Systems in depth

One section per system: its state at evidence close, its exposures and what the operational series will watch.

10 min read0 figures5 tables25 notesNR-XTECH-HPC-GLOBAL-2026-BASELINE

Indice dei contenuti
  1. ·Edition home
  2. ·Executive summary
  3. 1HPC is power, cooling and policy before it is speed
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Power and siting limits meet fast-growing demand
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
    1. 8.1 Systems and compute platforms
    2. 8.2 Power, cooling and data centres
    3. 8.3 Chips, memory and fabrication
    4. 8.4 Economy, investment and workforce
    5. 8.5 Security, export controls and governance watch
  11. AMetodologia
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

8.1Systems and compute platforms

Large systems are listed twice a year. Evidence is strongest where a public list exists, and weakest for systems that do not submit.

2.198exaflops

LineShine Linpack result4

18.73exaflops

combined list performance5

276of 500

systems with accelerators5

Table 8.1State at baseline
ComponenteStatoEvidenzaStato
Exascale systemsfive systems at or above 1 exaflop on Linpack; JUPITER at exactly 1.000; the Frontier page gives 1.6 exaflops peak147Dichiarato
Accelerated systems276 of 500, up from 255; AMD in 38.4% and Intel in 53.2% of systems5Dichiarato
Mixed-precision tablesEl Capitan 16.7 exaflops on HPL-MxP; LineShine 22.00 petaflops on HPCG5Dichiarato
Planned DOE systemsLux and Discovery are named at Oak Ridge; specifications not read82731Expert input

Accoppiamenti

  • INF ↔ ENE facility power
  • INF ↔ FIN programme funding
  • INF ↔ TRD licence rules

Evidence to bind in 2027

  • systems that do not submit to lists
  • specifications of planned systems

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • XT-01 Artificial Intelligence and Agentic Systems
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-08 Cloud, Edge and Distributed Computing
  • XT-02 Quantum Technologies

8.2Power, cooling and data centres

The five largest systems draw tens of megawatts. Efficiency leaders are small systems, and the wider data centre load is growing.

42.2MW

LineShine power1

73.282GFlops per watt

Green500 leader3

4.4%

US data centre electricity share, 202312

Table 8.2State at baseline
ComponenteStatoEvidenzaStato
Power of large systems15.8 to 42.2 megawatts for the five largest1Dichiarato
Efficienzaleader 73.282; El Capitan 60.94; LineShine 52.07 gigaflops per watt345Dichiarato
Data centre energyUS 176 terawatt-hours in 2023; 2028 range of 6.7% to 12% of US electricity12Dichiarato
Cooling waternot bound for large facilities9Expert input

Accoppiamenti

  • ENE ↔ INF facility power
  • WAT → INF cooling water
  • INF → CLI emissions

Evidence to bind in 2027

  • cooling-water use
  • facility energy on a common basis

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • XT-01 Artificial Intelligence and Agentic Systems
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-08 Cloud, Edge and Distributed Computing
  • XT-02 Quantum Technologies

8.3Chips, memory and fabrication

Large systems depend on chips and memory made in a few places. Policy pages show large public programmes, and supply figures are not bound.

50USD billion

CHIPS and Science Act funding to Commerce, Public Law 117-16743

33EUR billion

public and private investment in EU first-of-a-kind facilities, over25

2023year

EU Chips Act in force on 21 September25

Table 8.3State at baseline
ComponenteStatoEvidenzaStato
US chips programmesUSD 11 billion for research and USD 39 billion for incentives43Dichiarato
EU chips programmes19 State aid decisions for first-of-a-kind facilities; Chips Act 2.0 proposed in June 202625Dichiarato
Accelerator and memory supplyno volumes or concentration figures bound4325Expert input
Materialino HPC-specific figure bound25Expert input

Accoppiamenti

  • MIN → INF materials
  • TRD → INF licence rules
  • FIN → INF fabrication

Evidence to bind in 2027

  • accelerator and memory supply
  • fabrication capacity by country

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • XT-01 Artificial Intelligence and Agentic Systems
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-08 Cloud, Edge and Distributed Computing
  • XT-02 Quantum Technologies

8.4Economy, investment and workforce

Public programmes carry the largest systems. Workforce figures are the thin part of the evidence.

1.8USD billion

Exascale Computing Project, 2016 to 202417

8.2EUR billion

EuroHPC budget, 2021 to 2027, at least11

950projects

NAIRR pilot research projects, more than22

Table 8.4State at baseline
ComponenteStatoEvidenzaStato
US exascale programmeUSD 1.8 billion from 2016 to 2024; two GPU architectures proven17Dichiarato
EuroHPCbudget of at least EUR 8.2 billion; EU contribution EUR 4.1 billion11Dichiarato
Shared accessNAIRR pilot: more than 950 projects, 14 federal agencies, 26 non-governmental partners22Dichiarato
Forza lavoroDOE Genesis page names a goal of 100,000 professionals over a decade26Dichiarato

Accoppiamenti

  • FIN → INF scale-up
  • HLT → INF workforce
  • GOV → FIN programme lines

Evidence to bind in 2027

  • public funding outside the US and EU
  • workforce size and skills gaps

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • XT-01 Artificial Intelligence and Agentic Systems
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-08 Cloud, Edge and Distributed Computing
  • XT-02 Quantum Technologies

8.5Security, export controls and governance watch

Rules on advanced computing items are being adjusted in steps, and reporting rules for data centres are being drafted.

2026date

BIS timeline extended to 31 December13

500kW

IT power threshold in the EU reporting regulation34

2030target

FugakuNEXT operation, a plan14

Table 8.5State at baseline
ComponenteStatoEvidenzaStato
Export controlsauthorised designer timeline extended on 7 April 2026; guidance on D:5 headquartered entities in May 20261333Dichiarato
Data centre reportingEU delegated regulation of 2024 sets reporting; rating scheme proposed in 2026 in draft3435Dichiarato
StandardMPI 5.0 in 2025; OpenMP 6.0 in 2024; OpenMP 6.1 draft in 20261516Dichiarato
National platformsDOE Genesis Mission; UK compute plan; RIKEN FugakuNEXT262314Dichiarato

Accoppiamenti

  • TRD → INF licence rules
  • GOV → ENE reporting
  • GOV → FIN programme lines

Evidence to bind in 2027

  • text of the 2023 US rule
  • EU delegated regulations from the primary text

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • XT-01 Artificial Intelligence and Agentic Systems
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-08 Cloud, Edge and Distributed Computing
  • XT-02 Quantum Technologies

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  2. 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  3. 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  4. 7Oak Ridge Leadership Computing Facility (ed.), Frontier (system page; 1.6 exaflops peak; 74 cabinets; delivered 2021; the page value differs from the peak on the list page). Oak Ridge National Laboratory, Oak Ridge. Observation year 2022. Accessed 2026-11-03.back
  5. 8Oak Ridge Leadership Computing Facility (ed.), compute systems (index page; Lux and Discovery labelled as introduced; no specifications). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
  6. 27Oak Ridge National Laboratory (ed.), The Genesis Mission (page; Lux and Discovery listed with one-line descriptions only). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
  7. 31US Department of Energy, Office of Science (ed.), Energy Department Announces New Partnership with NVIDIA and Oracle to Build Largest DOE AI Supercomputer (bulletin, 28 October 2025; Solstice with 100,000 NVIDIA Blackwell GPUs; Equinox with 10,000 Blackwell GPUs, expected to be delivered in 2026; no performance figures stated). US Department of Energy, Washington. Observation year 2025. Accessed 2026-11-05.back
  8. 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  9. 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  10. 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
  11. 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03.back
  12. 25European Commission (ed.), European Chips Act (policy page; Regulation (EU) 2023/1781 in force 21 September 2023; 19 State aid decisions over EUR 33 billion; Chips Act 2.0 proposed June 2026). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2026. Accessed 2026-11-03.back
  13. 24POST-CLOSE, context only: NIST (ed.), CHIPS for America (programme page; USD 50 billion; USD 11 billion research and USD 39 billion incentives; awards of September and October 2026 listed). National Institute of Standards and Technology, Gaithersburg. Observation year 2026. Accessed 2026-11-03.back
  14. 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
  15. 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
  16. 22National Artificial Intelligence Research Resource Pilot (ed.), NAIRR pilot site (more than 950 projects; 14 federal agencies; 26 non-governmental partners; Operations Center award of 1 September 2026). US National Science Foundation, Alexandria. Observation year 2026. Accessed 2026-11-03.back
  17. 26POST-CLOSE, context only: US Department of Energy (ed.), Genesis Mission (programme page; goal of 100,000 science and technology professionals over a decade; announcements dated August to October 2026; no systems named). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
  18. 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
  19. 34European Commission (ed.), Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres (OJ L series, 17 May 2024; text read via the Publications Office; operators with installed IT power demand of at least 500 kW report by 15 September 2024, then by 15 May 2025 and every year thereafter). Publications Office of the European Union, Luxembourg. Observation year 2024. Accessed 2026-11-05.back
  20. 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back
  21. 33US Department of Commerce Bureau of Industry and Security (ed.), Implementation of Additional Export Controls: Certain Advanced Computing Items; Supercomputer and Semiconductor End Use; Updates and Corrections (interim final rule, 88 FR 73458, Federal Register document 2023-23055, 25 October 2023, effective 17 November 2023; Federal Register record and abstract read). Office of the Federal Register, Washington. Observation year 2023. Accessed 2026-11-05.back
  22. 35Latham & Watkins (ed.), European Commission Proposes Mandatory Sustainability Label for Data Centres (client note, 25 September 2026; Commission proposal of 21 September 2026 for a delegated regulation; A to G ratings for power and water usage effectiveness; labels issued annually from 15 August 2027; two-month scrutiny by Parliament and Council; data centres of 500 kW or above); law firm summary, the Commission text was not opened. Latham & Watkins. Observation year 2026. Accessed 2026-11-05.back
  23. 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03.back
  24. 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03.back
  25. 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Stampa

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF107 pages1020 KBTagged, with bookmarks

      SHA-256 c3c3e9d1277a616f4f8d597106a1c14752fc2e3fe68cacef0a05c65138510173

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF117 pages1.0 MBTagged, with bookmarks

      SHA-256 b1930c71db45cbcc42cecf8004ee9926a2476dd67c398f74e84a6649284e29b7

  • Web edition

  • Pacchetto di dati

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-HPC-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 2a89de21e69539d371d4fc87f1b6a46b8a8bd3ac8ec6f180005df9e20b461bcc

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-HPC-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 d7e1295f96aeff4d56015c654b1df24f835a8b689f65d5f432fab2ced10b8080

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-HPC-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 8fd5b0c4a509399a99a223dc468e03ac9eb73b4b26f18175f22c10129595b681

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-HPC-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 11175e84c9d4cb16ea1d2a4a3c566cc18b4922e2dd14d06cddb0f1c8437a040a

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-HPC-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 b6b328b31dc77b492f46a3e68222342a943ad922f15fb3d0806eae36667aca5d

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-HPC-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 6f312e18246515b489207b2877fb66a3e5b0c3abbe3e78400b57b865c30c1731

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 8: Systems in depth. In Exponential Technology Report 2026: HPC and Advanced Computing (Baseline Edition 2026, Report No. NR-XTECH-HPC-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

RapportiContribuisci

Send evidence or a correction on HPC and Advanced Computing.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

Redazione Systems Evidence del GCRITecnologia esponenziale

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace