Early warning saves lives only when forecasts, thresholds, institutions and actions work together under pressure. The Global Centre for Risk and Innovation (GCRI) strengthens that chain with forecast verification, warning-support information, preparedness analysis and controlled exercises. It issues no warnings. Warnings and dispatch stay with authorised national services. Part of GCRI programmes.

01Workspace

The workspace for early warning capability.

Programme board

Country programme A · Early warning capability · Cycle 1 of 4 · Example interface, not a record

  • Workstreams active
    8Active
  • Milestones due this quarter
    3Watch
  • Decisions pending with owners
    4Watch
  • Open risks
    7
Quarter review dueGCRI · GCRI

Workstreams

by stage

Scoping02
Report edition planningWS-427 · owner: National Desk
Evidence label auditWS-362 · owner: National Desk
In delivery02
Country programme formationMilestone M4 · slipping
Methods review cycleMilestone M3 · on plan
পর্যালোচনা01
National Model buildIndependent reviewer named
Closed01
Annual mission designClosure note on record

গেট

  1. Requestowner named
  2. Scoping noteboundary
  3. Qualifiedinputs
  4. BuildFoundry
  5. Testcontrolled
  6. Publishwith limits
  7. Decisionauthority
Programme board.Illustrative interface; not live data.

GCRI · Programme board. Programme board: example names and illustrative values, not a record.

02Contribution

Where GCRI contributes to the warning chain.

Link in the chainContributionStays with
Forecast fitnessVerification of forecasts against observations, with uncertaintyThe forecasting service
Thresholds and triggersEvaluation of trigger definitions and their performanceThe authority that sets them
Warning supportInformation that helps a service prepare a warningThe authorised issuer
প্রস্তুতিGap analysis of readiness, logistics and rolesThe responsible agencies
অনুশীলনControlled exercises with independent observationThe exercise owner
03Geography

Hazards now worldwide.

Flood water, active fires and rain across the world, from NASA GIBS. Each layer carries its own date.

ইন্টারঅ্যাক্টিভ মানচিত্রের জন্য JavaScript প্রয়োজন; স্তরের তালিকা ও উৎস নিচে দেওয়া আছে।

স্তরসমূহ 3

Hazards now, for this page

এই স্তর সম্পর্কে
প্রমাণ
পর্যবেক্ষিত (মেঘের কারণে ফাঁক থাকে)
উৎস
VIIRS বৈশ্বিক বন্যা পণ্য (NASA LANCE)
প্রদানকারী
NASA LANCE
লাইসেন্স
NASA উন্মুক্ত তথ্য
সময়কাল
দৈনিক; উপগ্রহ শনাক্তকরণ; মেঘের কারণে ফাঁক থাকে
নির্মাণের সময় সর্বশেষ
2026-10-14
রেজোলিউশন
প্রায় 250 মি. গ্রিড
অনিশ্চয়তা
উপগ্রহ শনাক্তকরণ; মেঘের কারণে ফাঁক থাকে। প্রদানকারী যেভাবে প্রকাশ করে সেভাবে উপগ্রহ বা মডেল রাস্টার। মেঘ, সোয়াথের ফাঁক ও আহরণ ত্রুটি ফাঁক ও গোলমাল সৃষ্টি করে; মানগুলো নির্দেশক, কোনো স্থানের পরিমাপ নয়।
যার মাধ্যমে পৌঁছানো হয়
এই সাইটের ডেটা রিলে, gibs.earthdata.nasa.gov থেকে
এই স্তর সম্পর্কে
প্রমাণ
পর্যবেক্ষিত (মেঘ ও উপগ্রহ অতিক্রমের সময়ের কারণে ফাঁক থাকে)
উৎস
VIIRS NOAA-20 375 মি. (FIRMS) (NASA LANCE FIRMS)
প্রদানকারী
NASA LANCE FIRMS
লাইসেন্স
NASA উন্মুক্ত তথ্য
সময়কাল
দৈনিক; উপগ্রহ শনাক্তকরণ; মেঘ ও উপগ্রহ অতিক্রমের সময়ের কারণে ফাঁক থাকে
নির্মাণের সময় সর্বশেষ
2026-10-13
রেজোলিউশন
প্রায় 500 মি. গ্রিড
অনিশ্চয়তা
প্রদর্শিত দিনের উপগ্রহ হটস্পট শনাক্তকরণ, গ্যাস শিখা ও শিল্প তাপসহ; এটি নিশ্চিত আগুন, ঘটনার প্রতিবেদন বা সতর্কবার্তা নয়।
যার মাধ্যমে পৌঁছানো হয়
এই সাইটের ডেটা রিলে, gibs.earthdata.nasa.gov থেকে
এই স্তর সম্পর্কে
প্রমাণ
প্রাক্কলিত
উৎস
GPM IMERG (NASA GES DISC)
প্রদানকারী
NASA GES DISC
লাইসেন্স
NASA উন্মুক্ত তথ্য
সময়কাল
দৈনিক; স্যাটেলাইট প্রাক্কলন, প্রায় তাৎক্ষণিক
নির্মাণের সময় সর্বশেষ
2026-10-12
রেজোলিউশন
প্রায় 2 কিমি. গ্রিড
অনিশ্চয়তা
স্যাটেলাইট প্রাক্কলন, প্রায় তাৎক্ষণিক। সরবরাহকারী যেভাবে প্রকাশ করে সেভাবে স্যাটেলাইট বা মডেলের রাস্টার। মেঘ, স্ক্যান-পথের ফাঁক ও আহরণের ত্রুটি ফাঁক ও গোলমাল রেখে যায়; মানগুলো সূচক, কোনো স্থানের পরিমাপ নয়।
যার মাধ্যমে পৌঁছানো হয়
এই সাইটের ডেটা রিলে, gibs.earthdata.nasa.gov থেকে
এই স্তর সম্পর্কে
প্রমাণ
পর্যবেক্ষিত
উৎস
VIIRS NOAA-20 সংশোধিত প্রতিফলন (NASA LANCE)
প্রদানকারী
NASA LANCE
লাইসেন্স
NASA উন্মুক্ত তথ্য
সময়কাল
দৈনিক; স্যাটেলাইট চিত্র
নির্মাণের সময় সর্বশেষ
2026-10-14
রেজোলিউশন
প্রায় 250 মি. গ্রিড
অনিশ্চয়তা
স্যাটেলাইট চিত্র। সরবরাহকারী যেভাবে প্রকাশ করে সেভাবে স্যাটেলাইট বা মডেলের রাস্টার। মেঘ, স্ক্যান-পথের ফাঁক ও আহরণের ত্রুটি ফাঁক ও গোলমাল রেখে যায়; মানগুলো সূচক, কোনো স্থানের পরিমাপ নয়।
যার মাধ্যমে পৌঁছানো হয়
এই সাইটের ডেটা রিলে, gibs.earthdata.nasa.gov থেকে
এই স্তর সম্পর্কে
প্রমাণ
প্রাক্কলিত
উৎস
বিশ্বের গ্রিডভিত্তিক জনসংখ্যা v4.11 (NASA SEDAC (CIESIN, কলম্বিয়া বিশ্ববিদ্যালয়))
প্রদানকারী
NASA SEDAC (CIESIN, কলম্বিয়া বিশ্ববিদ্যালয়)
লাইসেন্স
CC BY 4.0
সময়কাল
null; আদমশুমারিভিত্তিক প্রাক্কলন, স্থির (2020)
রেজোলিউশন
প্রায় 1 কিমি. গ্রিড
অনিশ্চয়তা
2020 সালে প্রতি বর্গকিলোমিটারে মানুষের আদমশুমারিভিত্তিক প্রাক্কলন, ঝুঁকির সংস্পর্শের প্রেক্ষাপট হিসেবে দেখানো; কোনো বিপদে ক্ষতিগ্রস্ত মানুষের গণনা নয়।
যার মাধ্যমে পৌঁছানো হয়
এই সাইটের ডেটা রিলে, gibs.earthdata.nasa.gov থেকে
এই স্তর সম্পর্কে
প্রমাণ
Modelled (latest year GIBS publishes)
উৎস
MODIS Terra and Aqua land cover (MCD12Q1) (NASA LP DAAC)
প্রদানকারী
NASA LP DAAC
লাইসেন্স
NASA উন্মুক্ত তথ্য
সময়কাল
yearly; Satellite classification; latest year GIBS publishes
নির্মাণের সময় সর্বশেষ
2024-01-01
রেজোলিউশন
প্রায় 500 মি. গ্রিড
অনিশ্চয়তা
Satellite land cover classes for the year shown, including croplands; a classification with known errors, not a farm register.
যার মাধ্যমে পৌঁছানো হয়
এই সাইটের ডেটা রিলে, gibs.earthdata.nasa.gov থেকে

সর্বশেষ প্রাপ্ত

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © OpenStreetMap অবদানকারীরা (ODbL) · Natural Earth

সর্বশেষ NASA চিত্র লোড হচ্ছে।

সরাতে টানুন। জুম করতে Ctrl বা ⌘ ধরে স্ক্রল করুন, পিঞ্চ করুন বা বোতাম ব্যবহার করুন; কার্সরের নিচের মান দেখতে ওপরে রাখুন; রিসেট অঞ্চলে ফিরিয়ে আনে।

Hazards now, framed on the world.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.

Data: NASA GIBS · ASTER GDEM · Blue Marble · © OpenStreetMap contributors · Natural Earth · NASA EONET · U.S. Geological Survey · NASA JPL OPERA DIST-ALERTSources and licences

  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • VIIRS near-real-time products (flood, land surface temperature, snow cover, corrected reflectance), NASA LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • NASA Fire Information for Resource Management System (FIRMS), VIIRS 375 m active fire product, NASA LANCE; vector tiles via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • GPM IMERG precipitation, NASA Precipitation Processing System; distributed by the NASA Goddard Earth Sciences Data and Information Services Center (GES DISC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Licensed under CC BY 4.0. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). doi:10.7927/H49C6VHW. CC BY 4.0
  • MODIS land products (vegetation indices, gross primary production, land cover), NASA LP DAAC and LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • ASTER GDEM is a product of METI and NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Cite as: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019). ASTER Global Digital Elevation Model V003. doi:10.5067/ASTER/ASTGTM.003. NASA open data
  • Natural Earth দিয়ে তৈরি। বিনামূল্যের ভেক্টর ও রাস্টার মানচিত্র তথ্য @ naturalearthdata.com। পাবলিক ডোমেইন
  • © OpenStreetMap contributors (ODbL), via NASA GIBS (coastlines, boundaries, roads and place names). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). ODbL
  • Blue Marble, NASA Earth Observatory; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • গ্লোব ও সমতল মানচিত্রে প্রেক্ষাপট: উপকূলরেখা, সীমানা, সড়ক ও স্থাননাম NASA GIBS রেফারেন্স স্তর থেকে (OpenStreetMap তথ্য, ODbL, © OpenStreetMap contributors); ঐচ্ছিক ভিত্তি হিসেবে Blue Marble চিত্র; 3D ভূভাগ ও উচ্চতা পাঠ ASTER GDEM উচ্চতা রঙ সূচক থেকে (5 m থেকে 200 m শ্রেণি, স্পষ্টতার জন্য অতিরঞ্জিত)। সীমানা যেভাবে প্রকাশিত সেভাবেই আঁকা এবং কোনো ভূখণ্ড সম্পর্কে অবস্থান বোঝায় না।
  • সরাসরি ঘটনা: NASA Earth Observatory Natural Event Tracker (EONET); ঘটনাগুলো নির্দেশক এবং মূল উৎসের লিংক বজায় রাখে।
  • সরাসরি: NASA EONET ঘটনাগুলো নির্দেশক, কর্তৃপক্ষের সতর্কতা নয়।
  • সরাসরি: U.S. Geological Survey ঘটনাগুলো নির্দেশক, কর্তৃপক্ষের সতর্কতা নয়।
  • Observed (EO): NASA JPL OPERA DIST-ALERT (contains modified Copernicus Sentinel data 2026). We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS).
  • NASA GIBS: আমরা নাসার আর্থ সায়েন্স ডেটা অ্যান্ড ইনফরমেশন সিস্টেম (ESDIS)-এর অংশ নাসার গ্লোবাল ইমেজারি ব্রাউজ সার্ভিসেস (GIBS) প্রদত্ত চিত্র ব্যবহারের কথা স্বীকার করি।
  • নদীপ্রবাহ পূর্বাভাস, পরিসরসহ 30 দিন (Open-Meteo-র মাধ্যমে GloFAS): 2026 সালের পরিবর্তিত Copernicus Emergency Management Service তথ্য ধারণ করে; এটি বন্যা সতর্কতা নয়।
  • আবহাওয়ার ডেটা: Open-Meteo.com (https://open-meteo.com/), লাইসেন্স CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/).
  • ঐচ্ছিক স্তর (স্তর তালিকায় 20টি উৎস: সরাসরি, পূর্বাভাস, পর্যবেক্ষিত ও প্রেক্ষাপট) চালু করলে মানচিত্রে ও এখানে প্রদানকারীর কৃতিস্বীকার দেখায়; পূর্বাভাস মডেলের ফল এবং উদ্ভূত সূচক অনুমান।

স্তর ও তারিখ

  • বন্যার পানি, 3 দিনের সমন্বিত চিত্র: VIIRS Global Flood Product, NASA LANCE · 14 অক্টোবর 2026
  • সক্রিয় আগুন ও তাপীয় অসংগতি: VIIRS NOAA-20 375 মি (FIRMS), NASA LANCE FIRMS · 13 অক্টোবর 2026
  • বৃষ্টিপাতের হার, দৈনিক গড়: GPM IMERG, NASA GES DISC · 12 অক্টোবর 2026
  • প্রকৃত রং: VIIRS NOAA-20 সংশোধিত প্রতিফলন, NASA LANCE · 13 অক্টোবর 2026
  • Population density, 2020: Population: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · static
  • Land cover type (IGBP), yearly: MODIS Terra and Aqua land cover (MCD12Q1), NASA LP DAAC · 2024

04ব্যবস্থা

Tools designed for the work.

EWS

পূর্বাভাস যাচাইকরণ

Forecast verification and warning support; issuing warnings stays with authorised parties. See NXS-EWS (multi-hazard monitoring and warning).

AAP

Anticipatory action

Trigger evaluation and preparedness, with no automatic fund release or dispatch. See NXS-AAP (anticipatory action and triggers).

05প্রক্রিয়া

How the process runs.

Process explorer · Process

Early warning capability: Policy question to decision

9 steps5 stages1 gate

প্রক্রিয়া

Early warning capability: Policy question to decision

A priority becomes a question, evidence, a decision case and a limited publication; the competent authority decides, never the programme.

  1. 01 Question

    1. 01A priority becomes a questionStep · Universe; national counterpartsA priority becomes a researchable question with stated criteria. National counterparts own the agenda, data and decisions.
    2. 03Scientific and stakeholder challengeStep · GCRI; the Global Risks Forum (GRF)Scientific and affected-stakeholder challenge informs mission selection and methods.
  2. 02 Evidence and options

    1. 04Assemble the evidenceStep · GCRIMethods, labelled data and uncertainty are assembled. Every finding carries one of nine evidence labels.
    2. 06Decision case with optionsRecord · The decision owner named in the caseA decision case binds owner, alternatives, evidence and deadline. It needs sensitivity and robustness.
  3. 03 Review and publication

    1. 07G6 · Publication authorisedGate · The Global Risks ForumGRF authorises publication of results that have passed scientific and editorial review. It cannot publish personal data.
    2. 08Publish with method, uncertainty and limitsRecord · ReportsFindings are published with their method, uncertainty and limits. An edition is published after review, not to a calendar.
  4. 04 Outside the programme

    1. 02Competent authority decidesDecision · The competent authorityThe authority or institution decides under its own rules. The authority decides; the programme informs.
    2. 05Action and implementation stay with the ownersActor · The relevant government, operator or licensed institutionDecisions and execution stay with the relevant government, operator or licensed institution. The programme records one only if shared.
  5. 05 Learning

    1. 09Corrections and lessons feed the next agendaStep · UniverseCorrections and lessons feed the next annual agenda. The findings of one year set the mandate of the next.

The Nexus cycle · Decision rights · The programme yearDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation.

06Exercise controls

Simulation is never confused with reality.

  • A master scenario events list with exercise controllers and simulation cells.
  • Independent evaluators who test objectives and observable performance, not attendance.
  • Time control, safety holds and an explicit real-world-emergency override.
  • Simulated warnings never reach live audiences, and real infrastructure is never an unapproved target.
  • Dissent and adverse findings are preserved in the after-action record.
07Deliverables

What a preparedness engagement produces.

  • A preparedness gap analysis
  • A scenario package
  • সতর্কতা ও ট্রিগার যাচাই
  • Exercise observations and an improvement plan
  • Handoffs to the competent authorities
08অবস্থা

What is open today.

Information and enquiries are open today. Disaster-management authorities, hydrometeorological services and humanitarian organisations can write to the contact form. The research is on Early warning research. The Global Risks Forum (GRF) examines the governance of disasters on Disaster and crisis governance. The Consortium is not an emergency service. In immediate danger, contact your local emergency services.

09প্রশ্ন

Questions and answers.

Does GCRI issue warnings?
No. Authority warnings are issued only by authorised national services. GCRI supports their work with verification, analysis and exercises.
Can a trigger evaluated here release funds automatically?
No. There is no automatic fund release or dispatch. Decisions stay with the competent authority and the financial institution concerned.
Does GCRI work with national hydrometeorological services?
Source agencies such as hydrometeorological and geological services can agree a source and methods interface. Their original source authority is retained, and programme estimates stay labelled as estimates. No specific agreement is claimed on this page.
Who can request an exercise?
A relevant authority, operator, humanitarian organisation or technical programme, with an approved scope and an exercise owner.
Global Centre for Risk and Innovation

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.