GCRI · Foundry
بنیاتنان لە Foundry
The Foundry سیستەمە that serve Foundry, what an authorised project can do with them, and how access is requested. Foundry’s public home is therisk.global/nexus-foundry.
ئەو ڕیزبەندییەی شتەکان تێیدا ڕوودەدەن.
- 01پرسیارئەولەویەتی نیشتمانی، ناوچەیی یان دامەزراوەیی
- 02بەڵگەبنەمای STEM بۆ پلاتفۆرمەکە
- 03بنیاتنانFoundry
- 04ڕێکخستنئیکۆسیستەمی Nexus
- 05تاقیکردنەوەUniverse (ماڵپەڕی سەربەخۆ)
- 06بڵاوکردنەوەReports
- 07بڕیارداندەسەڵات و دامەزراوە تایبەتمەندەکان، لە ڕێگەی NXS-RLS (بەشداربووان، ڕێککەوتن و دەستبەدەستکردن)
- 08نوێکردنەوەڕاستکردنەوەکان و ئەجێندای ساڵانەی داهاتوو
Foundry among the six pillars.
Where things are built, simulated and prepared: every output of the Global Centre for Risk and Innovation (GCRI), the Global Risks Forum (GRF) and the Global Risks Alliance (GRA), under the Nexus Consortium. It is led by the Nexus Consortium; its home is therisk.global/nexus-foundry.
handoff in playrecorded handoffno direct handoff
ساڵی پڕۆگرامهەموو قۆناغەکان
ڕێڕەو
Around Foundry
The pillars Foundry hands work to and receives it from.
L · F · U · S · R · A
- کۆڵەکەکان
- 6 لە 6
- دەستبەدەستکردنەکان
- 18 لە 18
- خولەکان
- 17 داخراو
دەستبەدەستکردنی لە کاردا
- F01Universe → Foundry · ئەرکی قبووڵکراو دەبێتە پڕۆژەی خول لەگەڵ کەیسی بڕیارئامادەکاری بۆ ئامادەیی
- F02Foundry → Universe · Core Build Report و بەڵگەی بەردەوامبوون یان وەستانبنیاتنانی کۆنترۆڵکراو
- F03Foundry → Reports · چاودێری داخراو و زنجیرەی نیشاندەر لە پشت پڕۆفایلێکداخستنی پڕۆژە
- F04Universe → Reports · دۆزینەوەی دوای کار و سیناریۆ بۆ بەشەکانی 10 و 13پێداچوونەوەی دوای کار
و 14 دیکە
- Labsئەو شوێنەی پرسیارەکان دەبنە تاقیکردنەوە و نموونەی سەرەتایی: ڕێگا، داتا و ئامرازی نوێ بە ئاشکرا تاقی دەکرێنەوە، لەگەڵ سنوورەکانیان لە تۆمارێکدا، پێش ئەوەی Foundry بیانبنیاتبنێت، لە ژێر Nexus Consortium.Labs
- Foundryئەو شوێنەی ڕێگا، داتا و مۆدێلەکان دەبنە بنیاتنانی دووبارەبووەوە، هەر کارپێکردنێک لەگەڵ تێکردنەکانی، وەشان و سنوورەکانی لە تۆمارێکدا.Foundry لە FoundryFoundry
- UniverseWhere a build is tested under controlled conditions with independent evaluators, so a method’s skill is measured, not assumed.Foundry لە Universeuniverse.nexus
- Nexus Standardsئەو شوێنەی ڕێگا، ناسێنەر و پلانی داتا بە ئاشکرا کۆد دەکرێن و کاتێک تاقیکردنەوەیەک هەڵەیەک دەدۆزێتەوە ڕاست دەکرێنەوە.داتا و بەڵگە لە Standardsnexustandards.com
- Reportsشوێنێک کە دۆزینەوەکان لەگەڵ میتۆد، نادڵنیایی و پۆلی بەڵگەیان بڵاو دەکرێنەوە و وەک وەشانی نوێ ڕاست دەکرێنەوە.Foundry لە ReportsReports
- Risk Academyئەو شوێنەی ڕێگا و سیستەمە لەسەر داتای ڕاستەقینە و شوێنی ڕاستەقینە فێر دەکرێن، بە کارکردن لەسەر بابەتەکە، لە Risk Academy.کۆلێژی تەکنەلۆجیا و سیستەمە دیجیتاڵییەکان لە Academyrisksacademy.com
Foundry in every area of the work
| ناوچە | Foundry |
|---|---|
| سەرکردایەتی | Each build is led by an authorised project with an accountable owner; leadership is technical and never extends to the decision the build informs. |
| Strategy | The build plan follows the National Portfolio and the missions admitted for the year. |
| Cadence | Works all year; the controlled build runs for one month in Q2, and measured capacity results are reviewed in Q4. |
| Ownership | Owns projects and builds, observations and canonical data, simulation and benchmark runs, the National Portfolio record and evidence seals. |
| پرۆسە | Work moves through governed rooms on twenty systems, and every run leaves a record with its limits. |
| گەشەپێدان | Develops the cycle’s software, data and environments, and develops each country’s National Portfolio. |
| Simulations | Runs scenarios, experiments and benchmarks with published method and conditions; a simulated capability is not a validated result. |
| Reporting | Supplies the permitted data bundles and sealed observations behind every edition. |
| حوکمڕانی | Shared infrastructure made available to the Consortium for public-good purposes; it holds no vote in the governance of the standards. |
| داتا و بەڵگە | Canonical observations and provenance are held in The Global Risks Index (NXS-GRX), and every value carries its source and licence. |
| Finance and resourcing | Compute and data allocations open per project when their terms and review capacity exist; temporary capacity is released at stand-down. |
| Risk and assurance | Builds are signed and tested for security and interoperability, and accepted for exercise only at gate G3. |
| بەشداریکردن | Stakeholders and service providers may establish their presence for non-profit and consortium objectives under the Terms. |
| Communication | Public pages describe each system’s purpose and design, and state what it does only as far as its record shows. |
| Local | Observations and models keep their place: every value carries the location and boundary it was drawn on. |
| نیشتمانی | Each country’s National Portfolio is developed and tracked. |
| هەرێمی | Shared systems and cross-border dependencies are modelled across the countries of a region. |
| Planetary | Global data and Earth observation are held with provenance, so planetary pressures can be read alongside national ones. |
What each institution brings
| کۆڵەکە | GCRI | GRF | GRA |
|---|---|---|---|
| Foundry | پلاتفۆرمە زانستی و تەکنیکییەکانی میتۆد، داتا و بەڵگە دەهێنن کە Foundry لەسەریان بنیات دەنرێت. | ئەرکەکان وەردەگرێت و دروستکراو بۆ ڕاهێنان لە دەروازەیەکی تۆمارکراودا قبوڵ دەکات، بۆ ئەوەی کاری Foundry بە تۆمارەوە بچێتە ناو پڕۆگرامەکە. | پرسیارەکانی ئامادەیی دارایی دەهێنێت، تاکو دروستکراوەکان بەڵگەیەک بەرهەم بهێنن کە دەزگا داراییەکان بتوانن بیخوێننەوە. |
The Foundry systems that Foundry work draws on.
- NXS-NSF (متمانە، ڕێپێدان و دڵنیاکردنەوە)Use in this fieldThe decision point every other system calls
- NXS-FAC (blueprints, builds and signing)Use in this fieldWhere Foundry’s own software is built
- NXS-COR (ژمێریاری، گرێ و کاتی کارکردن)Use in this fieldWhere workloads run
- NXS-POR (گەیاندنی گشتی، کڕیار و هاوبەش)Use in this fieldHow released views reach the public
چۆن پرۆسەکە کار دەکات.
Process explorer · Process
Build in Foundry: Build, sign and accept
10 steps·4 قۆناغ·2 دەروازە
پرۆسە
Build in Foundry: Build, sign and accept
An admitted mission becomes a cycle project; the build is pinned, verified and signed, and GRF records acceptance for exercise, not permission to deploy.
01 Request and sources
- 01Admitted mission becomes a cycle projectRecord · Universe to FoundryAn admitted mission becomes a cycle project with a decision case.
- 02Qualify data sources and resourcesهەنگاو · GCRIGCRI qualifies data sources and resource offers and builds the scenario models. An offer is not an allocation.
02 Build and verify
- 03Source snapshotتۆمار · NXS-FAC (blueprints, builds and signing)The snapshot pins the commit, dependencies and generator versions.
- 04Build contractRecord · NXS-FAC (blueprints, builds and signing)The build contract declares the artefact kind, environment and reproducibility envelope.
- 05Integrate and buildModel · GCRIGCRI integrates software and data, signs builds, and tests security and interoperability.
- 06Verification suiteGate · NXS-FAC (blueprints, builds and signing)Required and advisory checks stay separate. Reproducibility needs pinned inputs, declared nondeterminism and independent rebuilds.
03 Sign and admit
- 07Sign the exact artefactStep · NXS-FAC (blueprints, builds and signing)NXS-FAC builds, attests and requests a signature via a scoped signer identity. It holds no key material.
- 08Package admissionStep · NXS-NXQ (software, models and capability lifecycle)NXS-NXQ receives the signed package and keeps admission evidence that binds the task, data class, evaluation suite and expiration.
04 Accept
- 09ڕاپۆرتی بنیاتنانی سەرەکیتۆمار · GCRIThe Core Build Report is the go or no-go record. Universe assembles the Core and holds the decision for the exercise.
- 10G3 · Build بۆ ڕاهێنان وەرگیراوەدەروازە · Global Risks ForumGRF records whether the build is accepted for exercise. A signed build or release candidate is not permission to deploy to production.
ساڵی پڕۆگرام · NXS-FAC · UniverseDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The record order follows the Builds and Releases room lists of NXS-FAC.
Foundry systems for this field.
| سیستەم | What it does here | ڕۆڵ | Read more |
|---|---|---|---|
| NXS-CMDهەڵوێستی یەکخراو و کورتەی جێبەجێکار | Integrated posture and executive synthesis. | This field | بەڵگەنامەNot bound |
| NXS-NSTوێنەی کارپێکردنی هاوبەشی مەدەنی | Shows the common operating picture as a map on the page. | This field | بەڵگەنامەIntegrated, not bound |
| NXS-DSSدۆسیەکانی بڕیار و گفتوگۆ | Turns evidence into decision cases with stated uncertainty. | This field | بەڵگەنامەIntegrated, not bound |
| NXS-CORژمێریاری، گرێکان و ژینگەی کارپێکردن | Runs compute, nodes and runtimes behind authorised projects. | This field | بەڵگەنامەNot bound |
| NXS-NXQنەرمەکاڵا، مۆدێل و خولی ژیانی توانا | Takes in the site’s public pages so they can be searched with the evidence. | This field | بەڵگەنامەIntegrated, not bound |
| NXS-GRXداتای بنەڕەتی، ڕەسەنایەتی و مەترسی | Holds the canonical data, provenance and risk records the field cites. Index data service: unavailable. No public endpoint is published for this site yet. | This field | بەڵگەنامەIntegrated, not bound |
| NXS-EOPچاودێریی زەوی و دووانەی دیجیتاڵ | Brings Earth observation scenes and digital twins into the field. | This field | بەڵگەنامەIntegrated, not bound |
| NXS-EWSچاودێری و ئاگادارکردنەوەی فرەمەترسیدەر | Carries monitoring and warning layers for the hazards of the field. | This field | بەڵگەنامەIntegrated, not bound |
| NXS-AAPکاری پێشوەختی و دەستپێکەرەکان | کاری پێشوەختی and triggers. | This field | بەڵگەنامەIntegrated, not bound |
The release of the Nexus سیستەمە is on hold. Each code links its definition in the Nexus Risk Standards.
How a project gets access.
- 01
پرسیار
Describe the project and its owner to فۆرمی پەیوەندی.
- 02
Authorisation
Access requires an authorised project with an accountable owner, data terms and a review plan.
- 03
Allocation
Compute and data allocations open when their terms and review capacity exist.
زانیاری و پرسیار ئەمڕۆ کراوەن. پرسیارێک ژمارەی ئاماژەی پێدەدرێت و هەنگاوی دواتر دیاری دەکات؛ داواکاری، پارەدان، تەرخانکردنی کۆمپیوتەر و تۆمارکردن تەنیا کاتێک دەکرێنەوە کە تیم، مەرج و توانای پێداچوونەوەیان هەبێت.
Where this page’s references lead.
ئەو لەش و بەڵگەنامانەی ئەم لاپەڕەیەیان لەگەڵ دەخوێنرێتەوە. دۆخ و وەشانەکان دەگۆڕێن؛ هەر بەستەرێک دەچێتە لای لەشی دەرکەر.
ئەو شوێنانەی ئەم لاپەڕەیە لە ناو کۆنسۆرتیۆم بۆیان دەبات.
- NXS-CMDGCRI
- NXS-NSTGCRI
- NXS-DSSGCRI
- NXS-NXQGCRI
- NXS-GRXGCRI
- NXS-EOPGCRI
- NXS-EWSGCRI
- NXS-AAPGCRI
- NXS-NET (توپۆلۆجیای تۆڕ و بەردەوامی)GCRI
- NXS-OPS (ئامێر، هەستیار و ڕێکخستن)GCRI
- NXS-SIG (سیگناڵ، سپێکترۆم، کات و PNT)GCRI
- NXS-HUB (knowledge, records and learning)GCRI
- NXS-STU (composition, dashboards and workflows)GCRI
- NXS-APP (کاتالۆگی بەرنامە و خولی ژیان)GCRI
- NXS-RLSGCRI
- NXS-LAB (توێژینەوە، تاقیکردنەوە و شبیەسازی)GCRI
پرسیار و وەڵام.
Is Foundry access free?
ڕێگایەک، کۆمەڵە داتایەک یان پرسیارێک بهێنە.
زانیاری و پرسیار ئەمڕۆ کراوەن. پرسیارێک ژمارەی ئاماژەی پێدەدرێت و هەنگاوی دواتر دیاری دەکات؛ داواکاری، پارەدان، تەرخانکردنی کۆمپیوتەر و تۆمارکردن تەنیا کاتێک دەکرێنەوە کە تیم، مەرج و توانای پێداچوونەوەیان هەبێت.
بەڵگەنامە یاساییەکان.
نەخشە، داتا و وێنەکانی ئەم ماڵپەڕە بۆ ناوەڕۆک و زانیاریی گشتی پیشان دراون. ئامۆژگاری، پێشبینی یان ئاگادارکردنەوە نین؛ سنوورەکانی زانیارییەکە لە ڕەتکردنەوەی بەرپرسیارێتی و ئاگاداریی داتادا دەستنیشان کراون.
