Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

方法论

How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.

10 min read0 figures12 tables8 notesNR-COUNTRY-ARE-2026-BASELINE

目录
  1. ·Edition home
  2. ·Executive summary
  3. 1The United Arab Emirates’ risk is heat, water and supply at once
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Humid summer heat peak with grid and desalination stress
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. A方法论
    1. A.1 Methods
    2. A.2 Model card, National Model v0
    3. A.3 The baseline evidence cut
    4. A.4 Evidence age and coverage
    5. A.5 Evidence cards, two anchor sources
    6. A.6 Publication acceptance record
    7. A.7 Status words
    8. A.8 How the edition is made, released and corrected
    9. A.9 Glossary and abbreviations
    10. A.10 Technical annex
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

A.1方法

The baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.

Table A.1Methods
否。DerivationCalculation结果
(1)Fall in the gas share of generation, 2019 to 202597.357 − 68.039≈ 29.3 points
(2)Growth in total generation, 2019 to 2025184.411 ÷ 138.454 − 1≈ 33.2%
(3)Gap between the 2022 net inventory and the 2035 aim195.185 − 103.5≈ 91.7 Mt
(4)Growth in residents, 2023 to 202411,294,243 ÷ 10,678,556 − 1≈ 5.8%
Table A.2Coupling strength scale (matrix and model card)
Strength定义
STRONGa disruption in the source system has historically changed the target system’s service or output within one season
MODERATEan effect is documented but buffered or slower
WEAKan effect is plausible but not documented at national scale
Table A.3Status grammar
标签规则
报告值value as issued by its source, with year
Inferredreasoned from cited evidence; never a measurement
估计值Nexus analytical value with stated method
情景conditional on stated assumptions
Expert inputstructured editorial judgement awaiting evidence

A.2Model card, National Model v0

Model ID
MDL-ARE-NATIONAL · v0.1
目的
represent the United Arab Emirates as coupled water, energy, food, health and biodiversity systems with forcing and transmission layers
类别
graph-based system of systems
输入
the cited sources of this edition; no proprietary data
方法
expert-specified coupling strengths (STRONG · MODERATE · WEAK) from evidence and analogue events
验证
none yet, first validation against Q1 2027 Foundry evidence
不确定性
qualitative; strengths are hypotheses, not measurements
有效域
national scale; not for emirate or asset-level use
可复现性
strength table and sources published in this edition
20couplings

typed in v0

9strong

documented within one season

7moderate

documented, buffered

4weak

plausible, undocumented

A.3The baseline evidence cut

Every Nexus edition is published from a frozen evidence cut. The baseline cut is documentary: it pins the exact edition of every source cited. Model runs begin with the first Foundry cut in Q1 2027.

Cut ID
NQ-ARE-2026-Q0-1
类型
baseline documentary cut
Resolution policy
pinned · as of 30 September 2026
Sources pinned
46 cited sources, each at the edition and retrieval date in the references
模型运行
none at baseline, analytical values are stated with their method
摘要
computed at freeze and recorded in the publication record
Supersedes
nothing, first cut of the series
Superseded by
NQ-ARE-2027-Q1-1 at the Q1 2027 close

沿袭

  1. 01

    source edition

  2. 02

    pinned citation

  3. 03

    finding

  4. 04

    page

  5. 05

    publication record

Table A.4From the baseline cut to the first Foundry cut
要素Baseline 2026Q1 2027
来源cited publications, pinned by editionqualified source bindings with versions
Analysisstated methods and editorial estimatestyped analysis specifications
模型National Model v0 specificationmodel runs with receipts
发现twelve baseline findingsfindings re-bound to the cut
审核five passes scheduledfive passes on the exact digest

A.4Evidence age and coverage

A 2026 edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.

Table A.5Evidence age and coverage
指标观测已发布节奏Next release
GHG emissions2022Nov 2025两年一次second report
人口2024not stated年度年度
Electricity mix2025Apr 2026年度年度
Renewable capacity20252026 via press年度2027
Groundwater policy2022Dec 2022policynot scheduled
Economic outlook2025–2026Dec 2025年度2026 consultation
Extreme rain2024Apr 2024每个事件每个事件
Heat reading2025Jun 2025 via press每个事件每个事件
Protected areas20252025定期定期
Table A.6Coverage by system at baseline
系统覆盖范围Thinnest dimension
Climate forcingPARTIALannual anomaly; heat-illness link
能源GOODfuel burned for power and desalination
水PARTIALdesalination share and capacity in use
食品THINimport share by commodity; reserves
卫生THINheat deaths and illness series
生物多样性THINcondition outside reserves
金融PARTIALinsurance cover
数字THINdependency mapping

A.5Evidence cards, two anchor sources

Issued by the Ministry of Climate Change and Environment to the UNFCCC, November 2024. Periodic. Role: binds the 2035 aim, the 2019 base of 196.3 Mt, the sector pathways and several water and capacity statements, each as a national statement.

EVD-ARE-001

Third NDC1

Issued by Ember. Annual. Role: binds the 2019–2025 generation mix by source. The data file was read from the issuer’s public release, not through a press report.

EVD-ARE-002

Ember yearly electricity data17

Table A.7Quality dimensions at baseline
DimensionEVD-ARE-001EVD-ARE-002
Completenesseconomy-wide, all domestic sectorsnational, by source
Timelinesssubmitted November 20242025 data released in 2026
Revisionperiodic; the 2019 base moved from 225 to 196.3 Mt2annual back-revision
Method transparencyinventory method described; report text and tables differ in places3method published by the issuer
外部验证independent assessment exists30not bound

Evidence cards to follow in Q1 2027

  • Second Biennial Transparency Report, inventory series after 20223
  • FAO AQUASTAT country accounts, desalination and reuse volumes10
  • Federal and utility statistics, share of supply that is desalinated
  • Customs and trade statistics, food import share by commodity5

A.6Publication acceptance record

Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.

Table A.8Publication acceptance record
集团区域条目通过N/A待处理
D1Identity and scope8800
D2Source and data12912
D3Analysis and models12381
D4Findings and claims9801
D5Figures, tables, maps10622
D6Editorial and citations10802
D7Review and approval130013
D8Artefact and design12705
D9Registry and release9009

Publication gate

Conditions met
14 of 23 at evidence close
Blocking problems
none recorded
Open conditions
reviews, approval of the exact digest, deposit, registry pointer

Not applicable at baseline

模型运行
first runs in Q1 2027
地图
plates in Q2 2027
Waivers
无

A.7Status words

Table A.9The status every value carries
状态含义
观测Measured directly and published by the source.
报告值Published statistics of an official or institutional source.
已申报Stated by the body concerned; not independently measured.
估计值A Nexus estimate from cited evidence, with its method in Annex A.
模型生成Produced by a stated model from cited inputs.
InferredReasoned from cited evidence; not measured.
预报A projection by the cited source.
SimulatedA simulation result under stated assumptions.
情景A conditional statement under stated assumptions; never a prediction.
Expert inputExpert judgement, recorded with its basis.
CandidateProposed for a later edition; not yet evidence.
Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject.

A.8How the edition is made, released and corrected

Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.

步骤发生的事项来源
01 Evidence arrives from the pillarsFoundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s.
02 The cut is sealedOn the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on.
03 The edition is assembledThe edition is drafted from its template and content pack. Agents may draft; they never publish and never decide.
04 The keys turnAt the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward.
05 The gate opensA named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit.
06 Signed and depositedThe PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI.
07 Published on its desk’s siteOnly then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part.
08 Corrections go to StandardsMethod and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut.

A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).

Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.

A.9Glossary and abbreviations

Table A.10Series terms
术语含义
Baseline Editionthe inaugural annual edition that fixes the reference state for the series
WEFH+Bwater, energy, food, health and biodiversity, the national nexus core
耦合a typed dependency through which one system transmits to another
保障缺口the share of losses not covered by insurance
Capability ladderLISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED
EQLevidence-quality level, 1–5
证据切片a frozen resolution of exact sources and versions
NNC · NLC · NWGNational Nexus Consortium · National Leadership Council · National Working Groups
Table A.11Abbreviations used in this edition
AbbreviationExpansion
BTRBiennial Transparency Report
DEWADubai Electricity and Water Authority
EADEnvironment Agency Abu Dhabi
FAO联合国粮食及农业组织
FCSCFederal Competitiveness and Statistics Centre
IMF国际货币基金组织
IRENAInternational Renewable Energy Agency
LULUCFland use, land-use change and forestry
MOCCAEMinistry of Climate Change and Environment
MoHREMinistry of Human Resources and Emiratisation
NCEMANational Emergency Crisis and Disaster Management Authority
NCMNational Centre of Meteorology
NDCnationally determined contribution
WDPA世界保护区数据库

A.10Technical annex

Table A.12Technical annex
条目Annex目录状态
A.1Indicator definitionsthe baseline indicator set, with units and sourcesIN THIS EDITION
A.2Coupling strengthsthe twenty-cell matrix and its rationaleIN THIS EDITION
A.3Scenario specificationSCN-ARE-HTW-01 assumptions and signpostsIN THIS EDITION
A.4Capability placementsrung evidence for fifteen functionsIN THIS EDITION
A.5Model diagnosticsfirst runs and validationQ1 2027
A.6敏感性分析influence of coupling strengthsQ2 2027
A.7Emirate notesatlas cards for every emirateQ2 2027
A.8Review statementspass-by-pass review recordAT RELEASE

A.1 · indicator definition, gas share of electricity generation

Construct
gas-fired generation divided by total electricity generation
单位
per cent
范围
calendar year, national, including net imports
来源
Ember yearly electricity data17
Revision
annual back-revision by the data issuer
已知局限
Ember’s country page rounds differently from the dataset18; 2026 not bound

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1Ministry of Climate Change and Environment (ed.), The United Arab Emirates’ Third Nationally Determined Contribution (NDC 3.0): Accelerating Action Towards Mission 1.5C. Submission to the UNFCCC, Abu Dhabi, November 2024. Observation years 2019–2035. https://unfccc.int/sites/default/files/2024-11/UAE-NDC3.0.pdf, accessed 2026-11-03.back
  2. 17Ember (ed.), Yearly electricity data: generation by country and source (release_generation_yearly_global), United Arab Emirates 2019–2025. Ember, London, 2026. Observation year 2025. https://files.ember-energy.org/public-downloads/generation/outputs/release_generation_yearly_global.csv, accessed 2026-11-03.back
  3. 2Ministry of Climate Change and Environment (ed.), Third Update of Second Nationally Determined Contribution for the UAE. Submission to the UNFCCC, Abu Dhabi, 2023. Observation years 2019–2030. https://unfccc.int/sites/default/files/NDC/2023-07/Third%20Update%20of%20Second%20NDC%20for%20the%20UAE_v15.pdf, accessed 2026-11-03.back
  4. 3Ministry of Climate Change and Environment (ed.), United Arab Emirates’ First Biennial Transparency Report 2024. Submission to the UNFCCC, Abu Dhabi, submitted 6 November 2025. Observation years 2019–2022. https://unfccc.int/sites/default/files/resource/UAE’s%20First%20BTR%20-%20Submission%20Document.pdf, accessed 2026-11-03. The text (195,065 Gg) and Table 1 (195,185 Gg) differ for 2022; Table 1 is used.back
  5. 30Climate Action Tracker (ed.), UAE: country assessment, assessment dated 15 November 2024. Climate Analytics and NewClimate Institute, Berlin, 2024. Observation year 2024. The page rates the 2030 target of the 2023 update; a separate 2035 analysis is not read. https://climateactiontracker.org/countries/uae/, accessed 2026-11-03.back
  6. 10DATA VINTAGE AFTER CLOSE: World Bank (ed.), World Development Indicators: ER.H2O.INTR.PC, ER.H2O.INTR.K3, ER.H2O.FWTL.ZS, ER.H2O.FWAG.ZS, ER.H2O.FWDM.ZS and ER.H2O.FWIN.ZS for the United Arab Emirates, from FAO AQUASTAT. World Bank, Washington DC, database updated 8 October 2026. Observation year 2022. https://api.worldbank.org/v2/country/ARE/indicator/ER.H2O.INTR.PC, accessed 2026-11-03.back
  7. 5International Monetary Fund (ed.), United Arab Emirates: 2025 Article IV Consultation, Press Release, Staff Report and Statement by the Executive Director, IMF Country Report No. 25/327. IMF, Washington DC, December 2025. Observation years 2024–2026. https://www.imf.org/-/media/files/publications/cr/2025/english/1areea2025001-source-pdf.pdf, accessed 2026-11-03.back
  8. 18Ember (ed.), United Arab Emirates: country page (32% low-carbon, 68% fossil), last updated 22 April 2026. Ember, London, 2026. Observation year not stated on the page. https://ember-energy.org/countries-and-regions/united-arab-emirates/, accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • 打印

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF116 pages1000 KBTagged, with bookmarks

      SHA-256 3dbf3b596a607c2f8ddfa7c96a03b6bdba4da4d2373ca71c4ff3e03fd70bbb5a

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF124 pages1014 KBTagged, with bookmarks

      SHA-256 3d6e3ee929cfe5145862d3aa29b3eb7c2c637fec37e97491874d8d83b8573db0

  • Web edition

  • 数据包

    • Indicators, CSV

      30 indicators with unit, year, status and source

      NR-COUNTRY-ARE-2026-BASELINE-indicators.csv2 KB

      SHA-256 81c7d823734d0dc3373914ea644e2fba47d9456a3d323d17d3cbe7140a45056d

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-COUNTRY-ARE-2026-BASELINE-indicators.json3 KB

      SHA-256 ec72ca6bd271bd3da29db839f0aedc9cd94a350bb0873f666331d8d7059972e7

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-COUNTRY-ARE-2026-BASELINE-findings.csv3 KB

      SHA-256 6aab88663a224d773268a3890be783afcad1af29597da0eda086e89089d3ed32

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-COUNTRY-ARE-2026-BASELINE.bib1 KB

      SHA-256 5713cfba04663a08656338f2f1236256f01df66584c9270c47789dc58bd4b900

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-COUNTRY-ARE-2026-BASELINE.ris1 KB

      SHA-256 455f13d709d5c23a24ad51c817b10867519f988b2acda7610fb8dd873b316ca1

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-COUNTRY-ARE-2026-BASELINE.cff1 KB

      SHA-256 dbc2084b60a95ba396971cd99dbfde6496b690d7d7cfe25ce7779460a5ba36eb

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this annex

Valadbaygi, S. (Ed.). (2026). Annex A: Methodology. In United Arab Emirates Systems Risk and Resilience Report 2026: The State of the United Arab Emirates’ Interdependent Systems (Baseline Edition 2026, Report No. NR-COUNTRY-ARE-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

报告贡献

Send evidence or a correction on United Arab Emirates.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems 证据编辑部国家系统风险与韧性

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.