Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

References and record

Every source the edition rests on, the publication record, the corrections log and the open record.

16 min read0 figures1 table0 notesNR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE

உள்ளடக்கம்
  1. ·Edition home
  2. ·Executive summary
  3. 1Money meets risk
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5A loss year that meets tight public budgets
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. AMethodology
  12. BData appendix
  13. CReferences and record
    1. C.1 44 sources
    2. C.2 Publication record
    3. C.3 Corrections log
    4. C.4 Open record
    5. C.5 Where this edition sits among the six pillars
  14. ·Complete edition, for print

C.144 sources

NR-CIT-1, editor first. A DOI is linked where the source has one; Nexus records carry a UNI once the catalogue allocates it (NS-1).

  1. 1IEA (ed.), World Energy Investment 2026, launch presentation (11 pages, Paris, 28 May 2026; global energy investment USD 3.4 trillion in 2026 estimate against USD 2.6 trillion in 2015; electricity supply and infrastructure USD 1.6 trillion). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 6, chapter 8
  2. 2ASCE (ed.), 2025 Report Card for America’s Infrastructure (overall grade C; ten-year investment gap USD 3.6 trillion; energy D+, drinking water C−, dams D+). American Society of Civil Engineers, Reston. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  3. 3Munich Re (ed.), Natural disaster figures for 2025 (media information, 2026; overall losses about USD 224 billion; insured losses about USD 108 billion; weather events 92% of overall losses; Los Angeles wildfires about USD 53 billion overall). Munich Re, Munich. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 8
  4. 4Artemis (ed.), report on the Swiss Re Institute sigma 1/2026 natural catastrophe figures for 2025 (insured losses USD 107 billion; overall losses USD 220 billion; about 49% insured; 92% of insured losses from secondary perils; 80 to 90% of losses typically uninsured in emerging economies). Read in this trade report, not in the sigma itself. Artemis, Bermuda. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 4, chapter 6, chapter 8
  5. 5Artemis (ed.), Catastrophe bond market records that were broken in 2025 (issuance about USD 25.6 billion; outstanding market just over USD 61.3 billion; 122 new 144A and private deals). Artemis, Bermuda. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  6. 6Climate Policy Initiative (ed.), Global Landscape of Climate Finance 2025 (publication page, 23 June 2025; global climate finance USD 1.9 trillion in 2023; adaptation finance USD 65 billion, likely an underestimate; international flows to emerging and developing economies USD 196 billion, 78% public). Climate Policy Initiative, London. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  7. 7UNFCCC (ed.), New collective quantified goal on climate finance, decision text FCCC/PA/CMA/2024/L.22, 24 November 2024 (at least USD 300 billion a year by 2035; call for USD 1.3 trillion a year from all sources; adaptation finance needs USD 215 to 387 billion a year to 2030). United Nations Framework Convention on Climate Change, Bonn. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  8. 8UNFCCC (ed.), Report of the Board of the Fund for responding to Loss and Damage, addendum FCCC/CP/2025/10/Add.1, 10 November 2025 (pledges USD 790.24 million and amount received USD 397.74 million at 23 September 2025; 27 contributors). United Nations Framework Convention on Climate Change, Bonn. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  9. 9IMF (ed.), 2026 Update of Resource Adequacy of the Poverty Reduction and Growth Trust, Resilience and Sustainability Trust, and Debt Relief Trusts, policy paper, 6 March 2026 (27 RSF arrangements; commitments SDR 10.3 billion, about USD 14 billion; five new RSFs in 2025 for SDR 3.4 billion). International Monetary Fund, Washington. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  10. 10IMF (ed.), Lending, 2026 IMF Annual Report (five RSF requests agreed in the year to 30 April 2026, about SDR 1.8 billion). International Monetary Fund, Washington. Observation year 2026. Accessed 2026-11-03. Cited in chapter 6, chapter 8
  11. 11FEMA (ed.), Building Resilient Infrastructure and Communities (programme page updated 3 September 2026; fiscal years 2024 and 2025 funding opportunity of USD 1 billion published 25 March 2026; applications closed 23 July 2026). Federal Emergency Management Agency, Washington. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2, chapter 4, chapter 5, chapter 6
  12. 12GAO (ed.), High-Risk List 2025 (38 areas; includes limiting the federal fiscal exposure by better managing climate change risks). US Government Accountability Office, Washington. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6, chapter 8
  13. 13National Wealth Fund (ed.), About us (capital commitment GBP 27.8 billion; mission to drive more than GBP 100 billion of finance; GBP 3 mobilised per GBP 1 invested over the long term). National Wealth Fund, Leeds. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2
  14. 14HM Treasury and NISTA (eds.), UK Infrastructure: A 10 Year Strategy (publication page; published 19 June 2025; no funding total on the page). UK Government, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6
  15. 15Noerr (ed.), Bundestag approves exemption from the debt brake for defence spending and special funds for investments in infrastructure and climate protection (law-firm note; Bundestag vote 18 March 2025, Bundesrat 21 March 2025; EUR 100 billion for the Climate and Transformation Fund and EUR 100 billion for the states; twelve-year term). Noerr, Berlin. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  16. 16Tribune India (ed.), Japan approves 20 trillion yen plan for disaster resilient infrastructure (press agency report of 7 June 2025; more than 20 trillion yen over fiscal 2026 to 2030). Tribune India, Chandigarh. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 4, chapter 6, chapter 8
  17. 17Cabinet Secretariat of Japan (ed.), Fundamental Plan for National Resilience (English page; the plan is reviewed about every five years; no five-year amount on the page read). Cabinet Secretariat, Tokyo. Observation year 2023. Accessed 2026-11-03. Cited in chapter 6, chapter 8
  18. 18Scroll (ed.), Budget 2026-27 proposes capital expenditure of Rs 12.2 lakh crore (report of 1 February 2026; 8.9% above the Rs 11.2 lakh crore budgeted for 2025-26; revised estimate Rs 10.9 lakh crore). Scroll.in, Mumbai. Observation year 2026. Accessed 2026-11-03. Cited in the summary
  19. 19NSW Government (ed.), Disaster Ready Fund (page on the Commonwealth programme; AUD 1 billion nationally over five years from 1 July 2023 to 30 June 2028). New South Wales Government, Sydney. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 4, chapter 6, chapter 8
  20. 20European Parliament (ed.), European Competitiveness Fund, legislative observatory summary (proposed envelope EUR 234.3 billion for 2028 to 2034; multiannual financial framework described as a EUR 2 trillion budget). European Parliament, Brussels. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4, chapter 6
  21. 21POST-CLOSE, context only: ESG Today (ed.), EIB unveils EUR 30 billion climate adaptation plan (trade report of 22 October 2026; at least EUR 30 billion for adaptation in 2026 to 2030). ESG Today, online. Observation year 2026. Accessed 2026-11-03. Post-close, context only: dated after the 30 September 2026 close; supports no baseline claim. Cited in chapter 6
  22. 22World Resources Institute (ed.), 4 things to know about the global adaptation challenge (commentary of 10 September 2019 on the Global Commission on Adaptation; USD 1.8 trillion invested 2020 to 2030 could yield USD 7.1 trillion net benefits; benefit-cost ratios about 2 to 1 to 10 to 1). World Resources Institute, Washington. Observation year 2019. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6
  23. 23UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025: Resilience Pays: Financing and Investing for our Future (report, 2025; PDF ISBN 9789211576740; cost and return chapters not bound in this edition). United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6, chapter 8
  24. 24S. Hallegatte, J. Rentschler and J. Rozenberg, Lifelines: The Resilient Infrastructure Opportunity. Sustainable Infrastructure Series. World Bank, Washington, 2019. doi:10.1596/978-1-4648-1430-3. Observation year 2019. Accessed 2026-11-05. doi:10.1596/978-1-4648-1430-3 Cited in chapter 6
  25. 25Swiss Re Institute (ed.), Natural catastrophes in 2025: the persistent rise of wildfire and storm risk, sigma No 1/2026 (March 2026; insured losses USD 107 billion; economic losses USD 220 billion, about 49% insured; secondary perils 92% of insured losses; 80 to 90% of losses still uninsured in emerging economies). Swiss Re Management Ltd, Zurich. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  26. 26Global Commission on Adaptation, Adapt Now: A Global Call for Leadership on Climate Resilience (10 September 2019; benefit-cost ratios from 2:1 to 10:1; investing USD 1.8 trillion from 2020 to 2030 could generate USD 7.1 trillion in total net benefits). Global Center on Adaptation and World Resources Institute, Rotterdam and Washington, 2019. doi:10.1596/32362. Observation year 2019. Accessed 2026-11-05. doi:10.1596/32362 Cited in chapter 6
  27. 27World Bank (ed.), Global Shield Financing Facility Annual Report 2025 (February 2026; grants enabled 17 countries to access financial protection; disaster risk finance solutions triggered US$31 million in payouts in fiscal year 2025). Disaster Risk Financing and Insurance Program, World Bank and GFDRR, Washington. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6, chapter 8
  28. 28UK Parliament (ed.), UK Infrastructure: A 10 Year Strategy, written statement HCWS717 by the Chief Secretary to the Treasury, 19 June 2025 (strategy laid as CP 1344; funding of at least GBP 725 billion for infrastructure over the next decade). House of Commons, London. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  29. 29Federal Ministry of Justice (ed.), Basic Law for the Federal Republic of Germany, Article 143h, as amended in March 2025 (special fund for additional investment in infrastructure and in climate neutrality by 2045 of up to EUR 500 billion; investments approved within a twelve-year term; EUR 100 billion to the Climate and Transformation Fund; EUR 100 billion for investment by the states). Consolidated text, Berlin. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  30. 30Commonwealth of Australia (ed.), Disaster Ready Fund Act 2019 (compilation in force when read on the Federal Register of Legislation; establishes the Disaster Ready Fund and its special accounts and provides for publication, annual reporting and review of arrangements and grants). Office of Parliamentary Counsel, Canberra. Replaces the ANAO audit of the fund (Auditor-General Report No. 35 2024-25), whose pages and report file did not respond. No figure used. Accessed 2026-11-05. Cited in chapter 4, chapter 6
  31. 31I. Hallak, European competitiveness fund, EU Legislation in Progress briefing PE 779.225 (November 2025; indicative allocation EUR 362.2 billion in 2025 prices, EUR 409.3 billion in current prices, including EUR 175 billion in current prices for Horizon Europe and excluding the Innovation Fund). European Parliamentary Research Service, Brussels. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  32. 32European Union (ed.), Directive (EU) 2022/2557 of the European Parliament and of the Council of 14 December 2022 on the resilience of critical entities and repealing Council Directive 2008/114/EC. Official Journal of the European Union, L 333, 27 December 2022, p. 164. Observation year 2022. Accessed 2026-11-05. Cited in chapter 6
  33. 33United Nations General Assembly (ed.), Sendai Framework for Disaster Risk Reduction 2015 to 2030, resolution A/RES/69/283, 3 June 2015 (adopted at the Third UN World Conference, Sendai, 14 to 18 March 2015; Priority 3: investing in disaster risk reduction for resilience). United Nations, New York. Observation year 2015. Accessed 2026-11-05. Cited in chapter 6
  34. 34United Nations (ed.), Paris Agreement, Paris, 12 December 2015, in force 4 November 2016, Article 2.1(c) (making finance flows consistent with a pathway towards low greenhouse gas emissions and climate-resilient development). United Nations Treaty Collection, New York. Observation year 2015. Accessed 2026-11-05. Cited in chapter 6
  35. 35UNEP (ed.), Adaptation Gap Report 2025: Running on empty. The world is gearing up for climate resilience, without the money to get there (2025; ISBN 978-92-807-4237-4; developing country needs USD 310 to 365 billion a year by 2035; international public adaptation finance USD 26 billion in 2023; debt instruments 58% on average in 2022 to 2023). United Nations Environment Programme, Nairobi. doi:10.59117/20.500.11822/48798. Observation year 2025. Accessed 2026-11-05. doi:10.59117/20.500.11822/48798 Cited in chapter 6, chapter 8
  36. 36IEA (ed.), World Energy Investment 2026 (full report, 260 pages, Paris, 28 May 2026, revised version June 2026; free PDF from the IEA file store read; executive summary p. 9: spending on networks around USD 550 billion in 2026, up nearly 20% year-on-year, and spending on batteries for the power sector above USD 100 billion; grids section p. 95: grid spending rose USD 45 billion in 2025 to nearly USD 450 billion and is projected to grow a further 17% in 2026). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05. Cited in chapter 6
  37. 37United States Congress (ed.), Infrastructure Investment and Jobs Act, Public Law 117-58, enacted 15 November 2021. US Government Publishing Office, Washington. Observation year 2021. Accessed 2026-11-05. Cited in chapter 6
  38. 38S. Hallegatte, J. Rentschler and B. Walsh, Building Back Better: Achieving Resilience through Stronger, Faster, and More Inclusive Post-Disaster Reconstruction. World Bank, Washington, 2018. Open Knowledge Repository handle 10986/29867. Observation year 2018. Accessed 2026-11-05. Cited in chapter 3, chapter 4, chapter 6
  39. 39J. Rozenberg and M. Fay (eds.), Beyond the Gap: How Countries Can Afford the Infrastructure They Need while Protecting the Planet. Sustainable Infrastructure Series. World Bank, Washington, 2019. doi:10.1596/978-1-4648-1363-4. Observation year 2019. Accessed 2026-11-05. doi:10.1596/978-1-4648-1363-4 Cited in chapter 3, chapter 4, chapter 6
  40. 40OECD (ed.), Good Governance for Critical Infrastructure Resilience. OECD Reviews of Risk Management Policies. OECD Publishing, Paris, 2019. doi:10.1787/02f0e5a0-en. Observation year 2019. Accessed 2026-11-05. doi:10.1787/02f0e5a0-en Cited in chapter 6, chapter 8
  41. 41G20 (ed.), G20 Principles for Quality Infrastructure Investment (endorsed by G20 Leaders at the Osaka Summit, 28 to 29 June 2019; six principles, including building resilience against natural disasters and other risks). G20 Osaka Summit, Osaka. Observation year 2019. Accessed 2026-11-05. Cited in chapter 6
  42. 42ISO (ed.), ISO 14091:2021, Adaptation to climate change: Guidelines on vulnerability, impacts and risk assessment (edition 1, 16 February 2021; ISO/TC 207/SC 7). International Organization for Standardization, Geneva. Observation year 2021. Accessed 2026-11-05. Cited in chapter 4, chapter 6
  43. 43IPCC (ed.), Climate Change 2022: Impacts, Adaptation and Vulnerability. Contribution of Working Group II to the Sixth Assessment Report of the Intergovernmental Panel on Climate Change. Cambridge University Press, Cambridge and New York, 2022. doi:10.1017/9781009325844. Observation year 2022. Accessed 2026-11-05. doi:10.1017/9781009325844 Cited in chapter 6
  44. 44EIB (ed.), EIB Group Climate Bank Roadmap Phase 2: 2026-2030 (publication page dated 3 October 2025; new target of EUR 30 billion for climate adaptation finance for 2026 to 2030, doubling 2021 to 2025 volumes). European Investment Bank, Luxembourg. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 6

C.2Publication record

Publication

Title
Strategic Systems Report 2026: Global Resilience Investment and National Portfolios, Baseline Edition
தொடர்
Reports · Strategic Systems Series SR-14
பதிப்பு
Baseline Edition 2026 · inaugural annual
பதிப்பு
v1.0.0 · draft for stewardship review
Publication ID
NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE-v1.0.0
Evidence close
30 September 2026
Publication date
October 2026
DOI
concept and version DOI at deposit

வெளியீட்டாளர்

Publisher of record
The Global Centre for Risk and Innovation (GCRI), for the Nexus Consortium
இடம்
Toronto
Editor
Saeed Valadbaygi, Chief Steward and Managing Editor
Stewards
GCRI · technical truth · the Global Risks Forum (GRF) · public meaning · the Global Risks Alliance (GRA) · capital meaning
உரிமம்
text CC BY 4.0; data on the terms of each source
Copyright
© 2026 GCRI · Nexus Consortium
Language
English (en-GB) source edition
Correspondence
Registry correction pathway · editorial office

Colophon

Format
A4 portrait · screen, print and archival PDF
Typefaces
Space Grotesk (display) · Geist (text) · IBM Plex Sans Italic (standfirsts) · IBM Plex Mono (data)
Design standard
Reports Foundational Edition, Volume I, Part VII
அணுகல்தன்மை
tagged PDF and HTML targets; text alternatives for every figure
Production
Reports editorial team, GCRI

Release path for this version

Table C.1Release path for this version
படிWhat happensWhen
வரைவுeditorial self-check complete at evidence closeOctober 2026
Steward reviewfive passes on the exact draft (keys T · M · F · N)Q4 2026
Approvalpublication authority approves the exact digestbefore release
Depositconcept and version DOI minted; registry pointer setat release
வாரிசுரிமைthe 2027 resilience investment edition reports changes against this baseline2027
Current version
v1.0.0 draft, stewardship review
Previous edition
none, first edition of the series
Next edition
NR-STRATEGIC-INVESTMENT-GLOBAL-2027-v1.0.0
Latest version
resolve the concept DOI or the registry record
Correction route
Registry correction pathway
Notice types
erratum · addendum · supersession · withdrawal

C.3Corrections log

0correction notices. No edition has been released yet, so none can be corrected; the log below lists each edition’s current version.

பதிப்புபதிப்புDateநிலைமாற்றம்Notice
SR-14NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE-v1.0.0October 2026வரைவுBaseline Edition 2026, inaugural annual edition,None

Notice types: erratum, addendum, supersession, withdrawal. A correction is a new version with a published notice; the earlier version stays resolvable, and no edition is ever edited in silence.

C.4Open record

This edition’s open record

Publication ID
NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE-v1.0.0
Desk identifier and series alias
NR-GCRI-SR-14-2026-BASELINE-v1.0.0 · NR-STR-SR-14-2026-BL
Collection
NR-COL-2026-BASELINE (IsPartOf at deposit)
DOI
Concept and version DOI at deposit, on Zenodo with DataCite metadata
Versions
Each correction is a new version (isNewVersionOf); the concept DOI resolves to the latest
Bundle
RO-Crate 1.2 with CITATION.cff, CodeMeta and PROV-O provenance; a signed manifest
உரிமம்
CC BY 4.0 (SPDX CC-BY-4.0) for original material; metadata CC0 1.0

Credit and identity

ORCID
Your iD in the deposit and the contribution record; DataCite can then add the work to your ORCID record
ROR
Your organisation by its ROR identifier, never by a typed name alone
CRediT
Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualisation, Writing, review and editing
Account
None needed to contribute; never a password

Find and follow

Search the open indexes for Global Resilience Investment and National Portfolios; software is cited by its SWHID from Software Heritage, and a quantified scenario run is preregistered on OSF before it is run. Annotation is your choice: Hypothesis opens this page in its own viewer.

Mirrors and harvest

The DOI is canonical. At release each signed bundle is also given an IPFS content identifier and a bloxberg anchor as mirrors; both are listed in the record once they exist. Zenodo exposes every record over OAI-PMH, and reviews and endorsements can arrive through COAR Notify where the repository supports it.

InvenioRDM metadata for a contribution on Global Resilience Investment and National Portfolios, prefilled from this page
{
  "metadata": {
    "resource_type": {
      "id": "dataset"
    },
    "title": "Evidence on Global Resilience Investment and National Portfolios for Nexus Reports",
    "publication_date": "YYYY-MM-DD",
    "creators": [
      {
        "person_or_org": {
          "type": "personal",
          "family_name": "Your family name",
          "given_name": "Your given name",
          "identifiers": [
            {
              "scheme": "orcid",
              "identifier": "0000-0000-0000-0000"
            }
          ]
        },
        "affiliations": [
          {
            "id": "ROR identifier of your organisation"
          }
        ]
      }
    ],
    "description": "What it is, where its record is kept and how it bears on Strategic Systems Report 2026: Global Resilience Investment and National Portfolios.",
    "rights": [
      {
        "id": "cc-by-4.0"
      }
    ],
    "subjects": [
      {
        "subject": "Nexus Reports"
      },
      {
        "subject": "Global Resilience Investment and National Portfolios"
      },
      {
        "subject": "Strategic Systems Report · SR-14"
      }
    ],
    "related_identifiers": [
      {
        "identifier": "https://therisk.global/nexus-reports/editions/sr-14/",
        "scheme": "url",
        "relation_type": {
          "id": "issupplementto"
        },
        "resource_type": {
          "id": "publication-report"
        }
      }
    ],
    "version": "1.0.0"
  },
  "custom_fields": {},
  "access": {
    "record": "public",
    "files": "public"
  },
  "files": {
    "enabled": true
  },
  "parent": {
    "communities": {
      "default": "nexusreports"
    }
  }
}

C.5Where this edition sits among the six pillars

Foundry seals the evidence and Universe tests it; Reports publishes it; Standards takes its corrections and Academy teaches from it.

  1. F03 Sealed observations and indicator series Foundry Sealed observations and indicator series behind a profile (closeout).
  2. F04 After-action and scenario findings for Universe After-action and scenario findings for chapters 10 and 13 (after action review).
  3. F05 National Portfolio movement for chapter Foundry National Portfolio movement for chapter 11 (after action review).
  4. Applied in editions Standards Nexus Standards: applied in editions.
  5. SR-14 edition Reports Global Resilience Investment and National Portfolios 2026, published in every format with its sources, citation and corrections.
  6. F06 Method and correction findings as change Standards Method and correction findings as change proposals (correction).
  7. F12 Q4 synthesis informs the next-year Universe Q4 synthesis informs the next-year mandate (renewal).
  8. Taught in the open Academy Risk Academy: taught in the open.

What Foundry and Universe hand to this edition, and what it hands to Standards, Universe and Academy. From the programme spine; SR-14 is a drafted Baseline Edition, so these handoffs run from its first operational quarter.

HandoffBetweenWhat crosses, and when
F03Foundry to ReportsSealed observations and indicator series behind a profile (closeout).
F04Universe to ReportsAfter-action and scenario findings for chapters 10 and 13 (after action review).
F05Foundry to ReportsNational Portfolio movement for chapter 11 (after action review).
RingNexus Standards to ReportsNexus Standards: applied in editions.
F06Reports to Nexus StandardsMethod and correction findings as change proposals (correction).
F12Reports to UniverseQ4 synthesis informs the next-year mandate (renewal).
RingReports to Risk AcademyRisk Academy: taught in the open.

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Print

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF111 pages997 KBTagged, with bookmarks

      SHA-256 72a00b60f490e712a52b2aa358ac55337c6ac7bb454c6fa52569e1b3f30ba8a0

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF116 pages1007 KBTagged, with bookmarks

      SHA-256 141e2c6b7b22f28c3ed88ccdfda557cdb00a8f120498b03201f0e97eccf083ef

  • Web edition

  • Data bundle

    • Indicators, CSV

      15 indicators with unit, year, status and source

      NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 fac919b5aa7c6af427e86faa4d6aac913233c5c3c9aedb68f5e8c6b1230cd60f

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 2c360f3246a6d1204fe0cc142fbd0d130b871e4f8ac7e63e55bbaa80e72fc6d8

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 109550a9407fe574ebc157c317c8bb03ee99ebd461cc370c1895d84b024e96c7

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 d1f51b9820f3d2854bd0a9ed963f89e2eddceeb86e4e7b9951442c3c7f5696e1

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 b9ed34ac759218048d0b01f86fb2887d9978591c37e427fd0ad2c83cb41d7e2b

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 03d2a54dd84c236f20f8c3c591f324c94befc2de6b5c5f01944b3fbc415087a7

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this annex

Valadbaygi, S. (Ed.). (2026). Annex C: References and record. In Strategic Systems Report 2026: Global Resilience Investment and National Portfolios (Baseline Edition 2026, Report No. NR-STRATEGIC-INVESTMENT-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

அறிக்கைகள்பங்களி

Send evidence or a correction on Global Resilience Investment and National Portfolios.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the GCRI Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems Evidence deskStrategic Systems
Contribution form · reports.contribution.gcri

தனிப்பட்ட தரவு, உணர்திறன் வாய்ந்த உள்கட்டமைப்பு விவரங்கள் அல்லது பகிர உங்களுக்கு உரிமை இல்லாத எதையும் ஒருபோதும் அனுப்ப வேண்டாம். ஒரு பங்களிப்பு பயன்படுத்தப்படும் முன் மதிப்பாய்வு செய்யப்படுகிறது; அதை அனுப்புவது எந்த ஆசிரியர் உரிமையையோ பதிப்பு உரிமையையோ வழங்காது, நிதியுதவி ஒருபோதும் ஒரு கண்டுபிடிப்பை விலைக்கு வாங்காது.

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.