Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

The 2027 agenda

Eight bounded questions open the 2027 National Agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due at the Q1 2027 cut.

5 min read0 figures6 tables6 notesNR-COUNTRY-IND-2026-BASELINE

목차
  1. ·Edition home
  2. ·Executive summary
  3. 1India’s risk is monsoon-dependent, heat-loaded and changing fast in power
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5A second deficient monsoon across groundwater, kharif output, power demand and food budgets
  8. 6Readings from the other desks
  9. 7The 2027 agenda
    1. 7.1 Questions for the operational series
    2. 7.2 Portfolio proposed for the Q1 2027 alignment
    3. 7.3 The pathway
    4. 7.4 Universe 2027, evidence pack for the candidate mission
    5. 7.5 Handoffs and routing
    6. 7.6 Feeds and signal register
  10. 8Systems in depth
  11. A방법론
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

7.1Questions for the operational series

  1. A-01

    How would a second deficient monsoon change groundwater stress and kharif output in the north-west plains?

    INI-IND-WAT-01 · monsoon deficit and groundwater; first output: recharge and extraction baseline for three states.

  2. A-02

    How far can evening-peak balancing and fossil generation be reduced as solar grows?

    INI-IND-ENE-02 · power-system balancing; first output: hourly generation and curtailment register.

  3. A-03

    How do public grain stocks and export policy buffer a short harvest?

    INI-IND-FOO-03 · food buffers; first output: stock-and-policy table.

  4. A-04

    How would a Himalayan cloudburst and flood sequence cut roads, power and care together?

    INI-IND-CLI-04 · mountain flood continuity; first output: dependency graph for one river valley.

  5. A-05

    Where do flood, lightning and heat losses fall on households and on public budgets?

    INI-IND-FIN-05 · protection gap; first output: peril-by-state loss table.

  6. A-06

    How do heat and humidity load health and care in summer?

    To be admitted when heat-health data are bound; first output: scoping note.

  7. A-07

    How do land-use change and fire affect ecosystems outside protected areas?

    To be admitted in Q1 2027; first output: scoping note.

  8. A-08

    Which capabilities have been tested in real disasters, and which are only planned?

    National capability register; first output: rung evidence for 15 functions.

7.2Portfolio proposed for the Q1 2027 alignment

Five initiatives and one Universe mission candidate are proposed for admission at the Q1 2027 alignment. They are programme objects, no partner, funder or member is attached to them in this edition.

Table 7.1Objects proposed for the first operational quarter
ID객체유형질문상태
INI-IND-WAT-01Monsoon deficit and groundwater baselineInitiativeA-01제안됨
INI-IND-ENE-02Power-system balancing and fossil generationInitiativeA-02제안됨
INI-IND-FOO-03Food buffers: stocks and export policyInitiativeA-03제안됨
INI-IND-CLI-04Mountain flood continuityInitiativeA-04제안됨
INI-IND-FIN-05Disaster protection gapInitiativeA-05제안됨
PRJ-IND-WAT-01aThree-state recharge and extraction graph프로젝트A-01제안됨
MSN-IND-2027-01Deficient-monsoon compound Universe mission임무A-01Candidate

7.3The pathway

India is the national pathway through which the Nexus operating system will run in India from 2027. At baseline the pathway is designed and its records are prepared; its councils and working groups are constituted from Q1 2027. This page states what exists today and what comes next, nothing more.

  1. 01

    One National Agenda

    bounded national questions for the year

    DRAFT 2027 · agenda review at the Q1 alignment

  2. 02

    국가 데스크

    coordination, records, routing and continuity

    DESIGNED · constituted in Q1 2027

  3. 03

    국가 모델

    the country as a system of systems

    v0 SPECIFIED · v1 with the first Foundry cut

  4. 04

    국가 포트폴리오

    risks, capabilities, initiatives, projects, missions

    7 PROPOSED · admission at the Q1 alignment

  5. 05

    지역 임무에서 가장 많이 사용하는 Foundry

    continuous computational environment

    PREPARED · first sealed cut NQ-IND-2027-Q1

  6. 06

    보고서

    quarterly and annual publication

    BASELINE ISSUED · Q1 2027 · State & Agenda

  7. 07

    유니버스

    annual proving environment

    CANDIDATE MISSION · mandate set in 2027

  8. 08

    근거와 정정

    after-action, correction and renewal

    OPEN · first correction cycle in Q2 2027

7.4Universe 2027, evidence pack for the candidate mission

  1. 01

    임무

  2. 02

    Core Build · 1 month

  3. 03

    Action · 1 week

  4. 04

    Evidence seal

  5. 05

    Portfolio correction

  6. 06

    Next mandate

Table 7.2Universe 2027, evidence pack for the candidate mission
항목기록상태시기
F1Annual mandate recordPLANNEDafter the Q2 2027 alignment
F2Core Build recordPLANNEDone month before the exercise
F3훈련 증거PLANNEDduring the Action week
F4Decision packetsPLANNEDexercise state only
F5Proof receiptsPLANNEDscoped to each recorded check
F6After-action reportPLANNEDwithin one quarter
F7Upgrade docketPLANNEDrouted to the Portfolio
F8Portfolio renewalPLANNEDQ4 2027 annual edition
F9Public synthesisPLANNEDpublic-safe extracts only

임무

ID
MSN-IND-2027-01 · Deficient-monsoon compound Universe mission
Role spine
Leadership sponsor (NLC) · Institutional anchor (NNC) · Mission lead (NWG)
Receiving actors
to be identified with the mandate

7.5Handoffs and routing

Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.

Table 7.3Handoffs and routing
지적 사항Routed to목적등급
CLI-001 · 2025 climatepublic recordreference for the 2027 seriesPUBLIC
CLI-002 · 2026 monsoonINI-IND-WAT-01monsoon deficit baselinePUBLIC
ENE-006 · capacityINI-IND-ENE-02power-system balancingPUBLIC
CLI-003 · extreme-weather deathsINI-IND-CLI-04mountain flood continuityPUBLIC
WAT-004 · groundwaterINI-IND-WAT-01three-state graphPUBLIC
FOO-009 · foodgrainINI-IND-FOO-03food buffersPUBLIC
HLT-010 · heat countsINI-IND-FIN-05 · key F reviewprotection gap and heat seriesPUBLIC
SYS-012 · compound pathwayMSN-IND-2027-01Universe candidateCONSORTIUM
Table 7.4Routing rules by publication class
등급Where it goesWho can see it
PUBLICthe published edition and its evidence bundleanyone
CONSORTIUMgoverned rooms of the national pathwayconsortium members under agreement
CONTROLLEDneed-to-know channelsnamed competent actors only

7.6Feeds and signal register

Table 7.5Feeds watched from Q1 2027
FeedProducerLatencyFeeds into
Weather, climate and monsoon statementsIndia Meteorological Departmentdaily to annualCLI findings
Groundwater resource assessmentCentral Ground Water Board연간WAT-004
Reservoir storage bulletinCentral Water Commission매주WAT findings
Installed capacity and generationMinistry of New and Renewable Energy · Central Electricity Authority월별ENE-006 · ENE-007
Crop production estimatesMinistry of Agriculture and Farmers Welfarefour a yearFOO-009
Forest surveyForest Survey of Indiaevery two yearsBIO-011
Census resultsRegistrar General and Census Commissionerdecennialpopulation findings

Escalation routes

  • none · keep monitoring
  • research question
  • project
  • risk object
  • quarterly publication
  • signal report
Table 7.6Signals at baseline
IDSignalCorroboration시스템경로
SIG-IND-001A deficient 2026 monsoon after a record foodgrain estimate for 2025–261619CORROBORATEDCLI · FOOrisk object RSK-IND-CLI-001
SIG-IND-002Fossil generation fell while capacity grew in 20251112CORROBORATEDENE · CLIinitiative A-02
SIG-IND-003Official and media heat-death counts differ widely2122CORROBORATEDHLT · CLIresearch question A-06

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 16India Meteorological Department (ed.), Salient Features of the 2026 Southwest Monsoon Season. Ministry of Earth Sciences, New Delhi, 30 September 2026. Observation year 2026.back
  2. 19Ministry of Agriculture and Farmers Welfare (ed.), Third Advance Estimates of Production of Major Crops for 2025–26, released 27 May 2026. Directorate of Economics and Statistics, New Delhi. Observation year 2025–26.back
  3. 11Ember (ed.), Global Electricity Review 2026. Ember, London, 22 April 2026. Observation year 2025.back
  4. 12Ember (ed.), India: electricity data and analysis (country page). Ember, London, accessed 3 November 2026. Observation year 2025.back
  5. 21HeatWatch (ed.), Struck by Heat: A News Analysis of Heatstroke Deaths in India in 2025, as reported by The Print. New Delhi, 22 August 2025. Observation period February to July 2025.back
  6. 22Press Trust of India (ed.), “India recorded over 7,000 suspected heatstroke cases, 14 deaths in March–June period: RTI,” reporting National Centre for Disease Control data. The Print, New Delhi, July 2025. Observation period 1 March to 24 June 2025.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • 인쇄

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF107 pages890 KBTagged, with bookmarks

      SHA-256 49c58a075c8bdaf101848a1d47a18f9b02513074c204f4dd0fdd0257440db731

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF114 pages900 KBTagged, with bookmarks

      SHA-256 921fa5fb278870329ab813856517c3ebe36e856e38ad600c5da5a3b26ed57cf7

  • Web edition

  • 데이터 번들

    • Indicators, CSV

      23 indicators with unit, year, status and source

      NR-COUNTRY-IND-2026-BASELINE-indicators.csv2 KB

      SHA-256 d4e6c657321c6220b6f0501cff72a86d18bfc02906202c991bfbe74bd598aab6

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-COUNTRY-IND-2026-BASELINE-indicators.json3 KB

      SHA-256 cda0a874e50bd47ccff07219be894c6491133a2f7b1a9d17927def4db09380b3

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-COUNTRY-IND-2026-BASELINE-findings.csv3 KB

      SHA-256 e902ad085c18e5819d5bf51e1f04f0adde5b1c2535b0968dc28f60b4b1e6c4cb

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-COUNTRY-IND-2026-BASELINE.bib1 KB

      SHA-256 58c72e37c8990b7c82e5cfed6a971b6cc1391d1c567ec8a8ae71da0d6ed1e1a2

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-COUNTRY-IND-2026-BASELINE.ris1 KB

      SHA-256 ee530631c87180d0025b30177fde15edd459019236d1a80daed26ada8455341c

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-COUNTRY-IND-2026-BASELINE.cff1 KB

      SHA-256 8ea231cf312d1509088c1a6014e80f6bd7debaa0a1ae0e8ef8646b56fff32d29

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 7: The 2027 agenda. In India Systems Risk and Resilience Report 2026: The State of India’s Interdependent Systems (Baseline Edition 2026, Report No. NR-COUNTRY-IND-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

보고서기여하기

Send evidence or a correction on India.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI 시스템 증거 담당 부서국가 시스템 리스크와 회복력

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace