Exponential Technology Report 2026: HPC and Advanced Computing
Imprint
- Редактор
- Saeed Valadbaygi, Chief Steward and Managing Editor, the Global Centre for Risk and Innovation (GCRI)
- Официальный издатель
- The Global Centre for Risk and Innovation (GCRI) for the Nexus Consortium, Toronto
- Report number
- NR-XTECH-HPC-GLOBAL-2026-BASELINE
- Закрытие доказательной базы
- 30 September 2026, cut DC-XTECH-HPC-GLOBAL-2026-B0
- Статус
- Draft under stewardship review; not yet released
- DOI and UNI
- Issued at deposit
- Лицензия
- CC BY 4.0 for Nexus-authored text, tables and figures; third-party material keeps its own licence
- Cite as
- Valadbaygi, S. (Ed.). (2026). Exponential Technology Report 2026: HPC and Advanced Computing (Baseline Edition 2026, Report No. NR-XTECH-HPC-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI). https://therisk.global/nexus-reports/editions/xt-07/
Содержание
- HPC and Advanced Computing 2026
- Executive summary
Executive summary
The edition on a few pages: the abstract, the key messages, the headline finding and what each steward reads in it.
S.1Abstract
High-performance computing matters to the Nexus programme as physical infrastructure. Large systems are built from millions of cores and accelerators that draw tens of megawatts, need liquid cooling and depend on chips, funding and export rules. The June 2026 TOP500 list placed a new Chinese system, LineShine, first with 2.198 exaflops on the Linpack benchmark and about 42.2 megawatts of power14. Five systems now sit at or above one exaflop1. The combined performance of the list rose from 14.99 to 18.73 exaflops in six months, and 276 of 500 systems use accelerators5. Efficiency leaders are small systems: the Green500 leader reached 73.282 gigaflops per watt at 46 kilowatts35. Data centres, the wider class that holds these machines, used 176 terawatt-hours in the United States in 2023, 4.4% of national electricity, and a DOE news item reports a 2028 range of 6.7% to 12%12. The US Department of Commerce extended a compliance timeline for advanced computing chips to the end of 2026 and issued guidance in May 202613. EuroHPC reports a budget of at least EUR 8.2 billion for 2021 to 2027 and lists 19 AI Factories1011. The US Exascale Computing Project spent USD 1.8 billion from 2016 to 202417. Water use, supply of accelerators and memory, and workforce are not bound in this edition. This baseline sets out what the evidence supports and where it is thin. It forecasts no system and ranks no country or vendor.
S.2Key messages
Six readings that frame the HPC baseline, and the eight questions this edition answers, each with its status and source.
LineShine, with 2.198 exaflops on Linpack.14
Which system leads the June 2026 list?Reported
Five at or above one exaflop; JUPITER is listed at exactly 1.000.14
How many systems reach an exaflop?Reported
From 15.8 to 42.2 megawatts for the five largest.1
How much power do the largest systems draw?Reported
A 46 kilowatt system at 73.282 gigaflops per watt.35
Who leads on efficiency?Reported
US data centres used 4.4% of electricity in 2023.12
How large is the wider data centre load?Reported
BIS extended a timeline to the end of 2026 and issued guidance in May 2026.13
What do export rules do now?Reported
EuroHPC lists a budget of at least EUR 8.2 billion for 2021 to 2027.11
What does Europe fund?Reported
Power and siting limits against fast-growing demand. SCN-XT07-PWR-01
What will 2027 test first?Expert input
S.3Headline finding
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-001
LineShine, a CPU-only system at the National Supercomputing Center in Shenzhen, entered the June 2026 TOP500 list at first place with 2.198 exaflops on Linpack.
| Позиция | Bar, scaled to the largest value | Значение |
|---|---|---|
| LineShine · China | 2.198 | |
| El Capitan · United States | 1.809 | |
| Frontier · United States | 1.353 | |
| Aurora · United States | 1.012 | |
| JUPITER Booster · Germany | 1.000 |
Source: TOP500 list, June 20261. Bars show the Rmax values the list gives.
The list now holds five systems at or above one exaflop, on three continents. LineShine draws about 42.2 megawatts for 52.07 gigaflops per watt, and the page lists it as CPU-only4. A trade analysis calls LineShine the first Chinese submission to the list in nine years, so earlier lists did not show all Chinese capacity30. Linpack is one benchmark, and LineShine leads HPCG while El Capitan leads the mixed-precision table5.
S.4At a glance
S.5What each steward reads in it
GCRI · KEY T
Technical Truth
The evidence supports reading HPC as physical infrastructure.
GRF · KEY M
Public Meaning
For most people the HPC story arrives as a headline about a faster machine or a data centre.
GRA · KEY F
Capital Meaning
Readiness implications only. Public programmes carry the largest systems, and policy sets access to chips.
NEXUS
Синтез
HPC is well described by lists and thinly measured as a system.
S.6What this edition is, and is not
What this edition is
A baseline: the 2026 state of HPC and advanced computing as infrastructure and the couplings through which it carries risk into other systems. It synthesises published evidence and ranks no country, company or asset.
What it is not
Not a forecast of any machine or programme, a technology order of nations or vendors, an endorsement of any vendor or an assessment of any programme. Export controls, funding and standards are decisions of competent authorities.
What comes next
National, regional and sector evidence feeds the 2027 HPC edition through the federation. Each edition reports what changed against this baseline: observations, source revisions, method changes, scenario updates and corrections.
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
- 10EuroHPC Joint Undertaking (ed.), AI Factories (programme page; 19 AI Factories and 13 antennas stated; the page lists 18 sites and 15 antennas). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
- 30Chips and Cheese (ed.), Cozma, G., TOP500 at ISC’26: We have a New Number 1 (25 June 2026; LineShine described as the first Chinese submission to the TOP500 in nine years; other Chinese exascale systems not listed); trade analysis, weak evidence. Chips and Cheese. Observation year 2026. Accessed 2026-11-05.back
- 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back
- HPC and Advanced Computing 2026
- Chapter 1
HPC is power, cooling and policy before it is speed
Part I describes systems and their couplings. It ranks no country or operator and assesses no authority.
1.1The questions this part answers
Key questions
- Where is HPC risk concentrated?
- Which couplings carry HPC shocks into other systems?
- Which HPC capabilities hold under compound stress?
- What must 2027 evidence measure first?
In this part
- Narrative
- Headline finding
- Lead figure
- Five footprint and governance chapters
- Twelve-domain reading
- Sector screens
- Dependency matrix
- Risk objects
- Capability ladder
- Сценарий
- Three lenses
- Портфель
1.2The argument
High-performance computing is usually discussed as a speed race. The 2026 evidence reads it as infrastructure: millions of cores and accelerators that draw tens of megawatts, sit in purpose-built halls and depend on chips, funding and export rules1913.
The system evidence is strong. LineShine reached 2.198 exaflops on Linpack at about 42.2 megawatts, and four other systems reached one exaflop or more14. The combined list rose to 18.73 exaflops, and 276 of 500 systems use accelerators5. Lists show submitted systems only.
Efficiency and demand tell a different story. The Green500 leader is a 46 kilowatt system at 73.282 gigaflops per watt, and El Capitan reached 60.9435. Outside the lists, US data centres used 4.4% of national electricity in 2023 and a 2028 range of 6.7% to 12% is reported12.
The policy base is moving. BIS extended a timeline to the end of 2026 and issued guidance in May 202613. EuroHPC reports a budget of at least EUR 8.2 billion for 2021 to 202711. Cooling water, chip supply and workforce are the least measured parts.
Mixed-precision results are several times larger than Linpack results for the same machines. El Capitan reached 16.7 exaflops against 1.809 on Linpack. The two benchmarks measure different work, and the table is not a measure of useful output45.
| Позиция | Bar, scaled to the largest value | Значение |
|---|---|---|
| El Capitan | 16.7 | |
| Aurora | 11.6 | |
| Передний край | 11.4 | |
| LineShine | 7.92 | |
| JUPITER Booster | 7.92 |
Source: as cited in the note to this figure. Year 2026.
Figure ID FIG-XTECH-HPC-GLOBAL-2026-BASELINE-01-003
1.3The six-sector nexus: twenty couplings across five assessed sectors
The HPC-centred matrix types the twenty couplings between the five core systems, read for their HPC content. Strengths are Nexus estimates (ESTIMATED) from the cited evidence and analogue events; they set the graph that 2027 evidence will test.
Each line is one coupling from one sector to another, drawn by the strength the edition assigns. Strengths are Nexus estimates from the cited evidence and analogue events. Infrastructure: not assessed in this edition’s coupling matrix, so it is drawn hollow with no couplings. The hexagon is the estate doctrine: six sectors and fifteen relations.
- Strong
- Умеренные
- Weak
- Not assessed in this edition
Source: this edition’s coupling matrix (Table 1.1); status Estimated. Hexagon: the estate doctrine (Signature).
| From, to | WAT | ENE | FOO | HLT | BIO |
|---|---|---|---|---|---|
| WAT Вода | · | WEAK facility cooling | WEAK no documented link | WEAK no documented link | WEAK no documented link |
| ENE Энергетика | WEAK cooling load, not bound | · | WEAK no documented link | WEAK no documented link | WEAK no documented link |
| FOO Продовольствие | WEAK no documented link | WEAK no documented link | · | WEAK no documented link | WEAK no documented link |
| HLT Здравоохранение | WEAK no documented link | WEAK no documented link | WEAK no documented link | · | WEAK no documented link |
| BIO Биоразнообразие | WEAK no documented link | WEAK no documented link | WEAK no documented link | WEAK no documented link | · |
| Strength: strong, moderate or weak; a Nexus estimate (status Estimated) from cited evidence and analogue events. The scale is defined in Annex A. | |||||
Transmission paths
- 01
ENE → INF
Facility power and cooling limit siting and scale.
Reported power of the five largest systems1
- 02
TRD → INF
Licence rules shape access to advanced computing items.
Reported BIS timeline and guidance13
- 03
FIN → INF
Public programmes fund systems and software.
- 04
INF → ENE
Accelerated systems add load to data centres.
- 05
GOV → ENE
Reporting rules make facility energy visible.
Inferred EU delegated regulation34
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
- 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
- 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
- 34European Commission (ed.), Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres (OJ L series, 17 May 2024; text read via the Publications Office; operators with installed IT power demand of at least 500 kW report by 15 September 2024, then by 15 May 2025 and every year thereafter). Publications Office of the European Union, Luxembourg. Observation year 2024. Accessed 2026-11-05.back
- HPC and Advanced Computing 2026
- Chapter 2
Key findings
Twelve findings carry the HPC baseline. They are grouped by coupling and never ranked. Each resolves to its source or, where Nexus analysis is involved, to its stated method.
2.1Headline finding
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-001
LineShine, a CPU-only system at the National Supercomputing Center in Shenzhen, entered the June 2026 TOP500 list at first place with 2.198 exaflops on Linpack.
| Позиция | Bar, scaled to the largest value | Значение |
|---|---|---|
| LineShine · China | 2.198 | |
| El Capitan · United States | 1.809 | |
| Frontier · United States | 1.353 | |
| Aurora · United States | 1.012 | |
| JUPITER Booster · Germany | 1.000 |
Source: TOP500 list, June 20261. Bars show the Rmax values the list gives.
Implication
The list now holds five systems at or above one exaflop, on three continents. LineShine draws about 42.2 megawatts for 52.07 gigaflops per watt, and the page lists it as CPU-only4. A trade analysis calls LineShine the first Chinese submission to the list in nine years, so earlier lists did not show all Chinese capacity30. Linpack is one benchmark, and LineShine leads HPCG while El Capitan leads the mixed-precision table5.
What would move it
The November 2026 list, independent descriptions of LineShine and further submissions would each move this finding.
2.2Инфраструктура
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-001
LineShine, a new system at the National Supercomputing Center in Shenzhen, entered the June 2026 TOP500 list at first place with 2.198 exaflops on Linpack, 13,789,440 cores and about 42.2 megawatts of power.1430
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-002
The combined performance of the June 2026 TOP500 list is 18.73 exaflops, up from 14.99 six months before, and 276 of 500 systems use accelerators, up from 255.5
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-003
Benchmarks give different readings: El Capitan leads the mixed-precision HPL-MxP table at 16.7 exaflops, and LineShine leads HPCG at 22.00 petaflops.45
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-INF-009
JUPITER, inaugurated on 5 September 2025, uses about 24,000 NVIDIA GH200 superchips, warm-water cooling with heat reuse, and reached exactly 1.000 exaflops on Linpack.912
2.3Энергетика
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-ENE-004
The Green500 leader, KAIROS, reached 73.282 gigaflops per watt at 46 kilowatts, against 60.94 for El Capitan and 52.07 for LineShine.345
ReportedEQL 2NRF-XTECH-HPC-GLOBAL-2026-BASELINE-ENE-005
The IEA estimates that data centres used about 415 terawatt-hours in 2024 and projects about 945 terawatt-hours in 2030 in its Base Case.28
ReportedEQL 3NRF-XTECH-HPC-GLOBAL-2026-BASELINE-ENE-006
US data centres used 176 terawatt-hours in 2023, 4.4% of national electricity, and the Berkeley Lab report gives a 2028 range of 6.7% to 12%.1229
2.4Управление
ReportedEQL 3NRF-XTECH-HPC-GLOBAL-2026-BASELINE-GOV-007
BIS extended its authorised designer timeline for advanced computing chips to 31 December 2026 on 7 April 2026 and issued guidance in May 2026 on licences for entities headquartered in Country Group D:5 or Macau.1333
ReportedEQL 3NRF-XTECH-HPC-GLOBAL-2026-BASELINE-GOV-008
EuroHPC reports a budget of at least EUR 8.2 billion for 2021 to 2027 and lists 19 AI Factories and 13 antennas, though the page names 18 sites and 15 antennas.1011
ReportedEQL 3NRF-XTECH-HPC-GLOBAL-2026-BASELINE-GOV-011
RIKEN, Fujitsu and NVIDIA plan FugakuNEXT for around 2030, with more than 5 times the hardware performance of Fugaku and up to 100 times the application performance in about the same 40 megawatts.1441
2.5Финансы
ReportedEQL 4NRF-XTECH-HPC-GLOBAL-2026-BASELINE-FIN-010
The US Exascale Computing Project cost USD 1.8 billion from 2016 to 2024, and the CHIPS and Science Act gave USD 50 billion to Commerce for semiconductor programmes.1743
2.6Системные риски
Expert inputEQL 2NRF-XTECH-HPC-GLOBAL-2026-BASELINE-SYS-012
The leading compound pathway for 2027 testing is power and siting limits on large systems meeting fast-growing demand, while export controls and unlisted systems make capacity hard to see. § scenario
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 30Chips and Cheese (ed.), Cozma, G., TOP500 at ISC’26: We have a New Number 1 (25 June 2026; LineShine described as the first Chinese submission to the TOP500 in nine years; other Chinese exascale systems not listed); trade analysis, weak evidence. Chips and Cheese. Observation year 2026. Accessed 2026-11-05.back
- 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
- 2TOP500 (ed.), TOP500 list, November 2025, 66th edition (list page; top systems, Rmax, Rpeak, power). TOP500 project, Hamburg. Observation year 2025. Accessed 2026-11-03.back
- 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 28IEA (ed.), Energy and AI, World Energy Outlook Special Report (April 2025; report PDF read; around 415 TWh for data centres in 2024, about 1.5% of world electricity; around 945 TWh in 2030 in the Base Case). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05.back
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 29Shehabi, A., Smith, S.J., Hubbard, A., Newkirk, A., Lei, N., Siddik, M.A.B., Holecek, B., Koomey, J., Masanet, E. and Sartor, D., 2024 United States Data Center Energy Usage Report, LBNL-2001637 (December 2024; report PDF read; 176 TWh in 2023, 4.4% of US electricity; about 325 to 580 TWh in 2028, 6.7% to 12.0%; direct water estimates included). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-05.back
- 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
- 33US Department of Commerce Bureau of Industry and Security (ed.), Implementation of Additional Export Controls: Certain Advanced Computing Items; Supercomputer and Semiconductor End Use; Updates and Corrections (interim final rule, 88 FR 73458, Federal Register document 2023-23055, 25 October 2023, effective 17 November 2023; Federal Register record and abstract read). Office of the Federal Register, Washington. Observation year 2023. Accessed 2026-11-05.back
- 10EuroHPC Joint Undertaking (ed.), AI Factories (programme page; 19 AI Factories and 13 antennas stated; the page lists 18 sites and 15 antennas). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back
- 41TechNews (ed.), report on the next-generation Fugaku supercomputer (26 August 2025; development budget of JPY 110 billion; FP64 performance above 2.6 exaflops; memory bandwidth above 800 PB/s; operation in 2030 at the RIKEN Kobe campus); trade press, weak evidence. TechNews, Taipei. Observation year 2025. Accessed 2026-11-05.back
- 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
- 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03.back
- HPC and Advanced Computing 2026
- Chapter 3
Systems and sectors at baseline
3.1Where each system stood at evidence close
INF · Systems
LineShine Linpack result, new first place
2.198exaflopsCPU-only; about 42.2 MW.
Сообщённые данные2026TOP5004
INF · Systems
Combined performance of the TOP500 list
18.73exaflopsup from 14.99 six months before.
Сообщённые данные2026TOP5005
ENE · Efficiency
Green500 leader, KAIROS
73.282GFlops per watt3.05 petaflops at 46 kW.
ENE · Energy
US data centre electricity use
176TWh4.4% of US electricity.
Сообщённые данные2023DOE12
FIN · Finance
Exascale Computing Project budget
1.8USD billionfrom 2016 to 2024.
Сообщённые данные2024ECP17
GOV · Policy
EuroHPC budget, 2021 to 2027
8.2EUR billionat least; page gives the amended figure.
Reported2026EuroHPC11
3.2Domain posture
Each of the twelve coupled domains is read through HPC, in words, not scored. The coupling column names the dependency that carries HPC risk into each domain.
| Домен | Posture at baseline | Взаимосвязи | Статус |
|---|---|---|---|
| WAT | Cooling-water use of large facilities is not bound in this edition. | ENE → WAT | Expert input EQL 1 |
| ENE | The five largest systems draw 15.8 to 42.2 megawatts; US data centres used 4.4% of electricity in 2023. | ENE ↔ INF | Reported EQL 4 |
| FOO | No documented coupling at baseline; weather and crop applications are not evidenced here. | none documented | Expert input EQL 1 |
| HLT | No documented coupling at baseline; drug discovery and genomics workloads are not evidenced here. | none documented | Expert input EQL 1 |
| BIO | No documented coupling at baseline. | none documented | Expert input EQL 1 |
| CLI | Electricity and cooling demand matter for emissions; the footprint of large systems is not bound. | INF → CLI | Expert input EQL 1 |
| INF | The core system: five systems at or above one exaflop; list performance 18.73 exaflops. | the core system | Reported EQL 4 |
| FIN | USD 1.8 billion for the US exascale project; USD 50 billion for CHIPS programmes; EUR 8.2 billion for EuroHPC. | FIN → INF | Reported EQL 4 |
| DAT | Large systems hold sensitive scientific data; no figure is bound. | INF ↔ DAT | Expert input EQL 1 |
| AIC | Accelerators are in 276 of 500 listed systems; the AI and scientific demand split is not bound. | INF ↔ AIC | Reported EQL 3 |
| MIN | No supply figure for chips, memory or minerals is bound for HPC. | MIN → INF | Expert input EQL 1 |
| TRD | US licence rules and guidance shape access to advanced computing items. | INF ↔ TRD | Reported EQL 3 |
3.3Sector screens
All sixteen sectors are screened for their dependence on HPC, on the same grammar as every national edition. The evidence column describes coverage of the baseline evidence, not the performance of the sector.
| Код | Сектор | Baseline evidence | Exposure to watch | Evidence coverage |
|---|---|---|---|---|
| GS-00 | Cross-system | HPC couples to energy, chips and policy | power and siting limits | THIN |
| GS-01 | Вода | cooling-water use not bound | facility siting | THIN |
| GS-02 | Энергетика | five largest systems draw 15.8 to 42.2 MW1 | load from large facilities | PARTIAL |
| GS-03 | Продовольствие | no documented coupling | none documented | THIN |
| GS-04 | Здравоохранение | no documented coupling | none documented | THIN |
| GS-05 | Финансы | public programmes of USD 1.8 billion and EUR 8.2 billion1711 | dependence on a few programmes | PARTIAL |
| GS-06 | Разработка | access to compute and skills | widening gaps | THIN |
| GS-07 | Климат | footprint at scale not bound | electricity demand | THIN |
| GS-08 | Бедствие | no documented coupling | none documented | THIN |
| GS-09 | Инфраструктура | warm-water cooling and heat reuse at JUPITER9 | single-site dependence | THIN |
| GS-10 | Города | heat reuse into a campus network9 | none documented | THIN |
| GS-11 | Биоразнообразие | no documented coupling | none documented | THIN |
| GS-12 | «Наблюдение Земли» | weather and climate workloads not evidenced here | none documented | THIN |
| GS-13 | Кибербезопасность и цифровые технологии | security of large systems not bound | access control and export rules | THIN |
| GS-14 | Политика | BIS notices, EuroHPC and UK plan131123 | fragmented rules | PARTIAL |
| GS-15 | Наука | public lists and standards forums11516 | common benchmarks | GOOD |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
- 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
- 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
- 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back
- 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03.back
- 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03.back
- HPC and Advanced Computing 2026
- Chapter 4
Risks and capability
Four HPC risk objects open the portfolio. Order carries no rank. Each is read across driver, exposure, vulnerability, capacity, cascade and consequence.
4.1Risk objects
Each risk is read across the chain from hazard to consequence, with its status and evidence-quality level.
InferredEQL 3RSK-XT07-ENE-001
Power and siting limits for large systems
InferredEQL 3RSK-XT07-GOV-002
Fragmented controls and hidden capacity
Expert inputEQL 2RSK-XT07-INF-003
Benchmarks read alone
InferredEQL 2RSK-XT07-FIN-004
Dependence on a few public programmes
4.2Capability ladder
Existence is not readiness. Each of the fifteen capability functions is placed on the ladder by the strongest public evidence for HPC at the global level.
| Функция | Rung | Уровень | Strongest public evidence at baseline |
|---|---|---|---|
| Prevention and mitigation | LISTED | no common facility energy and water series found | |
| Monitoring and observation | EXISTS | public lists of systems and efficiency13 | |
| Раннее предупреждение | LISTED | no consolidated watch on power and siting limits | |
| Preparedness and planning | EXISTS | national plans and roadmaps142326 | |
| Redundancy and reserves | LISTED | spare capacity across sites is not documented | |
| Реагирование | LISTED | no tested response to a long outage of a large system | |
| Continuity of critical services | LISTED | continuity plans of large systems not bound | |
| Восстановление | LISTED | not applicable at baseline; no event to recover from | |
| Adaptation | EXISTS | warm-water cooling and heat reuse at one system9 | |
| Социальная защита | LISTED | not applicable at baseline | |
| Финансы и страхование | EXISTS | public programme funding171143 | |
| Institutional coordination | EXISTS | EuroHPC, DOE programmes and standards forums11261516 | |
| Technical infrastructure | EXISTS | exascale systems on three continents1 | |
| Workforce | LISTED | skills gaps not bound; no figure used | |
| Research capacity | ADEQUATE | public systems, lists and shared-access programmes12122 | |
| A capability listed in policy is not a tested one; each rung is the strongest public evidence at baseline. | |||
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
- 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
- 30Chips and Cheese (ed.), Cozma, G., TOP500 at ISC’26: We have a New Number 1 (25 June 2026; LineShine described as the first Chinese submission to the TOP500 in nine years; other Chinese exascale systems not listed); trade analysis, weak evidence. Chips and Cheese. Observation year 2026. Accessed 2026-11-05.back
- 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03.back
- 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03.back
- 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back
- 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
- 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03.back
- 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back
- 26POST-CLOSE, context only: US Department of Energy (ed.), Genesis Mission (programme page; goal of 100,000 science and technology professionals over a decade; announcements dated August to October 2026; no systems named). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 21Swiss National Supercomputing Centre (ed.), Alps (system page; 2,688 Grace-Hopper nodes; 434.9 petaflops; inaugurated September 2024). CSCS, Lugano. Observation year 2024. Accessed 2026-11-03.back
- 22National Artificial Intelligence Research Resource Pilot (ed.), NAIRR pilot site (more than 950 projects; 14 federal agencies; 26 non-governmental partners; Operations Center award of 1 September 2026). US National Science Foundation, Alexandria. Observation year 2026. Accessed 2026-11-03.back
- HPC and Advanced Computing 2026
- Chapter 5
Power and siting limits meet fast-growing demand
A conditional statement under stated assumptions, never a prediction.
5.1Допущения
Scenario SCN-XT07-PWR-01: what is assumed, and what is held constant.
- Базовый уровень
- the 2026 reference state in this edition
- Движущие факторы
- demand for large systems and data centres grows while grid connections and cooling capacity grow more slowly
- Analogues
- the 2023 US share of 4.4% and the 2028 range of 6.7% to 12%12
- Interventions
- none modelled: the specification describes the unmitigated case
- Run state
- narrative specification; quantified run scheduled for 2027
5.2The cascade, step by step
- 1
ENE → INF
new systems of 15 to 40 megawatts compete for grid connections
2026
- 2
INF → ENE
accelerated systems raise facility load
2026
- 3
GOV → ENE
reporting rules make load visible to regulators
2026
- 4
TRD → INF
licence rules shape where new hardware can go
2026
- 5
FIN → INF
public programmes favour sites with power and cooling
2024
- 6
INF → CLI
electricity demand adds to emissions where grids are carbon-intensive
2026
5.3The scenario as a table of steps
How the shock in scenario SCN-XT07-PWR-01 would travel through HPC and Advanced Computing’s coupled systems, step by step, under the assumptions the edition states.
| Шаг | Что происходит | Источник |
|---|---|---|
| 01 Energy to infrastructure | New systems of 15 to 40 megawatts compete for grid connections. Analogue or source: 2026. | Edition XT-07, scenario SCN-XT07-PWR-01, step 1 |
| 02 Infrastructure to energy | Accelerated systems raise facility load. Analogue or source: 2026. | Edition XT-07, scenario SCN-XT07-PWR-01, step 2 |
| 03 Governance to energy | Reporting rules make load visible to regulators. Analogue or source: 2026. | Edition XT-07, scenario SCN-XT07-PWR-01, step 3 |
| 04 Trade to infrastructure | Licence rules shape where new hardware can go. Analogue or source: 2026. | Edition XT-07, scenario SCN-XT07-PWR-01, step 4 |
| 05 Finance to infrastructure | Public programmes favour sites with power and cooling. Analogue or source: 2024. | Edition XT-07, scenario SCN-XT07-PWR-01, step 5 |
| 06 Infrastructure to climate | Electricity demand adds to emissions where grids are carbon-intensive. Analogue or source: 2026. | Edition XT-07, scenario SCN-XT07-PWR-01, step 6 |
A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: HPC and Advanced Computing 2026, scenario SCN-XT07-PWR-01 (2026); HPC and Advanced Computing 2026, references (NR-CIT-1) (2026).
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- HPC and Advanced Computing 2026
- Chapter 6
Readings from the other desks
The HPC baseline is read through each steward’s lens, then once as a whole. Each lens is a projection of reviewed findings, not a separate argument. The other desks’ own editions of this subject are listed first, as cross-references, not copies.
6.1The other desks’ editions of this subject
Federation: each desk writes its own edition for the subjects in its remit. Until a desk releases, its edition shows its frame and the reading this edition printed for it.
| Бюро | Выпуск | Статус | Идентификатор |
|---|---|---|---|
| GCRI Systems Evidence | Systems Evidence: HPC and Advanced Computing 2026 | Drafted, in stewardship review | NR-XTECH-HPC-GLOBAL-2026-BASELINE-v1.0.0 |
| GRF Public Deliberation | Outside this desk’s remit | Not in remit | |
| GRA Capital Readiness | Outside this desk’s remit | Not in remit | |
| Standards Progress | Standards Progress: HPC and Advanced Computing 2026 | В подготовке | NR-NXS-XT-07-2026-BASELINE (reserved) |
| Academy Capability | Capability: HPC and Advanced Computing 2026 | В подготовке | NR-RA-XT-07-2026-BASELINE (reserved) |
| Index Measurement | Outside this desk’s remit | Not in remit |
6.2Three lenses
One edition, read by each steward. The lens of this site comes first.
GCRI · KEY T
Technical Truth
The evidence supports reading HPC as physical infrastructure. Systems are large and efficient designs exist, while facility energy and water, chip supply and workforce are thinly measured. Evidence is strongest for public lists and weakest for supply and skills.
INF-001 · ENE-004 · ENE-006 · SYS-012
GRF · KEY M
Public Meaning
For most people the HPC story arrives as a headline about a faster machine or a data centre. The baseline asks that public debate separate list entries from useful work, and keep power and water in view.
INF-001 · ENE-004 · ENE-006
GRA · KEY F
Capital Meaning
Readiness implications only. Public programmes carry the largest systems, and policy sets access to chips1713. These show where finance-readiness evidence will matter. Nothing here is advice, a rating or an approval.
FIN-010 · GOV-007
NEXUS
Синтез
HPC is well described by lists and thinly measured as a system. The 2027 programme should bind facility energy and water, publish a comparable footprint and test the power and siting pathway.
SYS-012 · H-01 · H-02
6.3Standards, Academy and steward contributions
How the Nexus Standards drafts, the Risk Academy and the three stewards feed each quarterly edition for HPC. The standards are a preparatory working draft (2026) and are cited as drafts, never as adopted standards.
| Quarter | Выпуск | Вопрос | Граница |
|---|---|---|---|
| Q1 | State and Agenda | Что важно в этом году и какова исходная позиция? | observed baseline stays distinct from planned work |
| Q2 | Evidence and Build | What new evidence and capability exist? | a configured capability is not a validated result |
| Q3 | Стресс-тест и готовность | What do scenarios and tests show? | simulated loss or performance is not observed impact |
| Q4 | Annual Synthesis and Renewal | What changed in the year, and what renews? | release follows review, not event publicity deadlines |
| Steward or body | Роль | Contribution route |
|---|---|---|
| GCRI Canada | Lead Institution and Consortium Secretariat; publisher of record; technical truth (key T) | science and practice communities · GCRI gateway |
| Глобальный форум по рискам (The Global Risks Forum, GRF) | leadership, dialogue and the Universe programme; public meaning (key M) | policy, Universe and national adoption · GRF gateway |
| Глобальный альянс по рискам (The Global Risks Alliance, GRA) | finance, insurance and development readiness; capital meaning (key F) | finance and insurance · GRA gateway |
| Указатель Nexus Standards | preparatory drafts on vocabulary, hazards, indicators and methods | Standards site · working groups HAZ, IND, MTH, FIN, AI |
| Академия рисков | learning pathways tied to the agenda questions | Academy gateway · learning by review |
| Nexus Standards and Academy | technology chapter inputs: GCRI evidence, NXS standards, RA capability | technology editorial board |
Standards drafts used in this edition
- Risk vocabulary NRS-C1 (424 terms) for terms in the glossary
- Hazard atlas NHS-1 1.1.0 (905 hazards in 120 families) for risk objects
- Seven risk classes: global, catastrophic, existential, emerging, planetary, exponential, frontier-tech
Standards calendar to watch
- Founding calls from 20 October 2026; working groups meet from 5 November 2026
- Inaugural Global Standards Council session, 12 January 2027
- Quarterly reviews in March, June, September and December, aligned with each edition
6.4GCRI reading: the model card
GCRI’s reading of this edition is its model card: what the national model is, what it computes and where it stops. It is printed in full in Annex A, with the methods it belongs to. Annex A, methodology
6.5Global Risks Forum reading: editorial essays
Four signed essays by the Reports editorial team set out the positions this edition takes. They are interpretation, labelled as such; the evidence they draw on is in the findings register.
A list entry shows a benchmark result. The power, cooling, chips and rules behind it are less visible. Reading HPC as infrastructure brings them into view without judging any system.
EDITORIAL ESSAY · 01
Speed is the visible part
Linpack, HPCG and mixed-precision tables lead to different systems. Reading them together avoids single-number claims.
EDITORIAL ESSAY · 02
Different benchmarks, different leaders
Small systems lead on efficiency, while the load of data centres grows. Both facts hold and neither settles the footprint of large systems.
EDITORIAL ESSAY · 03
Efficiency and demand move apart
Licence rules, reporting schemes and national plans are being set while facility energy and water remain unmeasured on a common basis.
EDITORIAL ESSAY · 04
Rules arrive before measurements
6.6Global Risks Alliance reading: 2027 HPC readiness pack
The registers that open the 2027 global cycle. At baseline each is initialised from this edition.
| Позиция | Реестр | State at baseline | First 2027 entry |
|---|---|---|---|
| E1 | HPC risk state delta | baseline set by this edition | changes against the baseline |
| E2 | WEFH+B state delta | five global system readings set | indicator updates and freshness |
| E3 | Agenda and Portfolio movement | eight agenda items · 6 proposed objects | admission decisions |
| E4 | Federation delivery register | national chapters in preparation | national chapters |
| E5 | Consortium capability register | national consortia forming | first contributions |
| E6 | Leadership questions and challenges | пока нет | first challenge log |
| E7 | Foundry technical state | national environments prepared | first federation cut |
| E8 | Publication candidates | twelve findings carried forward | PUBLISH · HOLD dispositions |
| E9 | Universe readiness | one candidate mission | admission and role spine |
| E10 | Correction register | нет | first federation-wide cycle |
Publication dispositions
- Опубликовать
- Hold
- Needs evidence
- Ограниченный доступ
- Заменено
6.7Nexus Standards reading: standards and regulatory watch
Instruments and published guidance that shape the systems in this edition, by status on the retrieval date. The edition assesses no one’s compliance.
- IN FORCE
- PUBLISHED
- DRAFT
- PUBLISHED · VOLUNTARY
| Инструмент | Орган | Охват | Статус | Актуальность |
|---|---|---|---|---|
| MPI 5.016 | MPI Forum | global | PUBLISHED 2025 | message passing |
| OpenMP 6.015 | OpenMP Architecture Review Board | global | PUBLISHED 2024 | shared-memory parallelism |
| OpenMP technical report 1515 | OpenMP Architecture Review Board | global | DRAFT 2026 | public comment draft of 6.1 |
| Delegated Regulation (EU) 2024/136434 | Европейская комиссия | EU | IN FORCE | data centre reporting scheme |
| EU data centre rating scheme35 | Европейская комиссия | EU | DRAFT 2026 | preparatory working draft (2026) |
| ISO/IEC 30134-236 | ISO и IEC | global | PUBLISHED · VOLUNTARY | power usage effectiveness |
| BIS advanced computing due diligence rule1333 | US Department of Commerce | US | PUBLISHED 2025 | licence and designer timeline |
| EU Chips Act, Regulation (EU) 2023/178125 | Европейский союз | EU | IN FORCE | semiconductor policy |
| EuroHPC Council Regulations 2024/1732 and 2026/15011 | Council of the EU | EU | IN FORCE | joint undertaking budget |
| TOP500 and Green500 list rules13 | TOP500 project | global | PUBLISHED · VOLUNTARY | list submission |
Changed since 2024
6.8Risk Academy reading: literature and evidence review, science and assessments
The review behind this edition covers HPC assessments, peer-reviewed science and the institutional reports that bind its findings. Systematic reviews for each agenda item begin in 2027.
Review protocol
- Вопрос
- What does the published evidence establish about HPC and advanced computing as infrastructure and its couplings?
- Sources searched
- peer-reviewed journals and preprints; benchmark lists; standards forums and agencies; programme and funding pages
- Период
- releases available at evidence close, 30 September 2026
- Отбор
- sources that bind or contextualise a finding in this edition
- Следующий шаг
- systematic reviews for agenda items 01 to 05 in 2027
| Справка | Тип | Год | Роль | Used for |
|---|---|---|---|---|
| Patterson et al.18 | preprint | 2021 | supports | footprint of model training |
| Luccioni, Viguier and Ligozat20 | preprint | 2022 | supports | life-cycle footprint of one model |
| Luccioni, Jernite and Strubell19 | conference paper | 2024 | supports | cost of inference |
| Koomey et al.38 | journal article | 2011 | context | efficiency trends |
| Shalf39 | journal article | 2020 | context | limits of scaling |
| Dennard et al.40 | journal article | 1974 | IRGC | scaling rules |
| Dongarra, Luszczek and Petitet37 | journal article | 2003 | IRGC | Linpack benchmark |
| Справка | Issuer | Год | Роль | Used for |
|---|---|---|---|---|
| TOP500 list, June 20261 | TOP500 project | 2026 | supports | system results |
| TOP500 list, November 20252 | TOP500 project | 2025 | context | earlier list |
| Green500 list, June 20263 | TOP500 project | 2026 | supports | efficiency |
| TOP500 release, June 20264 | TOP500 project | 2026 | supports | LineShine, HPCG, HPL-MxP |
| TOP500 highlights5 | TOP500 project | 2026 | supports | list totals |
| TOP500 news page6 | TOP500 project | 2026 | context | list dates |
| Справка | Issuer | Год | Роль | Used for |
|---|---|---|---|---|
| BIS notices13 | US Department of Commerce | 2026 | supports | export rules |
| EuroHPC pages1011 | EuroHPC Joint Undertaking | 2026 | supports | programme and budget |
| UK action plan23 | UK Government | 2025 | supports | compute plan |
| EU Chips Act page25 | Европейская комиссия | 2026 | supports | chips policy |
| DOE Genesis pages2627 | US Department of Energy | 2026 | context | national platform |
| Справка | Issuer | Год | Роль | Used for |
|---|---|---|---|---|
| Exascale Computing Project17 | DOE programme | 2024 | supports | programme cost |
| CHIPS and Science Act43 | US Congress | 2022 | supports | chips funding |
| DOE news item12 | US Department of Energy | 2024 | supports | data centre energy |
| IEA Energy and AI28 | IEA | 2025 | context | demand estimate |
| RIKEN FugakuNEXT page14 | RIKEN | 2025 | context | national plan |
| CSCS Alps page21 | CSCS | 2024 | context | system description |
| NAIRR pilot page22 | NSF and partners | 2026 | context | shared access |
Where the evidence agrees
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
- 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
- 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03.back
- 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03.back
- 34European Commission (ed.), Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres (OJ L series, 17 May 2024; text read via the Publications Office; operators with installed IT power demand of at least 500 kW report by 15 September 2024, then by 15 May 2025 and every year thereafter). Publications Office of the European Union, Luxembourg. Observation year 2024. Accessed 2026-11-05.back
- 35Latham & Watkins (ed.), European Commission Proposes Mandatory Sustainability Label for Data Centres (client note, 25 September 2026; Commission proposal of 21 September 2026 for a delegated regulation; A to G ratings for power and water usage effectiveness; labels issued annually from 15 August 2027; two-month scrutiny by Parliament and Council; data centres of 500 kW or above); law firm summary, the Commission text was not opened. Latham & Watkins. Observation year 2026. Accessed 2026-11-05.back
- 36ISO and IEC (eds.), ISO/IEC 30134-2:2026 Information technology, Data centres key performance indicators, Part 2: Power usage effectiveness (PUE) (edition 2, published 16 January 2026, replacing ISO/IEC 30134-2:2016 and its Amendment 1:2018; ISO open data deliverables record read). International Organization for Standardization, Geneva. Observation year 2026. Accessed 2026-11-05.back
- 33US Department of Commerce Bureau of Industry and Security (ed.), Implementation of Additional Export Controls: Certain Advanced Computing Items; Supercomputer and Semiconductor End Use; Updates and Corrections (interim final rule, 88 FR 73458, Federal Register document 2023-23055, 25 October 2023, effective 17 November 2023; Federal Register record and abstract read). Office of the Federal Register, Washington. Observation year 2023. Accessed 2026-11-05.back
- 25European Commission (ed.), European Chips Act (policy page; Regulation (EU) 2023/1781 in force 21 September 2023; 19 State aid decisions over EUR 33 billion; Chips Act 2.0 proposed June 2026). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2026. Accessed 2026-11-03.back
- 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 18Patterson, D. et al., Carbon Emissions and Large Neural Network Training, arXiv:2104.10350, submitted 21 April 2021 (abstract page). arXiv, Ithaca. Observation year 2021. Accessed 2026-11-03.back
- 20Luccioni, A.S., Viguier, S. and Ligozat, A.-L., Estimating the Carbon Footprint of BLOOM, a 176B Parameter Language Model, arXiv:2211.02001, submitted 3 November 2022 (abstract page; about 24.7 tonnes CO2eq dynamic, about 50.5 tonnes life cycle). arXiv, Ithaca. Observation year 2022. Accessed 2026-11-03.back
- 19Luccioni, A.S., Jernite, Y. and Strubell, E., Power Hungry Processing: Watts Driving the Cost of AI Deployment?, ACM FAccT 2024, arXiv preprint of November 2023 (abstract page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
- 38Koomey, J.G., Berard, S., Sanchez, M. and Wong, H., Implications of historical trends in the electrical efficiency of computing, IEEE Annals of the History of Computing 33(3), 46 to 54, 2011, doi:10.1109/MAHC.2010.28 (Crossref record read). Institute of Electrical and Electronics Engineers, New York. Observation year 2011. Accessed 2026-11-05. doi:10.1109/MAHC.2010.28back
- 39Shalf, J., The future of computing beyond Moore’s Law, Philosophical Transactions of the Royal Society A 378(2166), 20190061, 2020, doi:10.1098/rsta.2019.0061 (Crossref record and abstract read). The Royal Society, London. Observation year 2020. Accessed 2026-11-05. doi:10.1098/rsta.2019.0061back
- 40Dennard, R.H., Gaensslen, F.H., Yu, H.-N., Rideout, V.L., Bassous, E. and LeBlanc, A.R., Design of ion-implanted MOSFET’s with very small physical dimensions, IEEE Journal of Solid-State Circuits 9(5), 256 to 268, October 1974, doi:10.1109/JSSC.1974.1050511 (Crossref record read). Institute of Electrical and Electronics Engineers, New York. Observation year 1974. Accessed 2026-11-05. doi:10.1109/JSSC.1974.1050511back
- 37Dongarra, J.J., Luszczek, P. and Petitet, A., The LINPACK Benchmark: past, present and future, Concurrency and Computation: Practice and Experience 15(9), 803 to 820, 2003, doi:10.1002/cpe.728 (Crossref record and abstract read). Wiley. Observation year 2003. Accessed 2026-11-05. doi:10.1002/cpe.728back
- 2TOP500 (ed.), TOP500 list, November 2025, 66th edition (list page; top systems, Rmax, Rpeak, power). TOP500 project, Hamburg. Observation year 2025. Accessed 2026-11-03.back
- 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 6POST-CLOSE, context only: TOP500 (ed.), TOP500 news index (headlines and dates of the lists of November 2024, June 2025, November 2025 and June 2026; no November 2026 list at page read). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 10EuroHPC Joint Undertaking (ed.), AI Factories (programme page; 19 AI Factories and 13 antennas stated; the page lists 18 sites and 15 antennas). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back
- 26POST-CLOSE, context only: US Department of Energy (ed.), Genesis Mission (programme page; goal of 100,000 science and technology professionals over a decade; announcements dated August to October 2026; no systems named). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 27Oak Ridge National Laboratory (ed.), The Genesis Mission (page; Lux and Discovery listed with one-line descriptions only). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
- 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03.back
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 28IEA (ed.), Energy and AI, World Energy Outlook Special Report (April 2025; report PDF read; around 415 TWh for data centres in 2024, about 1.5% of world electricity; around 945 TWh in 2030 in the Base Case). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05.back
- 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back
- 21Swiss National Supercomputing Centre (ed.), Alps (system page; 2,688 Grace-Hopper nodes; 434.9 petaflops; inaugurated September 2024). CSCS, Lugano. Observation year 2024. Accessed 2026-11-03.back
- 22National Artificial Intelligence Research Resource Pilot (ed.), NAIRR pilot site (more than 950 projects; 14 federal agencies; 26 non-governmental partners; Operations Center award of 1 September 2026). US National Science Foundation, Alexandria. Observation year 2026. Accessed 2026-11-03.back
- 30Chips and Cheese (ed.), Cozma, G., TOP500 at ISC’26: We have a New Number 1 (25 June 2026; LineShine described as the first Chinese submission to the TOP500 in nine years; other Chinese exascale systems not listed); trade analysis, weak evidence. Chips and Cheese. Observation year 2026. Accessed 2026-11-05.back
- HPC and Advanced Computing 2026
- Chapter 7
The 2027 agenda
Eight bounded questions open the 2027 HPC agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 HPC edition.
7.1Questions for the operational series
- H-01
What do the largest systems and the facilities around them draw in power and cooling water, and how does that compare with efficiency leaders?
INI-XT07-PWR-01 · power and cooling footprint; first output: footprint table by system.
- H-02
How much of the demand on data centres comes from scientific systems, and how much from commercial AI workloads?
INI-XT07-DEM-02 · demand split; first output: demand note.
- H-03
Which chips, memory and fabrication steps are single points of failure for large systems?
INI-XT07-SUP-03 · accelerator and memory supply; first output: dependence map.
- H-04
How can capacity be seen when systems do not submit to public lists?
INI-XT07-VIS-04 · visible and unlisted capacity; first output: visibility table.
- H-05
How can benchmark results be read together, given that Linpack, HPCG and mixed-precision tables differ?
INI-XT07-BMK-05 · benchmarks read together; first output: benchmark table.
- H-06
Which national and regional rules set data centre reporting, and how do they differ?
To be admitted in 2027; first output: rule overlay.
- H-07
What workforce exists for operating, programming and securing large systems?
To be admitted in 2027; first output: scoping note.
- H-08
Which readiness capabilities have been tested in real shortages or outages, and which are only planned?
Readiness capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for the 2027 HPC portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.
| ID | Объект | Вид | Вопрос | Статус |
|---|---|---|---|---|
| INI-XT07-PWR-01 | Power and cooling footprint | Initiative | H-01 | ПРЕДЛОЖЕН |
| INI-XT07-DEM-02 | Demand split | Initiative | H-02 | ПРЕДЛОЖЕН |
| INI-XT07-SUP-03 | Accelerator and memory supply | Initiative | H-03 | ПРЕДЛОЖЕН |
| INI-XT07-VIS-04 | Visible and unlisted capacity | Initiative | H-04 | ПРЕДЛОЖЕН |
| INI-XT07-BMK-05 | Benchmarks read together | Initiative | H-05 | ПРЕДЛОЖЕН |
| MSN-XT07-2027-01 | Power and siting Universe mission | Миссия | H-01 | Кандидат |
7.3The pathway
The HPC edition reads national readiness chapters, the coupled sector reports on energy, minerals and cybersecurity, and the global edition through one governed evidence graph. At baseline the federation is designed; the global energy and lifeline editions are drafted. This page states what exists today and what comes next.
- 01
National readiness chapters
computing and facility readiness in each national edition
IN PREPARATION · national baselines
- 02
Sector couplings
GS-02 energy · XT-06 semiconductors and AI compute · SR-04 minerals
GS-02 DRAFTED · sector baselines
- 03
Technology system model
systems, power, cooling, chips, funding, governance
v0 SPECIFIED · v1 with federation evidence
- 04
Strategic links
SR-02 lifeline systems · SR-13 strategic technology
PLANNED · strategic baselines
- 05
Вселенная
annual proving environment
CANDIDATE MISSION · mandate in 2027
- 06
XT-07 report
this series
BASELINE DRAFT · 2027 annual edition
- 07
Evidence and correction
one graph, many projections
OPEN · first correction cycle in 2027
7.4Universe 2027: evidence pack for the HPC candidate mission
- 01
Мандат
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Следующий мандат
| Позиция | Запись | Статус | Сроки |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Данные учений | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | 2027 global annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Миссия
- ID
- MSN-XT07-2027-01 · Power and siting Universe mission
- Role spine
- Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Вывод | Передаётся в | Цель | Класс |
|---|---|---|---|
| INF-001 · list entry | INI-XT07-VIS-04 | visible and unlisted capacity | PUBLIC |
| INF-003 · benchmarks | INI-XT07-BMK-05 | benchmarks read together | PUBLIC |
| ENE-004 · efficiency | INI-XT07-PWR-01 | power and cooling footprint | PUBLIC |
| ENE-006 · data centre energy | INI-XT07-DEM-02 | demand split | PUBLIC |
| GOV-007 · export rules | regional consortia | rule overlay | PUBLIC |
| GOV-008 · EuroHPC | regional consortia | rule overlay | PUBLIC |
| FIN-010 · public funding | INI-XT07-SUP-03 · key F review | accelerator and memory supply | PUBLIC |
| SYS-012 · compound pathway | MSN-XT07-2027-01 | Universe candidate | CONSORTIUM |
| Класс | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the federation | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| Списки TOP500 и Green500 | TOP500 project | twice a year | INF-001 |
| TOP500 highlights and release pages | TOP500 project | twice a year | INF-002 |
| Список Green500 | TOP500 project | twice a year | ENE-004 |
| BIS notices and guidance | US Department of Commerce | на выпуск | GOV-007 |
| EuroHPC pages and regulations | EuroHPC Joint Undertaking | на выпуск | GOV-008 |
| DOE data centre report and news | US Department of Energy | на выпуск | ENE-006 |
| National roadmaps and plans | agencies and institutes | на каждое событие | GOV-011 |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- annual publication
- signal report
| ID | Signal | Corroboration | Системная | Маршрут |
|---|---|---|---|---|
| SIG-XT07-001 | LineShine at first place on the June 2026 list4 | PARTIAL | INF · TRD | research question H-04 |
| SIG-XT07-002 | US data centre share of 4.4% in 2023 and a 2028 range12 | CORROBORATED | ENE | initiative H-01 |
| SIG-XT07-003 | Advanced computing timeline extended to end of 202613 | PARTIAL | TRD · INF | research question H-04 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
- HPC and Advanced Computing 2026
- Chapter 8
Systems in depth
One section per system: its state at evidence close, its exposures and what the operational series will watch.
8.1Systems and compute platforms
Large systems are listed twice a year. Evidence is strongest where a public list exists, and weakest for systems that do not submit.
| Компонент | Статус | Доказательная база | Статус |
|---|---|---|---|
| Exascale systems | five systems at or above 1 exaflop on Linpack; JUPITER at exactly 1.000; the Frontier page gives 1.6 exaflops peak | 147 | Сообщённые данные |
| Accelerated systems | 276 of 500, up from 255; AMD in 38.4% and Intel in 53.2% of systems | 5 | Сообщённые данные |
| Mixed-precision tables | El Capitan 16.7 exaflops on HPL-MxP; LineShine 22.00 petaflops on HPCG | 5 | Сообщённые данные |
| Planned DOE systems | Lux and Discovery are named at Oak Ridge; specifications not read | 82731 | Expert input |
Взаимосвязи
- INF ↔ ENE facility power
- INF ↔ FIN programme funding
- INF ↔ TRD licence rules
Evidence to bind in 2027
- systems that do not submit to lists
- specifications of planned systems
Related editions
- GLB Global Systems
- GS-02 Energy
- XT-01 Artificial Intelligence and Agentic Systems
- XT-06 Advanced Semiconductors and AI Compute
- XT-08 Cloud, Edge and Distributed Computing
- XT-02 Quantum Technologies
8.2Power, cooling and data centres
The five largest systems draw tens of megawatts. Efficiency leaders are small systems, and the wider data centre load is growing.
| Компонент | Статус | Доказательная база | Статус |
|---|---|---|---|
| Power of large systems | 15.8 to 42.2 megawatts for the five largest | 1 | Сообщённые данные |
| Эффективность | leader 73.282; El Capitan 60.94; LineShine 52.07 gigaflops per watt | 345 | Сообщённые данные |
| Data centre energy | US 176 terawatt-hours in 2023; 2028 range of 6.7% to 12% of US electricity | 12 | Сообщённые данные |
| Cooling water | not bound for large facilities | 9 | Expert input |
Взаимосвязи
- ENE ↔ INF facility power
- WAT → INF cooling water
- INF → CLI emissions
Evidence to bind in 2027
- cooling-water use
- facility energy on a common basis
Related editions
- GLB Global Systems
- GS-02 Energy
- XT-01 Artificial Intelligence and Agentic Systems
- XT-06 Advanced Semiconductors and AI Compute
- XT-08 Cloud, Edge and Distributed Computing
- XT-02 Quantum Technologies
8.3Chips, memory and fabrication
Large systems depend on chips and memory made in a few places. Policy pages show large public programmes, and supply figures are not bound.
| Компонент | Статус | Доказательная база | Статус |
|---|---|---|---|
| US chips programmes | USD 11 billion for research and USD 39 billion for incentives | 43 | Сообщённые данные |
| EU chips programmes | 19 State aid decisions for first-of-a-kind facilities; Chips Act 2.0 proposed in June 2026 | 25 | Сообщённые данные |
| Accelerator and memory supply | no volumes or concentration figures bound | 4325 | Expert input |
| Материалы | no HPC-specific figure bound | 25 | Expert input |
Взаимосвязи
- MIN → INF materials
- TRD → INF licence rules
- FIN → INF fabrication
Evidence to bind in 2027
- accelerator and memory supply
- fabrication capacity by country
Related editions
- GLB Global Systems
- GS-02 Energy
- XT-01 Artificial Intelligence and Agentic Systems
- XT-06 Advanced Semiconductors and AI Compute
- XT-08 Cloud, Edge and Distributed Computing
- XT-02 Quantum Technologies
8.4Economy, investment and workforce
Public programmes carry the largest systems. Workforce figures are the thin part of the evidence.
| Компонент | Статус | Доказательная база | Статус |
|---|---|---|---|
| US exascale programme | USD 1.8 billion from 2016 to 2024; two GPU architectures proven | 17 | Сообщённые данные |
| EuroHPC | budget of at least EUR 8.2 billion; EU contribution EUR 4.1 billion | 11 | Сообщённые данные |
| Shared access | NAIRR pilot: more than 950 projects, 14 federal agencies, 26 non-governmental partners | 22 | Сообщённые данные |
| Workforce | DOE Genesis page names a goal of 100,000 professionals over a decade | 26 | Сообщённые данные |
Взаимосвязи
- FIN → INF scale-up
- HLT → INF workforce
- GOV → FIN programme lines
Evidence to bind in 2027
- public funding outside the US and EU
- workforce size and skills gaps
Related editions
- GLB Global Systems
- GS-02 Energy
- XT-01 Artificial Intelligence and Agentic Systems
- XT-06 Advanced Semiconductors and AI Compute
- XT-08 Cloud, Edge and Distributed Computing
- XT-02 Quantum Technologies
8.5Security, export controls and governance watch
Rules on advanced computing items are being adjusted in steps, and reporting rules for data centres are being drafted.
| Компонент | Статус | Доказательная база | Статус |
|---|---|---|---|
| Export controls | authorised designer timeline extended on 7 April 2026; guidance on D:5 headquartered entities in May 2026 | 1333 | Сообщённые данные |
| Data centre reporting | EU delegated regulation of 2024 sets reporting; rating scheme proposed in 2026 in draft | 3435 | Сообщённые данные |
| Стандарты | MPI 5.0 in 2025; OpenMP 6.0 in 2024; OpenMP 6.1 draft in 2026 | 1516 | Сообщённые данные |
| National platforms | DOE Genesis Mission; UK compute plan; RIKEN FugakuNEXT | 262314 | Сообщённые данные |
Взаимосвязи
- TRD → INF licence rules
- GOV → ENE reporting
- GOV → FIN programme lines
Evidence to bind in 2027
- text of the 2023 US rule
- EU delegated regulations from the primary text
Related editions
- GLB Global Systems
- GS-02 Energy
- XT-01 Artificial Intelligence and Agentic Systems
- XT-06 Advanced Semiconductors and AI Compute
- XT-08 Cloud, Edge and Distributed Computing
- XT-02 Quantum Technologies
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 7Oak Ridge Leadership Computing Facility (ed.), Frontier (system page; 1.6 exaflops peak; 74 cabinets; delivered 2021; the page value differs from the peak on the list page). Oak Ridge National Laboratory, Oak Ridge. Observation year 2022. Accessed 2026-11-03.back
- 8Oak Ridge Leadership Computing Facility (ed.), compute systems (index page; Lux and Discovery labelled as introduced; no specifications). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
- 27Oak Ridge National Laboratory (ed.), The Genesis Mission (page; Lux and Discovery listed with one-line descriptions only). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
- 31US Department of Energy, Office of Science (ed.), Energy Department Announces New Partnership with NVIDIA and Oracle to Build Largest DOE AI Supercomputer (bulletin, 28 October 2025; Solstice with 100,000 NVIDIA Blackwell GPUs; Equinox with 10,000 Blackwell GPUs, expected to be delivered in 2026; no performance figures stated). US Department of Energy, Washington. Observation year 2025. Accessed 2026-11-05.back
- 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
- 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03.back
- 25European Commission (ed.), European Chips Act (policy page; Regulation (EU) 2023/1781 in force 21 September 2023; 19 State aid decisions over EUR 33 billion; Chips Act 2.0 proposed June 2026). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2026. Accessed 2026-11-03.back
- 24POST-CLOSE, context only: NIST (ed.), CHIPS for America (programme page; USD 50 billion; USD 11 billion research and USD 39 billion incentives; awards of September and October 2026 listed). National Institute of Standards and Technology, Gaithersburg. Observation year 2026. Accessed 2026-11-03.back
- 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
- 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 22National Artificial Intelligence Research Resource Pilot (ed.), NAIRR pilot site (more than 950 projects; 14 federal agencies; 26 non-governmental partners; Operations Center award of 1 September 2026). US National Science Foundation, Alexandria. Observation year 2026. Accessed 2026-11-03.back
- 26POST-CLOSE, context only: US Department of Energy (ed.), Genesis Mission (programme page; goal of 100,000 science and technology professionals over a decade; announcements dated August to October 2026; no systems named). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
- 34European Commission (ed.), Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres (OJ L series, 17 May 2024; text read via the Publications Office; operators with installed IT power demand of at least 500 kW report by 15 September 2024, then by 15 May 2025 and every year thereafter). Publications Office of the European Union, Luxembourg. Observation year 2024. Accessed 2026-11-05.back
- 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back
- 33US Department of Commerce Bureau of Industry and Security (ed.), Implementation of Additional Export Controls: Certain Advanced Computing Items; Supercomputer and Semiconductor End Use; Updates and Corrections (interim final rule, 88 FR 73458, Federal Register document 2023-23055, 25 October 2023, effective 17 November 2023; Federal Register record and abstract read). Office of the Federal Register, Washington. Observation year 2023. Accessed 2026-11-05.back
- 35Latham & Watkins (ed.), European Commission Proposes Mandatory Sustainability Label for Data Centres (client note, 25 September 2026; Commission proposal of 21 September 2026 for a delegated regulation; A to G ratings for power and water usage effectiveness; labels issued annually from 15 August 2027; two-month scrutiny by Parliament and Council; data centres of 500 kW or above); law firm summary, the Commission text was not opened. Latham & Watkins. Observation year 2026. Accessed 2026-11-05.back
- 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03.back
- 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03.back
- 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back
Методология
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
A.1Методы
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| Нет. | Derivation | Calculation | Результат |
|---|---|---|---|
| (1) | Combined power of the five largest systems, June 2026 | 42,220 + 29,685 + 24,607 + 38,698 + 15,794 kW | 151,004 kW, about 151 MW |
| (2) | Growth of combined list performance in six months | 18.73 ÷ 14.99 | about 1.25 times |
| (3) | Share of listed systems that use accelerators | 276 ÷ 500 | 55.2% |
| (4) | Ratio of El Capitan HPL-MxP to Linpack | 16.7 ÷ 1.809 | about 9.2 times |
| Strength | Определение |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| Метка | Правило |
|---|---|
| Сообщённые данные | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| Оценка | Nexus analytical value with stated method |
| Сценарий | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, HPC System Model v0
- Model ID
- MDL-XT07-HPC · v0.1
- Цель
- represent HPC and advanced computing as infrastructure coupled to electricity, cooling, chips, public funding, workforce and security policy
- Семейство
- graph-based system of systems
- Исходные данные
- the cited sources of this edition; no proprietary data
- Метод
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- Валидация
- none yet, first validation against federation evidence in 2027
- Неопределённость
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- global scale; not for asset-, site- or country-level use
- Воспроизводимость
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-XTECH-HPC-GLOBAL-2026-B0
- Тип
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 43 cited sources, each at the edition and access date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 HPC annual cut
Происхождение
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Элемент | Baseline 2026 | 2027 global annual |
|---|---|---|
| Источники | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Модели | HPC System Model v0 specification | model runs with receipts |
| Выводы | twelve baseline findings | findings re-bound to federation evidence |
| Рецензирование | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Индикатор | Наблюдаемые данные | Выпущено | Периодичность | Next release |
|---|---|---|---|---|
| Top-system results | 2026 | June 2026 | периодически | November 2026 list |
| Efficiency results | 2026 | June 2026 | периодически | November 2026 list |
| US data centre energy | 2023 | December 2024 | one-off | next national report |
| Export rule timeline | 2026 | April and May 2026 | на каждое событие | further guidance |
| EuroHPC budget | 2021 to 2027 | page read 2026-11-03 | непрерывно | regulation changes |
| Footprint papers | 2021 to 2024 | preprints and papers | one-off | new studies |
| MPI and OpenMP | 2024 to 2026 | June 2025 · July 2026 | периодически | OpenMP 6.1 |
| FugakuNEXT plan | 2025 | August 2025 | one-off | detailed design |
| Системная | Охват | Thinnest dimension |
|---|---|---|
| Системная | GOOD | unlisted systems |
| Эффективность | PARTIAL | facility-level figures |
| Энергетика | PARTIAL | common basis for facilities |
| Управление | PARTIAL | text of rules and guidance |
| Инвестиции | PARTIAL | public funding outside the US and EU |
| Предложение | THIN | accelerator and memory supply |
| Навыки | THIN | workforce numbers |
| Вода | THIN | cooling-water use |
| Область | Source that would fill it | Blocker |
|---|---|---|
| Cooling-water use of large computing facilities | operators, national laboratories, regulators under the EU scheme | not retrieved; no primary figure read |
| Facility energy and demand on a common basis for HPC and for commercial AI workloads | national statistics, operators, IEA | US figures read in the Berkeley Lab report29 and global figures in the IEA report28; no split between HPC and commercial AI |
| Data centre electricity by country outside the US | IEA Energy and AI28, national statistics | global figures read in the report; national series not bound |
| Lawrence Berkeley report text, including water use | LBNL 2024 United States Data Center Energy Usage Report29 | report read; its water estimates are not yet used in this edition |
| Power draw and cost of JUPITER from primary pages | EuroHPC, Jülich Supercomputing Centre | power and budget are not stated on the page read9; list value only1 |
| LineShine architecture and independent description | operator and peer-reviewed or institutional papers | list pages and one trade analysis30; no operator description |
| Specifications and schedules of DOE Solstice, Equinox, Lux and Discovery | Argonne and Oak Ridge system pages; DOE announcement31 | the DOE announcement gives 100,000 and 10,000 Blackwell GPUs for Solstice and Equinox and 2026 delivery for Equinox, without performance figures31; Oak Ridge pages name Lux and Discovery without specifications827 |
| El Capitan system description from the laboratory | Lawrence Livermore National Laboratory32 | news item read: 1.742 exaflops on HPL and 2.79 exaflops peak in November 202432; current values from the list1 |
| Text of the 2023 US advanced computing rule | Federal Register33 | Federal Register record and abstract read; full rule text not analysed |
| EU delegated regulations on data centre reporting and rating from the primary text | EUR-Lex3435 | the 2024 regulation was read34; the 2026 rating proposal is known from a law firm note35 |
| Supply of accelerators, high-bandwidth memory and fabrication capacity for HPC | industry and trade statistics | not retrieved; no figure used |
| HPC workforce size and skills gaps | national statistics, OECD, industry surveys | not retrieved; capability rung stays LISTED |
| Survey data on data centre efficiency and density | Uptime Institute global survey42 | report read; weighted average PUE of 1.54 in 2025; no figure used in the findings |
| Public funding totals for HPC outside the US and EU | national strategies and ministries | not consolidated; UK plan gives no budget figure23 |
| Results of the November 2026 TOP500 list | TOP500 news and lists6 | not yet published at page read; the news page shows June 2026 as latest |
| Capability rungs beyond list monitoring, planning and funding | agencies, operators, laboratories | not reviewed |
A.5Evidence cards, two anchor sources
Published by the TOP500 project at ISC 2026 on 23 June 2026, 67th edition. Periodic. Role: binds INF-001 and the dashboard power figures. Coverage: systems that submit results.
EVD-XT07-001
TOP500 list of June 20261
Published by the TOP500 project on the same date. Periodic. Role: binds ENE-004. Coverage: listed systems that report power.
EVD-XT07-002
Green500 list of June 20263
| Dimension | EVD-XT07-001 | EVD-XT07-002 |
|---|---|---|
| Completeness | submitted systems only | listed systems that report power |
| Timeliness | twice a year | twice a year |
| Revision | new list replaces old | new list replaces old |
| Method transparency | benchmark method published | power method stated by the project |
| External validation | results reported by submitters | results reported by submitters |
Evidence cards to follow in 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| Группа | Направление | Элементы | Пролёт | N/A | Ожидается |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Рубеж публикации
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- Карты
- plates in Q2 2027
- Waivers
- нет
A.7Status words
| Статус | Что это значит |
|---|---|
| Наблюдаемые данные | Measured directly and published by the source. |
| Сообщённые данные | Published statistics of an official or institutional source. |
| Объявлено | Stated by the body concerned; not independently measured. |
| Оценка | A Nexus estimate from cited evidence, with its method in Annex A. |
| Смоделировано | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Прогноз | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| Сценарий | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Кандидат | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| Шаг | Что происходит | Источник |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Термин | Значение |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| Взаимосвязи | a typed dependency through which one system transmits to another |
| Разрыв в защите | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Срез доказательств | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| BIS | Bureau of Industry and Security |
| CPU | central processing unit |
| DOE | US Department of Energy |
| ECP | Exascale Computing Project |
| EF | exaflops |
| GPU | graphics processing unit |
| HBM | high-bandwidth memory |
| HPC | high-performance computing |
| HPCG | High Performance Conjugate Gradients benchmark |
| HPL-MxP | mixed-precision High Performance Linpack benchmark |
| PUE | power usage effectiveness |
| TWh | terawatt-hours |
A.10Technical annex
| Позиция | Annex | Содержание | Статус |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-XT07-PWR-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Cluster notes | cards for the major exascale and data centre clusters | 2027 |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: Linpack result (Rmax)
- Construct
- sustained speed of a dense linear solve at the largest size the system can run
- Единица
- floating-point operations per second, shown here in exaflops
- Метод
- the Linpack benchmark run by the submitter and reported to the list
- Источник
- TOP500 list, June 20261
- Неопределённость
- reported by submitters; not independently repeated here
- Известные ограничения
- one benchmark; dense algebra only; not a measure of useful scientific output
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 29Shehabi, A., Smith, S.J., Hubbard, A., Newkirk, A., Lei, N., Siddik, M.A.B., Holecek, B., Koomey, J., Masanet, E. and Sartor, D., 2024 United States Data Center Energy Usage Report, LBNL-2001637 (December 2024; report PDF read; 176 TWh in 2023, 4.4% of US electricity; about 325 to 580 TWh in 2028, 6.7% to 12.0%; direct water estimates included). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-05.back
- 28IEA (ed.), Energy and AI, World Energy Outlook Special Report (April 2025; report PDF read; around 415 TWh for data centres in 2024, about 1.5% of world electricity; around 945 TWh in 2030 in the Base Case). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05.back
- 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
- 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 30Chips and Cheese (ed.), Cozma, G., TOP500 at ISC’26: We have a New Number 1 (25 June 2026; LineShine described as the first Chinese submission to the TOP500 in nine years; other Chinese exascale systems not listed); trade analysis, weak evidence. Chips and Cheese. Observation year 2026. Accessed 2026-11-05.back
- 31US Department of Energy, Office of Science (ed.), Energy Department Announces New Partnership with NVIDIA and Oracle to Build Largest DOE AI Supercomputer (bulletin, 28 October 2025; Solstice with 100,000 NVIDIA Blackwell GPUs; Equinox with 10,000 Blackwell GPUs, expected to be delivered in 2026; no performance figures stated). US Department of Energy, Washington. Observation year 2025. Accessed 2026-11-05.back
- 8Oak Ridge Leadership Computing Facility (ed.), compute systems (index page; Lux and Discovery labelled as introduced; no specifications). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
- 27Oak Ridge National Laboratory (ed.), The Genesis Mission (page; Lux and Discovery listed with one-line descriptions only). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
- 32Lawrence Livermore National Laboratory (ed.), Lawrence Livermore National Laboratory’s El Capitan verified as world’s fastest supercomputer (news item, 18 November 2024; 1.742 exaflops on HPL; 2.79 exaflops peak; more than 11,000 compute nodes). Lawrence Livermore National Laboratory, Livermore. Observation year 2024. Accessed 2026-11-05.back
- 33US Department of Commerce Bureau of Industry and Security (ed.), Implementation of Additional Export Controls: Certain Advanced Computing Items; Supercomputer and Semiconductor End Use; Updates and Corrections (interim final rule, 88 FR 73458, Federal Register document 2023-23055, 25 October 2023, effective 17 November 2023; Federal Register record and abstract read). Office of the Federal Register, Washington. Observation year 2023. Accessed 2026-11-05.back
- 34European Commission (ed.), Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres (OJ L series, 17 May 2024; text read via the Publications Office; operators with installed IT power demand of at least 500 kW report by 15 September 2024, then by 15 May 2025 and every year thereafter). Publications Office of the European Union, Luxembourg. Observation year 2024. Accessed 2026-11-05.back
- 35Latham & Watkins (ed.), European Commission Proposes Mandatory Sustainability Label for Data Centres (client note, 25 September 2026; Commission proposal of 21 September 2026 for a delegated regulation; A to G ratings for power and water usage effectiveness; labels issued annually from 15 August 2027; two-month scrutiny by Parliament and Council; data centres of 500 kW or above); law firm summary, the Commission text was not opened. Latham & Watkins. Observation year 2026. Accessed 2026-11-05.back
- 42Donnellan, D., Lawrence, A., Bizo, D., Rogers, O., Judge, P., Davis, J., Smolaks, M. and Weinschenk, R., Uptime Institute Global Data Center Survey 2025, UII Keynote Report 180 (July 2025; report PDF read; more than 800 owners and operators surveyed; weighted average annual PUE of 1.54 in 2025). Uptime Institute, New York. Observation year 2025. Accessed 2026-11-05.back
- 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back
- 6POST-CLOSE, context only: TOP500 (ed.), TOP500 news index (headlines and dates of the lists of November 2024, June 2025, November 2025 and June 2026; no November 2026 list at page read). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
Data appendix
The indicator set with its sources, the source registers, the licences of every kind of material and the formats of the edition.
B.1The indicator set
| Индикатор | Значение | Единица | Год | Статус | Источник |
|---|---|---|---|---|---|
| LineShine Linpack result | 2.198 | exaflops | 2026 | Сообщённые данные | 1 |
| LineShine power | 42.2 | MW | 2026 | Сообщённые данные | 1 |
| LineShine efficiency | 52.07 | GFlops per watt | 2026 | Сообщённые данные | 4 |
| El Capitan Linpack result | 1.809 | exaflops | 2026 | Сообщённые данные | 1 |
| El Capitan efficiency | 60.94 | GFlops per watt | 2026 | Сообщённые данные | 5 |
| El Capitan HPL-MxP result | 16.7 | exaflops | 2026 | Сообщённые данные | 5 |
| LineShine HPCG result | 22.00 | petaflops | 2026 | Сообщённые данные | 5 |
| Combined list performance | 18.73 | exaflops | 2026 | Сообщённые данные | 5 |
| Systems with accelerators | 276 | of 500 | 2026 | Сообщённые данные | 5 |
| Green500 leader efficiency | 73.282 | GFlops per watt | 2026 | Сообщённые данные | 3 |
| US data centre electricity use | 176 | TWh | 2023 | Сообщённые данные | 12 |
| US data centre electricity share | 4.4 | % | 2023 | Сообщённые данные | 12 |
| Exascale Computing Project budget | 1.8 | USD billion | 2024 | Сообщённые данные | 17 |
| CHIPS and Science Act funding to Commerce | 50 | USD billion | 2022 | Сообщённые данные | 43 |
| EuroHPC budget 2021 to 2027 | 8.2 | EUR billion | 2026 | Сообщённые данные | 11 |
| JUPITER GH200 superchips | 24,000 | about | 2025 | Сообщённые данные | 9 |
B.2Global source register
The governed source set behind this edition. Each source keeps its authority, coverage, cadence and role; categories describe origin, not truth.
Domains bound by the register
- INF
- ENE
- FIN
- TRD
- AIC
- MIN
- CLI
- WAT
- DAT
- HLT
| Источник | Категория | Охват | Period | Периодичность | Роль |
|---|---|---|---|---|---|
| TOP500 list pages12 | benchmark project | global | 2025 to 2026 | twice a year | системы |
| Список Green5003 | benchmark project | global | 2026 | twice a year | efficiency |
| TOP500 release and highlights45 | benchmark project | global | 2026 | twice a year | totals and benchmarks |
| EuroHPC pages91011 | EU body | EU | 2025 to 2026 | непрерывно | systems and budget |
| DOE news item12 | national agency | US | 2024 | one-off | data centre energy |
| BIS homepage13 | national agency | US | 2025 to 2026 | непрерывно | export rules |
| RIKEN page14 | national institute | Япония | 2025 | one-off | roadmap |
| MPI and OpenMP pages1516 | standards forums | global | 2024 to 2026 | периодически | software standards |
| ECP page and CHIPS and Science Act1743 | national programme and statute | US | 2022 to 2024 | one-off | funding |
| UK action plan23 | national government | UK | 2025 | one-off | compute plan |
B.3Regional reading, HPC across ten clusters
Regional plates follow with the regional editions. This page gives the regional reading of HPC infrastructure in table form and ranks no region.
| Регион | Principal hazards | Systems most exposed | Baseline evidence |
|---|---|---|---|
| Северная Америка | three exascale systems at DOE laboratories; chips funding | systems, finance, energy | TOP5001; CHIPS and Science Act43; DOE12 |
| Южная Америка | regional evidence not bound | not bound | regional evidence (not bound) |
| Европа | JUPITER; EuroHPC budget; AI Factories; rules for data centres | systems, governance | EuroHPC91011 |
| Eurasia | regional evidence not bound | not bound | regional evidence (not bound) |
| Ближний Восток и Северная Африка | regional evidence not bound | not bound | regional evidence (not bound) |
| Африка | regional evidence not bound | not bound | regional evidence (not bound) |
| Южная Азия | regional evidence not bound | not bound | regional evidence (not bound) |
| Восточная Азия | LineShine in China; Fugaku and FugakuNEXT plan in Japan | systems, roadmaps | TOP50014; RIKEN14 |
| ASEAN | regional evidence not bound | not bound | regional evidence (not bound) |
| Oceania-Pacific | regional evidence not bound | not bound | regional evidence (not bound) |
B.4Cluster card: exascale systems on the June 2026 list
- системы
- power
- efficiency
- public lists
- Systems in view
- LineShine, El Capitan, Frontier, Aurora, JUPITER Booster
- Defining events
- LineShine entry at first place; JUPITER inauguration19
- Взаимосвязи
- ENE → INF facility power; TRD → INF licence rules
- Capability evidence
- warm-water cooling and heat reuse at one system9
- Пробелы
- cooling water; newest system power from primary pages; supply
- Пункты повестки
- H-01 · H-04
The five largest systems draw from 15.8 to 42.2 megawatts, as the list reports [1].
POWER
Tens of megawatts
The Green500 leader draws 46 kilowatts and reaches 73.282 gigaflops per watt [3] [5].
EFFICIENCY
Small systems lead
JUPITER uses warm-water cooling and sends heat to a campus network. No other system is documented here [9].
RESPONSE
Heat reuse
B.5How countries appear in the HPC edition
Countries enter the HPC edition through the readiness chapters of their own national editions, on one card grammar. They are read against peer distributions and thresholds, never ranked.
| Card field | Что он показывает | Источник |
|---|---|---|
| WEFH+B state | each core system against peer distribution bands | national edition |
| Взаимосвязи | the national dependency matrix | national edition |
| Risk objects | the national risk portfolio | national edition |
| Capability rungs | the national capability ladder | national edition |
| Evidence age | oldest and newest source dates | national source register |
Editions in the 2026 Baseline programme
countries and unions
clusters
flagship and sector
technology reports
How to read a country card
- Each system is shown against the distribution of its peers, with thresholds where they exist
- Couplings and risk objects come from the country’s own national edition
- Capability rungs record evidence, not a judgement of institutions
- Evidence age is printed, so older national data are visible as such
| Волна | Countries and unions | Статус |
|---|---|---|
| W0 | Канада | ISSUED |
| W1 | United States, United Kingdom, France, Germany, Italy, Japan, European Union, Switzerland | PLANNED |
| W2 | Mexico, Brazil, Argentina, Türkiye, Russian Federation, Saudi Arabia, United Arab Emirates, South Africa, Senegal, Kenya, African Union, India, China, Republic of Korea, Indonesia, Singapore, Australia | PLANNED |
B.6Лицензии
| Материал | Лицензия |
|---|---|
| Text | CC BY 4.0 |
| Данные | on the licence of each source; Nexus tables CC BY 4.0 |
| Цифры | Nexus figures CC BY 4.0; third-party as credited |
| Карты | boundary source and licence printed on each plate |
| Метаданные | CC0 1.0, as Zenodo publishes it |
| Third-party data, figures and text | The source’s own licence, credited where it is used; never relicensed |
| Nexus-authored text, tables and figures: CC BY 4.0 (SPDX CC-BY-4.0). Map plates print their boundary source and licence. | |
B.7Formats and provenance
| Формат | Вид | Статус | Что это такое | Идентификатор |
|---|---|---|---|---|
| Web edition | HTML | На этом сайте | Draft in stewardship review; every value resolves to its source. | NR-XTECH-HPC-GLOBAL-2026-BASELINE-v1.0.0 |
| Print edition | At release | A4 portrait · screen, print and archival PDF, signed with the web edition at release. | NR-XTECH-HPC-GLOBAL-2026-BASELINE-v1.0.0 | |
| Indicator data | CSV · JSON | На этом сайте | 16 indicators with unit, year, status and source; the machine-readable copy ships with the evidence bundle at release. | NR-XTECH-HPC-GLOBAL-2026-BASELINE data release v1 |
| Цифры | SVG · PNG | На этом сайте | 4 on the web edition: headline figure, figure 1.3, coupling instrument, capability ladder. | FIG-XTECH-HPC-GLOBAL-2026-BASELINE-* |
| Slides | Не зафиксировано | No slide deck is recorded for this edition. | ||
| Аналитическая справка | HTML · PDF | Не зафиксировано | No evidence brief is recorded for this edition. | |
| Dataset with DOI | DataCite | At release | Concept and version DOI are minted at deposit; none is recorded yet. |
Происхождение
- Edition pack
- The edition’s content pack (JSON), from which the print and web editions are built
- Срез доказательств
- DC-XTECH-HPC-GLOBAL-2026-B0, closed 30 September 2026
- Воспроизводимость
- sourced values cited; analytical values reproducible from stated parameters
- Self-check
- 14 of 23 at evidence close; a fail on any item blocks release
- Рецензирование
- five passes scheduled before release (in Annex C)
- Официальный издатель
- GCRI for the Nexus Consortium
- Исправления
- Registry correction pathway; upheld corrections are published as notices with a new version
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
- 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03.back
- 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
- 2TOP500 (ed.), TOP500 list, November 2025, 66th edition (list page; top systems, Rmax, Rpeak, power). TOP500 project, Hamburg. Observation year 2025. Accessed 2026-11-03.back
- 10EuroHPC Joint Undertaking (ed.), AI Factories (programme page; 19 AI Factories and 13 antennas stated; the page lists 18 sites and 15 antennas). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
- 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back
- 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03.back
- 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03.back
- 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back
References and record
Every source the edition rests on, the publication record, the corrections log and the open record.
C.143 sources
NR-CIT-1, editor first. A DOI is linked where the source has one; Nexus records carry a UNI once the catalogue allocates it (NS-1).
- 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 2TOP500 (ed.), TOP500 list, November 2025, 66th edition (list page; top systems, Rmax, Rpeak, power). TOP500 project, Hamburg. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 6
- 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 6POST-CLOSE, context only: TOP500 (ed.), TOP500 news index (headlines and dates of the lists of November 2024, June 2025, November 2025 and June 2026; no November 2026 list at page read). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03. Cited in chapter 6
- 7Oak Ridge Leadership Computing Facility (ed.), Frontier (system page; 1.6 exaflops peak; 74 cabinets; delivered 2021; the page value differs from the peak on the list page). Oak Ridge National Laboratory, Oak Ridge. Observation year 2022. Accessed 2026-11-03. Cited in chapter 8
- 8Oak Ridge Leadership Computing Facility (ed.), compute systems (index page; Lux and Discovery labelled as introduced; no specifications). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03. Cited in chapter 8
- 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03. Cited in chapter 1, chapter 2, chapter 3, chapter 4, chapter 8
- 10EuroHPC Joint Undertaking (ed.), AI Factories (programme page; 19 AI Factories and 13 antennas stated; the page lists 18 sites and 15 antennas). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 6
- 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 7, chapter 8
- 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 4, chapter 6, chapter 8
- 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
- 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
- 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 18Patterson, D. et al., Carbon Emissions and Large Neural Network Training, arXiv:2104.10350, submitted 21 April 2021 (abstract page). arXiv, Ithaca. Observation year 2021. Accessed 2026-11-03. Cited in chapter 6
- 19Luccioni, A.S., Jernite, Y. and Strubell, E., Power Hungry Processing: Watts Driving the Cost of AI Deployment?, ACM FAccT 2024, arXiv preprint of November 2023 (abstract page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03. Cited in chapter 6
- 20Luccioni, A.S., Viguier, S. and Ligozat, A.-L., Estimating the Carbon Footprint of BLOOM, a 176B Parameter Language Model, arXiv:2211.02001, submitted 3 November 2022 (abstract page; about 24.7 tonnes CO2eq dynamic, about 50.5 tonnes life cycle). arXiv, Ithaca. Observation year 2022. Accessed 2026-11-03. Cited in chapter 6
- 21Swiss National Supercomputing Centre (ed.), Alps (system page; 2,688 Grace-Hopper nodes; 434.9 petaflops; inaugurated September 2024). CSCS, Lugano. Observation year 2024. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 22National Artificial Intelligence Research Resource Pilot (ed.), NAIRR pilot site (more than 950 projects; 14 federal agencies; 26 non-governmental partners; Operations Center award of 1 September 2026). US National Science Foundation, Alexandria. Observation year 2026. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
- 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
- 24POST-CLOSE, context only: NIST (ed.), CHIPS for America (programme page; USD 50 billion; USD 11 billion research and USD 39 billion incentives; awards of September and October 2026 listed). National Institute of Standards and Technology, Gaithersburg. Observation year 2026. Accessed 2026-11-03. Cited in chapter 8
- 25European Commission (ed.), European Chips Act (policy page; Regulation (EU) 2023/1781 in force 21 September 2023; 19 State aid decisions over EUR 33 billion; Chips Act 2.0 proposed June 2026). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2026. Accessed 2026-11-03. Cited in chapter 6, chapter 8
- 26POST-CLOSE, context only: US Department of Energy (ed.), Genesis Mission (programme page; goal of 100,000 science and technology professionals over a decade; announcements dated August to October 2026; no systems named). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
- 27Oak Ridge National Laboratory (ed.), The Genesis Mission (page; Lux and Discovery listed with one-line descriptions only). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03. Cited in chapter 6, chapter 8
- 28IEA (ed.), Energy and AI, World Energy Outlook Special Report (April 2025; report PDF read; around 415 TWh for data centres in 2024, about 1.5% of world electricity; around 945 TWh in 2030 in the Base Case). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05. Cited in chapter 2, chapter 6
- 29Shehabi, A., Smith, S.J., Hubbard, A., Newkirk, A., Lei, N., Siddik, M.A.B., Holecek, B., Koomey, J., Masanet, E. and Sartor, D., 2024 United States Data Center Energy Usage Report, LBNL-2001637 (December 2024; report PDF read; 176 TWh in 2023, 4.4% of US electricity; about 325 to 580 TWh in 2028, 6.7% to 12.0%; direct water estimates included). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-05. Cited in chapter 2
- 30Chips and Cheese (ed.), Cozma, G., TOP500 at ISC’26: We have a New Number 1 (25 June 2026; LineShine described as the first Chinese submission to the TOP500 in nine years; other Chinese exascale systems not listed); trade analysis, weak evidence. Chips and Cheese. Observation year 2026. Accessed 2026-11-05. Cited in the summary, chapter 2, chapter 4, chapter 6
- 31US Department of Energy, Office of Science (ed.), Energy Department Announces New Partnership with NVIDIA and Oracle to Build Largest DOE AI Supercomputer (bulletin, 28 October 2025; Solstice with 100,000 NVIDIA Blackwell GPUs; Equinox with 10,000 Blackwell GPUs, expected to be delivered in 2026; no performance figures stated). US Department of Energy, Washington. Observation year 2025. Accessed 2026-11-05. Cited in chapter 8
- 32Lawrence Livermore National Laboratory (ed.), Lawrence Livermore National Laboratory’s El Capitan verified as world’s fastest supercomputer (news item, 18 November 2024; 1.742 exaflops on HPL; 2.79 exaflops peak; more than 11,000 compute nodes). Lawrence Livermore National Laboratory, Livermore. Observation year 2024. Accessed 2026-11-05.
- 33US Department of Commerce Bureau of Industry and Security (ed.), Implementation of Additional Export Controls: Certain Advanced Computing Items; Supercomputer and Semiconductor End Use; Updates and Corrections (interim final rule, 88 FR 73458, Federal Register document 2023-23055, 25 October 2023, effective 17 November 2023; Federal Register record and abstract read). Office of the Federal Register, Washington. Observation year 2023. Accessed 2026-11-05. Cited in chapter 2, chapter 6, chapter 8
- 34European Commission (ed.), Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres (OJ L series, 17 May 2024; text read via the Publications Office; operators with installed IT power demand of at least 500 kW report by 15 September 2024, then by 15 May 2025 and every year thereafter). Publications Office of the European Union, Luxembourg. Observation year 2024. Accessed 2026-11-05. Cited in chapter 1, chapter 6, chapter 8
- 35Latham & Watkins (ed.), European Commission Proposes Mandatory Sustainability Label for Data Centres (client note, 25 September 2026; Commission proposal of 21 September 2026 for a delegated regulation; A to G ratings for power and water usage effectiveness; labels issued annually from 15 August 2027; two-month scrutiny by Parliament and Council; data centres of 500 kW or above); law firm summary, the Commission text was not opened. Latham & Watkins. Observation year 2026. Accessed 2026-11-05. Cited in chapter 6, chapter 8
- 36ISO and IEC (eds.), ISO/IEC 30134-2:2026 Information technology, Data centres key performance indicators, Part 2: Power usage effectiveness (PUE) (edition 2, published 16 January 2026, replacing ISO/IEC 30134-2:2016 and its Amendment 1:2018; ISO open data deliverables record read). International Organization for Standardization, Geneva. Observation year 2026. Accessed 2026-11-05. Cited in chapter 6
- 37Dongarra, J.J., Luszczek, P. and Petitet, A., The LINPACK Benchmark: past, present and future, Concurrency and Computation: Practice and Experience 15(9), 803 to 820, 2003, doi:10.1002/cpe.728 (Crossref record and abstract read). Wiley. Observation year 2003. Accessed 2026-11-05. doi:10.1002/cpe.728 Cited in chapter 6
- 38Koomey, J.G., Berard, S., Sanchez, M. and Wong, H., Implications of historical trends in the electrical efficiency of computing, IEEE Annals of the History of Computing 33(3), 46 to 54, 2011, doi:10.1109/MAHC.2010.28 (Crossref record read). Institute of Electrical and Electronics Engineers, New York. Observation year 2011. Accessed 2026-11-05. doi:10.1109/MAHC.2010.28 Cited in chapter 6
- 39Shalf, J., The future of computing beyond Moore’s Law, Philosophical Transactions of the Royal Society A 378(2166), 20190061, 2020, doi:10.1098/rsta.2019.0061 (Crossref record and abstract read). The Royal Society, London. Observation year 2020. Accessed 2026-11-05. doi:10.1098/rsta.2019.0061 Cited in chapter 6
- 40Dennard, R.H., Gaensslen, F.H., Yu, H.-N., Rideout, V.L., Bassous, E. and LeBlanc, A.R., Design of ion-implanted MOSFET’s with very small physical dimensions, IEEE Journal of Solid-State Circuits 9(5), 256 to 268, October 1974, doi:10.1109/JSSC.1974.1050511 (Crossref record read). Institute of Electrical and Electronics Engineers, New York. Observation year 1974. Accessed 2026-11-05. doi:10.1109/JSSC.1974.1050511 Cited in chapter 6
- 41TechNews (ed.), report on the next-generation Fugaku supercomputer (26 August 2025; development budget of JPY 110 billion; FP64 performance above 2.6 exaflops; memory bandwidth above 800 PB/s; operation in 2030 at the RIKEN Kobe campus); trade press, weak evidence. TechNews, Taipei. Observation year 2025. Accessed 2026-11-05. Cited in chapter 2
- 42Donnellan, D., Lawrence, A., Bizo, D., Rogers, O., Judge, P., Davis, J., Smolaks, M. and Weinschenk, R., Uptime Institute Global Data Center Survey 2025, UII Keynote Report 180 (July 2025; report PDF read; more than 800 owners and operators surveyed; weighted average annual PUE of 1.54 in 2025). Uptime Institute, New York. Observation year 2025. Accessed 2026-11-05.
- 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03. Cited in chapter 2, chapter 4, chapter 6, chapter 8
C.2Publication record
Публикация
- Название
- Exponential Technology Report 2026: HPC and Advanced Computing, Baseline Edition
- Серия
- Reports · Exponential Technology Series XT-07
- Выпуск
- Baseline Edition 2026 · inaugural annual
- Версия
- v1.0.0 · draft for stewardship review
- Publication ID
- NR-XTECH-HPC-GLOBAL-2026-BASELINE-v1.0.0
- Закрытие доказательной базы
- 30 September 2026
- Publication date
- Октябрь 2026
- DOI
- concept and version DOI at deposit
Издатель
- Официальный издатель
- The Global Centre for Risk and Innovation (GCRI), for the Nexus Consortium
- Место
- Toronto
- Редактор
- Saeed Valadbaygi, Chief Steward and Managing Editor
- Управляющие
- GCRI · technical truth · GRF · public meaning · GRA · capital meaning
- Лицензия
- text CC BY 4.0; data on the terms of each source
- Copyright
- © 2026 GCRI · Nexus Consortium
- Язык
- English (en-GB) source edition
- Correspondence
- Registry correction pathway · editorial office
Colophon
- Формат
- A4 portrait · screen, print and archival PDF
- Typefaces
- Space Grotesk (display) · Geist (text) · IBM Plex Sans Italic (standfirsts) · IBM Plex Mono (data)
- Design standard
- Reports Foundational Edition, Volume I, Part VII
- Доступность
- tagged PDF and HTML targets; text alternatives for every figure
- Производство
- Reports editorial team, GCRI
Release path for this version
| Шаг | Что происходит | Когда |
|---|---|---|
| Проект | editorial self-check complete at evidence close | Октябрь 2026 |
| Steward review | five passes on the exact draft (keys T · M · F · N) | Q4 2026 |
| Утверждение | publication authority approves the exact digest | before release |
| Deposit | concept and version DOI minted; registry pointer set | at release |
| Преемственность | the 2027 HPC edition reports changes against this baseline | 2027 |
- Current version
- v1.0.0 draft, stewardship review
- Previous edition
- none, first edition of the series
- Next edition
- NR-XTECH-HPC-GLOBAL-2027-v1.0.0
- Latest version
- resolve the concept DOI or the registry record
- Correction route
- Registry correction pathway
- Notice types
- erratum · addendum · supersession · withdrawal
C.3Журнал исправлений
0correction notices. No edition has been released yet, so none can be corrected; the log below lists each edition’s current version.
| Выпуск | Версия | Дата | Статус | Изменение | Уведомление |
|---|---|---|---|---|---|
| XT-07 | NR-XTECH-HPC-GLOBAL-2026-BASELINE-v1.0.0 | Октябрь 2026 | Проект | Baseline Edition 2026, inaugural annual edition, | Нет |
Notice types: erratum, addendum, supersession, withdrawal. A correction is a new version with a published notice; the earlier version stays resolvable, and no edition is ever edited in silence.
C.4Открытая запись
This edition’s open record
- Publication ID
- NR-XTECH-HPC-GLOBAL-2026-BASELINE-v1.0.0
- Desk identifier and series alias
- NR-GCRI-XT-07-2026-BASELINE-v1.0.0 · NR-XTC-XT-07-2026-BL
- Collection
- NR-COL-2026-BASELINE (IsPartOf at deposit)
- DOI
- Concept and version DOI at deposit, on Zenodo with DataCite metadata
- Versions
- Each correction is a new version (isNewVersionOf); the concept DOI resolves to the latest
- Bundle
- RO-Crate 1.2 with CITATION.cff, CodeMeta and PROV-O provenance; a signed manifest
- Лицензия
- CC BY 4.0 (SPDX CC-BY-4.0) for original material; metadata CC0 1.0
Credit and identity
- ORCID
- Your iD in the deposit and the contribution record; DataCite can then add the work to your ORCID record
- ROR
- Your organisation by its ROR identifier, never by a typed name alone
- CRediT
- Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualisation, Writing, review and editing
- Учётная запись
- None needed to contribute; never a password
Find and follow
Search the open indexes for HPC and Advanced Computing; software is cited by its SWHID from Software Heritage, and a quantified scenario run is preregistered on OSF before it is run. Annotation is your choice: Hypothesis opens this page in its own viewer.
Mirrors and harvest
The DOI is canonical. At release each signed bundle is also given an IPFS content identifier and a bloxberg anchor as mirrors; both are listed in the record once they exist. Zenodo exposes every record over OAI-PMH, and reviews and endorsements can arrive through COAR Notify where the repository supports it.
{
"metadata": {
"resource_type": {
"id": "dataset"
},
"title": "Evidence on HPC and Advanced Computing for Nexus Reports",
"publication_date": "YYYY-MM-DD",
"creators": [
{
"person_or_org": {
"type": "personal",
"family_name": "Your family name",
"given_name": "Your given name",
"identifiers": [
{
"scheme": "orcid",
"identifier": "0000-0000-0000-0000"
}
]
},
"affiliations": [
{
"id": "ROR identifier of your organisation"
}
]
}
],
"description": "What it is, where its record is kept and how it bears on Exponential Technology Report 2026: HPC and Advanced Computing.",
"rights": [
{
"id": "cc-by-4.0"
}
],
"subjects": [
{
"subject": "Nexus Reports"
},
{
"subject": "HPC and Advanced Computing"
},
{
"subject": "Exponential Technology Report · XT-07"
}
],
"related_identifiers": [
{
"identifier": "https://therisk.global/nexus-reports/editions/xt-07/",
"scheme": "url",
"relation_type": {
"id": "issupplementto"
},
"resource_type": {
"id": "publication-report"
}
}
],
"version": "1.0.0"
},
"custom_fields": {},
"access": {
"record": "public",
"files": "public"
},
"files": {
"enabled": true
},
"parent": {
"communities": {
"default": "nexusreports"
}
}
}C.5Where this edition sits among the six pillars
Foundry seals the evidence and Universe tests it; Reports publishes it; Standards takes its corrections and Academy teaches from it.
- F03 Sealed observations and indicator series Foundry Sealed observations and indicator series behind a profile (closeout).
- F04 After-action and scenario findings for Universe After-action and scenario findings for chapters 10 and 13 (after action review).
- F05 National Portfolio movement for chapter Foundry National Portfolio movement for chapter 11 (after action review).
- Applied in editions Standards Nexus Standards: applied in editions.
- XT-07 edition Reports HPC and Advanced Computing 2026, published in every format with its sources, citation and corrections.
- F06 Method and correction findings as change Standards Method and correction findings as change proposals (correction).
- F12 Q4 synthesis informs the next-year Universe Q4 synthesis informs the next-year mandate (renewal).
- Taught in the open Academy Risk Academy: taught in the open.
What Foundry and Universe hand to this edition, and what it hands to Standards, Universe and Academy. From the programme spine; XT-07 is a drafted Baseline Edition, so these handoffs run from its first operational quarter.
| Передача | Between | What crosses, and when |
|---|---|---|
| F03 | Foundry to Reports | Sealed observations and indicator series behind a profile (closeout). |
| F04 | Universe to Reports | After-action and scenario findings for chapters 10 and 13 (after action review). |
| F05 | Foundry to Reports | National Portfolio movement for chapter 11 (after action review). |
| Ring | Nexus Standards to Reports | Nexus Standards: applied in editions. |
| F06 | Reports to Nexus Standards | Method and correction findings as change proposals (correction). |
| F12 | Reports to Universe | Q4 synthesis informs the next-year mandate (renewal). |
| Ring | Reports to Risk Academy | Risk Academy: taught in the open. |