References and record
Every source the edition rests on, the publication record, the corrections log and the open record.
İçindekiler
- ·Edition home
- ·Executive summary
- 1Cloud is shared infrastructure with a physical footprint
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Shared control-plane fault with diverging sovereignty rules
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMetodoloji
- BData appendix
- CReferences and record
- ·Complete edition, for print
C.143 sources
NR-CIT-1, editor first. A DOI is linked where the source has one; Nexus records carry a UNI once the catalogue allocates it (NS-1).
- 1IEA (ed.), Energy and AI in East Asia, revised version April 2026, prepared with the Korea Energy Economics Institute (PDF; restates the base case of the IEA report Energy and AI of April 2025: data centres about 415 TWh in 2024, 1.5% of global electricity consumption, more than doubling to about 945 TWh by 2030, about 3% of global demand; the main report pages returned access errors, so the figures are read in this IEA report). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Q Cited in the summary, chapter 2, chapter 3, chapter 4, chapter 6
- 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 6, chapter 8
- 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 4, chapter 6, chapter 8
- 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 9Uptime Institute (ed.), Uptime Institute Global Data Center Survey 2025, UII Keynote Report 180, July 2025 (PDF; respondents’ annual PUE a weighted average of 1.54 in 2025, the sixth year with little change; power the top cause of impactful outages at 45% of incidents in 2025; respondent survey). Uptime Institute, New York. Observation year 2025. Accessed 2026-11-05. Cited in chapter 2, chapter 6, chapter 8
- 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 13The Register (ed.), Brussels eyes AWS, Azure for gatekeeper tag in cloud clampdown (news article of 18 November 2025; possible obligations and fines up to 10% of worldwide turnover; trade press, secondary). Situation Publishing, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 8
- 14European Commission (ed.), Commission reaches preliminary position that Amazon’s and Microsoft’s market leading cloud services should be designated under the DMA, press release IP/26/1444 of 25 June 2026 (Amazon and Microsoft informed of the preliminary view that AWS and Azure should be designated as gatekeepers for cloud computing services although they do not meet the quantitative thresholds; findings do not prejudge the outcome; six months to comply if designated). European Commission, Brussels. Observation year 2026. Accessed 2026-11-05. Cited in chapter 2
- 15European Commission (ed.), Data Act (policy page; applicable from 12 September 2025; entered into force in January 2024). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 6
- 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 17European Securities and Markets Authority (ed.), Digital Operational Resilience Act (page; applies from 17 January 2025; lists materials on critical ICT third-party provider designation; no designations on the page). ESMA, Paris. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
- 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03. Cited in chapter 1, chapter 3, chapter 4, chapter 6, chapter 8
- 19European Commission (ed.), Energy Efficiency Directive (policy page; states a data centre energy efficiency package planned for the third quarter of 2026 and links to reporting of data centre energy consumption; no threshold or dates on the page). Directorate-General for Energy, Brussels. Observation year 2026. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 7, chapter 8
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 7, chapter 8
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 7, chapter 8
- 23Amazon Web Services (ed.), Opening the AWS European Sovereign Cloud (blog announcement of 14 January 2026; Brandenburg region; investment of EUR 7.8 billion stated; vendor announcement, weak evidence). Amazon Web Services, Seattle. Observation year 2026. Accessed 2026-11-03. Cited in chapter 4, chapter 8
- 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
- 25NIST (ed.), The NIST Definition of Cloud Computing, NIST SP 800-145 (publication page; September 2011; five essential characteristics, three service models and four deployment models). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
- 26NIST (ed.), Cloud Computing Synopsis and Recommendations, NIST SP 800-146 (publication page; May 2012). National Institute of Standards and Technology, Gaithersburg. Observation year 2012. Accessed 2026-11-03. Cited in chapter 6, chapter 8
- 27NIST (ed.), NIST Cloud Computing Reference Architecture, NIST SP 500-292 (publication page; 8 September 2011). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03. Cited in chapter 6, chapter 8
- 28Armbrust, M. et al., Above the Clouds: A Berkeley View of Cloud Computing, Technical Report UCB/EECS-2009-28, 10 February 2009 (report page and abstract). University of California, Berkeley. Observation year 2009. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
- 29Cloud Native Computing Foundation (ed.), CNCF Annual Survey 2024 (report page; tenth annual survey; 750 respondents in fall 2024; Kubernetes percentage not on the page). CNCF, San Francisco. Observation year 2024. Accessed 2026-11-03. Cited in chapter 3, chapter 6, chapter 8
- 30ETSI (ed.), Multi-access Edge Computing (technology page; industry specification group; news item of 31 October 2025 on Phase 4 specifications and a white paper; no counts on the page). European Telecommunications Standards Institute, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
- 31Masanet, E., Shehabi, A., Lei, N., Smith, S. and Koomey, J., Recalibrating global data centre energy-use estimates, Science 367(6481), 984 to 986, 28 February 2020, DOI 10.1126/science.aba3758 (Crossref record; growth in energy use has slowed owing to efficiency gains). American Association for the Advancement of Science, Washington. Observation year 2020. Accessed 2026-11-05. doi:10.1126/science.aba3758 Cited in chapter 4, chapter 6
- 32Satyanarayanan, M., The emergence of edge computing, Computer 50(1), 30 to 39, January 2017, DOI 10.1109/MC.2017.9 (Crossref record). IEEE, Piscataway. Observation year 2017. Accessed 2026-11-05. doi:10.1109/MC.2017.9 Cited in chapter 4, chapter 6, chapter 8
- 33Shi, W., Cao, J., Zhang, Q., Li, Y. and Xu, L., Edge computing: vision and challenges, IEEE Internet of Things Journal 3(5), 637 to 646, October 2016, DOI 10.1109/JIOT.2016.2579198 (Crossref record). IEEE, Piscataway. Observation year 2016. Accessed 2026-11-05. doi:10.1109/JIOT.2016.2579198 Cited in chapter 4, chapter 6, chapter 8
- 34Barroso, L.A., Hölzle, U. and Ranganathan, P., The Datacenter as a Computer: Designing Warehouse-Scale Machines, third edition, Synthesis Lectures on Computer Architecture, Morgan and Claypool, 2018, reissued by Springer, DOI 10.1007/978-3-031-01761-2 (Crossref record). Springer, Cham. Observation year 2018. Accessed 2026-11-05. doi:10.1007/978-3-031-01761-2 Cited in chapter 4, chapter 6
- 35Directive (EU) 2023/1791 of the European Parliament and of the Council of 13 September 2023 on energy efficiency and amending Regulation (EU) 2023/955 (recast), Official Journal of the European Union L 231, 20 September 2023 (Article 12: from 15 May 2024 and yearly, operators of data centres with installed IT power demand of at least 500 kW publish the Annex VII information, including energy consumption, power utilisation, waste heat utilisation, water usage and renewable energy use). Publications Office of the European Union, Luxembourg. Observation year 2023. Accessed 2026-11-05. Cited in chapter 4, chapter 6
- 36Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres, Official Journal of the European Union L series, 17 May 2024 (adopted under Article 33(3) of Directive (EU) 2023/1791). Publications Office of the European Union, Luxembourg. Observation year 2024. Accessed 2026-11-05. Cited in chapter 6
- 37Regulation (EU) 2023/2854 of the European Parliament and of the Council of 13 December 2023 on harmonised rules on fair access to and use of data (Data Act), Official Journal of the European Union L series, 22 December 2023 (applies from 12 September 2025; Article 23 on removing obstacles to effective switching between data processing services). Publications Office of the European Union, Luxembourg. Observation year 2023. Accessed 2026-11-05. Cited in chapter 6
- 38Regulation (EU) 2022/2554 of the European Parliament and of the Council of 14 December 2022 on digital operational resilience for the financial sector (DORA), Official Journal of the European Union L 333, 27 December 2022 (applies from 17 January 2025; Article 31 on designation of critical ICT third-party service providers by the European Supervisory Authorities). Publications Office of the European Union, Luxembourg. Observation year 2022. Accessed 2026-11-05. Cited in chapter 6, chapter 8
- 39UK Competition and Markets Authority (ed.), Cloud services market investigation: Summary of final decision, 31 July 2025, and Final decision report, 1 August 2025 (summary opened; competition not working well; recommends that the CMA prioritise strategic market status investigations to consider designating Microsoft and AWS; UK customers spent GBP 10.5 billion on cloud services in 2024). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-05.
- 40Microsoft (ed.), Post Incident Review: Azure Front Door, connectivity issues across multiple regions, tracking ID YKYN-BWZ (Azure status history; 15:41 UTC on 29 October 2025 to 00:05 UTC on 30 October 2025; customer configuration metadata exposed a latent data plane bug; repair items listed, some in progress in early 2026; operator report, no figure used). Microsoft, Redmond. Observation year 2025. Accessed 2026-11-05. Cited in chapter 4
- 41ISO and IEC (eds.), ISO/IEC 30134-2:2026 Information technology, data centres key performance indicators, part 2, power usage effectiveness (PUE), second edition, 16 January 2026, replacing the 2016 edition (ISO open data deliverables record). International Organization for Standardization, Geneva. Observation year 2026. Accessed 2026-11-05. Cited in chapter 6
- 42ISO and IEC (eds.), ISO/IEC 22123-1:2023 Information technology, cloud computing, part 1, vocabulary, second edition, 10 February 2023 (ISO open data deliverables record). International Organization for Standardization, Geneva. Observation year 2023. Accessed 2026-11-05. Cited in chapter 6
- 43Infocomm Media Development Authority (ed.), Green Data Centre Roadmap (programme page; charts a pathway for data centre growth in Singapore and aims to provide at least 300 MW of additional capacity in the near term, with more through green energy deployments; no figure used in this edition). IMDA, Singapore. Observation year 2024. Accessed 2026-11-05. Cited in chapter 6, chapter 8
C.2Publication record
Yayım
- Başlık
- Exponential Technology Report 2026: Cloud, Edge and Distributed Computing, Baseline Edition
- Seri
- Reports · Exponential Technology Series XT-08
- Baskı
- Baseline Edition 2026 · inaugural annual
- Sürüm
- v1.0.0 · draft for stewardship review
- Publication ID
- NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0
- Kanıt kapanışı
- 30 September 2026
- Publication date
- Ekim 2026
- DOI
- concept and version DOI at deposit
Yayımcı
- Kayıtlı yayımcı
- The Global Centre for Risk and Innovation (GCRI), for the Nexus Consortium
- Yer
- Toronto
- Editör
- Saeed Valadbaygi, Chief Steward and Managing Editor
- Yöneticiler
- GCRI · technical truth · the Global Risks Forum (GRF) · public meaning · the Global Risks Alliance (GRA) · capital meaning
- Lisans
- text CC BY 4.0; data on the terms of each source
- Copyright
- © 2026 GCRI · Nexus Consortium
- Dil
- English (en-GB) source edition
- Correspondence
- Registry correction pathway · editorial office
Colophon
- Biçim
- A4 portrait · screen, print and archival PDF
- Typefaces
- Space Grotesk (display) · Geist (text) · IBM Plex Sans Italic (standfirsts) · IBM Plex Mono (data)
- Design standard
- Reports Foundational Edition, Volume I, Part VII
- Erişilebilirlik
- tagged PDF and HTML targets; text alternatives for every figure
- Üretim
- Reports editorial team, GCRI
Release path for this version
| Adım | Ne olur | Ne zaman |
|---|---|---|
| Taslak | editorial self-check complete at evidence close | Ekim 2026 |
| Steward review | five passes on the exact draft (keys T · M · F · N) | Q4 2026 |
| Onay | publication authority approves the exact digest | before release |
| Deposit | concept and version DOI minted; registry pointer set | at release |
| Halefiyet | the 2027 cloud edition reports changes against this baseline | 2027 |
- Current version
- v1.0.0 draft, stewardship review
- Previous edition
- none, first edition of the series
- Next edition
- NR-XTECH-CLOUD-GLOBAL-2027-v1.0.0
- Latest version
- resolve the concept DOI or the registry record
- Correction route
- Registry correction pathway
- Notice types
- erratum · addendum · supersession · withdrawal
C.3Düzeltme günlüğü
0correction notices. No edition has been released yet, so none can be corrected; the log below lists each edition’s current version.
| Baskı | Sürüm | Tarih | Statü | Değişim | Bildirim |
|---|---|---|---|---|---|
| XT-08 | NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0 | Ekim 2026 | Taslak | Baseline Edition 2026, inaugural annual edition, | Yok |
Notice types: erratum, addendum, supersession, withdrawal. A correction is a new version with a published notice; the earlier version stays resolvable, and no edition is ever edited in silence.
C.4Açık kayıt
This edition’s open record
- Publication ID
- NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0
- Desk identifier and series alias
- NR-GCRI-XT-08-2026-BASELINE-v1.0.0 · NR-XTC-XT-08-2026-BL
- Collection
- NR-COL-2026-BASELINE (IsPartOf at deposit)
- DOI
- Concept and version DOI at deposit, on Zenodo with DataCite metadata
- Versions
- Each correction is a new version (isNewVersionOf); the concept DOI resolves to the latest
- Bundle
- RO-Crate 1.2 with CITATION.cff, CodeMeta and PROV-O provenance; a signed manifest
- Lisans
- CC BY 4.0 (SPDX CC-BY-4.0) for original material; metadata CC0 1.0
Credit and identity
- ORCID
- Your iD in the deposit and the contribution record; DataCite can then add the work to your ORCID record
- ROR
- Your organisation by its ROR identifier, never by a typed name alone
- CRediT
- Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualisation, Writing, review and editing
- Hesap
- None needed to contribute; never a password
Find and follow
Search the open indexes for Cloud, Edge and Distributed Computing; software is cited by its SWHID from Software Heritage, and a quantified scenario run is preregistered on OSF before it is run. Annotation is your choice: Hypothesis opens this page in its own viewer.
Mirrors and harvest
The DOI is canonical. At release each signed bundle is also given an IPFS content identifier and a bloxberg anchor as mirrors; both are listed in the record once they exist. Zenodo exposes every record over OAI-PMH, and reviews and endorsements can arrive through COAR Notify where the repository supports it.
{
"metadata": {
"resource_type": {
"id": "dataset"
},
"title": "Evidence on Cloud, Edge and Distributed Computing for Nexus Reports",
"publication_date": "YYYY-MM-DD",
"creators": [
{
"person_or_org": {
"type": "personal",
"family_name": "Your family name",
"given_name": "Your given name",
"identifiers": [
{
"scheme": "orcid",
"identifier": "0000-0000-0000-0000"
}
]
},
"affiliations": [
{
"id": "ROR identifier of your organisation"
}
]
}
],
"description": "What it is, where its record is kept and how it bears on Exponential Technology Report 2026: Cloud, Edge and Distributed Computing.",
"rights": [
{
"id": "cc-by-4.0"
}
],
"subjects": [
{
"subject": "Nexus Reports"
},
{
"subject": "Cloud, Edge and Distributed Computing"
},
{
"subject": "Exponential Technology Report · XT-08"
}
],
"related_identifiers": [
{
"identifier": "https://therisk.global/nexus-reports/editions/xt-08/",
"scheme": "url",
"relation_type": {
"id": "issupplementto"
},
"resource_type": {
"id": "publication-report"
}
}
],
"version": "1.0.0"
},
"custom_fields": {},
"access": {
"record": "public",
"files": "public"
},
"files": {
"enabled": true
},
"parent": {
"communities": {
"default": "nexusreports"
}
}
}C.5Where this edition sits among the six pillars
Foundry seals the evidence and Universe tests it; Reports publishes it; Standards takes its corrections and Academy teaches from it.
- F03 Sealed observations and indicator series Foundry Sealed observations and indicator series behind a profile (closeout).
- F04 After-action and scenario findings for Universe After-action and scenario findings for chapters 10 and 13 (after action review).
- F05 National Portfolio movement for chapter Foundry National Portfolio movement for chapter 11 (after action review).
- Applied in editions Standards Nexus Standards: applied in editions.
- XT-08 edition Reports Cloud, Edge and Distributed Computing 2026, published in every format with its sources, citation and corrections.
- F06 Method and correction findings as change Standards Method and correction findings as change proposals (correction).
- F12 Q4 synthesis informs the next-year Universe Q4 synthesis informs the next-year mandate (renewal).
- Taught in the open Academy Risk Academy: taught in the open.
What Foundry and Universe hand to this edition, and what it hands to Standards, Universe and Academy. From the programme spine; XT-08 is a drafted Baseline Edition, so these handoffs run from its first operational quarter.
| Devir | Between | What crosses, and when |
|---|---|---|
| F03 | Foundry to Reports | Sealed observations and indicator series behind a profile (closeout). |
| F04 | Universe to Reports | After-action and scenario findings for chapters 10 and 13 (after action review). |
| F05 | Foundry to Reports | National Portfolio movement for chapter 11 (after action review). |
| Ring | Nexus Standards to Reports | Nexus Standards: applied in editions. |
| F06 | Reports to Nexus Standards | Method and correction findings as change proposals (correction). |
| F12 | Reports to Universe | Q4 synthesis informs the next-year mandate (renewal). |
| Ring | Reports to Risk Academy | Risk Academy: taught in the open. |