The edition on a few pages: the abstract, the key messages, the headline finding and what each steward reads in it.

7 min read1 figure0 tables15 notesNR-XTECH-FUSION-GLOBAL-2026-BASELINE

目录
  1. ·Edition home
  2. ·Executive summary
    1. S.1 Abstract
    2. S.2 Key messages
    3. S.3 Headline finding
    4. S.4 At a glance
    5. S.5 What each steward reads in it
    6. S.6 What this edition is, and is not
  3. 1Fusion is an experiment record and a fuel-cycle question
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5First-plant fuel and licence set the pace
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. A方法论
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

S.1Abstract

Fusion energy matters to the Nexus programme as a possible future power source and as a present infrastructure question. The experimental record is strong and narrow. The National Ignition Facility produced 8.6 MJ of fusion energy from 2.08 MJ of laser energy delivered to the target on 7 April 2025, a target gain of 4.135. The JET tokamak produced 69 MJ in about 5 seconds in its final deuterium-tritium campaign4. WEST held a plasma for 1,337 seconds in February 20251, and EAST held a high-confinement plasma for 1,066 seconds in January 20252. No source read reports electricity delivered to a grid from fusion. ITER now plans deuterium-tritium operation in 20397. The fuel cycle is the least measured part. Tritium is available commercially from one source, heavy-water reactors, and one analysis finds that the amount free for fusion in 2055 ranges from 0 to 27.7 kg20. Lithium-6, needed for breeding, has effectively no supply today according to one company presentation21. Private investment reached USD 4.48 billion in the 12 months to July 2026, in a survey of 56 companies10. Public programmes expanded in the UK and Germany1516. The US regulator proposed in February 2026 to license fusion machines under the byproduct material framework14. This baseline sets out what the evidence supports and where it is thin. It forecasts no plant date and ranks no country or company.

S.2Key messages

Six readings that frame the fusion baseline, and the eight questions this edition answers, each with its status and source.

  1. Yes at one facility, counting laser energy on target only: 8.6 MJ from 2.08 MJ in 2025.56

    Has fusion produced more energy than the laser put in?Reported

  2. WEST held a plasma for 1,337 seconds in 2025; EAST held 1,066 seconds in high confinement.12

    What is the longest plasma?Reported

  3. The plan is 2039, with research operation from 2034.7

    When will ITER burn deuterium and tritium?Reported

  4. No source read reports it. Companies state plans for 2028 and the early 2030s.2423

    Does any fusion plant deliver electricity?Reported

  5. Tritium free for fusion in 2055 ranges from 0 to 27.7 kg; lithium-6 supply is effectively zero today.2021

    Is there enough fuel?Reported

  6. USD 4.48 billion of private funding in the 12 months to July 2026, in a survey.10

    What does the money look like?Reported

  7. A US rule is proposed to license fusion machines as byproduct material users.14

    What does regulation look like?Reported

  8. First-plant fuel: start-up tritium and blanket demonstration. SCN-XT14-FUE-01

    What will 2027 test first?Expert input

S.3Headline finding

ReportedEQL 4NRF-XTECH-FUSION-GLOBAL-2026-BASELINE-INF-001

On 7 April 2025 the National Ignition Facility produced 8.6 MJ of fusion energy from 2.08 MJ of laser energy delivered to the target, a target gain of 4.13.

Figure S.1Energy in and out, NIF shot of 7 April 2025 (MJ)
条目Bar, scaled to the largest value数值
Laser energy delivered to the target2.08
Fusion energy produced8.6

Source: Lawrence Livermore National Laboratory annual report5. Laser energy on target only; facility electricity is not included.

Fusion energy out exceeded laser energy on target by a factor of 4.13. The laboratory lowered the maximum shot energy from 2.2 MJ to 1.9 MJ during refurbishment and plans an upgrade to 2.6 MJ, at which yields above 30 MJ become possible5. The first ignition shot, on 5 December 2022, produced 3.15 MJ from 2.05 MJ6.

S.4At a glance

4.13times

NIF target gain, 20255

1,337秒

WEST plasma, 20251

4.48USD billion

private funding, 12 months to July 202610

2039year

ITER deuterium-tritium plan7

>160devices

operational, under construction or planned9

>2.5GBP billion

UK funding over five years15

S.5What each steward reads in it

GCRI · KEY T

Technical Truth

The evidence supports reading fusion as an experiment record and a fuel-cycle question.

GRF · KEY M

Public Meaning

For most people the fusion story arrives as a headline about a record or a start-up.

GRA · KEY F

Capital Meaning

Readiness implications only. Private funding is growing, public programmes are expanding and plant dates are stated for the 2030s.

NEXUS

综合

Fusion is well described by single results and thinly measured as a system.

S.6What this edition is, and is not

What this edition is

A baseline: the 2026 state of fusion and frontier energy as infrastructure and the couplings through which it carries risk into other systems. It synthesises published evidence and ranks no country, company or asset.

What it is not

Not a forecast of when any plant will deliver electricity, a technology ranking, an endorsement of any company or an assessment of any programme. Licensing, funding and fuel allocation are decisions of competent authorities.

What comes next

National, regional and sector evidence feeds the 2027 fusion edition through the federation. Each edition reports what changed against this baseline: observations, source revisions, method changes, scenario updates and corrections.

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 5Lawrence Livermore National Laboratory (ed.), National Ignition Facility 2025 (annual report page; 8.6 MJ on 7 April 2025 from 2.08 MJ delivered, target gain 4.13; refurbishment and enhanced yield capability to 2.6 MJ). Lawrence Livermore National Laboratory, Livermore. Observation year 2025. Accessed 2026-11-03.back
  2. 4World Nuclear News (ed.), New world record set in JET final fusion experiments (news report of 9 February 2024; 69 MJ over 5 seconds from 0.2 milligrams of fuel; 59 MJ in 2021). World Nuclear Association, London. Observation year 2024. Accessed 2026-11-03.back
  3. 1CEA IRFM (ed.), WEST sets a new plasma duration record (news page; plasma 61299, 12 February 2025, 1,337 seconds, 2 MW lower hybrid heating, 2.6 GJ injected and extracted). Commissariat a l energie atomique et aux energies alternatives, Cadarache. Observation year 2025. Accessed 2026-11-03.back
  4. 2Physics World (ed.), China experimental advanced superconducting tokamak smashes fusion confinement record (news report; EAST 1066 seconds in high confinement, January 2025; earlier 403 seconds in 2023). IOP Publishing, Bristol. Observation year 2025. Accessed 2026-11-03.back
  5. 7ITER Organization (ed.), ITER in a few lines (project page; baseline reviewed by the ITER Council in November 2024; start of research operation 2034; deuterium-tritium operation 2039; Q of 10, 500 MW from 50 MW). ITER Organization, Saint-Paul-lez-Durance. Observation year 2026. Accessed 2026-11-03.back
  6. 20Coleman, M. and Kovari, M., Global supply of tritium for fusion R and D from heavy water reactors (conference paper, UK Atomic Energy Authority; abstract and introduction read from the PDF; 0 to 27.7 kg available in 2055 across scenarios; 7.4 kg for a demonstration reactor in 2055 in one case). UK Atomic Energy Authority, Abingdon. Observation year 2018. Accessed 2026-11-03.back
  7. 21Pearson, R.J., The availability and supply of critical natural resources for the realisation of a fusion pilot plant: fuels for fusion (presentation to the US Department of Energy fusion workshop, 1 to 3 June 2022; lithium-6 is 7.4% of natural lithium; blankets need 30 to 90%; supply effectively zero; a company presentation, weak evidence). Kyoto Fusioneering, London. Observation year 2022. Accessed 2026-11-03.back
  8. 10World Nuclear News (ed.), Fusion industry raised USD4.5 billion in past year, report says (14 July 2026; Fusion Industry Association 2026 survey: USD 4.48 billion in 12 months, USD 14.24 billion cumulative, 56 companies; an industry survey, weak evidence). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
  9. 15UK Department for Energy Security and Net Zero (ed.), A new energy revolution: the UK plan for delivering fusion energy (policy paper of 16 March 2026; over GBP 2.5 billion over five years; GBP 1.3 billion for STEP and UK Fusion Energy; the first 100,000 of 127,790 characters were read). UK Government, London. Observation year 2026. Accessed 2026-11-03.back
  10. 16Clean Energy Wire (ed.), German government pledges more than EUR 2 bln for nuclear fusion (news report of 2 October 2025; cabinet plan of 1 October 2025). Clean Energy Wire, Berlin. Observation year 2025. Accessed 2026-11-03.back
  11. 14US Nuclear Regulatory Commission (ed.), Federal Register notice of 26 February 2026, proposed rule on regulatory framework for fusion machines (10 CFR part 30; comments due 27 May 2026; the first 100,000 of 168,363 characters were read). Office of the Federal Register, Washington. Observation year 2026. Accessed 2026-11-03.back
  12. 6Lawrence Livermore National Laboratory (ed.), NIF fusion ignition shot hailed as historic scientific feat (news page; shot of 5 December 2022, 3.15 MJ from 2.05 MJ; announced 13 December 2022). Lawrence Livermore National Laboratory, Livermore. Observation year 2022. Accessed 2026-11-03.back
  13. 24Helion (ed.), Orion, the first fusion power plant (company page; Malaga, Washington; construction from 2025; initial operations stated for 2028; Microsoft agreement for 50 MW; a vendor announcement, weak evidence). Helion Energy, Everett. Observation year 2026. Accessed 2026-11-03.back
  14. 23Commonwealth Fusion Systems and Eni (eds.), Eni and CFS sign over USD 1 billion power purchase agreement (joint company release of 22 September 2025; 400 MW ARC plant in Chesterfield County, Virginia; grid connection in the early 2030s; a vendor announcement, weak evidence). Commonwealth Fusion Systems, Devens. Observation year 2025. Accessed 2026-11-03.back
  15. 9World Nuclear News (ed.), Fusion entering implementation phase, says Grossi (report on the IAEA World Fusion Outlook 2025; more than 160 devices; private investment above USD 10 billion; October 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • 打印

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF111 pages1.0 MBTagged, with bookmarks

      SHA-256 95ea6260368aa0483c7600adb816df2588668e2705a7c61df26551a7f08196bb

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF116 pages1.0 MBTagged, with bookmarks

      SHA-256 cd6ff1ee3bd369d83af00d23585c1a820ed5f60753bd7d185413c8b374ed06cb

  • Web edition

  • 数据包

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 15b48613596ef6658aea97b4be459048745680a4d5743420961925d0fb5fc184

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 795fb6485d15d0238d6969a29fb1d2b451f39e30a11e9a87798383945ad1c866

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 5b2f84ca06ea89262b5806ee57aea891732ba58210745e02cdc3bcb4b273e6c5

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 8645da30ee35054dbe86496623088e6daebdd4eb17a90b05301e2aefd365c195

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 97347fa5766ebe941471f6f388e39c48684f209b455c168d45b26089ab8a40a9

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 13fea3d4003712c5aa7738f75bd93d0cac96aa4ee1e7f504f3eb76a8c627ecbb

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this summary

Valadbaygi, S. (Ed.). (2026). Executive summary: Executive summary. In Exponential Technology Report 2026: Fusion and Frontier Energy (Baseline Edition 2026, Report No. NR-XTECH-FUSION-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

报告贡献

Send evidence or a correction on Fusion and Frontier Energy.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems 证据编辑部指数级技术

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

部门特征

The sectors behind Fusion and Frontier Energy.

A reading aid: the sectors the findings run through and how strongly they depend on each other.

选择角点 · 悬停连线6 / 15 项关系

签名

能源及其合作伙伴

能源为基础设施提供交通和电信用电(0.8),为水提供泵送和处理用电(0.5),为粮食提供化肥、机械和冷链(0.5)。

W · E · I · F · H · B

部门
4 共 6
关系
6 共 15
耦合
0.46 占总量份额

当前最强的关系

  • 能源 → 基础设施 · 为交通和电信供电0.8
  • 水 → 能源 · 冷却水与水电0.6
  • 水 → 粮食 · 灌溉0.8
  • 基础设施 → 水 · 管道、水坝和处理设施0.6
典型城市区域的教学数值,不是任何地点的测量值。耦合是所涉关系强度的总和,以全部十五种关系的占比表示。
Your role here

What you can do from this page.

  • ReaderNew to the reports? A short guide to reading an edition.Start here
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace