Skip to content

GCRI · Digital Public Infrastructure

Digital service resilience

When identity, payment or benefit systems fail, people cannot prove who they are, get paid or receive help. Public digital services must withstand outages, cyber attacks and surges in demand, and degrade gracefully when they cannot. This page sets out how digital public services fail and recover, how resilience is measured, and what evidence serves the agencies and regulators responsible.

01رجسٹر

Digital service resilience on the record.

02The question

Digital service resilience: how the risk develops.

Outage, cyber and operational controls. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

طریقۂ کار

Shared components fail together

Services that share an identity layer, payment switch or hosting platform fail together when that component fails.

طریقۂ کار

Demand surges overwhelm

Benefit applications in a crisis, tax deadlines and enrolment periods can overload systems designed for normal demand.

طریقۂ کار

Attacks target public systems

Ransomware and denial-of-service attacks on public systems disrupt services and can expose the personal data of many people.

طریقۂ کار

Fallbacks protect people

Offline modes, manual processes and alternative channels let people still receive essential services during outages.

03جغرافیہ

Connected activity in India.

Night lights, population density and true-colour imagery over India, from NASA GIBS. Each layer carries its own date.

انٹرایکٹو نقشے کے لیے JavaScript درکار ہے؛ پرتوں کی فہرست اور ماخذات نیچے دیے گئے ہیں۔

پرتیں 3

Connected activity, for this page

تازہ ترین دستیاب

NASA GIBS / EOSDIS · ASTER GDEM (METI، NASA) · Blue Marble (NASA) · © OpenStreetMap کے معاونین (ODbL) · Natural Earth

NASA کی تازہ ترین تصاویر لوڈ ہو رہی ہیں۔

منتقل کرنے کے لیے گھسیٹیں۔ زوم کے لیے Ctrl یا ⌘ کے ساتھ اسکرول کریں، چٹکی لیں یا بٹن استعمال کریں؛ پوائنٹر کے نیچے اقدار کے لیے ہوور کریں؛ ری سیٹ خطے پر واپس لے جاتا ہے۔

Connected activity, framed on India.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.

Data: NASA GIBS · ASTER GDEM · Blue Marble · © OpenStreetMap contributors · Natural Earth · NASA EONET · NASA HLS S30Sources and licences

  • ہم NASA کی Global Imagery Browse Services (GIBS) کی خدمات سے فراہم کردہ تصاویر کے استعمال کا اعتراف کرتے ہیں، جو NASA کے Earth Science Data and Information System (ESDIS) کا حصہ ہے۔ رنگ شائع شدہ رنگی نقشے سے دوبارہ بنائے گئے؛ جہاں دکھائی گئی ہیں، اقدار کا مسدس خانوں میں اوسط لیا گیا (ترمیم شدہ)۔ NASA کا کھلا ڈیٹا
  • ہم NASA کی Global Imagery Browse Services (GIBS) کی خدمات سے فراہم کردہ تصاویر کے استعمال کا اعتراف کرتے ہیں، جو NASA کے Earth Science Data and Information System (ESDIS) کا حصہ ہے۔ رنگ شائع شدہ رنگی نقشے سے دوبارہ بنائے گئے؛ جہاں دکھائی گئی ہیں، اقدار کا مسدس خانوں میں اوسط لیا گیا (ترمیم شدہ)۔ NASA کا کھلا ڈیٹا
  • VIIRS Black Marble رات کی روشنیاں، NASA Goddard Space Flight Center؛ تقسیم کار NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC)؛ تصاویر بذریعہ NASA GIBS۔ رنگ شائع شدہ رنگی نقشے سے دوبارہ بنائے گئے؛ جہاں دکھائی گئی ہیں، اقدار کا مسدس خانوں میں اوسط لیا گیا (ترمیم شدہ)۔ NASA کا کھلا ڈیٹا
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Licensed under CC BY 4.0. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). doi:10.7927/H49C6VHW. CC BY 4.0
  • VIIRS کی تقریباً حقیقی وقت کی مصنوعات (سیلاب، زمینی سطح کا درجہ حرارت، برف کا احاطہ، درست شدہ انعکاس)، NASA LANCE؛ تصاویر بذریعہ NASA GIBS۔ رنگ شائع شدہ رنگی نقشے سے دوبارہ بنائے گئے؛ جہاں دکھائی گئی ہیں، اقدار کا مسدس خانوں میں اوسط لیا گیا (ترمیم شدہ)۔ NASA کا کھلا ڈیٹا
  • MODIS زمینی مصنوعات (نباتاتی اشاریے، مجموعی بنیادی پیداوار، زمینی احاطہ)، NASA LP DAAC اور LANCE؛ تصاویر بذریعہ NASA GIBS۔ رنگ شائع شدہ رنگی نقشے سے دوبارہ بنائے گئے؛ جہاں دکھائی گئی ہیں، اقدار کا مسدس خانوں میں اوسط لیا گیا (ترمیم شدہ)۔ NASA کا کھلا ڈیٹا
  • ASTER GDEM، METI اور NASA کی پروڈکٹ ہے (ASTER Global Digital Elevation Model V003، NASA LP DAAC)؛ تصاویر بذریعہ NASA GIBS۔ رنگ شائع شدہ رنگی نقشے سے دوبارہ بنائے گئے؛ جہاں دکھائی گئی ہیں، اقدار کا مسدس خانوں میں اوسط لیا گیا (ترمیم شدہ)۔ حوالہ: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019)۔ ASTER Global Digital Elevation Model V003۔ doi:10.5067/ASTER/ASTGTM.003. NASA کا کھلا ڈیٹا
  • Natural Earth کے ساتھ تیار کردہ۔ مفت ویکٹر اور راسٹر نقشہ ڈیٹا @ naturalearthdata.com۔ عوامی ملکیت
  • © OpenStreetMap contributors (ODbL), via NASA GIBS (coastlines, boundaries, roads and place names). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). ODbL
  • Blue Marble، NASA Earth Observatory؛ تصاویر بذریعہ NASA GIBS۔ رنگ شائع شدہ رنگی نقشے سے دوبارہ بنائے گئے؛ جہاں دکھائی گئی ہیں، اقدار کا مسدس خانوں میں اوسط لیا گیا (ترمیم شدہ)۔ NASA کا کھلا ڈیٹا
  • گلوب اور ہموار نقشے پر سیاق و سباق: NASA GIBS کی حوالہ جاتی پرتوں سے ساحلی لکیریں، سرحدیں، سڑکیں اور مقامات کے نام (OpenStreetMap ڈیٹا، ODbL، © OpenStreetMap کے معاونین)؛ اختیاری بنیاد کے طور پر Blue Marble تصاویر؛ ASTER GDEM بلندی کے رنگی اشاریے سے 3D زمینی سطح اور بلندی کی ریڈنگ (5 m سے 200 m کی جماعتیں، وضاحت کے لیے مبالغہ آمیز)۔ سرحدیں شائع شدہ صورت میں کھینچی گئی ہیں اور کسی علاقے کے بارے میں کوئی موقف ظاہر نہیں کرتیں۔
  • براہ راست واقعات: NASA Earth Observatory Natural Event Tracker (EONET)؛ واقعات اشاریاتی ہیں اور اپنے اصل ماخذ کے لنکس برقرار رکھتے ہیں۔
  • Observed (EO): NASA HLS S30 (contains modified Copernicus Sentinel data 2026). We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS).
  • NASA GIBS: ہم NASA کی Global Imagery Browse Services (GIBS) کی خدمات سے فراہم کردہ تصاویر کے استعمال کا اعتراف کرتے ہیں، جو NASA کے Earth Science Data and Information System (ESDIS) کا حصہ ہے۔
  • اختیاری پرتیں (پرتوں کی فہرست میں 5 ماخذات: براہ راست، پیش گوئی، مشاہدہ شدہ اور سیاق) فعال ہونے پر اپنے فراہم کنندہ کا حوالہ نقشے پر اور یہاں درج کرتی ہیں؛ پیش گوئیاں ماڈل کا نتیجہ ہیں اور اخذ شدہ اشاریے تخمینے ہیں۔

پرتیں اور تاریخیں

  • رات کی روشنیاں، یومیہ: VIIRS Black Marble (VNP46A2)، NASA LAADS DAAC · 12 اکتوبر 2026
  • Population density, 2020: Population: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · static
  • سیلابی پانی، 3 روزہ مرکب: VIIRS Global Flood Product، NASA LANCE · 14 اکتوبر 2026
  • حقیقی رنگ: VIIRS NOAA-20 درست شدہ انعکاس، NASA LANCE · 13 اکتوبر 2026
  • زمینی احاطے کی قسم (IGBP)، سالانہ: MODIS Terra اور Aqua زمینی احاطہ (MCD12Q1)، NASA LP DAAC · 2024
  • بہتر نباتاتی اشاریہ، مسلسل 8 دن: MODIS Terra EVI، NASA LANCE · 13 اکتوبر 2026

04Across the domains

Digital public services must stay up when other domains fail.

05نگرانی

DPI service health.

وہ اسکرین جو ایک ٹیم اس موضوع کی پیروی کے لیے استعمال کرے گی: اس کے پیمانے، حالتیں اور فیصلے۔ نام مثالیں ہیں اور اقدار توضیحی ہیں۔

DPI service health

Digital service resilience · Payment switch · Today

  • Transactions today
    3,798,4234فعال
  • Authentication success, %
    99.0معمول
  • Availability, % this month
    99.55معمول
  • Grievances open
    464نگرانی کریں
All rails operationalGCRI · Digital Public Infrastructure

Throughput

Rails

Identity verify3580.2معمول
Instant payment7510.4معمول
ڈیٹا کا تبادلہ9900.5Degraded
Offline fallbackلاگو نہیںلاگو نہیںStandby
DPI service health: the screen's structure, terms and states for Digital service resilience.Example names and illustrative values; a design, not a record or a live system.
06اشاریے

What is measured, and how well.

Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.

IndicatorUnitCadenceSource typeلیبل
Availability of critical public digital servicespercent of timemonthlyService monitoringمشاہدہ شدہ
Major outagescount and durationannualIncident recordsمشاہدہ شدہ
Cyber incidents affecting public servicescountannualNational CSIRT reportsPublished statistics
Services with tested offline fallbackpercent of critical servicesper assessmentContinuity test recordsرپورٹ شدہ
Peak load capacity relative to normalratioper testLoad testingمشاہدہ شدہ
Recovery time after major outageshoursper incidentIncident recordsمشاہدہ شدہ
07Simulator

Stocks, flows, delays and a tipping threshold.

Two stocks, pressure and adaptive capacity, joined by a reinforcing growth loop, a delayed balancing response and damage when pressure outruns capacity; past the threshold the system can tip. Teaching model with stated illustrative values, not a prediction. The map on this page shows India; the model itself is not tied to a place.

کنٹرولز

Growth of pressure
6.0% a year
Efficacy of capacity in reducing pressure
4.0% a year
Investment response to perceived pressure
20%
Perception delay
4.0 years
Tipping threshold of pressure
60 index
Amplification past the threshold
2.0 times
Years simulated
50 سال

ریڈنگز

Peak pressure
113 index
Capacity at the end
186 index
Years over the threshold
15.8 years
اعداد، طریقے اور ماخذات
سالPressureاستعدادPerceived
020.050.020.0
423.344.921.2
827.242.224.0
1231.742.327.7
1636.845.532.2
2042.351.537.2
2447.960.342.6
2853.271.348.0
3257.884.353.1
3666.498.458.4
4082.7115.969.7
4497.8139.783.8
48109.1169.497.3

طریقے

  1. System dynamics Forrester (1961), Industrial Dynamics, MIT Press; Sterman (2000), Business Dynamics
  2. Critical transitions and tipping points Scheffer and others (2009), Early-warning signals for critical transitions, Nature 461
  3. Causal loop diagram Sterman (2000), Business Dynamics, McGraw-Hill
  4. غیر یقینی کا پنکھا (پیرامیٹر Monte Carlo) Spiegelhalter، Pearson and Short (2011)، Visualising uncertainty about the future، Science 333
  5. ایک وقت میں ایک کی حساسیت (ٹورنیڈو) Saltelli and others (2008)، Global Sensitivity Analysis: The Primer، Wiley

ڈیٹا

اس ماڈل میں کوئی مشاہدہ شدہ ڈیٹا داخل نہیں ہوتا: یہ کنٹرولز سے طے شدہ تدریسی اقدار پر چلتا ہے، جنہیں کسی پروگرام کے اپنے شواہد سے بدلا جانا ہے۔

Stocks, flows, delays and a tipping threshold. Illustrative teaching model: it runs on the values set by the controls, not on measured data. Methods: System dynamics (Forrester (1961), Industrial Dynamics, MIT Press; Sterman (2000), Business Dynamics); Critical transitions and tipping points (Scheffer and others (2009), Early-warning signals for critical transitions, Nature 461); Causal loop diagram (Sterman (2000), Business Dynamics, McGraw-Hill).
08ماخذات

Where the evidence comes from.

Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.

ماخذWhat it givesLicence class
National CSIRT and cyber agency reportsIncidents affecting public servicesPublic, terms per agency
Published post-incident reviews of government digital servicesCauses and recovery of outagesPublic records, terms per publisher
NIS2 Directive requirements for public administrationResilience obligations for public entities in the EUPublic, EU terms
Government service performance dashboardsAvailability and usage of digital servicesOpen data where published
ENISA reports on public sector cybersecurityThreats and good practicePublic, ENISA terms
09جڑواں اور سلسلہ وار اثر کا سمیلیٹر

Model digital service resilience as a system. Run the cascade.

Assembled from the Nexus Standards area profile Cyber and digital resilience law alignment: the hazards it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Choose the components, pick an initiating hazard and step through the cascade. The Map view places the run on an example geography with open data. Every coupling weight is a stated assumption you can change. A teaching model, not a forecast, an assessment or a certification. To model a place of your own choosing, open the full System Builder.

خطرات

  • Dam failure
  • Sea-ice loss
  • Coastal erosion (set off downstream)
  • River flood (set off downstream)
  • Flash flood (set off downstream)
  • بڑے پیمانے پر نقل مکانی (آگے کے شعبوں میں اثر)
  • Biodiversity loss (set off downstream)
  • بجلی کی وسیع بندش (آگے کے شعبوں میں اثر)
  • Water supply shortfall (set off downstream)
  • Arctic winter sea-ice collapse (set off downstream)
  • Polar vortex disruption (set off downstream)

کنٹرولز

  • NS-10 پالیسیاں اور شقیں (مشین کے پڑھنے کے قابل ذمہ داریاں: تعریف، پابندی، تشخیص اور نفاذ)
  • NS-11 تصدیق اور نگرانی (شواہد، تصدیق نامے، zero-trust مطابقت کا مشاہدہ)
  • NS-9 سیاقی UNIs (تعیناتیاں، مثالیں، پروگرام کی مثالیں)
  • NRS-X6 سائبر اور ڈیجیٹل سلامتی کا خطرہ
  • NRS-H93 خطرات کا خاندان: شناخت، اعتماد اور خفیہ نگاری کی ناکامی (NHS-1 cyber.identity)
  • NRS-K31 شعبہ جاتی پیک کا خاکہ: قومی سائبر لچک (DOMAIN-031)
  • NRS-H54 خطرات کا خاندان: سگنل اور پلیٹ فارم میں خلل (NHS-1 cyber.platform)
  • NRS-H86 خطرات کا خاندان: ٹیلی کام اور ڈیٹا سینٹر کی ناکامی (NHS-1 infra.digital)
  • NRS-H94 خطرات کا خاندان: نظامی سائبر واقعات (NHS-1 cyber.systemic-cyber)

مشاہدہ

  • NIST National Vulnerability Database APIs (listed for reference)
  • CISA Known Exploited Vulnerabilities catalogue (listed for reference)
  • EUR-Lex Cellar (EU legal acts and delegated acts) (listed for reference)
  • Cybersecurity Supply Chain Risk Management
  • Legal measures pillar of the Global Cybersecurity Index

مثالی جغرافیہ

  • North America: 243 hexagonal cells
  • آج رات کی روشنیاں، بندشیں (VIIRS Day/Night Band)، NASA GIBS
  • بادلوں کے پار سطحی پانی، 30 m (OPERA DSWx-S1 ریڈار)، NASA GIBS
  • بارش کی شرح، گزشتہ نصف گھنٹہ (IMERG)، NASA GIBS
  • Vegetation disturbance alerts, 30 m (OPERA DIST-ALERT), NASA GIBS
10Decisions

Who decides, and what the evidence serves.

Digital Public Infrastructure prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.

کون فیصلہ کرتا ہےThe questionEvidence this page serves
Digital government agenciesWhere to add redundancy, capacity and fallbacksDependency maps; continuity reviews
Social protection and tax agenciesHow to keep services available at peak and in crisesLoad testing evidence
Regulators and auditorsWhat resilience to require and checkIncident and availability evidence

Outputs this topic produces

  • Shared component dependency maps
  • Surge and load testing designs
  • Fallback and continuity reviews
  • Evidence notes for resilience requirements
11Methods and evidence

How digital service resilience is modelled, measured and tested.

The model, its assumptions, its data and its uncertainty, in the form a scientist or engineer would check. Structures follow published methods. The values drawn are illustrative, not findings.

Datasets and provenance

The data classes behind digital service resilience and what is recorded about each before it is used.

Data classProvenance recordedResolution statedLicence checked
Satellite imagery, optical and radarsensor, processing level, acquisition datepixel size and revisitper scene
Reanalysis and climate model outputmodel, experiment, member, versiongrid and time stepper release
In-situ sensors and gaugesstation, instrument, calibration recordpoint and sampling rateper network
Population and asset exposuremethod, vintage, input sourcescell size and unitper release
Boundaries and reference geographyproducer, edition, datescaleper edition
نسب
W3C PROV record from source to figure
اصول
FAIR: findable, accessible, interoperable, reusable
Gaps
shown as missing, never filled silently
Data classes and the provenance fields recorded for each; a dataset is listed by name only once its licence admits the use.
FAIR guiding principles · GO FAIR and FORCE11W3C PROV · World Wide Web ConsortiumGuidance on consistent treatment of uncertainties · IPCCCEOS Analysis Ready Data · Committee on Earth Observation Satellites
12Core questions

What experts ask.

A digital public service is only as dependable as its weakest dependency. Identity, payment and data exchange components are shared across many services, so an outage in one can halt several at once. Demand surges, for example during an emergency benefit programme, can overwhelm systems that perform well in normal times. Resilience requires engineering, operations and governance that plan for failure.

  • Which public services are essential, and what minimum level of service must they maintain during disruption?
  • Which shared components do they depend on, and what happens to each service if one fails?
  • How quickly can services be restored, and have recovery plans been tested?
  • What offline or assisted channels let people reach essential services while digital systems are down?
13Mechanisms

Drivers and processes.

Resilience depends on design, operations and fallback arrangements.

Design

Architecture for failure

Redundancy, graceful degradation and isolation of components so that one failure does not take down everything.

Operations

Monitoring and response

Capacity planning, change control, monitoring and incident response. Many outages follow changes or updates.

Fallback

Continuity channels

Offline procedures, assisted service and deferred processing that keep essential functions running.

Resilience is often traded away quietly. Paper processes are retired to save money, the staff who knew manual procedures move on, and redundancy is cut because it was never used. Evidence from outages suggests that maintaining and exercising fallback arrangements for the most essential functions is one of the most cost-effective resilience measures available.

14Methods and data

How the evidence is built, and its limits.

  1. 01

    Service level data

    Availability and performance records. Public reporting by government services is uneven.

  2. 02

    Incident reviews

    Post-incident reports show causes and lessons. Blame-free review encourages candour.

  3. 03

    مشقیں

    Simulated outages and cyber incidents test plans. Digital service continuity is the platform's Universe theme.

  4. 04

    Dependency mapping

    Maps of shared components and their failure impact, applying cybersecurity and cryptography and high-performance, cloud and edge computing.

16Where this page's references

اس صفحے کے حوالے کہاں لے جاتے ہیں۔

وہ ادارے اور دستاویزات جن کے تناظر میں یہ صفحہ پڑھا جاتا ہے۔ حیثیت اور ایڈیشن بدلتے رہتے ہیں؛ ہر لنک جاری کرنے والے ادارے تک جاتا ہے۔

17سوالات

سوالات و جوابات۔

What is graceful degradation in public services?
Designing services so that, when parts fail, essential functions continue in a reduced form, such as offline verification or manual processing.
Why do shared components matter?
Because when many services depend on one identity, payment or hosting component, its failure disrupts all of them at once.
How are digital services tested for surges?
Through load and stress testing that simulates peak demand, combined with capacity plans for crisis periods.
What is graceful degradation?
Designing a service so that, when part of it fails, essential functions continue at a reduced level instead of the whole service stopping.
Why do many outages follow updates?
Because changes introduce errors or unexpected interactions. Staged rollout, testing and quick rollback reduce the risk.
Is the platform an operator of public services?
No. It studies resilience and does not operate, monitor or support any live service.
Are demand surges a resilience issue?
Yes. Emergencies often create sudden demand for digital services, such as benefit applications, which can overwhelm systems sized for normal use.
رپورٹیںحصہ ڈالیں

اس صفحے سے شواہد فراہم کریں۔

Reports is the Consortium's quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

GCRIڈیجیٹل عوامی بنیادی ڈھانچہحکمت عملی کے نظامتیزی سے بڑھتی ٹیکنالوجی
ڈیجیٹل عوامی بنیادی ڈھانچہ

Bring a method, a dataset or a question.

معلومات اور استفسارات آج کھلے ہیں۔ استفسار کو ایک حوالہ نمبر ملتا ہے اور اگلے مرحلے کی نشاندہی ہوتی ہے؛ درخواستیں، ادائیگیاں، کمپیوٹنگ کی تخصیص اور رجسٹریشن صرف اس وقت کھلتی ہیں جب ان کی ٹیم، شرائط اور جائزے کی استعداد موجود ہو۔