Skip to content

GCRI · Trade and Strategic Resources

Foundry இல் உருவாக்கு

The Foundry systems that serve Trade and Strategic Resources, what an authorised project can do with them, and how access is requested. Foundry’s public home is therisk.global/nexus-foundry.

01ஆறு தூண்கள்

Foundry among the six pillars.

Where things are built, simulated and prepared: every output of the Global Centre for Risk and Innovation (GCRI), the Global Risks Forum (GRF) and the Global Risks Alliance (GRA), under the Nexus Consortium. It is led by the Nexus Consortium; its home is therisk.global/nexus-foundry.

தூண்களைத் தேர்ந்தெடு · கோடுகளின் மேல் நகர்த்து18 / 18 ஒப்படைப்புகள்

வழித்தடம்

Around Foundry

The pillars Foundry hands work to and receives it from.

L · F · U · S · R · A

தூண்கள்
6 6 இல்
ஒப்படைப்புகள்
18 18 இல்
சுழற்சிகள்
17 மூடப்பட்டது

செயல்பாட்டிலுள்ள ஒப்படைப்புகள்

  • F01Universe → Foundry · Admitted mission becomes a cycle project with a decision caseReadiness preparation
  • F02Foundry → Universe · Core Build Report and go or no-go evidenceControlled build
  • F03Foundry → Reports · Sealed observations and indicator series behind a profileCloseout
  • F04Universe → அறிக்கைகள் · அத்தியாயங்கள் 10 மற்றும் 13 க்கான நடவடிக்கைக்குப் பிந்தைய மற்றும் சூழ்நிலைக் கண்டுபிடிப்புகள்நடவடிக்கைக்குப் பிந்தைய மதிப்பாய்வு

மற்றும் மேலும் 14

F01 முதல் F14 வரை திட்ட ஆண்டின் பதிவுசெய்யப்பட்ட ஒப்படைப்புகள், ஒவ்வொன்றும் நகரும் ஆவணப்பொருளுடனும் அதன் கட்டத்துடனும்; R1, R2, R3 மற்றும் R4 வளையத்தைச் சுற்றிப் பணியைக் கொண்டு செல்கின்றன. ஒரு சுழற்சியிலுள்ள ஒவ்வொரு தூணும் தேர்ந்தெடுக்கப்படும்போது அது கணக்கிடப்படுகிறது. ஒவ்வொரு தூணும் Nexus Consortium ஆல் வழிநடத்தப்படுகிறது.
  1. ஆய்வகங்கள்கேள்விகள் சோதனைகளாகவும் முன்மாதிரிகளாகவும் மாறும் இடம்: Nexus Consortium இன் கீழ், Foundry அவற்றைக் கட்டமைக்கும் முன், புதிய முறைகள், தரவு மற்றும் கருவிகள் அவற்றின் வரம்புகள் பதிவில் இருக்க, வெளிப்படையாகச் சோதிக்கப்படுகின்றன.ஆய்வகங்கள்
  2. FoundryWhere methods, data and models become reproducible builds, each run with its inputs, version and limits on record.Trade and Strategic Resources in FoundryFoundry
  3. UniverseWhere a build is tested under controlled conditions with independent evaluators, so a method’s skill is measured, not assumed.Trade and Strategic Resources in Universeuniverse.nexus
  4. Nexus StandardsWhere methods, identifiers and data schemas are codified in the open and corrected when a test finds a fault.Industry, Trade and Supply Chains in Standardsnexustandards.com
  5. ReportsWhere findings are published with their method, uncertainty and evidence class, and corrected as new versions.Trade and Strategic Resources in ReportsReports
  6. Risk AcademyWhere methods and systems are taught on real data and real places, by working the case, on Risk Academy.Faculty of Finance and Economics in Academyrisksacademy.com

Foundry in every area of the work

பரப்புFoundry
தலைமைத்துவம்Each build is led by an authorised project with an accountable owner; leadership is technical and never extends to the decision the build informs.
StrategyThe build plan follows the National Portfolio and the missions admitted for the year.
CadenceWorks all year; the controlled build runs for one month in Q2, and measured capacity results are reviewed in Q4.
OwnershipOwns projects and builds, observations and canonical data, simulation and benchmark runs, the National Portfolio record and evidence seals.
செயல்முறைWork moves through governed rooms on twenty systems, and every run leaves a record with its limits.
DevelopmentDevelops the cycle’s software, data and environments, and develops each country’s National Portfolio.
SimulationsRuns scenarios, experiments and benchmarks with published method and conditions; a simulated capability is not a validated result.
ReportingSupplies the permitted data bundles and sealed observations behind every edition.
ஆளுகைShared infrastructure made available to the Consortium for public-good purposes; it holds no vote in the governance of the standards.
Data and evidenceCanonical observations and provenance are held in The Global Risks Index (NXS-GRX), and every value carries its source and licence.
Finance and resourcingCompute and data allocations open per project when their terms and review capacity exist; temporary capacity is released at stand-down.
Risk and assuranceBuilds are signed and tested for security and interoperability, and accepted for exercise only at gate G3.
பங்கேற்புStakeholders and service providers may establish their presence for non-profit and consortium objectives under the Terms.
CommunicationPublic pages describe each system’s purpose and design, and state what it does only as far as its record shows.
LocalObservations and models keep their place: every value carries the location and boundary it was drawn on.
தேசியEach country’s National Portfolio is developed and tracked.
பிராந்தியShared systems and cross-border dependencies are modelled across the countries of a region.
PlanetaryGlobal data and Earth observation are held with provenance, so planetary pressures can be read alongside national ones.

What each institution brings

தூண்GCRIGRFGRA
Foundryஅதன் அறிவியல் மற்றும் தொழில்நுட்பத் தளங்கள் Foundry கட்டமைக்கும் முறைகள், தரவு மற்றும் சான்றுகளைக் கொண்டுவருகின்றன.பதிவுசெய்யப்பட்ட வாயிலில் திட்டப்பணிகளை அனுமதித்து, பயிற்சிக்கான உருவாக்கத்தை ஏற்கிறது, இதனால் Foundry பணி பதிவின்படி திட்டத்திற்குள் நுழைகிறது.நிதித் தயார்நிலைக் கேள்விகளைக் கொண்டுவருகிறது, இதனால் உருவாக்கங்கள் நிதி நிறுவனங்கள் படிக்கக்கூடிய சான்றுகளை உருவாக்குகின்றன.
03பணியிடம்

The workspace for Build in Foundry.

செயல்முறைத் தொடர்

Build in Foundry · Workspace WS-70 · Example interface, not a record

One stage waitingGCRI · Trade and Strategic Resources

Stages

  1. Ingest4 sources
  2. Validateschema · licence
  3. Transformversioned
  4. ModelNetwork science
  5. Testheld-out
  6. Releasewith limits

Artefacts

Customs trade flowsv4.8திறPublished statistics
Vessel position datav2.4To checkகவனிக்கப்பட்டது
Supplier surveyv6.3To checkSURVEY
Freight indicesv3.6திறகவனிக்கப்பட்டது

Compute quota

share used vs alert level

CPU hours34 used of 80 used limitStorage70 used of 90 used limitGPU hours13 used of 70 used limit
Pipeline.Illustrative interface; not live data.

Trade and Strategic Resources · Pipeline. Pipeline: example names and illustrative values, not a record.

04அமைப்புகள்

Foundry systems for this field.

அமைப்புWhat it does hereபங்குRead more
NXS-GRXCanonical data, provenance and riskHolds the canonical data, provenance and risk records the field cites.

Index data service: unavailable. No public endpoint is published for this site yet.

This fieldDocumentationIntegrated, not bound
NXS-DSSDecision cases and deliberationTurns evidence into decision cases with stated uncertainty.This fieldDocumentationIntegrated, not bound
NXS-NSTCivilian common operating pictureShows the common operating picture as a map on the page.This fieldDocumentationIntegrated, not bound
NXS-EOPEarth observation and digital twinsBrings Earth observation scenes and digital twins into the field.This siteDocumentationIntegrated, not bound
NXS-EWSMulti-hazard monitoring and warningCarries monitoring and warning layers for the hazards of the field.This siteDocumentationIntegrated, not bound
NXS-LABResearch, experiments and simulationsRuns research, experiments and simulations before anything is built.This siteDocumentationIntegrated, not bound
NXS-PORPublic, client and partner deliveryDelivers released views and maps into the page.This siteDocumentationIntegrated, not bound
NXS-HUBKnowledge, records and learningSearches the knowledge and records of the field.This siteDocumentationIntegrated, not bound

The release of the Nexus systems is on hold. Each code links its definition in the Nexus Risk Standards.

05செயல்முறை

செயல்முறை எவ்வாறு நடைபெறுகிறது.

Process explorer · Process

Build in Foundry: Build, sign and accept

10 steps4 stages2 gates

செயல்முறை

Build in Foundry: Build, sign and accept

An admitted mission becomes a cycle project; the build is pinned, verified and signed, and GRF records acceptance for exercise, not permission to deploy.

  1. 01 Request and sources

    1. 01Admitted mission becomes a cycle projectRecord · Universe to FoundryAn admitted mission becomes a cycle project with a decision case.
    2. 02Qualify data sources and resourcesStep · GCRIGCRI qualifies data sources and resource offers and builds the scenario models. An offer is not an allocation.
  2. 02 Build and verify

    1. 03Source snapshotRecord · NXS-FAC (blueprints, builds and signing)The snapshot pins the commit, dependencies and generator versions.
    2. 04Build contractRecord · NXS-FAC (blueprints, builds and signing)The build contract declares the artefact kind, environment and reproducibility envelope.
    3. 05Integrate and buildModel · GCRIGCRI integrates software and data, signs builds, and tests security and interoperability.
    4. 06Verification suiteGate · NXS-FAC (blueprints, builds and signing)Required and advisory checks stay separate. Reproducibility needs pinned inputs, declared nondeterminism and independent rebuilds.
  3. 03 Sign and admit

    1. 07Sign the exact artefactStep · NXS-FAC (blueprints, builds and signing)NXS-FAC builds, attests and requests a signature via a scoped signer identity. It holds no key material.
    2. 08Package admissionStep · NXS-NXQ (software, models and capability lifecycle)NXS-NXQ receives the signed package and keeps admission evidence that binds the task, data class, evaluation suite and expiration.
  4. 04 Accept

    1. 09Core Build ReportRecord · GCRIThe Core Build Report is the go or no-go record. Universe assembles the Core and holds the decision for the exercise.
    2. 10G3 · Build accepted for exerciseGate · The Global Risks ForumGRF records whether the build is accepted for exercise. A signed build or release candidate is not permission to deploy to production.

The programme year · NXS-FAC · UniverseDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The record order follows the Builds and Releases room lists of NXS-FAC.

06அணுகல்

How a project gets access.

  1. 01

    Enquiry

    Describe the project and its owner to the contact form.

  2. 02

    Authorisation

    Access requires an authorised project with an accountable owner, data terms and a review plan.

  3. 03

    Allocation

    Compute and data allocations open when their terms and review capacity exist.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.

07மூலங்கள்

Where this page’s references lead.

இந்தப் பக்கம் ஒப்பிட்டுப் படிக்கப்படும் அமைப்புகளும் ஆவணங்களும். நிலையும் பதிப்புகளும் மாறுகின்றன; ஒவ்வொரு இணைப்பும் வெளியிடும் அமைப்புக்குச் செல்கிறது.

08கேள்விகள்

கேள்விகளும் பதில்களும்.

Is Foundry access free?
Terms are set per project when allocations open.
வர்த்தகமும் உத்திசார் வளங்களும்

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.

சட்டம்

இந்தத் தளத்திலுள்ள வரைபடங்கள், தரவு மற்றும் படங்கள் சூழலுக்காகவும் பொதுத் தகவலுக்காகவும் காட்டப்படுகின்றன. அவை ஆலோசனையோ முன்னறிவிப்புகளோ எச்சரிக்கைகளோ அல்ல; தகவலின் வரம்புகள் பொறுப்புத் துறப்புகள் மற்றும் தரவு அறிவிப்புகளில் விளக்கப்பட்டுள்ளன.