Fusion is an experiment record and a fuel-cycle question

Part I describes systems and their couplings. It ranks no country or operator and assesses no authority.

7 min read2 figures1 table13 notesNR-XTECH-FUSION-GLOBAL-2026-BASELINE

فہرست مضامین
  1. ·Edition home
  2. ·Executive summary
  3. 1Fusion is an experiment record and a fuel-cycle question
    1. 1.1 The questions this part answers
    2. 1.2 The argument
    3. 1.3 The six-sector nexus: twenty couplings across five assessed sectors
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5First-plant fuel and licence set the pace
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. Aطریقۂ کار
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

1.1The questions this part answers

Key questions

  • Where is fusion risk concentrated?
  • Which couplings carry fusion shocks into other systems?
  • Which fusion capabilities hold under compound stress?
  • What must 2027 evidence measure first?

In this part

  • Narrative
  • Headline finding
  • Lead figure
  • Five footprint and governance chapters
  • Twelve-domain reading
  • Sector screens
  • Dependency matrix
  • Risk objects
  • Capability ladder
  • منظرنامہ
  • Three lenses
  • پورٹ فولیو

1.2The argument

Fusion is usually discussed as a race to a first power plant. The 2026 evidence reads it as two things: a set of strong experimental records at research devices, and a set of infrastructure questions about fuel, materials, licensing and money that decide whether plants follow52014.

The experimental evidence is strong and narrow. NIF produced 8.6 MJ from 2.08 MJ of laser energy on target5. JET produced 69 MJ over about 5 seconds4. WEST held a plasma for 1,337 seconds1. Each is a different quantity on a different device, and none is electricity to a grid.

The schedule evidence is plain. ITER plans deuterium-tritium operation in 20397. Companies state plants for 2028 and the early 2030s2423. The US roadmap targets power by the mid-2030s12. These are plans, and the baselines of public projects have moved before25.

The fuel cycle is the least measured part. Tritium is available from heavy-water reactors only, and the amount free for fusion in 2055 ranges from 0 to 27.7 kg20. Lithium-6 supply is effectively zero according to one presentation21. Licensing is moving: the US rule is proposed14.

Figure 1.1How long have fusion plasmas been held? Seconds

Plasma duration in tokamaks rose from 403 seconds to 1,337 seconds in two years. Duration is not fusion power: WEST used 2 MW of heating in hydrogen, and the devices differ in regime and size12.

ItemBar, scaled to the largest valueقدر
EAST, high confinement, 2023403
EAST, high confinement, January 20251066
WEST, February 20251337

Source: as cited in the note to this figure. Year 2025.

Figure ID FIG-XTECH-FUSION-GLOBAL-2026-BASELINE-01-003

1,337seconds

WEST, 20251

1,066seconds

EAST, high confinement, 20252

403seconds

EAST, 20232

2.6GJ

energy injected and extracted in the WEST pulse1

1.3The six-sector nexus: twenty couplings across five assessed sectors

The fusion-centred matrix types the twenty couplings between the five core systems, read for their fusion content. Strengths are Nexus estimates (ESTIMATED) from the cited evidence and analogue events; they set the graph that 2027 evidence will test.

Figure 1.2Couplings across the six sectors

Each line is one coupling from one sector to another, drawn by the strength the edition assigns. Strengths are Nexus estimates from the cited evidence and analogue events. Infrastructure: not assessed in this edition’s coupling matrix, so it is drawn hollow with no couplings. The hexagon is the estate doctrine: six sectors and fifteen relations.

  • Strong
  • معتدل
  • Weak
  • Not assessed in this edition

Source: this edition’s coupling matrix (Table 1.1); status Estimated. Hexagon: the estate doctrine (Signature).

Table 1.1Coupling matrix: from the row system to the column system
From, toWATENEFOOHLTBIO
WAT پانی·WEAK
plant cooling
WEAK
no documented link
WEAK
no documented link
WEAK
no documented link
ENE توانائیWEAK
cooling load
·WEAK
no documented link
WEAK
no documented link
WEAK
no documented link
FOO خوراکWEAK
no documented link
WEAK
no documented link
·WEAK
no documented link
WEAK
no documented link
HLT صحتWEAK
workforce
WEAK
workforce
WEAK
no documented link
·WEAK
no documented link
BIO حیاتیاتی تنوعWEAK
no documented link
WEAK
no documented link
WEAK
no documented link
WEAK
no documented link
·
Strength: strong, moderate or weak; a Nexus estimate (status Estimated) from cited evidence and analogue events. The scale is defined in Annex A.

Transmission paths

  1. 01

    MIN → INF

    A tritium or lithium-6 shortfall delays first plants.

    Inferred tritium and lithium analyses2021

  2. 02

    FIN → INF

    Private and public funding pay for devices and test facilities.

    Reported USD 4.48 billion, 202610

  3. 03

    GOV → INF

    Licensing rules set the route and timing for first plants.

    Reported US proposed rule14

  4. 04

    INF → ENE

    A successful plant would add firm power; none is documented.

    Inferred company statements2423

  5. 05

    ENE → INF

    Facility electricity limits what a shot or pulse means.

    Inferred NIF and WEST reports51

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 5Lawrence Livermore National Laboratory (ed.), National Ignition Facility 2025 (annual report page; 8.6 MJ on 7 April 2025 from 2.08 MJ delivered, target gain 4.13; refurbishment and enhanced yield capability to 2.6 MJ). Lawrence Livermore National Laboratory, Livermore. Observation year 2025. Accessed 2026-11-03.back
  2. 20Coleman, M. and Kovari, M., Global supply of tritium for fusion R and D from heavy water reactors (conference paper, UK Atomic Energy Authority; abstract and introduction read from the PDF; 0 to 27.7 kg available in 2055 across scenarios; 7.4 kg for a demonstration reactor in 2055 in one case). UK Atomic Energy Authority, Abingdon. Observation year 2018. Accessed 2026-11-03.back
  3. 14US Nuclear Regulatory Commission (ed.), Federal Register notice of 26 February 2026, proposed rule on regulatory framework for fusion machines (10 CFR part 30; comments due 27 May 2026; the first 100,000 of 168,363 characters were read). Office of the Federal Register, Washington. Observation year 2026. Accessed 2026-11-03.back
  4. 4World Nuclear News (ed.), New world record set in JET final fusion experiments (news report of 9 February 2024; 69 MJ over 5 seconds from 0.2 milligrams of fuel; 59 MJ in 2021). World Nuclear Association, London. Observation year 2024. Accessed 2026-11-03.back
  5. 1CEA IRFM (ed.), WEST sets a new plasma duration record (news page; plasma 61299, 12 February 2025, 1,337 seconds, 2 MW lower hybrid heating, 2.6 GJ injected and extracted). Commissariat a l energie atomique et aux energies alternatives, Cadarache. Observation year 2025. Accessed 2026-11-03.back
  6. 7ITER Organization (ed.), ITER in a few lines (project page; baseline reviewed by the ITER Council in November 2024; start of research operation 2034; deuterium-tritium operation 2039; Q of 10, 500 MW from 50 MW). ITER Organization, Saint-Paul-lez-Durance. Observation year 2026. Accessed 2026-11-03.back
  7. 24Helion (ed.), Orion, the first fusion power plant (company page; Malaga, Washington; construction from 2025; initial operations stated for 2028; Microsoft agreement for 50 MW; a vendor announcement, weak evidence). Helion Energy, Everett. Observation year 2026. Accessed 2026-11-03.back
  8. 23Commonwealth Fusion Systems and Eni (eds.), Eni and CFS sign over USD 1 billion power purchase agreement (joint company release of 22 September 2025; 400 MW ARC plant in Chesterfield County, Virginia; grid connection in the early 2030s; a vendor announcement, weak evidence). Commonwealth Fusion Systems, Devens. Observation year 2025. Accessed 2026-11-03.back
  9. 12US Department of Energy (ed.), Energy Department announces Fusion Science and Technology Roadmap to accelerate commercial fusion power (announcement of 16 October 2025; Build-Innovate-Grow; power on the grid by the mid-2030s; no funding commitment). US Department of Energy, Washington. Observation year 2025. Accessed 2026-11-03.back
  10. 25Physics Today (ed.), ITER costs are pinned down with caveats (news report on the 2016 baseline review; review committee chaired by A. Wagner; estimate without contingencies). American Institute of Physics, College Park. Observation year 2016. Accessed 2026-11-03.back
  11. 21Pearson, R.J., The availability and supply of critical natural resources for the realisation of a fusion pilot plant: fuels for fusion (presentation to the US Department of Energy fusion workshop, 1 to 3 June 2022; lithium-6 is 7.4% of natural lithium; blankets need 30 to 90%; supply effectively zero; a company presentation, weak evidence). Kyoto Fusioneering, London. Observation year 2022. Accessed 2026-11-03.back
  12. 2Physics World (ed.), China experimental advanced superconducting tokamak smashes fusion confinement record (news report; EAST 1066 seconds in high confinement, January 2025; earlier 403 seconds in 2023). IOP Publishing, Bristol. Observation year 2025. Accessed 2026-11-03.back
  13. 10World Nuclear News (ed.), Fusion industry raised USD4.5 billion in past year, report says (14 July 2026; Fusion Industry Association 2026 survey: USD 4.48 billion in 12 months, USD 14.24 billion cumulative, 56 companies; an industry survey, weak evidence). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Print

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF111 pages1.0 MBTagged, with bookmarks

      SHA-256 95ea6260368aa0483c7600adb816df2588668e2705a7c61df26551a7f08196bb

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF116 pages1.0 MBTagged, with bookmarks

      SHA-256 cd6ff1ee3bd369d83af00d23585c1a820ed5f60753bd7d185413c8b374ed06cb

  • Web edition

  • Data bundle

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 15b48613596ef6658aea97b4be459048745680a4d5743420961925d0fb5fc184

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 795fb6485d15d0238d6969a29fb1d2b451f39e30a11e9a87798383945ad1c866

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 5b2f84ca06ea89262b5806ee57aea891732ba58210745e02cdc3bcb4b273e6c5

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 8645da30ee35054dbe86496623088e6daebdd4eb17a90b05301e2aefd365c195

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 97347fa5766ebe941471f6f388e39c48684f209b455c168d45b26089ab8a40a9

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 13fea3d4003712c5aa7738f75bd93d0cac96aa4ee1e7f504f3eb76a8c627ecbb

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 1: Fusion is an experiment record and a fuel-cycle question. In Exponential Technology Report 2026: Fusion and Frontier Energy (Baseline Edition 2026, Report No. NR-XTECH-FUSION-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

رپورٹیںحصہ ڈالیں

Send evidence or a correction on Fusion and Frontier Energy.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems Evidence deskExponential Technology

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

شعبہ جاتی دستخط

The sectors behind Fusion and Frontier Energy.

A reading aid: the sectors the findings run through and how strongly they depend on each other.

کونے منتخب کریں · لکیروں پر ہوور کریں6 / 15 روابط

دستخط

توانائی اور اس کے شراکت دار

توانائی بنیادی ڈھانچے کو نقل و حمل اور مواصلات کے لیے بجلی (0.8)، پانی کو پمپنگ اور صفائی (0.5) اور خوراک کو کھاد، مشینری اور سرد زنجیریں (0.5) فراہم کرتی ہے۔

W · E · I · F · H · B

شعبے
4 6 میں سے
روابط
6 15 میں سے
باہمی ربط
0.46 کل کا حصہ

زیر عمل مضبوط ترین روابط

  • Energy → Infrastructure · power for transport and telecoms0.8
  • Water → Energy · cooling water and hydropower0.6
  • پانی ← خوراک · آبپاشی0.8
  • بنیادی ڈھانچہ ← پانی · پائپ، ڈیم اور صفائی کے کارخانے0.6
ایک عام شہری خطے کے لیے تدریسی اقدار، کسی مقام کی پیمائشیں نہیں۔ باہمی ربط زیر عمل روابط کی مجموعی قوت ہے، تمام پندرہ کے حصے کے طور پر۔
Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace