (Table 1.1); status Estimated. Hexagon: the estate doctrine (Signature).

Table 1.1Coupling matrix: from the row system to the column system
From, toWATENEFOOHLTBIO
WAT ئاو·MODERATE
water for power and cooling
WEAK
no documented link
WEAK
no documented link
WEAK
no documented link
ENE وزەMODERATE
cooling and fab water demand
·WEAK
no documented link
WEAK
no documented link
WEAK
no documented link
FOO خۆراکWEAK
no documented link
WEAK
no documented link
·WEAK
no documented link
WEAK
no documented link
HLT تەندروستیWEAK
workforce
WEAK
workforce
WEAK
no documented link
·WEAK
no documented link
BIO فرەجۆریی زیندەوەریWEAK
no documented link
WEAK
no documented link
WEAK
no documented link
WEAK
no documented link
·
Strength: strong, moderate or weak; a Nexus estimate (status Estimated) from cited evidence and analogue events. The scale is defined in Annex A.

Transmission paths

  1. 01

    AIC → ENE → INF

    Compute demand raises electricity demand and constrains where sites can be built.

    Reported US data centre estimates15

  2. 02

    TRD → INF

    Export controls change who can buy advanced chips and equipment.

    Reported US guidance of May 202613

  3. 03

    FIN → INF

    Sales and subsidies fund plants and equipment.

    Reported sales and CHIPS Act figures844

  4. 04

    WAT → INF

    Water supply constrains plant siting.

    Inferred one company water report23

  5. 05

    GOV → INF

    Subsidy programmes set where capacity is built.

    Reported EU and US programmes4412

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1Pilz, K.F., Sanders, J., Rahman, R. and Heim, L., Trends in AI Supercomputers, arXiv:2504.16026, submitted 22 April 2025 (abstract page: 500 systems from 2019 to 2025; performance doubling about every nine months; cost and power doubling about every year; one March 2025 system with about 200,000 chips, USD 7 billion and 300 MW; about 75% of performance in the United States). arXiv, Ithaca. Observation year 2025. Accessed 2026-11-03.back
  2. 8Semiconductor Industry Association (ed.), Global Annual Semiconductor Sales Increase 25.6% to $791.7 Billion in 2025 (release; WSTS data; logic USD 301.9 billion; memory USD 223.1 billion; regional growth; about USD 1 trillion projected for 2026). Semiconductor Industry Association, Washington. Observation year 2025. Accessed 2026-11-03.back
  3. 9Evertiq (ed.), Semiconductor equipment billings reached $135B in 2025, 9 April 2026, a trade report of a SEMI release (USD 135.06 billion in 2025 against USD 117.14 billion in 2024; regional table); the SEMI page itself returned an access error, so this is a secondary report and weak evidence. Evertiq, Munich. Observation year 2025. Accessed 2026-11-03.back
  4. 3Sevilla, J. and others, Can AI scaling continue through 2030?, Epoch AI, 20 August 2024 (first 100,000 characters read: about 4 times a year; 1 to 5 GW campuses; about 2e29 FLOP feasible by 2030; power binds first). Epoch AI, San Francisco. Observation year 2024. Accessed 2026-11-03.back
  5. 2Sevilla, J., Heim, L., Ho, A., Besiroglu, T., Hobbhahn, M. and Villalobos, P., Compute Trends Across Three Eras of Machine Learning, arXiv:2202.05924, 2022 (abstract page: doubling about every 20 months before 2010 and about every 6 months in the deep learning era). arXiv, Ithaca. Observation year 2022. Accessed 2026-11-03.back
  6. 44United States Congress, CHIPS and Science Act, Public Law 117-167, enacted 9 August 2022 (text of section 102 on Congress.gov, first 100,000 characters read: the funding lines for sections 9902 and 9906 of Public Law 116-283 by fiscal year 2022 to 2026 sum to USD 39 billion for manufacturing incentives and USD 11 billion for research, USD 50 billion in all; the totals are sums of the listed amounts, not stated in the text). Observation year 2022. Accessed 2026-11-03.back
  7. 12European Commission (ed.), European Chips Act policy page (entered into force 21 September 2023; three pillars; more than EUR 33 billion across 19 State aid decisions; second Chips Act proposed June 2026). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2026. Accessed 2026-11-03.back
  8. 13US Department of Commerce, Bureau of Industry and Security (ed.), home page and news items (May 2026 guidance on licences for advanced computing items to Country Group D:5 entities; 7 April 2026 extension of the authorised IC designer timeline to 31 December 2026; Section 232 investigation of semiconductor imports listed). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
  9. 15US Department of Energy (ed.), DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers, 20 December 2024 (176 TWh in 2023, about 4.4%; 325 to 580 TWh, about 6.7% to 12%, in 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  10. 23AZFamily (ed.), TSMC Arizona expansion could make it Phoenix’s largest water customer, 22 July 2026 (total planned investment USD 265 billion; about 5,300 acre-feet a year for the first fab; 65% reclaimed; goal 90%); local news reporting company figures, weak evidence. Gray Media, Phoenix. Observation year 2026. Accessed 2026-11-03.back
  11. 6Luccioni, A.S., Jernite, Y. and Strubell, E., Power Hungry Processing: Watts Driving the Cost of AI Deployment?, ACM FAccT 2024, arXiv:2311.16863 (abstract page: multi-purpose generative models orders of magnitude more costly per 1,000 inferences than task-specific models). ACM, New York. Observation year 2024. Accessed 2026-11-03.back
  12. 7Patterson, D. and others, Carbon Emissions and Large Neural Network Training, arXiv:2104.10350, April 2021 (abstract page: sparse models under one tenth of the energy; location effect 5 to 10 times; choice of model, datacentre and processor 100 to 1000 times). arXiv, Ithaca. Observation year 2021. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Print

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF114 pages1.1 MBTagged, with bookmarks

      SHA-256 bdc959d4fc4bbbbe2e363defc329ac97d9895480df3e6b762719afe146821a42

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF120 pages1.1 MBTagged, with bookmarks

      SHA-256 f2682d99fd7abbacfb364f9320ec24c74e3ebeffd380abcd1deccee09126ca1a

  • Web edition

  • Data bundle

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 9e18c3135992ded96f25a598f2ede5d3ad8d1b5a0df4f9f6efeccb5249337c65

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 ee74b4b72f479a63d21a84e85cd8a5121fc308970edba28a7457e3e1e56877ef

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 de296c9e6a3741ffc53b236d4087dd5a4d769e91a11fa8172443c06ca1929be0

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 13bf3da1d45e1cb807d983784ccdef5c1281525183d0e09212282a1bf0e4cd9a

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 e6a42dc88ae3e72218740088af26ad62c05c649651cb4b04bbb37ce7f0e903d8

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 5f36eb94f8c7c05a3418147e4ab6dfbc437b0bc377a7961ad22e35d3d9f81be5

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 1: AI compute is physical infrastructure built on a few chips and a few places. In Exponential Technology Report 2026: Advanced Semiconductors and AI Compute (Baseline Edition 2026, Report No. NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

ڕاپۆرتەکانبەشداربە

Send evidence or a correction on Advanced Semiconductors and AI Compute.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

مێزی بەڵگەی سیستەمەکانی GCRIتەکنەلۆجیای ئێکسپۆنێنشیاڵ

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace