Skip to content

GCRI · Foundry

NXS-RLS

NXS-RLS (participants, agreements and handoffs) records obligations, handoffs and receipts: who committed to what, under which mandate, and what evidence version a decision relied on.

01شوێنی کار

The workspace for NXS-RLS.

شوێنی کاری بنیاتنان

Foundry · NXS-RLS · Run R-9262 · Example interface, not a record

Run in progressGCRI · Foundry

ئەنجامدانەکان

هەمان تێچوو، وەشانبەندکراو

R-7053High-performance, cloudv3.80.81کارا
R-9136ئەندازیاریی داتاv3.10.82دەرچوو
R-4071Geospatial informationv5.40.67لادان
R-3150زیرەکی دەستکردv4.60.46دەرچوو

کارتی مۆدێل

ڕێگا
کۆمپیوتەری کارایی بەرز، هەور و لێوار
تێکردنەکان
Job scheduler log, Model registry
پشتڕاستکردنەوە
ماوەی جیاکراوە بۆ تاقیکردنەوە، لێهاتوویی ڕاپۆرت کراوە
ناونیشان
مۆدێلکراو

تۆماری ئەنجامدان

  1. 00:00:49InfoIngest job scheduler log
  2. 00:03:12زانیاریپشکنینەکانی سکێما و مۆڵەت تێپەڕین
  3. 00:05:40ئاگادارکردنەوەبۆشایی بە نێوانکاری پڕکرایەوە، نیشانە کراوە
  4. 00:16:03تەواو بووڕێکخستنی پێوانە تەواو بوو
  5. 00:28:55دەروازەتاقیکردنەوەی سەربەخۆ لە ڕیزدایە
شوێنی کاری بنیاتنان.ڕووکاری نموونەیی؛ داتای ڕاستەوخۆ نییە.

Foundry · Build workspace. Build workspace: example names and illustrative values, not a record.

03The problem it addresses

Decisions without records cannot be corrected.

NXS-RLS is defined in system profile NRS-S18 of the Nexus Standards. When evidence is corrected, the decisions that relied on it must be found. A record of handoffs and obligations with references to evidence versions makes that possible, and makes accountability concrete.

  • Obligation and handoff records.
  • References to evidence versions.
  • Receipts that survive staff turnover.
04Reference practice

The standards a design like this is read against.

ئاماژەRelevance
ISO 15489Records management
Open Contracting Data StandardStructured records for public contracting
05Neighbouring systems

What it exchanges with the other systems.

06Rooms

The ten rooms of NXS-RLS.

NXS-RLS has the eight rooms every Foundry system shares, set to its own authority, and two specialist rooms, Obligations and Handoffs. Each is described by the work it is designed for; the public register records NXS-RLS as declared, not deployed.

RoomجۆرDesigned to
وێستگەهاوبەشOperate, inspect and correct authoritative domain posture for participants, roles, agreements, protocols, obligations, handoffs, receipts and disputes
ئەرکهاوبەشCoordinate bounded objective-oriented intelligence and human handoff for participants, roles, agreements, protocols, obligations, handoffs, receipts and disputes
BuilderهاوبەشDesign, engineer and prepare governed changes and artefacts for participants, roles, agreements, protocols, obligations, handoffs, receipts and disputes
نەخشەکانهاوبەشInspect and compose spatial, temporal and world-model intelligence for participants, roles, agreements, protocols, obligations, handoffs, receipts and disputes
داتاهاوبەشWork with data, ontology, Chronotopes, graphs, scientific methods and risk for participants, roles, agreements, protocols, obligations, handoffs, receipts and disputes
CommonsهاوبەشWork with policy, law, standards, clauses, obligations and assurance for participants, roles, agreements, protocols, obligations, handoffs, receipts and disputes
ڕاپۆرتەکانهاوبەشCompute, model, synthesise and visualise governed analytical products and reproducible reports for participants, roles, agreements, protocols, obligations, handoffs, receipts and disputes
زانیاریهاوبەشWork with institutional memory, records, citations, runbooks and learning for participants, roles, agreements, protocols, obligations, handoffs, receipts and disputes
ObligationsپسپۆڕTrack commitments, duties, conditions, deadlines, evidence of performance, exceptions and dispute references arising from governing instruments
دەستبەدەستکردنەکانپسپۆڕPrepare, transmit, acknowledge, accept, reject, correct and close governed exchanges among authorised participants
07دەستگەیشتن

Authorised projects only.

Access requires an authorised project with an accountable owner, data terms and a review plan. Enquiries go to the contact form.

09سەرچاوەکان

Where this page’s references lead.

ئەو لەش و بەڵگەنامانەی ئەم لاپەڕەیەیان لەگەڵ دەخوێنرێتەوە. دۆخ و وەشانەکان دەگۆڕێن؛ هەر بەستەرێک دەچێتە لای لەشی دەرکەر.

10پرسیارەکان

پرسیار و وەڵام.

Is the system available now?
Allocations open when their terms and review capacity exist; information and enquiries are open today.
Foundry

ڕێگایەک، کۆمەڵە داتایەک یان پرسیارێک بهێنە.

زانیاری و پرسیار ئەمڕۆ کراوەن. پرسیارێک ژمارەی ئاماژەی پێدەدرێت و هەنگاوی دواتر دیاری دەکات؛ داواکاری، پارەدان، تەرخانکردنی کۆمپیوتەر و تۆمارکردن تەنیا کاتێک دەکرێنەوە کە تیم، مەرج و توانای پێداچوونەوەیان هەبێت.

The Global Centre for Risk and Innovation (GCRI Canada) is a Canadian not-for-profit organisation, not a registered charity, with its registered office in Ontario.