Skip to content

GCRI · Civak û pêşketina mirovî

Dane û rêbazên teknîkî

The public technical tools of Society and Human Development: the models and data behind them, how to reproduce a view and the uncertainty it carries.

01Qada xebatê

The workspace for data and technical methods.

Pipeline

Data and technical methods · Workspace WS-86 · Example interface, not a record

One stage waitingGCRI · Society and Human Development

Stages

  1. Ingest3 çavkanî
  2. Erê bikeschema · licence
  3. Transformversioned
  4. ModelSocial
  5. Ceribandinheld-out
  6. Releasewith limits

Berhem

Household surveyv2.8VekirîSURVEY
Displacement trackingv6.2VekirîREPORTED
Social registryv2.3Ji bo kontrolkirinêStatîstîkên weşandî
School recordsv4.1VekirîREPORTED

Compute quota

share used vs alert level

CPU hours22 used of 80 used limitStorage35 used of 90 used limitGPU hours41 used of 70 used limit
Pipeline.Navrûyeke ronîker; ne daneya zindî ye.

Society and Human Development · Pipeline. Pipeline: example names and illustrative values, not a record.

02Amûr

What is published here.

Nexşe

Released maps

Open the released maps

Model

Reviewed models and scenarios

Open the reviewed models

Scenarios

Sector scenarios

Open the sector scenarios

03Fitness for purpose

What every human development tool should state about itself.

Human development tools serve social ministries, humanitarian planners and statistics offices. A specialist checks survey years, aggregation protecting individuals and the weighting of composite indices. Tools rest on spatial statistics and social science and support the poverty and inequality and urban vulnerability topics. Small-area estimates are published only above a population threshold that prevents identification.

  • Survey year of social data.
  • Aggregation protecting individuals.
  • Composite index weighting.
04Pêvajo

Pêvajo çawa dimeşe.

Process explorer · Process

Data and technical methods: Build, sign and accept

10 steps4 qonax2 derî

Pêvajo

Data and technical methods: Build, sign and accept

An admitted mission becomes a cycle project; the build is pinned, verified and signed, and the Global Risks Forum (GRF) records acceptance for exercise, not permission to deploy.

  1. 01 Request and sources

    1. 01Admitted mission becomes a cycle projectTomar · Universe to FoundryAn admitted mission becomes a cycle project with a decision case.
    2. 02Qualify data sources and resourcesStep · the Global Centre for Risk and Innovation (GCRI)GCRI qualifies data sources and resource offers and builds the scenario models. An offer is not an allocation.
  2. 02 Build and verify

    1. 03Source snapshotTomar · NXS-FAC (blueprints, builds and signing)The snapshot pins the commit, dependencies and generator versions.
    2. 04Build contractRecord · NXS-FAC (blueprints, builds and signing)The build contract declares the artefact kind, environment and reproducibility envelope.
    3. 05Integrate and buildModel · GCRIGCRI integrates software and data, signs builds, and tests security and interoperability.
    4. 06Verification suiteGate · NXS-FAC (blueprints, builds and signing)Required and advisory checks stay separate. Reproducibility needs pinned inputs, declared nondeterminism and independent rebuilds.
  3. 03 Sign and admit

    1. 07Sign the exact artefactStep · NXS-FAC (blueprints, builds and signing)NXS-FAC builds, attests and requests a signature via a scoped signer identity. It holds no key material.
    2. 08Package admissionStep · NXS-NXQ (software, models and capability lifecycle)NXS-NXQ receives the signed package and keeps admission evidence that binds the task, data class, evaluation suite and expiration.
  4. 04 Accept

    1. 09Core Build ReportTomar · GCRIThe Core Build Report is the go or no-go record. Universe assembles the Core and holds the decision for the exercise.
    2. 10G3 · Avakirin ji bo pratîkê hatiye pejirandinDerî · The Global Risks ForumGRF records whether the build is accepted for exercise. A signed build or release candidate is not permission to deploy to production.

Salê bernameyê · NXS-FAC · UniverseDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The record order follows the Builds and Releases room lists of NXS-FAC.

05Build environment

Working with the tools.

Analysis runs in Foundry for authorised projects. Public pages show released views only, each with its time and space reference and its rights.

06Çavkanî

Where this page’s references lead.

Sazî û belgeyên ku ev rûpel li hember wan tê xwendin. Rewş û çap diguherin; her girêdan diçe ba saziya derxistinê.

07Rûpel

Pages in Data and technical methods.

08Pirs

Pirs û bersiv.

Can I use the data?
Each released view states its licence and terms. Data that is not released is not available through these pages.
rêzeya Pergalên StratejîkTevkarî bike

Ji vê rûpelê delîl bidin.

rêzeya Pergalên Stratejîk is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

GCRICivak û pêşketina mirovîXetera pergalan û berxwedana welatanKurteya delîlan
Civak û pêşketina mirovî

Rêbazek, danehevek an pirsek bîne.

Agahî û pirs îro vekirî ne. Pirsek referansekê distîne û gava piştî wê dide nasîn; serlêdan, drav, veqetandina hesabkirinê û tomarkirin tenê dema ku tîm, mercên wê û kapasîteya vekolînê hebin vedibin.