- HPC and Advanced Computing 2026
- Chapter 2
Key findings
Twelve findings carry the HPC baseline. They are grouped by coupling and never ranked. Each resolves to its source or, where Nexus analysis is involved, to its stated method.
Inhalt
- ·Edition home
- ·Executive summary
- 1HPC is power, cooling and policy before it is speed
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Power and siting limits meet fast-growing demand
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodik
- BData appendix
- CReferences and record
- ·Complete edition, for print
2.1Headline finding
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-001
LineShine, a CPU-only system at the National Supercomputing Center in Shenzhen, entered the June 2026 TOP500 list at first place with 2.198 exaflops on Linpack.
| Position | Bar, scaled to the largest value | Wert |
|---|---|---|
| LineShine · China | 2.198 | |
| El Capitan · United States | 1.809 | |
| Frontier · United States | 1.353 | |
| Aurora · United States | 1.012 | |
| JUPITER Booster · Germany | 1.000 |
Source: TOP500 list, June 20261. Bars show the Rmax values the list gives.
Implication
The list now holds five systems at or above one exaflop, on three continents. LineShine draws about 42.2 megawatts for 52.07 gigaflops per watt, and the page lists it as CPU-only4. A trade analysis calls LineShine the first Chinese submission to the list in nine years, so earlier lists did not show all Chinese capacity30. Linpack is one benchmark, and LineShine leads HPCG while El Capitan leads the mixed-precision table5.
What would move it
The November 2026 list, independent descriptions of LineShine and further submissions would each move this finding.
2.2Infrastruktur
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-001
LineShine, a new system at the National Supercomputing Center in Shenzhen, entered the June 2026 TOP500 list at first place with 2.198 exaflops on Linpack, 13,789,440 cores and about 42.2 megawatts of power.1430
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-002
The combined performance of the June 2026 TOP500 list is 18.73 exaflops, up from 14.99 six months before, and 276 of 500 systems use accelerators, up from 255.5
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-003
Benchmarks give different readings: El Capitan leads the mixed-precision HPL-MxP table at 16.7 exaflops, and LineShine leads HPCG at 22.00 petaflops.45
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-009
JUPITER, inaugurated on 5 September 2025, uses about 24,000 NVIDIA GH200 superchips, warm-water cooling with heat reuse, and reached exactly 1.000 exaflops on Linpack.912
2.3Energie
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-ENE-004
The Green500 leader, KAIROS, reached 73.282 gigaflops per watt at 46 kilowatts, against 60.94 for El Capitan and 52.07 for LineShine.345
ReportedEQL 2NRF-XTECH-HPC-GLOBAL-2026-BASELINE-ENE-005
The IEA estimates that data centres used about 415 terawatt-hours in 2024 and projects about 945 terawatt-hours in 2030 in its Base Case.28
ReportedEQL 3NRF-XTECH-HPC-GLOBAL-2026-BASELINE-ENE-006
US data centres used 176 terawatt-hours in 2023, 4.4% of national electricity, and the Berkeley Lab report gives a 2028 range of 6.7% to 12%.1229
2.4Governance
ReportedEQL 3NRF-XTECH-HPC-GLOBAL-2026-BASELINE-GOV-007
BIS extended its authorised designer timeline for advanced computing chips to 31 December 2026 on 7 April 2026 and issued guidance in May 2026 on licences for entities headquartered in Country Group D:5 or Macau.1333
ReportedEQL 3NRF-XTECH-HPC-GLOBAL-2026-BASELINE-GOV-008
EuroHPC reports a budget of at least EUR 8.2 billion for 2021 to 2027 and lists 19 AI Factories and 13 antennas, though the page names 18 sites and 15 antennas.1011
ReportedEQL 3NRF-XTECH-HPC-GLOBAL-2026-BASELINE-GOV-011
RIKEN, Fujitsu and NVIDIA plan FugakuNEXT for around 2030, with more than 5 times the hardware performance of Fugaku and up to 100 times the application performance in about the same 40 megawatts.1441
2.5Finanzen
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-FIN-010
The US Exascale Computing Project cost USD 1.8 billion from 2016 to 2024, and the CHIPS and Science Act gave USD 50 billion to Commerce for semiconductor programmes.1743
2.6Systemisch
Expert inputEQL 2NRF-XTECH-HPC-GLOBAL-2026-BASELINE-SYS-012
The leading compound pathway for 2027 testing is power and siting limits on large systems meeting fast-growing demand, while export controls and unlisted systems make capacity hard to see. § scenario
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 30Chips and Cheese (ed.), Cozma, G., TOP500 at ISC’26: We have a New Number 1 (25 June 2026; LineShine described as the first Chinese submission to the TOP500 in nine years; other Chinese exascale systems not listed); trade analysis, weak evidence. Chips and Cheese. Observation year 2026. Accessed 2026-11-05.back
- 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
- 2TOP500 (ed.), TOP500 list, November 2025, 66th edition (list page; top systems, Rmax, Rpeak, power). TOP500 project, Hamburg. Observation year 2025. Accessed 2026-11-03.back
- 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 28IEA (ed.), Energy and AI, World Energy Outlook Special Report (April 2025; report PDF read; around 415 TWh for data centres in 2024, about 1.5% of world electricity; around 945 TWh in 2030 in the Base Case). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05.back
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 29Shehabi, A., Smith, S.J., Hubbard, A., Newkirk, A., Lei, N., Siddik, M.A.B., Holecek, B., Koomey, J., Masanet, E. and Sartor, D., 2024 United States Data Center Energy Usage Report, LBNL-2001637 (December 2024; report PDF read; 176 TWh in 2023, 4.4% of US electricity; about 325 to 580 TWh in 2028, 6.7% to 12.0%; direct water estimates included). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-05.back
- 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
- 33US Department of Commerce Bureau of Industry and Security (ed.), Implementation of Additional Export Controls: Certain Advanced Computing Items; Supercomputer and Semiconductor End Use; Updates and Corrections (interim final rule, 88 FR 73458, Federal Register document 2023-23055, 25 October 2023, effective 17 November 2023; Federal Register record and abstract read). Office of the Federal Register, Washington. Observation year 2023. Accessed 2026-11-05.back
- 10EuroHPC Joint Undertaking (ed.), AI Factories (programme page; 19 AI Factories and 13 antennas stated; the page lists 18 sites and 15 antennas). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back
- 41TechNews (ed.), report on the next-generation Fugaku supercomputer (26 August 2025; development budget of JPY 110 billion; FP64 performance above 2.6 exaflops; memory bandwidth above 800 PB/s; operation in 2030 at the RIKEN Kobe campus); trade press, weak evidence. TechNews, Taipei. Observation year 2025. Accessed 2026-11-05.back
- 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
- 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03.back