Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

Compute-heavy radio networks built ahead of Release 21

A conditional statement under stated assumptions, never a prediction.

2 min read0 figures0 tables2 notesNR-XTECH-6G-GLOBAL-2026-BASELINE

目次
  1. ·Edition home
  2. ·Executive summary
  3. 1Connectivity is radio, compute and electricity
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Compute-heavy radio networks built ahead of Release 21
    1. 5.1 Assumptions
    2. 5.2 The cascade, step by step
    3. 5.3 The scenario as a table of steps
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. A方法論
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

5.1前提

Scenario SCN-XT09-CMP-01: what is assumed, and what is held constant.

ベースライン
the 2026 reference state in this edition
要因
operators add AI compute to radio sites for 5G-Advanced while the first normative 6G specifications freeze only in 2028
Analogues
the vendor announcement of 2025 and the Release 21 timetable310
Interventions
none modelled: the specification describes the unmitigated case
Run state
narrative specification; quantified run scheduled for 2027

5.2The cascade, step by step

  1. 1

    AIC → INF

    operators begin field evaluations of AI-RAN platforms

    2026

  2. 2

    INF → ENE

    site power rises where compute is added; energy per bit is not measured

    2024

  3. 3

    FIN → INF

    capital commits to platforms before 6G text freezes

    2025

  4. 4

    TRD → INF

    supplier concentration limits the platform choices

    2025

  5. 5

    GOV → INF

    spectrum decisions and national rules diverge

    2026

  6. 6

    ENE → CLI

    network energy enters emissions reporting

    2024

5.3The scenario as a table of steps

How the shock in scenario SCN-XT09-CMP-01 would travel through 6G, AI-RAN and Next-Generation Connectivity’s coupled systems, step by step, under the assumptions the edition states.

ステップ何が起きるか出典
01 AI compute to infrastructureOperators begin field evaluations of AI-RAN platforms. Analogue or source: 2026.Edition XT-09, scenario SCN-XT09-CMP-01, step 1
02 Infrastructure to energySite power rises where compute is added; energy per bit is not measured. Analogue or source: 2024.Edition XT-09, scenario SCN-XT09-CMP-01, step 2
03 Finance to infrastructureCapital commits to platforms before 6G text freezes. Analogue or source: 2025.Edition XT-09, scenario SCN-XT09-CMP-01, step 3
04 Trade to infrastructureSupplier concentration limits the platform choices. Analogue or source: 2025.Edition XT-09, scenario SCN-XT09-CMP-01, step 4
05 Governance to infrastructureSpectrum decisions and national rules diverge. Analogue or source: 2026.Edition XT-09, scenario SCN-XT09-CMP-01, step 5
06 Energy to climateNetwork energy enters emissions reporting. Analogue or source: 2024.Edition XT-09, scenario SCN-XT09-CMP-01, step 6

A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: 6G, AI-RAN and Next-Generation Connectivity 2026, scenario SCN-XT09-CMP-01 (2026); 6G, AI-RAN and Next-Generation Connectivity 2026, references (NR-CIT-1) (2026).

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 33GPP (ed.), Release 21 page (timetable agreed at the June 2026 TSG#112 plenaries; first normative 6G release; Stage-3 freeze December 2028; ASN.1 freeze March 2029). 3rd Generation Partnership Project, Sophia Antipolis. Observation year 2026. Accessed 2026-11-03.back
  2. 10NVIDIA and Nokia (eds.), NVIDIA to invest USD 1 billion in Nokia to accelerate AI-RAN innovation (joint company press release of 28 October 2025; USD 6.01 per share; ARC-Pro platform; T-Mobile field evaluations from 2026; company announcement, weak evidence). NVIDIA, Santa Clara, and Nokia, Espoo. Observation year 2025. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • 印刷

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF110 pages1.0 MBTagged, with bookmarks

      SHA-256 ed5e484abe9330d2efe13a909a399668bbfd1db19703d87f2a6db6ac89b61b3b

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF117 pages1.0 MBTagged, with bookmarks

      SHA-256 d953e7bdcd5815dab8cb3e56fb371b3acc808b97d8f7e2633bbce9426f8e8e31

  • Web edition

  • データバンドル

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-6G-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 5a559df298f1d78fa444c5c834ae054cb8e9f9b66abcd752461cff285f1f96c8

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-6G-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 64003267b97e644bfea49c1e19f069f60450615ec55cb0725fccf829bada346c

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-6G-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 d842846869e5039b35c1f26e151ceaf44a5558ce48682d1937394b918bd04ecc

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-6G-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 f618338a44c5f1f95008fbeef100a3cde3d014fd3f7fc267ef7033291649f544

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-6G-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 9728c1012753dced8ef28e9bdf2785ad723556e1f39a6db1dd96f49e6d225046

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-6G-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 231790504577f8faced867f027358055f4911a44eaae882a7b8b7e7bc2386b54

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 5: Compute-heavy radio networks built ahead of Release 21. In Exponential Technology Report 2026: 6G, AI-RAN and Next-Generation Connectivity (Baseline Edition 2026, Report No. NR-XTECH-6G-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

報告書貢献する

Send evidence or a correction on 6G, AI-RAN and Next-Generation Connectivity.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI システム・エビデンスデスク指数関数的テクノロジー

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace