Risk analysis needs compute in very different places: a large cloud allocation for a national ensemble, a ministry’s own servers for records that may not leave, a field laptop that keeps a model running when the network fails. This page sets out how compute risk develops, from capacity shortfall and concentration in a few providers to jurisdiction, energy and degraded connectivity, and how cloud, local nodes and edge devices are designed to be scheduled as one capacity.
Compute and edge on the record.
Compute and edge: how the risk develops.
Cloud, local nodes and edge technical capacity. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.
Capacity fails when needed
Demand for compute peaks during events, exactly when shared capacity is contested, networks are degraded and power is unstable. Queues lengthen, ensembles shrink and forecasts arrive after the decision window has closed.
Concentration
Many institutions rely on a few cloud providers, regions and chip suppliers. An outage, sanction, price change or supply shortage reaches all of them at once, which makes compute concentration a systemic dependency in its own right.
Jurisdiction and data location
Where data may be processed is set by law and contract. Moving analysis to the data keeps records in place, but constrains which methods can run and can still leave results open to inference about the inputs.
Disconnection and reconciliation
Edge nodes keep working offline and reconcile later. Conflicting edits, clock skew and stale models accumulate during an outage, and reconciliation after a long disconnection may need human judgement rather than an automatic merge.
How compute and edge is modelled, measured and tested.
مۆدێلەکە، گریمانەکانی، داتاکانی و نادڵنیاییەکەی، بەو شێوەیەی زانا یان ئەندازیارێک دەیپشکنێت. پێکهاتەکان ڕێگا بڵاوکراوەکان دەگرنەبەر. بەهاکانی کێشراو نموونەییە، نەک دۆزینەوە.
مۆدێل، هاوکێشەکان و گریمانەکان
The model structure used for compute and edge, the assumptions it makes and how each is tested.
Ri = f(Hi, Ei, Vi, Ci)مەترسیدەر، ڕووبەڕووبوون، لاوازی و توانای مامەڵەکردنEAL = ∑k pk · Lkover events k with annual probability pkxt+1 = A xt + B ut + εtA carries the couplings, u the shock, ε the error| گریمانە | بۆچی دروست دەکرێت | چۆن تاقی دەکرێتەوە |
|---|---|---|
| مەترسیدەر و ڕووبەڕووبوون لە ناو پێشهاتێکدا سەربەخۆن | ئینتێگراڵی زیان بە ئاسانی دەهێڵێتەوە | بەراورد بکە لەگەڵ گونجاندنی کۆپیولا لەسەر تۆمارە هاوبەشەکان |
| هاوبەستییەکان لە نزیک خاڵی کارکردن هێڵین | ڕێگە دەدات شۆکەکان بڵاو ببنەوە لە A | لە دەرەوەی مەودای هێڵیی شڵەژێنە و بەراورد بکە |
| چەمکەکانی لاوازی لە شوێنێکەوە بۆ شوێنێکی تر دەگوازرێنەوە | چەمکی ناوخۆیی بە دەگمەن بەردەستە | لەگەڵ زیانە چاودێریکراوەکان پشتڕاستی بکەرەوە کە هەن |
- تێکردنەکان
- کۆمەڵە داتای وەشانکراو لەگەڵ ڕەسەنایەتی
- دەرچووەکان
- دابەشبوون، نەک یەک ژمارە
- کۆد
- بڵاوکراوەتەوە لەگەڵ کارتی مۆدێل و تاقیکردنەوەکان
- بەرهەمهێنانەوە
- هەمان داتا، کۆد، ژینگە و تۆو
Compute is designed to serve each domain’s heaviest models.
Compute readiness is designed for the Foundry Build and Readiness series. Energy efficiency is reported with ISO/IEC 30134 indicators; no hardware specifications are summed into performance claims.
- Workload profiles.
- Efficiency measurements.
What is measured, and how well.
Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.
| نیشاندەر | یەکە | ڕیتم | Source type | ناونیشان |
|---|---|---|---|---|
| Queue wait time | minutes, median and tail | daily | Scheduler accounting | چاودێریکراو |
| Service availability | proportion of scheduled time | مانگانە | Availability monitoring | چاودێریکراو |
| Workloads placed outside permitted jurisdiction | count | per placement | Placement policy logs | چاودێریکراو |
| Edge reconciliation conflicts | count per resynchronisation | per event | Synchronisation logs | چاودێریکراو |
| Energy use per workload | kilowatt-hours | per run | Power telemetry or provider estimates | مەزەندەکراو |
| Carbon intensity of electricity used | grams CO2 equivalent per kilowatt-hour | hourly | Grid operator and provider data | مەزەندەکراو |
| Capacity offered against capacity allocated | core-hours or GPU-hours | مانگانە | Offer and allocation register | DECLARED |
| Recovery time in failover exercises | minutes | per exercise | Exercise records | چاودێریکراو |
Where the evidence comes from.
Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.
| سەرچاوە | What it gives | Licence class |
|---|---|---|
| TOP500 and Green500 lists | Published performance and energy efficiency of large systems | Free, terms of the project |
| Ember electricity data | Generation mix and carbon intensity of electricity by country | CC BY 4.0 |
| Copernicus Data Space Ecosystem | Earth observation archives with processing next to the data | Free and open, attribution |
| NASA Earthdata Cloud | Earth science archives in cloud object storage for in-region analysis | Free and open, NASA data policy |
| Public cloud region and status records | Region locations, availability history and incident reports | Provider terms |
| Kubernetes release and deprecation records | Version support windows and API removals that affect workload portability | CC BY 4.0 |
Who decides, and what the evidence serves.
Foundry prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.
| کێ بڕیار دەدات | پرسیارەکە | Evidence this page serves |
|---|---|---|
| Data owners and data protection authorities | Where data may be processed, and whether results may leave | Placement logs, the jurisdiction of each tier, federated execution records |
| Project owners | How to prioritise workloads within an allocation during an event | Queue state, allocation remaining, deadlines |
| Infrastructure contributors and operators | What capacity to offer and on what terms | Offer register, utilisation, energy and support load |
| Ministries responsible for digital infrastructure | How far national risk analysis depends on foreign or concentrated providers | Provider and region dependency map; exit and failover plans |
Outputs this topic produces
- Placement policies by data class, jurisdiction, urgency and cost
- Workload packages portable across cloud, private and edge tiers
- Failover and degraded-operation runbooks with exercise records
- Register of capacity offered, allocated and used, kept apart
What computing engineers and data owners ask.
- Where is the data legally and contractually allowed to be processed?
- Which workloads need burst capacity, and which need steady, local availability?
- How does work continue when connectivity is degraded or lost?
- How is offered capacity distinguished from capacity actually allocated and used?
One control plane across three tiers.
NXS-COR (compute, nodes and runtimes) is designed as the compute control plane across cloud, private infrastructure and edge. Workloads are packaged with their dependencies so they can run on any tier that the project’s policy allows, and the scheduler places them according to data location, sensitivity, cost and urgency. Where data cannot move, the analysis is designed to run where the data is held and only permitted results leave.
Edge capacity matters most when it is hardest to provide: during the events risk work is about. Field kits, observatory nodes managed through NXS-OPS (instruments, sensors and calibration) and offline operation of NXS-NST (civilian common operating picture) are designed so that coordination continues through outages, synchronising when connectivity returns. Energy use, cooling and hardware supply are part of the engineering, and the platform’s computing questions connect to the energy and data-centre analysis at Data and Compute.
What is engineered, and what remains hard.
Compute to data
Federated execution keeps sensitive data in place and moves code and permitted results.
Degraded operation
Edge nodes continue locally and reconcile later, with conflicts flagged rather than silently overwritten.
Offer is not allocation
Contributed infrastructure is recorded as an offer until it is separately allocated.
Limits: federated analysis constrains which methods can run, edge devices have little capacity, and reconciliation after long disconnection can need human judgement. No hardware specifications are summed into performance claims.
How it is studied, and what the methods cannot say.
- 01High-performance, cloud and edge computingEnsemble scheduling across tiers · Federated execution next to the dataApplied here
- 02Systems engineeringCanonical system inventory · Contract-first interfaces · Requirements traced to evidenceApplied here
- 03Software and safety-critical systems engineeringFail-closed policy gates · Build provenance and bills of materials · Assurance casesApplied here
- 04Data engineering, interoperability and stewardshipValidation at the ingest boundary · Frozen data cuts for reproducible productsApplied here
- 05Geospatial information systemsImagery catalogues through STAC · Exposure overlays with stated aggregationApplied here
Where this page’s references lead.
ئەو لەش و بەڵگەنامانەی ئەم لاپەڕەیەیان لەگەڵ دەخوێنرێتەوە. دۆخ و وەشانەکان دەگۆڕێن؛ هەر بەستەرێک دەچێتە لای لەشی دەرکەر.
پرسیار و وەڵام.
Why move analysis to the data instead of the reverse?
What happens to edge work during an outage?
Can my institution contribute servers?
Is energy use reported?
Does membership include compute?
Is any compute allocation open?
لەم لاپەڕەیەوە بەڵگە پێشکەش بکە.
Reports بڵاوکراوەی وەرزیی کۆنسۆرتیۆم ـە. ئەوەی تۆ لەسەر ئەم بابەتە دەیزانیت دەتوانێت لە وەشانی داهاتوودا ببێتە بەڵگە، کەیس یان ڕاستکردنەوە، بە ناوی خۆتەوە و لەژێر CC BY 4.0 بڵاو دەکرێتەوە کاتێک کاری خۆتە.
- ئیمەیڵدەروازەی GW-GCRIلەم لاپەڕەیەوە بینێرەبەڵگە، ڕاستکردنەوە، بابەت، ڕێگا، پێداچوونەوە، وەرگێڕان یان تێکردنی پڕۆفایل. بە نیشانەی ئەم لاپەڕەیە دەگات، بۆ ئەوەی دەستکاریکەری خاوەنەکەی وەریبگرێت.
- ZenodoOpen depositDeposit it and submit to the communityPublish your own record on Zenodo with your ORCID iD, then submit it to the Reports community there. Curators review it; the DOI stays yours.
- ڕاپۆرتەکانGCRIهەموو ڕێگاکانی بەشداری ببینەجۆرەکانی بەشداری، هەریەکە چۆن پێداچوونەوەی بۆ دەکرێت، چ ناوبردنێک وەردەگریت، مۆڵەتەکە و ئەوەی هەرگیز وەرناگیرێت.
هەرگیز داتای کەسی، وردەکاریی هەستیاری ژێرخان یان هیچ شتێک مەنێرە کە مافی بڵاوکردنەوەت نییە. بەشدارییەک پێش بەکارهێنان پێداچوونەوەی بۆ دەکرێت؛ ناردنی ماف نابەخشێت بە نووسەرایەتی یان بەڕێوەبردنی ڕاگەیاندن، و پاڵپشتی دارایی هەرگیز دۆزینەوەیەک ناکڕێت.
ڕێگایەک، کۆمەڵە داتایەک یان پرسیارێک بهێنە.
زانیاری و پرسیار ئەمڕۆ کراوەن. پرسیارێک ژمارەی ئاماژەی پێدەدرێت و هەنگاوی دواتر دیاری دەکات؛ داواکاری، پارەدان، تەرخانکردنی کۆمپیوتەر و تۆمارکردن تەنیا کاتێک دەکرێنەوە کە تیم، مەرج و توانای پێداچوونەوەیان هەبێت.
بەڵگەنامە یاساییەکان.
نەخشە، داتا و وێنەکانی ئەم ماڵپەڕە بۆ ناوەڕۆک و زانیاریی گشتی پیشان دراون. ئامۆژگاری، پێشبینی یان ئاگادارکردنەوە نین؛ سنوورەکانی زانیارییەکە لە ڕەتکردنەوەی بەرپرسیارێتی و ئاگاداریی داتادا دەستنیشان کراون.