Skip to content

GCRI · Agency

Team formation

Most technical assistance is delivered by teams that combine disciplines: law and economics, engineering and safeguards, data and public finance. The risk lies less in any one member than in the interfaces between them and in who answers for the whole. This page sets out how teams are composed, where accountability breaks, how composition changes propagate through a work plan, and what the institutions that commission and receive the work need to see.

02The question

Team formation: how the risk develops.

Interdisciplinary assignments and accountability. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

Indlela yokusebenza

Interfaces carry the risk

Each discipline works to its own standards and vocabulary. Gaps open where an engineer’s design assumes a safeguard measure no one costed, or an economist’s model assumes a legal power the lawyer has not confirmed.

Indlela yokusebenza

Shared work, diffused accountability

When a deliverable has several contributors and no single accountable holder, quality checks fall between them. A named team leader with documented authority over content and schedule is the usual remedy, and often missing.

Indlela yokusebenza

Composition drifts

Members leave, are reassigned or are replaced mid-assignment. Each change loses context, relationships with counterparts and undocumented decisions, and the replacement inherits work they did not scope.

Indlela yokusebenza

Delays follow the critical path

One late input, such as a survey or a legal opinion, holds back every deliverable that depends on it. Downstream experts wait or proceed on assumptions, and rework compounds the original delay.

03Ijografi

People and hazards in East Africa.

Population density, night lights and flood water over East Africa, from NASA GIBS. Each layer carries its own date.

Imephu esebenzisanayo idinga i-JavaScript; uluhlu lweeleya nemithombo zingezantsi.

Iileya 3

People and hazards, for this page

Malunga nale leya
Ubungqina
Kuqikelelwe
Umthombo
Gridded Population of the World v4.11 (NASA SEDAC (CIESIN, Columbia University))
Umboneleli
NASA SEDAC (CIESIN, Columbia University)
Ilayisensi
CC BY 4.0
Uhlelo
null; Census-based estimate, static (2020)
Ucaciso
igridi emalunga ne-1 km
Ukungaqiniseki
Uqikelelo olusekelwe kubalo-bantu lwabantu kwikhilomitha-sikwere nganye ngo-2020, luboniswe njengemeko yokuchaphazeleka; asilonani labantu abachatshazelwe yiyo nayiphi na ingozi.
Kufikelelwe nge
this site's data relay, from gibs.earthdata.nasa.gov
Malunga nale leya
Ubungqina
Kuqwalaselwe
Umthombo
VIIRS Black Marble (VNP46A2) (NASA LAADS DAAC)
Umboneleli
NASA LAADS DAAC
Ilayisensi
Idatha evulekileyo ye-NASA
Uhlelo
imihla ngemihla; Ukukhanya okulinganiswe ngesathelayithi, kulungiselelwe ukukhanya kwenyanga nomoya
Okutsha ngexesha lokwakha
2026-10-12
Ucaciso
igridi emalunga ne-500 m
Ukungaqiniseki
Ukukhanya kwasebusuku okulinganiswe ngesathelayithi komhla oboniswayo; izibane zingumbonakaliso wokusetyenziswa kombane nokuqhawuka, hayi umlinganiselo wobonelelo okanye wokufikelela.
Kufikelelwe nge
this site's data relay, from gibs.earthdata.nasa.gov
Malunga nale leya
Ubungqina
Kuqwalaselwe (amafu ashiya izikhewu)
Umthombo
VIIRS Global Flood Product (NASA LANCE)
Umboneleli
NASA LANCE
Ilayisensi
Idatha evulekileyo ye-NASA
Uhlelo
imihla ngemihla; Ukufunyanwa ngesathelayithi; amafu ashiya izikhewu
Okutsha ngexesha lokwakha
2026-10-14
Ucaciso
igridi emalunga ne-250 m
Ukungaqiniseki
Ukufunyanwa ngesathelayithi; amafu ashiya izikhewu. I-raster yesathelayithi okanye yemodeli njengoko umboneleli eyipapasha. Amafu, izikhewu zokugubungela neempazamo zokufumana zishiya izikhewu nengxolo; amaxabiso zizalathisi, awayomilinganiselo kwindawo ethile.
Kufikelelwe nge
this site's data relay, from gibs.earthdata.nasa.gov
Malunga nale leya
Ubungqina
Kuqwalaselwe
Umthombo
VIIRS NOAA-20 corrected reflectance (NASA LANCE)
Umboneleli
NASA LANCE
Ilayisensi
Idatha evulekileyo ye-NASA
Uhlelo
imihla ngemihla; Umfanekiso wesathelayithi
Okutsha ngexesha lokwakha
2026-10-14
Ucaciso
igridi emalunga ne-250 m
Ukungaqiniseki
Umfanekiso wesathelayithi. I-raster yesathelayithi okanye yemodeli njengoko umboneleli eyipapasha. Amafu, izikhewu zokugubungela neempazamo zokufumana zishiya izikhewu nengxolo; amaxabiso zizalathisi, awayomilinganiselo kwindawo ethile.
Kufikelelwe nge
this site's data relay, from gibs.earthdata.nasa.gov
Malunga nale leya
Ubungqina
Kumodelwe (unyaka wamva nje opapashwa yi-GIBS)
Umthombo
MODIS Terra and Aqua isigubungelo somhlaba (MCD12Q1) (NASA LP DAAC)
Umboneleli
NASA LP DAAC
Ilayisensi
Idatha evulekileyo ye-NASA
Uhlelo
ngonyaka; Ukuhlelwa ngesathelayithi; unyaka wamva nje opapashwa yi-GIBS
Okutsha ngexesha lokwakha
2024-01-01
Ucaciso
igridi emalunga ne-500 m
Ukungaqiniseki
Iiklasi zesigubungelo somhlaba ngesathelayithi zonyaka oboniswayo, kuquka imihlaba elinyiweyo; ukuhlelwa okuneempazamo ezaziwayo, hayi irejista yeefama.
Kufikelelwe nge
this site's data relay, from gibs.earthdata.nasa.gov
Malunga nale leya
Ubungqina
Kuqwalaselwe (amafu ashiya izikhewu)
Umthombo
MODIS Terra EVI (NASA LANCE)
Umboneleli
NASA LANCE
Ilayisensi
Idatha evulekileyo ye-NASA
Uhlelo
imihla ngemihla; Isalathiso sesathelayithi; amafu ashiya izikhewu
Okutsha ngexesha lokwakha
2026-10-13
Ucaciso
igridi emalunga ne-250 m
Ukungaqiniseki
Isalathiso sezityalo sesathelayithi seentsuku ezi-8 ukuya kumhla oboniswayo, isalathisi semeko yendawo yokuhlala; asingomlinganiselo weentlobo okanye weentlobo ngeentlobo zezinto eziphilayo.
Kufikelelwe nge
this site's data relay, from gibs.earthdata.nasa.gov

Okutsha okukhoyo

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © abanegalelo kwi-OpenStreetMap (ODbL) · Natural Earth

Kulayishwa imifanekiso yamva nje ye-NASA.

Rhuqa ukuze uhambise. Ctrl okanye ⌘ uze ujikelezise, chophela okanye usebenzise amaqhosha ukusondeza; beka isalathisi phezu kwento ukuze ubone amaxabiso aphantsi kwaso; ukubuyisela kubuyela kummandla.

People and hazards, framed on East Africa.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.

Data: NASA GIBS · ASTER GDEM · Blue Marble · © OpenStreetMap contributors · Natural Earth · NASA EONET · NASA JPL OPERA DIST-ALERTSources and licences

  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Licensed under CC BY 4.0. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). doi:10.7927/H49C6VHW. CC BY 4.0
  • VIIRS Black Marble night-time lights, NASA Goddard Space Flight Center; distributed by the NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • VIIRS near-real-time products (flood, land surface temperature, snow cover, corrected reflectance), NASA LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • MODIS land products (vegetation indices, gross primary production, land cover), NASA LP DAAC and LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • ASTER GDEM is a product of METI and NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Cite as: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019). ASTER Global Digital Elevation Model V003. doi:10.5067/ASTER/ASTGTM.003. NASA open data
  • Yenziwe nge-Natural Earth. Idatha yemephu ye-vector ne-raster esimahla @ naturalearthdata.com. Yeyoluntu
  • © OpenStreetMap contributors (ODbL), via NASA GIBS (coastlines, boundaries, roads and place names). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). ODbL
  • Blue Marble, NASA Earth Observatory; imifanekiso ivela kwi-NASA GIBS. Imibala izotywe ngokutsha ukusuka kwimephu yemibala epapashiweyo; amaxabiso afakwe umndilili kwiiseli ezineheksagoni apho aboniswa khona (iguqulwe). Idatha evulekileyo ye-NASA
  • Imeko kwigloubhu nakwimephu ethe tyaba: unxweme, imida, iindlela namagama eendawo avela kwiileya zesalathiso ze-NASA GIBS (idatha ye-OpenStreetMap, ODbL, © abanegalelo kwi-OpenStreetMap); imifanekiso ye-Blue Marble njengesiseko esikhethwayo; umhlaba we-3D nokufundwa kokuphakama okuvela kwisalathiso semibala sokuphakama se-ASTER GDEM (iiklasi ezisuka kwi-5 m ukuya kwi-200 m, zandisiwe ukuze zifundeke). Imida izotywe njengoko ipapashiwe kwaye ayibonisi kuma kuwo nawuphi na ummandla.
  • Iziganeko ezenzeka ngoku: NASA Earth Observatory Natural Event Tracker (EONET); iziganeko zingumqondiso nje kwaye zigcina amakhonkco azo emithombo yokuqala.
  • Ngoku: Iziganeko ze-NASA EONET zingumqondiso nje, azizizo izilumkiso ezisemthethweni.
  • Observed (EO): NASA JPL OPERA DIST-ALERT (contains modified Copernicus Sentinel data 2026). We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS).
  • NASA GIBS: We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS).
  • Iileya ezikhethwayo (imithombo emi-5 kuluhlu lweeleya: ephilayo, uqikelelo, eqwalaselweyo nemeko) zibonisa isincomo somboneleli wazo kwimephu nalapha xa zivuliwe; uqikelelo sisiphumo semodeli kwaye izalathisi ezivelisiweyo ziqikelelo.

Iileya nemihla

  • Population density, 2020: Population: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · static
  • Night-time lights, daily: VIIRS Black Marble (VNP46A2), NASA LAADS DAAC · 12 Oct 2026
  • Flood water, 3-day composite: VIIRS Global Flood Product, NASA LANCE · 14 Oct 2026
  • True colour: VIIRS NOAA-20 corrected reflectance, NASA LANCE · 13 Oct 2026
  • Uhlobo lwesigubungelo somhlaba (IGBP), ngonyaka: MODIS Terra and Aqua isigubungelo somhlaba (MCD12Q1), NASA LP DAAC · 2024
  • Enhanced vegetation index, rolling 8 days: MODIS Terra EVI, NASA LANCE · 13 Oct 2026

05Beka iliso

Assignment and team board.

The screen a team would use to follow this subject: its measures, states and decisions. Names are examples and values are illustrative.

Assignment and team board

Team formation · Assignment pool · Quarter 3

One team awaiting independence reviewGCRI · Agency

Assignments

Isicelo02
Flood recovery planning supportCountry team A
Data system reviewInstitution B
Ukumisela ububanzi01
Heat-health plan review5 experts proposed
Independence check01
Water utility auditDeclaration pending
In field01
Early warning assessmentWeek 4 of 10
Close-out01
Agriculture data auditReview signed

Team record

Team leadDisaster risk managementNone declaredConfirmed
HydrologistFlood modellingDeclared, managedConfirmed
Data engineerPipelinesNone declaredInvited
ReviewerIndependentNone declaredConfirmed

Ubungakanani bomsebenzi

Requester
Requesting institution
Duration
8 weeks
Igunya
stays with the requester
Fee
no fee stated
Assignment and team board: the screen’s structure, terms and states for Team formation.Example names and illustrative values; a design, not a record or a live system.
06Izalathisi

What is measured, and how well.

Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.

IndicatorUnitCadenceSource typeIleyibhile
Deliverables with a single accountable holderpercent of deliverablesper work planInception reports, responsibility matricesDECLARED
Disciplines required against disciplines staffedratioper assignmentTerms of reference against team rosterKUXELIWE
Documented interface agreements between workstreamscount per assignmentper work planInception and work-plan recordsKUXELIWE
Team member changes during the assignmentcount per assignmentper assignmentContract variation recordsPublished statistics
National and local expert inputpercent of expert person-daysper assignmentTimesheets and contract recordsKUXELIWE
Gender composition of expert teamspercent of team membersper assignmentTeam rostersDECLARED
Schedule variance on team deliverablesdaysper deliverableWork plan against acceptance datesKUQWALASELWE
07Isilinganisi sokuphindwa nothotho lweziphumo

Model team formation as a system. Run the cascade.

Assembled from the Nexus Standards area profile Disaster risk reduction: the hazards it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Choose the components, pick an initiating hazard and step through the cascade. The Map view places the run on an example geography with open data. Every coupling weight is a stated assumption you can change. A teaching model, not a forecast, an assessment or a certification. To model a place of your own choosing, open the full System Builder.

Iingozi

  • Tropical cyclone
  • Isikhukhula esikhawulezayo
  • Ubushushu obugqithisileyo
  • Ice-jam flood
  • HIV epidemic
  • Inyikima
  • Storm surge (set off downstream)
  • Intense rainfall (set off downstream)
  • River flood (set off downstream)
  • Dangerous surf (set off downstream)
  • Ukuqhawuka kombane okuxhaphakileyo (kubangela iziphumo ezilandelayo)
  • Ukufuduswa kwabantu abaninzi (kubangela iziphumo ezilandelayo)
  • Coastal flood (set off downstream)
  • Imozulu egqithisileyo yemililo (ibangela iziphumo ezilandelayo)
  • Umlilo wasendle (ubangela iziphumo ezilandelayo)
  • Uxinzelelo lwegridi olubangelwa bubushushu (lubangela iziphumo ezilandelayo)
  • Imbalela yezolimo (ibangela iziphumo ezilandelayo)
  • Imbalela ekhawulezayo (ibangela iziphumo ezilandelayo)

Izilawuli

  • NS-0 Umgaqo-siseko nemigaqo
  • NS-1 The UNI and the artefact catalogue (grammar v0.2: domain, sector, region and environment segments)
  • NS-3 Ii-UNI zerekhodi yomngcipheko (igrama, uthelekiso lwakudala, igunya lokwabiwa)
  • NS-3b Dataset and product metadata profile (STAC, DCAT, PROV-O)
  • NS-9 Ii-UNI zemeko (ukusasazwa, iimeko, iimeko zenkqubo)
  • NS-11 Ukuqinisekiswa nokubekwa kweliso (ubungqina, iziqinisekiso, uqwalaselo lokuhambelana ngaphandle kokuthemba)
  • NS-14 Ukuhambelana nokuthelekiswa nemigangatho yangaphandle
  • NRS-C15 Loss, damage and impact accounting
  • NRS-H114 Hazard family: Macroeconomic and fiscal shocks (NHS-1 soc.macro-fiscal)
  • NRS-K20 Iprofayili yepakethi yommandla: Ukuziqhelanisa nemozulu (DOMAIN-020)
  • NRS-H54 Hazard family: Signal and platform disruption (NHS-1 cyber.platform)
  • NRS-H65 Usapho lweengozi: Ukugqithwa kwemida yeplanethi (NHS-1 planet.boundary)
  • NRS-H119 Hazard family: Cultural heritage loss (NHS-1 soc.heritage)

Uqwalaselo

  • DesInventar disaster loss databases (listed for reference)
  • INFORM Risk Index (listed for reference)
  • Global SDG Indicators Database (listed for reference)
  • EM-DAT international disaster database (listed for reference)
  • Number of deaths and missing persons attributed to disasters per 100,000 population
  • Number of directly affected people attributed to disasters per 100,000 population
  • Direct economic loss attributed to disasters in relation to global GDP
  • Damage to critical infrastructure attributed to disasters
  • Number of countries that adopt and implement national DRR strategies
  • Total public international support for national disaster risk reduction actions (Sendai indicator F-1)
  • Number of countries that have multi-hazard early warning systems
  • Number of deaths, missing persons and directly affected persons attributed to disasters per 100,000 population

Umzekelo wejografi

  • Bangladesh: 134 hexagonal cells
  • Isantya semvula, isiqingatha seyure esidlulileyo (IMERG), NASA GIBS
  • Amanzi aphezu komhlaba phantsi kwamafu, 30 m (OPERA DSWx-S1 radar), NASA GIBS
  • Ubushushu bomoya ongaphezulu, emini (AIRS), NASA GIBS
  • Izibane zasebusuku namhlanje, ukuqhawuka kombane (VIIRS Day/Night Band), NASA GIBS
08Imithombo

Where the evidence comes from.

Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.

UmthomboWhat it givesLicence class
World Bank Implementation Completion and Results ReportsRecords of team, implementation arrangements and lessons on deliveryPublic documents under the World Bank access to information policy
OECD DAC Evaluation Resource CentrePublished evaluations of programmes, including team and management arrangementsPublic reports, terms per evaluating agency
EU Results Oriented Monitoring reportsStructured monitoring of EU-funded actions, including implementation and management findingsPublished reports, European Commission reuse terms
IATI DatastoreParticipating organisations and roles in each activityOpen, licence declared per publisher
National audit office performance auditsFindings on the management and accountability of consultancy teamsPublic records, terms per audit office
09Methods and evidence

How team formation is modelled, measured and tested.

The model, its assumptions, its data and its uncertainty, in the form a scientist or engineer would check. Structures follow published methods. The values drawn are illustrative, not findings.

Datasets and provenance

The data classes behind team formation and what is recorded about each before it is used.

Data classProvenance recordedResolution statedLicence checked
Satellite imagery, optical and radarsensor, processing level, acquisition datepixel size and revisitper scene
Reanalysis and climate model outputmodel, experiment, member, versiongrid and time stepper release
In-situ sensors and gaugesstation, instrument, calibration recordpoint and sampling rateper network
Population and asset exposuremethod, vintage, input sourcescell size and unitper release
Boundaries and reference geographyproducer, edition, datescaleper edition
Imvelaphi
W3C PROV record from source to figure
Imigaqo
FAIR: findable, accessible, interoperable, reusable
Gaps
shown as missing, never filled silently
Data classes and the provenance fields recorded for each; a dataset is listed by name only once its licence admits the use.
FAIR guiding principles · GO FAIR and FORCE11W3C PROV · World Wide Web ConsortiumGuidance on consistent treatment of uncertainties · IPCCCEOS Analysis Ready Data · Committee on Earth Observation Satellites
10Decisions

Who decides, and what the evidence serves.

Agency prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.

Who decidesThe questionEvidence this page serves
Client project implementation unit or programme directorWhether the proposed team covers every discipline the work requires and names who answers for each deliverableComposition matrix and responsibility matrix against the terms of reference
Funding agency task team leaderWhether a mid-assignment team change keeps the competence and continuity the contract assumedSubstitution evidence and continuity plan
Employing firm or institution managementWhether it can field and retain the team for the assignment’s durationAvailability commitments and interface register
Programme steering committeeWhether delays on one workstream require rescoping the othersInterface register and schedule variance on dependent deliverables

Outputs this topic produces

  • Team composition matrices that map each requirement to a discipline and a holder
  • Responsibility matrices with one accountable holder per deliverable
  • Interface registers between workstreams with agreed inputs and dates
  • Continuity plans for planned and unplanned team changes
11Core questions

What a team lead must settle first.

  • What is the question, and which disciplines does it genuinely need?
  • Who is the one accountable lead, and to whom do they answer?
  • How will different methods and vocabularies be integrated into one answer?
  • Who reviews the integrated output independently?
12Mechanisms

Why interdisciplinary teams struggle.

Teams fail when each discipline produces its own report and nobody integrates them, when assumptions made by one member are invisible to another, or when responsibility is shared so widely that no one answers for the result. Status differences between disciplines can silence the people closest to the affected communities.

Well-run teams agree a shared problem statement and a common set of assumptions early, make interfaces between workstreams explicit and schedule integration as work in its own right rather than an afterthought.

13Good practice

Signals of a healthy team.

  • A one-page problem statement every member can explain in their own words.
  • A shared register of assumptions, updated when any workstream changes one.
  • Integration time scheduled in the plan, not left to the final week.
  • Voices from affected communities and operators heard alongside technical specialists.
14Iindlela zokusebenza

How it is studied, and what the methods cannot say.

  1. Systems engineeringTracing terms of reference to deliverables · Managing interfaces in multidisciplinary teamsApplied here
  2. Decision analysis under uncertaintyMulti-criteria assessment of expert fit · Value of information before deploymentApplied here
15Where this page’s references

Where this page’s references lead.

Amaqumrhu namaxwebhu eli phepha elifundwa ngokuthelekiswa nawo. Imeko neenguqulelo ziyatshintsha; ikhonkco ngalinye liya kwiqumrhu elikhuphayo.

16Imibuzo

Imibuzo neempendulo.

Why name one accountable holder per deliverable?
Because shared authorship without a single owner lets quality checks fall between contributors. One holder answers for the whole deliverable, while others remain responsible for their parts.
What is an interface agreement?
A short record of what one workstream needs from another, in what form and by when. It turns an assumption into a commitment that can be tracked.
How should national expertise be counted?
By expert input on substantive tasks, not by headcount. A team can list national members whose input is minor; person-days on core deliverables say more.
Is a team a legal entity or joint venture?
No. A listed team describes a scope and roles. Contracting arrangements are set out separately in written terms.
How is disagreement within a team handled?
It is recorded rather than resolved silently. Dissent is preserved in the review record and, where relevant, in the output.
Can institutions second staff to a team?
Yes, under their own terms and with the secondment arrangement written down before work starts.
How large should a team be?
As small as the question allows. Each added discipline brings insight and coordination cost, so the scope names which disciplines are essential and which can be consulted as reviewers instead.
IingxeloNikela

Faka ubungqina obuvela kweli phepha.

Reports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

GCRIIarhenteIpotifoliyo noKulungela
Iarhente

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.