Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

The 2027 agenda

Eight bounded questions open the 2027 National Agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due at the Q1 2027 cut.

5 min read0 figures6 tables3 notesNR-COUNTRY-KEN-2026-BASELINE

Inhalt
  1. ·Edition home
  2. ·Executive summary
  3. 1Kenya’s risk runs between its rains and its grid
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Failed rains, grid shortfall and outbreak in the arid counties
  8. 6Readings from the other desks
  9. 7The 2027 agenda
    1. 7.1 Questions for the operational series
    2. 7.2 Portfolio proposed for the Q1 2027 alignment
    3. 7.3 The pathway
    4. 7.4 Universe 2027, evidence pack for the candidate mission
    5. 7.5 Handoffs and routing
    6. 7.6 Feeds and signal register
  10. 8Systems in depth
  11. AMethodik
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

7.1Questions for the operational series

  1. A-01

    How would a failed rainy season in the arid counties spread through food prices, health services and displacement, and how long would recovery take?

    INI-KEN-FOO-01 · arid-county compound stress; first output: dependency graph for three counties.

  2. A-02

    How exposed is power supply to hydrological swings, import contracts and curtailment of geothermal energy?

    INI-KEN-ENE-02 · grid exposure; first output: supply-mix and import table.

  3. A-03

    Where do distribution losses fall, and what do they cost in energy?

    INI-KEN-ENE-03 · system losses; first output: loss-by-region table.

  4. A-04

    Where do water and sanitation gaps overlap with outbreak counties?

    INI-KEN-WAT-04 · service gaps and outbreaks; first output: county-by-county register.

  5. A-05

    Where do flood losses fall on households, counties and the national budget?

    INI-KEN-FIN-05 · flood protection gap; first output: peril-by-county loss table.

  6. A-06

    How do river basins and reservoirs perform under multi-year drought?

    INI-KEN-WAT-01 · workstream; first output: basin performance note.

  7. A-07

    What is the condition of the ecosystems that supply water and energy, and how is it changing?

    To be admitted in Q1 2027; first output: scoping note on catchments and rangelands.

  8. A-08

    Which capabilities have been tested in real disasters, and which are only planned?

    National capability register; first output: rung evidence for 15 functions.

7.2Portfolio proposed for the Q1 2027 alignment

Five initiatives and one Universe mission candidate are proposed for admission at the Q1 2027 alignment. They are programme objects, no partner, funder or member is attached to them in this edition.

Table 7.1Objects proposed for the first operational quarter
IDObjektArtFrageStatus
INI-KEN-FOO-01Arid-county compound stressInitiativeA-01VORGESCHLAGEN
INI-KEN-ENE-02Grid exposure and importsInitiativeA-02VORGESCHLAGEN
INI-KEN-ENE-03System lossesInitiativeA-03VORGESCHLAGEN
INI-KEN-WAT-04Service gaps and outbreaksInitiativeA-04VORGESCHLAGEN
INI-KEN-FIN-05Flood protection gapInitiativeA-05VORGESCHLAGEN
PRJ-KEN-FOO-01aThree-county dependency graphProjektA-01VORGESCHLAGEN
MSN-KEN-2027-01Drought, grid and outbreak Universe missionAuftragA-01Candidate

7.3The pathway

Kenya is the national pathway through which the Nexus operating system will run in Kenya from 2027. At baseline the pathway is designed and its records are prepared; its councils and working groups are constituted from Q1 2027. This page states what exists today and what comes next, nothing more.

  1. 01

    One National Agenda

    bounded national questions for the year

    DRAFT 2027 · agenda review at the Q1 alignment

  2. 02

    Nationaler Schalter

    coordination, records, routing and continuity

    DESIGNED · constituted in Q1 2027

  3. 03

    Nationales Modell

    the country as a system of systems

    v0 SPECIFIED · v1 with the first Foundry cut

  4. 04

    Nationales Portfolio

    risks, capabilities, initiatives, projects, missions

    7 PROPOSED · admission at the Q1 alignment

  5. 05

    Foundry

    continuous computational environment

    PREPARED · first sealed cut NQ-KEN-2027-Q1

  6. 06

    Berichte

    quarterly and annual publication

    BASELINE ISSUED · Q1 2027 · State & Agenda

  7. 07

    Universum

    annual proving environment

    CANDIDATE MISSION · mandate set in 2027

  8. 08

    Evidence and correction

    after-action, correction and renewal

    OPEN · first correction cycle in Q2 2027

7.4Universe 2027, evidence pack for the candidate mission

  1. 01

    Mandat

  2. 02

    Core Build · 1 month

  3. 03

    Action · 1 week

  4. 04

    Evidence seal

  5. 05

    Portfolio correction

  6. 06

    Next mandate

Table 7.2Universe 2027, evidence pack for the candidate mission
PositionEintragStatusZeitrahmen
F1Annual mandate recordPLANNEDafter the Q2 2027 alignment
F2Core Build recordPLANNEDone month before the exercise
F3ÜbungsnachweisePLANNEDduring the Action week
F4Decision packetsPLANNEDexercise state only
F5Proof receiptsPLANNEDscoped to each recorded check
F6After-action reportPLANNEDwithin one quarter
F7Upgrade docketPLANNEDrouted to the Portfolio
F8Portfolio renewalPLANNEDQ4 2027 annual edition
F9Public synthesisPLANNEDpublic-safe extracts only

Auftrag

ID
MSN-KEN-2027-01 · Drought, grid and outbreak Universe mission
Role spine
Leadership sponsor (NLC) · Institutional anchor (NNC) · Mission lead (NWG)
Receiving actors
to be identified with the mandate

7.5Handoffs and routing

Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.

Table 7.3Handoffs and routing
BefundRouted toZweckKlasse
CLI-001 · emissionspublic recordreference for the 2027 seriesPUBLIC
ENE-003 · generation mixINI-KEN-ENE-02grid exposurePUBLIC
ENE-004 · lossesINI-KEN-ENE-03loss and energyPUBLIC
WAT-005 · servicesINI-KEN-WAT-04service gaps and outbreaksPUBLIC
FOO-006 · food insecurityINI-KEN-FOO-01arid-county stressPUBLIC
CLI-011 · floodsINI-KEN-FIN-05 · key F reviewflood protection gapPUBLIC
HLT-009 · outbreaksresearch question A-04service continuityPUBLIC
SYS-012 · compound pathwayMSN-KEN-2027-01Universe candidateCONSORTIUM
Table 7.4Routing rules by publication class
KlasseWhere it goesWho can see it
PUBLICthe published edition and its evidence bundleanyone
CONSORTIUMgoverned rooms of the national pathwayconsortium members under agreement
CONTROLLEDneed-to-know channelsnamed competent actors only

7.6Feeds and signal register

Table 7.5Feeds watched from Q1 2027
FeedProducerLatenzFeeds into
Weather warnings and rainfallKenya Meteorological DepartmenttäglichCLI findings
Drought early warning bulletinsNational Drought Management AuthoritymonatlichFOO-006
Energy and petroleum statisticsEnergy and Petroleum Regulatory Authorityannual and biannualENE-003
Food security analysisIPC and FAO GIEWSperiodischFOO-006
Weekly emergency situation reportWHO Regional Office for Africa and Ministry of HealthwöchentlichHLT-009
Price and agriculture surveysCentral Bank of KenyaperiodischFOO-007
Population and economic statisticsKenya National Bureau of Statisticsje VeröffentlichungProfil

Escalation routes

  • none · keep monitoring
  • research question
  • project
  • risk object
  • quarterly publication
  • signal report
Table 7.6Signals at baseline
IDSignalCorroborationSystemPfad
SIG-KEN-001Generation up 8.44% with a new peak demand25CORROBORATEDENE · FINrisk object RSK-KEN-ENE-003
SIG-KEN-0023.7 million in IPC Phase 3 or worse in the arid counties3233CORROBORATEDFOO · HLTinitiative A-01
SIG-KEN-003Concurrent outbreaks reported in June 202633CORROBORATEDHLT · WATinitiative A-04

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 25Energy and Petroleum Regulatory Authority (ed.), Energy and Petroleum Statistics Report for the year ended 30th June 2026. EPRA, Nairobi, September 2026, observation year FY2025/26, accessed 2026-11-03.back
  2. 32Food and Agriculture Organization (ed.), GIEWS Country Brief: Kenya, reference date 4 May 2026. FAO, Rome, 2026, accessed 2026-11-03.back
  3. 33World Health Organization Regional Office for Africa (ed.), Weekly Situation Report, Kenya, Week 22: 31 May to 7 June 2026. WHO AFRO, Brazzaville, 2026, accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Drucken

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF107 pages863 KBTagged, with bookmarks

      SHA-256 8d928f36edf865960e70e5b9dd6a76ef5029c23647f75988d283139336f66c8e

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF112 pages872 KBTagged, with bookmarks

      SHA-256 7770500a09043ed09d3674daccf20810c1ef6858372427899d2c18837456ba7a

  • Web edition

  • Datenbündel

    • Indicators, CSV

      23 indicators with unit, year, status and source

      NR-COUNTRY-KEN-2026-BASELINE-indicators.csv1 KB

      SHA-256 35f73cb9ca8860a7b7f4862e4d7346ce9a70ccd584df8cb5245fc8606515fb24

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-COUNTRY-KEN-2026-BASELINE-indicators.json3 KB

      SHA-256 41affbfcbb0d6dbe7461b1aa019c4c3c09e83d365533bc2a0fd8e204596d5238

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-COUNTRY-KEN-2026-BASELINE-findings.csv3 KB

      SHA-256 8e945af50f16319e3580d3a8a2f3b13d7da54ff3a4786d51cb695bfe4c69f596

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-COUNTRY-KEN-2026-BASELINE.bib1 KB

      SHA-256 649e2749a57b967ddd2caded5325893e1e70136f87272915512ef286569507b8

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-COUNTRY-KEN-2026-BASELINE.ris1 KB

      SHA-256 fe7c5c2d525bb87f66487c4be8a51ece76e5b4d5f1a0492b82fcfcfae6e77756

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-COUNTRY-KEN-2026-BASELINE.cff1 KB

      SHA-256 d1b82796e642c32ed2a8a83478cc9ef01936381124971b128e847b724d206f5d

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 7: The 2027 agenda. In Kenya Systems Risk and Resilience Report 2026: The State of Kenya’s Interdependent Systems (Baseline Edition 2026, Report No. NR-COUNTRY-KEN-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

BerichteBeitragen

Send evidence or a correction on Kenya.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

Redaktion Systems Evidence von GCRIRisiko und Resilienz nationaler Systeme

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace