Skip to content

GCRI · Agency

Team formation

Most technical assistance is delivered by teams that combine disciplines: law and economics, engineering and safeguards, data and public finance. The risk lies less in any one member than in the interfaces between them and in who answers for the whole. This page sets out how teams are composed, where accountability breaks, how composition changes propagate through a work plan, and what the institutions that commission and receive the work need to see.

02The question

Team formation: how the risk develops.

Interdisciplinary assignments and accountability. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

Mechanism

Interfaces carry the risk

Each discipline works to its own standards and vocabulary. Gaps open where an engineer’s design assumes a safeguard measure no one costed, or an economist’s model assumes a legal power the lawyer has not confirmed.

Mechanism

Shared work, diffused accountability

When a deliverable has several contributors and no single accountable holder, quality checks fall between them. A named team leader with documented authority over content and schedule is the usual remedy, and often missing.

Mechanism

Composition drifts

Members leave, are reassigned or are replaced mid-assignment. Each change loses context, relationships with counterparts and undocumented decisions, and the replacement inherits work they did not scope.

Mechanism

Delays follow the critical path

One late input, such as a survey or a legal opinion, holds back every deliverable that depends on it. Downstream experts wait or proceed on assumptions, and rework compounds the original delay.

03Geography

People and hazards in East Africa.

Population density, night lights and flood water over East Africa, from NASA GIBS. Each layer carries its own date.

Imephu esebenzisanayo idinga i-JavaScript; uhlu lwezendlalelo nemithombo luphansi.

Izendlalelo 3

People and hazards, for this page

Mayelana nalesi sendlalelo
Ubufakazi
Kulinganisiwe
Umthombo
Gridded Population of the World v4.11 (NASA SEDAC (CIESIN, Columbia University))
Umhlinzeki
NASA SEDAC (CIESIN, Columbia University)
Ilayisensi
CC BY 4.0
Inguqulo
null; isilinganiso esisekelwe ekubalweni kwabantu, akuguquki (2020)
Ukucaca
igridi elinganiselwa ku-1 km
Ukungaqiniseki
Isilinganiso esisekelwe ekubalweni kwabantu sabantu ngekhilomitha eyisikwele ngo-2020, esiboniswa njengesimo sokuchayeka; akusona isibalo sabantu abathintwe yinoma iyiphi ingozi.
Kufinyelelwe nge-
ukudluliswa kwedatha kwale sayithi, kusuka ku-gibs.earthdata.nasa.gov
Mayelana nalesi sendlalelo
Ubufakazi
Kubonwe
Umthombo
VIIRS Black Marble (VNP46A2) (NASA LAADS DAAC)
Umhlinzeki
NASA LAADS DAAC
Ilayisensi
Idatha evulekile ye-NASA
Inguqulo
nsuku zonke; ukukhanya kwesathelayithi, kulungiselwe ukukhanya kwenyanga nomkhathi
Okusha kakhulu ngesikhathi sokwakha
2026-10-12
Ukucaca
igridi elinganiselwa ku-500 m
Ukungaqiniseki
Ukukhanya kwasebusuku okutholwe ngesathelayithi ngosuku oluboniswayo; izibani ziyinkomba yokusetshenziswa kukagesi nokucima kwawo, hhayi isilinganiso sokuhlinzekwa noma ukufinyelela.
Kufinyelelwe nge-
ukudluliswa kwedatha kwale sayithi, kusuka ku-gibs.earthdata.nasa.gov
Mayelana nalesi sendlalelo
Ubufakazi
Kubonwe (amafu ashiya izikhala)
Umthombo
VIIRS Global Flood Product (NASA LANCE)
Umhlinzeki
NASA LANCE
Ilayisensi
Idatha evulekile ye-NASA
Inguqulo
nsuku zonke; ukutholwa ngesathelayithi; amafu ashiya izikhala
Okusha kakhulu ngesikhathi sokwakha
2026-10-14
Ukucaca
igridi elinganiselwa ku-250 m
Ukungaqiniseki
Ukutholwa ngesathelayithi; amafu ashiya izikhala. I-raster yesathelayithi noma yemodeli njengoba umhlinzeki eyishicilela. Amafu, izikhala zomzila nephutha lokuthola kushiya izikhala nomsindo; amanani angizinkomba, hhayi izilinganiso endaweni.
Kufinyelelwe nge-
ukudluliswa kwedatha kwale sayithi, kusuka ku-gibs.earthdata.nasa.gov
Mayelana nalesi sendlalelo
Ubufakazi
Kubonwe
Umthombo
VIIRS NOAA-20 corrected reflectance (NASA LANCE)
Umhlinzeki
NASA LANCE
Ilayisensi
Idatha evulekile ye-NASA
Inguqulo
daily; Satellite image
Okusha kakhulu ngesikhathi sokwakha
2026-10-14
Ukucaca
igridi elinganiselwa ku-250 m
Ukungaqiniseki
Satellite image. Satellite or model raster as the provider publishes it. Clouds, swath gaps and retrieval error leave gaps and noise; values are indicators, not measurements at a place.
Kufinyelelwe nge-
ukudluliswa kwedatha kwale sayithi, kusuka ku-gibs.earthdata.nasa.gov
Mayelana nalesi sendlalelo
Ubufakazi
Modelled (latest year GIBS publishes)
Umthombo
MODIS Terra and Aqua land cover (MCD12Q1) (NASA LP DAAC)
Umhlinzeki
NASA LP DAAC
Ilayisensi
Idatha evulekile ye-NASA
Inguqulo
yearly; Satellite classification; latest year GIBS publishes
Okusha kakhulu ngesikhathi sokwakha
2024-01-01
Ukucaca
igridi elinganiselwa ku-500 m
Ukungaqiniseki
Satellite land cover classes for the year shown, including croplands; a classification with known errors, not a farm register.
Kufinyelelwe nge-
ukudluliswa kwedatha kwale sayithi, kusuka ku-gibs.earthdata.nasa.gov
Mayelana nalesi sendlalelo
Ubufakazi
Kubonwe (amafu ashiya izikhala)
Umthombo
MODIS Terra EVI (NASA LANCE)
Umhlinzeki
NASA LANCE
Ilayisensi
Idatha evulekile ye-NASA
Inguqulo
daily; Satellite index; clouds leave gaps
Okusha kakhulu ngesikhathi sokwakha
2026-10-13
Ukucaca
igridi elinganiselwa ku-250 m
Ukungaqiniseki
Satellite vegetation index for the 8 days to the date shown, a habitat condition indicator; not a measure of species or biodiversity.
Kufinyelelwe nge-
ukudluliswa kwedatha kwale sayithi, kusuka ku-gibs.earthdata.nasa.gov

Okutholakala kwakamuva

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © abanikele ku-OpenStreetMap (ODbL) · Natural Earth

Iyalayisha izithombe zakamuva ze-NASA.

Donsa ukuze unyakazise. U-Ctrl noma u-⌘ bese uskrola, ucindezele ngeminwe emibili noma izinkinobho ukuze usondeze; beka isikhombi ukuze ubone amanani aphansi kwaso; ukusetha kabusha kubuyisela esifundeni.

People and hazards, framed on East Africa.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.

Data: NASA GIBS · ASTER GDEM · Blue Marble · © OpenStreetMap contributors · Natural Earth · NASA EONET · NASA JPL OPERA DIST-ALERTSources and licences

  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Licensed under CC BY 4.0. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). doi:10.7927/H49C6VHW. CC BY 4.0
  • VIIRS Black Marble night-time lights, NASA Goddard Space Flight Center; distributed by the NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • VIIRS near-real-time products (flood, land surface temperature, snow cover, corrected reflectance), NASA LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • MODIS land products (vegetation indices, gross primary production, land cover), NASA LP DAAC and LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • ASTER GDEM is a product of METI and NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Cite as: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019). ASTER Global Digital Elevation Model V003. doi:10.5067/ASTER/ASTGTM.003. NASA open data
  • Kwenziwe nge-Natural Earth. Idatha yamamephu yamahhala ye-vector ne-raster ku-naturalearthdata.com. Esizindeni somphakathi
  • © OpenStreetMap contributors (ODbL), via NASA GIBS (coastlines, boundaries, roads and place names). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). ODbL
  • Blue Marble, NASA Earth Observatory; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Umongo ephaseleni nasemephini oyisicaba: amagoda olwandle, imingcele, imigwaqo namagama ezindawo avela emaleyeni ereferensi e-NASA GIBS (idatha ye-OpenStreetMap, ODbL, © abafaki be-OpenStreetMap); izithombe ze-Blue Marble njengesisekelo ongasikhetha; umhlaba we-3D nokufundwa kokuphakama okuvela enkombeni yombala wokuphakama ye-ASTER GDEM (amakilasi e-5 m kuya ku-200 m, andiswe ukuze afundeke kahle). Imingcele idwetshwe njengoba ishicilelwe futhi ayisho sikhundla ngasiphi isifunda.
  • Imicimbi eqondene nesikhathi samanje: NASA Earth Observatory Natural Event Tracker (EONET); imicimbi iyisikhombisi kuphela futhi igcina izixhumanisi zomthombo wayo wokuqala.
  • Bukhoma: NASA EONET Imicimbi iyisikhombisi, akuyizixwayiso zesiphathimandla.
  • Observed (EO): NASA JPL OPERA DIST-ALERT (contains modified Copernicus Sentinel data 2026). We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS).
  • NASA GIBS: Siyakwamukela ukusetshenziswa kwezithombe ezihlinzekwe yizinsiza ze-NASA Global Imagery Browse Services (GIBS), eziyingxenye ye-NASA Earth Science Data and Information System (ESDIS).
  • Optional layers (5 sources in the layer list: live, forecast, observed and context) print their provider credit on the map and here when switched on; forecasts are model output and derived indices are estimates.

Izendlalelo nezinsuku

  • Population density, 2020: Population: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · static
  • Amalambu ebusuku, nsuku zonke: VIIRS Black Marble (VNP46A2), NASA LAADS DAAC · 12 Okt 2026
  • Amanzi esikhukhula, inhlanganisela yezinsuku ezi-3: VIIRS Global Flood Product, NASA LANCE · 14 Okt 2026
  • Umbala weqiniso: VIIRS NOAA-20 corrected reflectance, NASA LANCE · 13 Okt 2026
  • Land cover type (IGBP), yearly: MODIS Terra and Aqua land cover (MCD12Q1), NASA LP DAAC · 2024
  • Enhanced vegetation index, rolling 8 days: MODIS Terra EVI, NASA LANCE · 13 Oct 2026

05Monitor

Assignment and team board.

The screen a team would use to follow this subject: its measures, states and decisions. Names are examples and values are illustrative.

Assignment and team board

Team formation · Assignment pool · Quarter 3

One team awaiting independence reviewGCRI · Agency

Assignments

Request02
Flood recovery planning supportCountry team A
Data system reviewInstitution B
Scoping01
Heat-health plan review5 experts proposed
Independence check01
Water utility auditDeclaration pending
In field01
Early warning assessmentWeek 4 of 10
Close-out01
Agriculture data auditReview signed

Team record

Team leadDisaster risk managementNone declaredConfirmed
HydrologistFlood modellingDeclared, managedConfirmed
Data engineerPipelinesNone declaredInvited
ReviewerIndependentNone declaredConfirmed

Ububanzi

Requester
Requesting institution
Duration
8 weeks
Authority
stays with the requester
Fee
no fee stated
Assignment and team board: the screen’s structure, terms and states for Team formation.Example names and illustrative values; a design, not a record or a live system.
06Izinkomba

What is measured, and how well.

Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.

IndicatorUnitCadenceSource typeLabel
Deliverables with a single accountable holderpercent of deliverablesper work planInception reports, responsibility matricesDECLARED
Disciplines required against disciplines staffedratioper assignmentTerms of reference against team rosterREPORTED
Documented interface agreements between workstreamscount per assignmentper work planInception and work-plan recordsREPORTED
Team member changes during the assignmentcount per assignmentper assignmentContract variation recordsPublished statistics
National and local expert inputpercent of expert person-daysper assignmentTimesheets and contract recordsREPORTED
Gender composition of expert teamspercent of team membersper assignmentTeam rostersDECLARED
Schedule variance on team deliverablesdaysper deliverableWork plan against acceptance datesOBSERVED
07Twin and cascade simulator

Model team formation as a system. Run the cascade.

Assembled from the Nexus Standards area profile Disaster risk reduction: the hazards it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Choose the components, pick an initiating hazard and step through the cascade. The Map view places the run on an example geography with open data. Every coupling weight is a stated assumption you can change. A teaching model, not a forecast, an assessment or a certification. To model a place of your own choosing, open the full System Builder.

Izingozi

  • Tropical cyclone
  • Flash flood
  • Ukushisa okukhulu
  • Ice-jam flood
  • HIV epidemic
  • Earthquake
  • Storm surge (set off downstream)
  • Intense rainfall (set off downstream)
  • River flood (set off downstream)
  • Dangerous surf (set off downstream)
  • Widespread power outage (set off downstream)
  • Mass displacement (set off downstream)
  • Coastal flood (set off downstream)
  • Extreme fire weather (set off downstream)
  • Wildfire (set off downstream)
  • Heat-driven grid stress (set off downstream)
  • Agricultural drought (set off downstream)
  • Flash drought (set off downstream)

Controls

  • NS-0 Umthethosisekelo nezimiso
  • NS-1 The UNI and the artefact catalogue (grammar v0.2: domain, sector, region and environment segments)
  • NS-3 Ama-UNI amarekhodi obungozi (uhlelo lolimi, ukuqhathanisa nezinhlelo ezindala, igunya lokwabela)
  • NS-3b Iphrofayili yemetadatha yedathasethi nomkhiqizo (STAC, DCAT, PROV-O)
  • NS-9 Ama-UNI omongo (ukufakwa, izibonelo, izibonelo zohlelo)
  • NS-11 Ukuqinisekisa nokuqapha (ubufakazi, izifakazelo, ukuqapha ukuhambisana ngaphandle kokwethembana)
  • NS-14 Ukuhambisana nokuqhathaniswa namazinga angaphandle
  • NRS-C15 Ukubalwa kokulahlekelwa, umonakalo nomthelela
  • NRS-H114 Umndeni wezingozi: Ukushaqeka komnotho omkhulu nezimali zikahulumeni (NHS-1 soc.macro-fiscal)
  • NRS-K20 Iphrofayela yephakethe lomkhakha: Ukuzivumelanisa nesimo sezulu (DOMAIN-020)
  • NRS-H54 Umndeni wezingozi: Ukuphazamiseka kwesignali neplatifomu (NHS-1 cyber.platform)
  • NRS-H65 Umndeni wezingozi: Ukweqiwa kwemingcele yomhlaba (NHS-1 planet.boundary)
  • NRS-H119 Umndeni wezingozi: Ukulahleka kwamagugu amasiko (NHS-1 soc.heritage)

Observation

  • DesInventar disaster loss databases (listed for reference)
  • INFORM Risk Index (listed for reference)
  • Global SDG Indicators Database (listed for reference)
  • EM-DAT international disaster database (listed for reference)
  • Number of deaths and missing persons attributed to disasters per 100,000 population
  • Number of directly affected people attributed to disasters per 100,000 population
  • Direct economic loss attributed to disasters in relation to global GDP
  • Damage to critical infrastructure attributed to disasters
  • Number of countries that adopt and implement national DRR strategies
  • Total public international support for national disaster risk reduction actions (Sendai indicator F-1)
  • Number of countries that have multi-hazard early warning systems
  • Number of deaths, missing persons and directly affected persons attributed to disasters per 100,000 population

Example geography

  • Bangladesh: 134 hexagonal cells
  • Rain rate, last half hour (IMERG), NASA GIBS
  • Surface water through cloud, 30 m (OPERA DSWx-S1 radar), NASA GIBS
  • Surface air temperature, daytime (AIRS), NASA GIBS
  • Night lights tonight, outages (VIIRS Day/Night Band), NASA GIBS
08Imithombo

Where the evidence comes from.

Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.

UmthomboWhat it givesLicence class
World Bank Implementation Completion and Results ReportsRecords of team, implementation arrangements and lessons on deliveryPublic documents under the World Bank access to information policy
OECD DAC Evaluation Resource CentrePublished evaluations of programmes, including team and management arrangementsPublic reports, terms per evaluating agency
EU Results Oriented Monitoring reportsStructured monitoring of EU-funded actions, including implementation and management findingsPublished reports, European Commission reuse terms
IATI DatastoreParticipating organisations and roles in each activityOpen, licence declared per publisher
National audit office performance auditsFindings on the management and accountability of consultancy teamsPublic records, terms per audit office
09Methods and evidence

How team formation is modelled, measured and tested.

The model, its assumptions, its data and its uncertainty, in the form a scientist or engineer would check. Structures follow published methods. The values drawn are illustrative, not findings.

Datasets and provenance

The data classes behind team formation and what is recorded about each before it is used.

Data classProvenance recordedResolution statedLicence checked
Satellite imagery, optical and radarsensor, processing level, acquisition datepixel size and revisitper scene
Reanalysis and climate model outputmodel, experiment, member, versiongrid and time stepper release
In-situ sensors and gaugesstation, instrument, calibration recordpoint and sampling rateper network
Population and asset exposuremethod, vintage, input sourcescell size and unitper release
Boundaries and reference geographyproducer, edition, datescaleper edition
Lineage
W3C PROV record from source to figure
Izimiso
FAIR: findable, accessible, interoperable, reusable
Gaps
shown as missing, never filled silently
Data classes and the provenance fields recorded for each; a dataset is listed by name only once its licence admits the use.
FAIR guiding principles · GO FAIR and FORCE11W3C PROV · World Wide Web ConsortiumGuidance on consistent treatment of uncertainties · IPCCCEOS Analysis Ready Data · Committee on Earth Observation Satellites
10Decisions

Who decides, and what the evidence serves.

Agency prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.

Ubani onqumayoThe questionEvidence this page serves
Client project implementation unit or programme directorWhether the proposed team covers every discipline the work requires and names who answers for each deliverableComposition matrix and responsibility matrix against the terms of reference
Funding agency task team leaderWhether a mid-assignment team change keeps the competence and continuity the contract assumedSubstitution evidence and continuity plan
Employing firm or institution managementWhether it can field and retain the team for the assignment’s durationAvailability commitments and interface register
Programme steering committeeWhether delays on one workstream require rescoping the othersInterface register and schedule variance on dependent deliverables

Outputs this topic produces

  • Team composition matrices that map each requirement to a discipline and a holder
  • Responsibility matrices with one accountable holder per deliverable
  • Interface registers between workstreams with agreed inputs and dates
  • Continuity plans for planned and unplanned team changes
11Core questions

What a team lead must settle first.

  • What is the question, and which disciplines does it genuinely need?
  • Who is the one accountable lead, and to whom do they answer?
  • How will different methods and vocabularies be integrated into one answer?
  • Who reviews the integrated output independently?
12Mechanisms

Why interdisciplinary teams struggle.

Teams fail when each discipline produces its own report and nobody integrates them, when assumptions made by one member are invisible to another, or when responsibility is shared so widely that no one answers for the result. Status differences between disciplines can silence the people closest to the affected communities.

Well-run teams agree a shared problem statement and a common set of assumptions early, make interfaces between workstreams explicit and schedule integration as work in its own right rather than an afterthought.

13Good practice

Signals of a healthy team.

  • A one-page problem statement every member can explain in their own words.
  • A shared register of assumptions, updated when any workstream changes one.
  • Integration time scheduled in the plan, not left to the final week.
  • Voices from affected communities and operators heard alongside technical specialists.
14Izindlela

How it is studied, and what the methods cannot say.

  1. Systems engineeringTracing terms of reference to deliverables · Managing interfaces in multidisciplinary teamsApplied here
  2. Decision analysis under uncertaintyMulti-criteria assessment of expert fit · Value of information before deploymentApplied here
15Where this page’s references

Where this page’s references lead.

The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.

16Imibuzo

Questions and answers.

Why name one accountable holder per deliverable?
Because shared authorship without a single owner lets quality checks fall between contributors. One holder answers for the whole deliverable, while others remain responsible for their parts.
What is an interface agreement?
A short record of what one workstream needs from another, in what form and by when. It turns an assumption into a commitment that can be tracked.
How should national expertise be counted?
By expert input on substantive tasks, not by headcount. A team can list national members whose input is minor; person-days on core deliverables say more.
Is a team a legal entity or joint venture?
No. A listed team describes a scope and roles. Contracting arrangements are set out separately in written terms.
How is disagreement within a team handled?
It is recorded rather than resolved silently. Dissent is preserved in the review record and, where relevant, in the output.
Can institutions second staff to a team?
Yes, under their own terms and with the secondment arrangement written down before work starts.
How large should a team be?
As small as the question allows. Each added discipline brings insight and coordination cost, so the scope names which disciplines are essential and which can be consulted as reviewers instead.
ImibikoNikela

Nikela ngobufakazi kusuka kuleli khasi.

Reports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

GCRIAgencyPortfolio and Readiness
Agency

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.