- Global Energy 2026
- Chapter 4
Risks and capability
Four energy risk objects open the portfolio. Order carries no rank. Each is read across driver, exposure, vulnerability, capacity, cascade and consequence.
Contenido
- ·Edition home
- ·Executive summary
- 1Energy is where the systems meet
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Fuel supply shock under a hot, high-demand season
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMetodología
- BData appendix
- CReferences and record
- ·Complete edition, for print
4.1Risk objects
Each risk is read across the chain from hazard to consequence, with its status and evidence-quality level.
ReportedEQL 4RSK-GS02-ENE-001
Seaborne oil and LNG chokepoint disruption
- Impulsor
- conflict-related closure or damage affecting Hormuz flows and Qatari LNG1113
- Exposición
- importing economies, refiners, power systems burning gas or oil
- Vulnerabilidad
- thin spare capacity; limited bypass routes
- Capacidad
- emergency stocks; bypass pipelines; demand response12
- Cascada
- ENE → FIN, FOO, HLT
- Horizonte
- 1 to 3 years
InferredEQL 3RSK-GS02-INF-002
Power-system stability with high inverter-based supply
- Impulsor
- rapid change in the generation mix and voltage control gaps9
- Exposición
- synchronous grids and large cities
- Vulnerabilidad
- uneven stabilisation capability; coordination gaps
- Capacidad
- reactive power requirements; grid-forming equipment; operator coordination
- Cascada
- ENE → HLT, WAT, INF
- Horizonte
- 1 to 5 years
ReportedEQL 4RSK-GS02-MIN-003
Critical-mineral export controls and refining concentration
InferredEQL 3RSK-GS02-AIC-004
Concentrated data-centre load on local grids
- Impulsor
- rapid growth of AI and digital services4
- Exposición
- local grids in a few clusters; nearly half of US capacity sits in five clusters4
- Vulnerabilidad
- long lead times for connections and equipment
- Capacidad
- flexible load; on-site supply; planning and tariffs
- Cascada
- AIC → ENE → FIN, HLT
- Horizonte
- 1 to 5 years
4.2Capability ladder
Existence is not readiness. Each of the fifteen capability functions is placed on the ladder by the strongest public evidence for energy at the global level.
| Función | Rung | Nivel | Strongest public evidence at baseline |
|---|---|---|---|
| Prevention and mitigation | EXISTS | efficiency and reliability standards widespread; implementation uneven2436 | |
| Monitoring and observation | ADEQUATE | market and operational data strong in advanced grids; thin elsewhere79 | |
| Alerta temprana | EXISTS | weather-linked demand forecasts and grid alerts; fuel-market early warning is partial | |
| Preparedness and planning | EXISTS | adequacy assessments published for several grids30 | |
| Redundancy and reserves | DEMONSTRATED | record coordinated oil stock release in March 202612 | |
| Respuesta | DEMONSTRATED | emergency measures and demand response used in 2022 and 202612 | |
| Continuity of critical services | EXISTS | priority supply for hospitals and water works in many systems; testing uneven | |
| Recuperación | DEMONSTRATED | Iberian system restored after the 2025 blackout; reasons studied in a final report9 | |
| Adaptation | EXISTS | storage, flexibility and diversified supply growing27 | |
| Protección social | LISTED | energy support for poor households documented but not consolidated | |
| Finanzas y seguros | EXISTS | investment of USD 3.4 trillion; public finance for minerals rising13 | |
| Institutional coordination | EXISTS | IEA collective action; network codes in the EU1235 | |
| Technical infrastructure | EXISTS | grids ageing in places; equipment lead times a constraint22 | |
| Fuerza laboral | LISTED | skills gaps reported across the energy sector23 | |
| Research capacity | ADEQUATE | strong energy-system science; data access uneven43 | |
| A capability listed in policy is not a tested one; each rung is the strongest public evidence at baseline. | |||
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 11IEA (ed.), Oil Market Report, June 2026 (17 June 2026, public version; May 2026 world oil output 13.6 mb/d below pre-conflict levels, Gulf exports 14.8 mb/d below February levels and exports via the Strait of Hormuz from known origins at 1.9 mb/d). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
- 13IEA (ed.), Gas Market Report, Q2-2026 (April 2026; Qatar halted LNG production on 2 March 2026 and Qatari and UAE output, about 20% of global LNG supply, was isolated from the market). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
- 12IEA (ed.), Oil Market Report, March 2026 (12 March 2026), including the box on the collective action agreed by the 32 IEA member countries on 11 March 2026 to make 400 million barrels of emergency oil stocks available, described as unprecedented; flows through the Strait of Hormuz of nearly 20 mb/d in 2025 and transits at less than 10% of pre-crisis levels. International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
- 9ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 4IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back
- 24IEA (ed.), Energy Efficiency 2025. International Energy Agency, Paris, November 2025. Observation year 2025. Accessed 2026-11-05.back
- 36ISO (ed.), ISO 50001:2018, Energy management systems: Requirements with guidance for use, edition 2. International Organization for Standardization, Geneva, August 2018. Observation year 2018. Accessed 2026-11-05.back
- 7Ember (ed.), Global Electricity Review 2026: 2025 in review (generation, demand, solar, coal). Ember, London. Observation year 2025. Accessed 2026-11-03.back
- 30NERC (ed.), 2025 Long-Term Reliability Assessment (published January 2026; 13 of 23 assessment areas face resource adequacy challenges over the next ten years). North American Electric Reliability Corporation, Atlanta. Observation year 2025. Accessed 2026-11-05.back
- 2IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 1IEA (ed.), World Energy Investment 2026, launch presentation, Paris, 28 May 2026. International Energy Agency, Paris. Observation year 2026 (estimates, with 2025 data). Accessed 2026-11-03.back
- 35Commission Delegated Regulation (EU) 2024/1366 of 11 March 2024 supplementing Regulation (EU) 2019/943 by establishing a network code on sector-specific rules for cybersecurity aspects of cross-border electricity flows. Official Journal of the European Union, L series, 2024. Observation year 2024. Accessed 2026-11-05.back
- 22IEA (ed.), Electricity Grids and Secure Energy Transitions. International Energy Agency, Paris, October 2023. Observation year 2023. Accessed 2026-11-05.back
- 23IEA (ed.), World Energy Employment 2025 (shortages of skilled workers reported across the energy sector). International Energy Agency, Paris, 2025. Observation year 2024. Accessed 2026-11-05.back
- 43Davis, S.J. et al., Net-zero emissions energy systems, Science 360(6396), eaas9793, 2018. American Association for the Advancement of Science. Observation year 2018. Accessed 2026-11-05.back