- Reports
- Baseline Edition 2026
- Complete edition
Exponential Technology Report 2026: Cloud, Edge and Distributed Computing
Exponential Technology
Cloud, Edge and Distributed Computing 2026
Imprint
- Editor
- Saeed Valadbaygi, Chief Steward and Managing Editor, the Global Centre for Risk and Innovation (GCRI)
- Publisher of record
- The Global Centre for Risk and Innovation (GCRI) for the Nexus Consortium, Toronto
- Report number
- NR-XTECH-CLOUD-GLOBAL-2026-BASELINE
- Evidence close
- 30 September 2026, cut DC-XTECH-CLOUD-GLOBAL-2026-B0
- Status
- Draft under stewardship review; not yet released
- DOI and UNI
- Issued at deposit
- Licence
- CC BY 4.0 for Nexus-authored text, tables and figures; third-party material keeps its own licence
- Cite as
- Valadbaygi, S. (Ed.). (2026). Exponential Technology Report 2026: Cloud, Edge and Distributed Computing (Baseline Edition 2026, Report No. NR-XTECH-CLOUD-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI). https://therisk.global/nexus-reports/editions/xt-08/
Contents
- Cloud, Edge and Distributed Computing 2026
- Executive summary
Executive summary
The edition on a few pages: the abstract, the key messages, the headline finding and what each steward reads in it.
S.1Abstract
Cloud, edge and distributed computing matter to the Nexus programme because other infrastructure now runs on them. They are also physical: data centres draw electricity, reject heat and, in some designs, consume water. The IEA reports that data centres used about 415 TWh in 2024, 1.5% of global electricity, and shows 945 TWh in its 2030 base case1. In the United States the share was 4.4% in 2023, with 6.7 to 12% projected for 202823. In Ireland it was 22% of metered electricity in 20244. Three providers held 63% of cloud infrastructure revenue in the second quarter of 2026, according to an industry analyst10. Market power is now a regulatory subject. The UK competition authority recommended further investigation of Microsoft and AWS in July 202511, and the European Commission opened three cloud market investigations on 18 November 202512. The EU Data Act removes switching charges from 12 January 202716. Concentration shows in outages: a fault in one regional database service disrupted AWS services for 14 hours 32 minutes in October 202520. Operator reports on efficiency and water are company-reported and use different baselines. This baseline sets out what the evidence supports and where it is thin. It forecasts no demand or outage and ranks no country or provider.
S.2Key messages
Six readings that frame the cloud baseline, and the eight questions this edition answers, each with its status and source.
About 415 TWh worldwide in 2024, 1.5% of the total, per the IEA.1
How much electricity do data centres use?Reported
In Ireland data centres used 22% of metered electricity in 2024; in the US 4.4% in 2023.34
Is it a national issue?Reported
Operators report PUE of 1.09 to 1.15, against baselines that differ.57
How efficient are the large operators?Reported
Operator figures exist but use different methods; one projection is modelled.68
What about water?Reported
Three providers held 63% of cloud infrastructure revenue in Q2 2026.10
How concentrated is the market?Reported
Competition reviews in the UK and EU, and the Data Act switching rules.111216
What are regulators doing?Reported
A single regional fault disrupted AWS services for 14 hours 32 minutes in 2025.20
Do outages cascade?Reported
A fault in a shared control plane while dependence is concentrated. SCN-XT08-DEP-01
What will 2027 test first?Expert input
S.3Headline finding
ReportedEQL 4NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-INF-011
Three large cloud and network events in 2025 lasted from 3 hours 10 minutes to 14 hours 32 minutes, each traced by its operator to an internal fault.
| Item | Bar, scaled to the largest value | Value |
|---|---|---|
| AWS us-east-1, 19 to 20 October 2025 | 14.5 | |
| Google Cloud, 12 June 2025 | 7.5 | |
| Cloudflare, 18 November 2025, to core traffic restored | 3.2 |
Sources: AWS20; Google Cloud21; Cloudflare22. Durations are derived from stated times, method (3). The events differ in scope and are not comparable.
Each operator traced its event to an internal fault: a latent race condition in a DNS system for a regional database service at AWS20, blank fields in policy data that crashed a control service at Google Cloud21, and a feature file that doubled in size at Cloudflare, which stated that no cyber attack was involved22. Services built on these platforms failed together. The reports do not say how many customers or public services were affected.
S.4At a glance
S.5What each steward reads in it
GCRI · KEY T
Technical Truth
The evidence supports reading cloud and distributed computing as shared infrastructure with a measurable physical footprint.
GRF · KEY M
Public Meaning
For most people the cloud arrives as an app that stops working or a headline about energy and water.
GRA · KEY F
Capital Meaning
Readiness implications only. Revenue is concentrated, switching charges end in 2027, and recovery from large events falls on customers as well as providers.
NEXUS
Synthesis
Cloud is well described by single events and dated rules and thinly measured as a system.
S.6What this edition is, and is not
What this edition is
A baseline: the 2026 state of cloud, edge and distributed computing as infrastructure and the couplings through which it carries risk into other systems. It synthesises published evidence and ranks no country, company or asset.
What it is not
Not a forecast of demand or outages, a provider ranking, an endorsement of any vendor or an assessment of any programme. Competition, resilience and energy rules are decisions of competent authorities.
What comes next
National, regional and sector evidence feeds the 2027 cloud edition through the federation. Each edition reports what changed against this baseline: observations, source revisions, method changes, scenario updates and corrections.
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
- 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
- 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
- 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
- 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
- 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
- 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
- 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
- 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
Cloud is shared infrastructure with a physical footprint
Part I describes systems and their couplings. It ranks no country or operator and assesses no authority.
1.1The questions this part answers
Key questions
- Where is cloud risk concentrated?
- Which couplings carry cloud shocks into other systems?
- Which cloud capabilities hold under compound stress?
- What must 2027 evidence measure first?
In this part
- Narrative
- Headline finding
- Lead figure
- Five footprint and governance chapters
- Twelve-domain reading
- Sector screens
- Dependency matrix
- Risk objects
- Capability ladder
- Scenario
- Three lenses
- Portfolio
1.2The argument
Cloud computing is usually discussed as a service. The 2026 evidence reads it as shared infrastructure: facilities that draw electricity and reject heat, a few providers that carry much of the market, and a set of rules that are only now catching up11016.
The electricity evidence is clear in direction and uneven in method. Data centres used about 415 TWh in 20241, 4.4% of US electricity in 20233 and 22% of metered electricity in Ireland in 20244. Operators report efficient fleets, but their baselines differ57.
The market evidence is concentrated. Three providers held 63% of cloud infrastructure revenue in the second quarter of 202610. Competition authorities in the UK and EU have opened cloud reviews1112, and the Data Act removes switching charges in January 202716.
The resilience evidence comes from operators. One regional fault disrupted AWS services for 14 hours 32 minutes in 202520; a policy data error and a configuration file fault caused two other large events2122. Dependence of public services is not measured.
Three providers hold about two thirds of cloud infrastructure revenue, and the analyst reports that the market grew 43% in a year. The shares cover infrastructure and platform services and hosted private cloud, not all cloud revenue10.
| Item | Bar, scaled to the largest value | Value |
|---|---|---|
| Amazon | 28 | |
| Microsoft | 20 | |
| 15 | ||
| All others (derived) | 37 |
Source: as cited in the note to this figure. Year 2026.
Figure ID FIG-XTECH-CLOUD-GLOBAL-2026-BASELINE-01-003
1.3Twenty couplings between five systems
The cloud-centred matrix types the twenty couplings between the five core systems, read for their cloud content. Strengths are Nexus estimates (ESTIMATED) from the cited evidence and analogue events; they set the graph that 2027 evidence will test.
Each line is one coupling from one system to another, drawn by the strength the edition assigns. Strengths are Nexus estimates from the cited evidence and analogue events.
- Strong
- Moderate
- Weak
Source: this edition’s coupling matrix (Table 1.1); status Estimated.
| From, to | WAT | ENE | FOO | HLT | BIO |
|---|---|---|---|---|---|
| WAT Water | · | MODERATE cooling choice and power | WEAK no documented link | WEAK no documented link | WEAK no documented link |
| ENE Energy | MODERATE power and cooling water | · | WEAK no documented link | WEAK hosted health services, not bound | WEAK no documented link |
| FOO Food | WEAK no documented link | WEAK no documented link | · | WEAK no documented link | WEAK no documented link |
| HLT Health | WEAK no documented link | WEAK no documented link | WEAK no documented link | · | WEAK no documented link |
| BIO Biodiversity | WEAK no documented link | WEAK no documented link | WEAK no documented link | WEAK no documented link | · |
| Strength: strong, moderate or weak; a Nexus estimate (status Estimated) from cited evidence and analogue events. The scale is defined in Annex A. | |||||
Transmission paths
- 01
ENE → INF
Local grid share limits siting and growth of facilities.
Reported Ireland 22% of metered electricity4
- 02
INF → DAT
A fault in one provider control plane interrupts many dependent services.
- 03
FIN → INF
Revenue concentration funds capacity and raises dependence.
Reported top three 63%10
- 04
WAT → ENE
Cooling method trades water use against electricity use.
- 05
GOV → DAT
Switching and sovereignty rules change where data and workloads sit.
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
- 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
- 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
- 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
- 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
- 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
- 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
- 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
Key findings
Twelve findings carry the cloud baseline. They are grouped by coupling and never ranked. Each resolves to its source or, where Nexus analysis is involved, to its stated method.
2.1Headline finding
ReportedEQL 4NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-INF-011
Three large cloud and network events in 2025 lasted from 3 hours 10 minutes to 14 hours 32 minutes, each traced by its operator to an internal fault.
| Item | Bar, scaled to the largest value | Value |
|---|---|---|
| AWS us-east-1, 19 to 20 October 2025 | 14.5 | |
| Google Cloud, 12 June 2025 | 7.5 | |
| Cloudflare, 18 November 2025, to core traffic restored | 3.2 |
Sources: AWS20; Google Cloud21; Cloudflare22. Durations are derived from stated times, method (3). The events differ in scope and are not comparable.
Implication
Each operator traced its event to an internal fault: a latent race condition in a DNS system for a regional database service at AWS20, blank fields in policy data that crashed a control service at Google Cloud21, and a feature file that doubled in size at Cloudflare, which stated that no cyber attack was involved22. Services built on these platforms failed together. The reports do not say how many customers or public services were affected.
What would move it
Further post-event reports, any regulator reporting of cloud incidents and provider dependence registers would each move this finding.
2.2Energy
ReportedEQL 3NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-ENE-001
The IEA reports that data centres used about 415 TWh of electricity in 2024, 1.5% of global electricity, and shows 945 TWh in its 2030 base case, with the United States the largest share of growth.1
ReportedEQL 4NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-ENE-002
US data centres used about 176 TWh in 2023, 4.4% of US electricity, up from 58 TWh in 2014; the national laboratory projects 6.7 to 12% of US electricity in 2028.23
ReportedEQL 4NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-ENE-003
Data centres used 22% of metered electricity in Ireland in 2024, up from 21% in 2023.4
ReportedEQL 3NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-ENE-004
Google reports that its data centre electricity use grew 27% in 2024 while its data centre energy emissions fell 12%, and Microsoft reports company-wide electricity use of 29.8 TWh in fiscal 2024, up from 23.6 TWh.56
ReportedEQL 3NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-ENE-005
Operators report fleet efficiency, with Google at a PUE of 1.09 and AWS at 1.15 in 2024, but each compares itself with a different industry average, from 1.25 to 1.56.579
2.3Water
ReportedEQL 3NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-WAT-006
Microsoft reports water consumption of 5,807 megalitres in fiscal 2024, down from 7,844 after a change of estimation method, and 46% of its withdrawals in areas of water stress; Google reports water consumption up 28% in 2024.56
ReportedEQL 2NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-WAT-007
A modelling preprint projects that global AI demand could need 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; it is a projection, not a measurement.8
2.4Finance
ReportedEQL 3NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-FIN-008
Three providers held 63% of cloud infrastructure revenue in the second quarter of 2026, which was USD 143.4 billion and 43% above the year before, according to an industry analyst.10
2.5Governance
ReportedEQL 4NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-GOV-009
The UK competition authority published its final cloud market decision on 31 July 2025 and recommended strategic market status investigations of Microsoft and AWS; the European Commission opened three DMA cloud market investigations on 18 November 2025.11121314
ReportedEQL 5NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-GOV-010
The EU Data Act has applied since 12 September 2025 and removes cloud switching and data egress charges from 12 January 2027.1516
2.6Infrastructure
ReportedEQL 4NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-INF-011
Operator reports describe three large events: AWS us-east-1 for 14 hours 32 minutes in October 2025, Google Cloud for about 7 hours 27 minutes in June 2025, and Cloudflare for 3 hours 10 minutes until core traffic was largely restored in November 2025.202122
2.7Systemic
Expert inputEQL 2NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-SYS-012
The leading compound pathway for 2027 testing is a fault in a shared provider control plane while dependence is concentrated and sovereignty rules diverge. § scenario
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
- 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
- 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
- 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
- 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
- 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
- 9UNVERIFIED, not opened: Uptime Institute (ed.), Global Data Center Survey 2025 (average PUE 1.54; power the cause of 45% of outages), taken from search-result summaries; the survey page returned an access error. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
- 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
- 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
- 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
- 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 13The Register (ed.), Brussels eyes AWS, Azure for gatekeeper tag in cloud clampdown (news article of 18 November 2025; possible obligations and fines up to 10% of worldwide turnover; trade press, secondary). Situation Publishing, London. Observation year 2025. Accessed 2026-11-03.back
- 14UNVERIFIED, not opened: trade press reports of mid-2026 that the Commission informed Amazon and Microsoft of a preliminary view that they should be designated as gatekeepers for cloud, taken from search-result summaries; the one article fetched returned an access error. Observation year 2026. Accessed 2026-11-03.back
- 15European Commission (ed.), Data Act (policy page; applicable from 12 September 2025; entered into force in January 2024). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
Systems and sectors at baseline
3.1Where each system stood at evidence close
ENE · Energy
Global data centre electricity use
415TWh1.5% of global electricity; 945 TWh in the 2030 base case.
Reported2024IEA1
ENE · Energy
US data centre share of electricity
4.4%176 TWh in 2023; 6.7 to 12% projected for 2028.
ENE · Grid
Data centre share of metered electricity, Ireland
22%21% in 2023.
Reported2024CSO4
FIN · Market
Top three providers share of cloud revenue
63%Amazon 28, Microsoft 20, Google 15; sum is method (2).
Reported2026Synergy10
INF · Resilience
Duration of the AWS us-east-1 event
14.5hoursfault in a regional database service DNS.
Reported2025AWS20
GOV · Governance
EU switching charges removed from
2027JanuaryData Act, 12 January 2027.
Reported2025European Commission16
3.2Domain posture
Each of the twelve coupled domains is read through cloud, in words, not scored. The coupling column names the dependency that carries cloud risk into each domain.
| Domain | Posture at baseline | Coupling | Status |
|---|---|---|---|
| WAT | Operators report water use on different methods; cooling choice trades water against power. | WAT ↔ ENE | Reported EQL 3 |
| ENE | Data centres used about 415 TWh in 2024; shares are high in some grids, such as Ireland at 22%. | ENE ↔ INF | Reported EQL 4 |
| FOO | No documented coupling at baseline; platform use in agrifood is not evidenced here. | none documented | Expert input EQL 1 |
| HLT | Health records and services run on cloud platforms; no figure bound here. | INF → HLT | Expert input EQL 1 |
| BIO | No documented coupling at baseline. | none documented | Expert input EQL 1 |
| CLI | Operator emissions and electricity growth are reported; no sector total is bound. | INF → CLI | Reported EQL 3 |
| INF | The core system: shared facilities and platforms, with large operator-reported events in 2025. | the core system | Reported EQL 4 |
| FIN | Three providers held 63% of cloud infrastructure revenue in Q2 2026. | FIN → INF | Reported EQL 3 |
| DAT | Data location, switching and sovereignty rules are changing in the EU. | GOV → DAT | Reported EQL 5 |
| AIC | AI demand is a stated driver of data centre electricity growth; shares are not split here. | AIC → ENE | Reported EQL 3 |
| MIN | Hardware and mineral dependence of data centres is not bound here. | none documented | Expert input EQL 1 |
| TRD | Sovereignty and procurement rules shape where workloads may run. | INF ↔ TRD | Inferred EQL 2 |
3.3Sector screens
All sixteen sectors are screened for their dependence on cloud, on the same grammar as every national edition. The evidence column describes coverage of the baseline evidence, not the performance of the sector.
| Code | Sector | Baseline evidence | Exposure to watch | Evidence coverage |
|---|---|---|---|---|
| GS-00 | Cross-system | cloud couples to energy, water, finance and cyber systems | shared control-plane fault | THIN |
| GS-01 | Water | operator water figures on different methods68 | cooling in water-stressed areas | THIN |
| GS-02 | Energy | data centre electricity reported134 | local grid load | PARTIAL |
| GS-03 | Food | no documented coupling | none documented | THIN |
| GS-04 | Health | health services run on cloud; no figure bound | service outage | THIN |
| GS-05 | Finance | market concentration reported10 | provider dependence | PARTIAL |
| GS-06 | Development | access to capacity and skills | widening gaps | THIN |
| GS-07 | Climate | operator emissions reported5 | electricity growth | THIN |
| GS-08 | Disaster | no documented coupling | none documented | THIN |
| GS-09 | Infrastructure | facilities, grids and networks418 | single-region dependence | PARTIAL |
| GS-10 | Cities | siting near load centres; not bound | grid competition | THIN |
| GS-11 | Biodiversity | no documented coupling | none documented | THIN |
| GS-12 | Earth observation | platform use not evidenced here | none documented | THIN |
| GS-13 | Cyber and digital | incident reports and authorisation rules20212224 | shared-platform faults | GOOD |
| GS-14 | Policy | competition and data rules11121618 | outcomes pending | GOOD |
| GS-15 | Science | definitions and surveys252829 | common metrics | PARTIAL |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
- 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
- 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
- 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
- 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
- 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
- 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
- 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03.back
- 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
- 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 25NIST (ed.), The NIST Definition of Cloud Computing, NIST SP 800-145 (publication page; September 2011; five essential characteristics, three service models and four deployment models). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03.back
- 28Armbrust, M. et al., Above the Clouds: A Berkeley View of Cloud Computing, Technical Report UCB/EECS-2009-28, 10 February 2009 (report page and abstract). University of California, Berkeley. Observation year 2009. Accessed 2026-11-03.back
- 29Cloud Native Computing Foundation (ed.), CNCF Annual Survey 2024 (report page; tenth annual survey; 750 respondents in fall 2024; Kubernetes percentage not on the page). CNCF, San Francisco. Observation year 2024. Accessed 2026-11-03.back
Risks and capability
Four cloud risk objects open the portfolio. Order carries no rank. Each is read across driver, exposure, vulnerability, capacity, cascade and consequence.
4.1Risk objects
Each risk is read across the chain from hazard to consequence, with its status and evidence-quality level.
InferredEQL 4RSK-XT08-INF-001
Shared control-plane failure
InferredEQL 3RSK-XT08-ENE-002
Local grid constraint
Expert inputEQL 2RSK-XT08-WAT-003
Water stress at cooling sites
InferredEQL 3RSK-XT08-GOV-004
Fragmented sovereignty and concentration
4.2Capability ladder
Existence is not readiness. Each of the fifteen capability functions is placed on the ladder by the strongest public evidence for cloud at the global level.
| Function | Rung | Level | Strongest public evidence at baseline |
|---|---|---|---|
| Prevention and mitigation | EXISTS | operator efficiency programmes and EU reporting rules5735 | |
| Monitoring and observation | LISTED | operators publish reports; no common cross-provider record2021 | |
| Early warning | LISTED | no consolidated early warning of provider faults | |
| Preparedness and planning | EXISTS | DORA and FedRAMP programmes1724 | |
| Redundancy and reserves | LISTED | multi-region designs exist; 2025 events show shared dependencies2021 | |
| Response | EXISTS | operators restored services within hours in three reported events202122 | |
| Continuity of critical services | LISTED | no consolidated evidence of tested failover or exit16 | |
| Recovery | EXISTS | full recovery was reported in each of the three events202122 | |
| Adaptation | LISTED | post-event changes reported by operators; not reviewed here40 | |
| Social protection | LISTED | not applicable at baseline | |
| Finance and insurance | LISTED | not reviewed | |
| Institutional coordination | EXISTS | competition authorities and EU institutions111217 | |
| Technical infrastructure | EXISTS | large installed base and standards2102530 | |
| Workforce | LISTED | no figure bound | |
| Research capacity | ADEQUATE | strong literature on cloud and edge2831323334 | |
| A capability listed in policy is not a tested one; each rung is the strongest public evidence at baseline. | |||
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
- 17European Securities and Markets Authority (ed.), Digital Operational Resilience Act (page; applies from 17 January 2025; lists materials on critical ICT third-party provider designation; no designations on the page). ESMA, Paris. Observation year 2025. Accessed 2026-11-03.back
- 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
- 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
- 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
- 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
- 19European Commission (ed.), Energy Efficiency Directive (policy page; states a data centre energy efficiency package planned for the third quarter of 2026 and links to reporting of data centre energy consumption; no threshold or dates on the page). Directorate-General for Energy, Brussels. Observation year 2026. Accessed 2026-11-03.back
- 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
- 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
- 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
- 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 23Amazon Web Services (ed.), Opening the AWS European Sovereign Cloud (blog announcement of 14 January 2026; Brandenburg region; investment of EUR 7.8 billion stated; vendor announcement, weak evidence). Amazon Web Services, Seattle. Observation year 2026. Accessed 2026-11-03.back
- 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
- 35UNVERIFIED, not opened: Directive (EU) 2023/1791 on energy efficiency, Article 12 on data centre reporting, Official Journal of the European Union, 2023, cited from memory; the page returned no content. Observation year 2023. Accessed 2026-11-03.back
- 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03.back
- 40UNVERIFIED, not opened: Microsoft (ed.), Azure Front Door incident reports of October 2025, cited from memory; the page returned an error and no figure is used. Microsoft, Redmond. Observation year 2025. Accessed 2026-11-03.back
- 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
- 25NIST (ed.), The NIST Definition of Cloud Computing, NIST SP 800-145 (publication page; September 2011; five essential characteristics, three service models and four deployment models). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03.back
- 30ETSI (ed.), Multi-access Edge Computing (technology page; industry specification group; news item of 31 October 2025 on Phase 4 specifications and a white paper; no counts on the page). European Telecommunications Standards Institute, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03.back
- 28Armbrust, M. et al., Above the Clouds: A Berkeley View of Cloud Computing, Technical Report UCB/EECS-2009-28, 10 February 2009 (report page and abstract). University of California, Berkeley. Observation year 2009. Accessed 2026-11-03.back
- 31UNVERIFIED, not opened: Masanet, E., Shehabi, A., Lei, N., Smith, S. and Koomey, J., Recalibrating global data centre energy-use estimates, Science 367, 984 to 986, 2020, cited from memory; the page returned an access error. Observation year 2020. Accessed 2026-11-03.back
- 32UNVERIFIED, not opened: Satyanarayanan, M., The emergence of edge computing, Computer 50(1), 30 to 39, 2017, cited from memory. Observation year 2017. Accessed 2026-11-03.back
- 33UNVERIFIED, not opened: Shi, W., Cao, J., Zhang, Q., Li, Y. and Xu, L., Edge computing: vision and challenges, IEEE Internet of Things Journal 3(5), 637 to 646, 2016, cited from memory. Observation year 2016. Accessed 2026-11-03.back
- 34UNVERIFIED, not opened: Barroso, L.A., Clidaras, J. and Hölzle, U., The Datacenter as a Computer: Designing Warehouse-Scale Machines, third edition, Morgan and Claypool, 2018, cited from memory. Observation year 2018. Accessed 2026-11-03.back
Shared control-plane fault with diverging sovereignty rules
A conditional statement under stated assumptions, never a prediction.
5.1Assumptions
Scenario SCN-XT08-DEP-01: what is assumed, and what is held constant.
- Baseline
- the 2026 reference state in this edition
- Drivers
- a fault in a shared provider control plane lasts many hours while public services depend on it and sovereignty rules limit failover
- Analogues
- the 2025 events at AWS, Google Cloud and Cloudflare202122
- Interventions
- none modelled: the specification describes the unmitigated case
- Run state
- narrative specification; quantified run scheduled for 2027
5.2The cascade, step by step
- 1
INF → DAT
a control-plane fault interrupts dependent services in one region
2025
- 2
DAT → FIN
payment and business services stall until recovery
2025
- 3
DAT → HLT
hosted records and booking services become unavailable
2025
- 4
GOV → INF
sovereignty rules limit moves between providers or regions
2026
- 5
ENE → INF
recovery load meets local grid limits at the host region
2024
- 6
FIN → INF
customers re-weigh dependence as switching charges end
2025
5.3The scenario as a table of steps
How the shock in scenario SCN-XT08-DEP-01 would travel through Cloud, Edge and Distributed Computing’s coupled systems, step by step, under the assumptions the edition states.
| Step | What happens | Source |
|---|---|---|
| 01 Infrastructure to dat | A control-plane fault interrupts dependent services in one region. Analogue or source: 2025. | Edition XT-08, scenario SCN-XT08-DEP-01, step 1 |
| 02 DAT to finance | Payment and business services stall until recovery. Analogue or source: 2025. | Edition XT-08, scenario SCN-XT08-DEP-01, step 2 |
| 03 DAT to health | Hosted records and booking services become unavailable. Analogue or source: 2025. | Edition XT-08, scenario SCN-XT08-DEP-01, step 3 |
| 04 Governance to infrastructure | Sovereignty rules limit moves between providers or regions. Analogue or source: 2026. | Edition XT-08, scenario SCN-XT08-DEP-01, step 4 |
| 05 Energy to infrastructure | Recovery load meets local grid limits at the host region. Analogue or source: 2024. | Edition XT-08, scenario SCN-XT08-DEP-01, step 5 |
| 06 Finance to infrastructure | Customers re-weigh dependence as switching charges end. Analogue or source: 2025. | Edition XT-08, scenario SCN-XT08-DEP-01, step 6 |
A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Cloud, Edge and Distributed Computing 2026, scenario SCN-XT08-DEP-01 (2026); Cloud, Edge and Distributed Computing 2026, references (NR-CIT-1) (2026).
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
Readings from the other desks
The cloud baseline is read through each steward’s lens, then once as a whole. Each lens is a projection of reviewed findings, not a separate argument. The other desks’ own editions of this subject are listed first, as cross-references, not copies.
6.1The other desks’ editions of this subject
Federation: each desk writes its own edition for the subjects in its remit. Until a desk releases, its edition shows its frame and the reading this edition printed for it.
| Desk | Edition | State | Identifier |
|---|---|---|---|
| GCRI Systems Evidence | No edition of this subject at this desk in the 2026 Baseline cycle | Not in this cycle | |
| GRF Public Deliberation | Outside this desk’s remit | Not in remit | |
| GRA Capital Readiness | Outside this desk’s remit | Not in remit | |
| Standards Progress | No edition of this subject at this desk in the 2026 Baseline cycle | Not in this cycle | |
| Academy Capability | No edition of this subject at this desk in the 2026 Baseline cycle | Not in this cycle | |
| Index Measurement | Outside this desk’s remit | Not in remit |
6.2Three lenses
One edition, read by each steward. The lens of this site comes first.
GCRI · KEY T
Technical Truth
The evidence supports reading cloud and distributed computing as shared infrastructure with a measurable physical footprint. Electricity use is reported and rising, the market is concentrated, and large events have been traced to internal faults. Evidence is strongest for single events and dated rules, and weakest for dependence, water and edge.
ENE-001 · ENE-002 · INF-011 · SYS-012
GRF · KEY M
Public Meaning
For most people the cloud arrives as an app that stops working or a headline about energy and water. The baseline asks that public debate separate measured use from projections and company claims, and keep the dependence of public services in view.
ENE-003 · INF-011 · WAT-007
GRA · KEY F
Capital Meaning
Readiness implications only. Revenue is concentrated, switching charges end in 2027, and recovery from large events falls on customers as well as providers1016. These show where finance-readiness evidence will matter. Nothing here is advice, a rating or an approval.
FIN-008 · GOV-010
NEXUS
Synthesis
Cloud is well described by single events and dated rules and thinly measured as a system. The 2027 programme should map dependence of public services, put operator metrics on a common basis and test exit before the next large event.
SYS-012 · C-01 · C-03
6.3Standards, Academy and steward contributions
How the Nexus Standards drafts, the Risk Academy and the three stewards feed each quarterly edition for cloud. The standards are a preparatory working draft (2026) and are cited as drafts, never as adopted standards.
| Quarter | Edition | Question | Boundary |
|---|---|---|---|
| Q1 | State and Agenda | What matters this year, and what is the starting position? | observed baseline stays distinct from planned work |
| Q2 | Evidence and Build | What new evidence and capability exist? | a configured capability is not a validated result |
| Q3 | Stress Test and Readiness | What do scenarios and tests show? | simulated loss or performance is not observed impact |
| Q4 | Annual Synthesis and Renewal | What changed in the year, and what renews? | release follows review, not event publicity deadlines |
| Steward or body | Role | Contribution route |
|---|---|---|
| GCRI Canada | Lead Institution and Consortium Secretariat; publisher of record; technical truth (key T) | science and practice communities · GCRI gateway |
| The Global Risks Forum (GRF) | leadership, dialogue and the Universe programme; public meaning (key M) | policy, Universe and national adoption · GRF gateway |
| The Global Risks Alliance (GRA) | finance, insurance and development readiness; capital meaning (key F) | finance and insurance · GRA gateway |
| Nexus Standards | preparatory drafts on vocabulary, hazards, indicators and methods | Standards site · working groups HAZ, IND, MTH, FIN, AI |
| Risk Academy | learning pathways tied to the agenda questions | Academy gateway · learning by review |
| Nexus Standards and Academy | technology chapter inputs: GCRI evidence, NXS standards, RA capability | technology editorial board |
Standards drafts used in this edition
- Risk vocabulary NRS-C1 (424 terms) for terms in the glossary
- Hazard atlas NHS-1 1.1.0 (905 hazards in 120 families) for risk objects
- Seven risk classes: global, catastrophic, existential, emerging, planetary, exponential, frontier-tech
Standards calendar to watch
- Founding calls from 20 October 2026; working groups meet from 5 November 2026
- Inaugural Global Standards Council session, 12 January 2027
- Quarterly reviews in March, June, September and December, aligned with each edition
6.4GCRI reading: the model card
GCRI’s reading of this edition is its model card: what the national model is, what it computes and where it stops. It is printed in full in Annex A, with the methods it belongs to. Annex A, methodology
6.5Global Risks Forum reading: editorial essays
Four signed essays by the Reports editorial team set out the positions this edition takes. They are interpretation, labelled as such; the evidence they draw on is in the findings register.
Cloud services run on facilities owned by a few companies and used by almost every sector. That makes them infrastructure in effect, and the evidence on dependence is the thinnest part of the picture.
EDITORIAL ESSAY · 01
Shared infrastructure, private operators
Operators report PUE and water use, and each picks its own baseline. A common basis would show whether growth is limited by grids, water or money.
EDITORIAL ESSAY · 02
Footprints need a common basis
The Data Act, DORA, the DMA reviews and the Cloud and AI Development Act proposal address different parts of one market. Their order and overlap will shape 2027.
EDITORIAL ESSAY · 03
Rules arrive in sequence
Edge computing is defined in specifications and papers, but sites, devices and energy use are not counted in the sources read here.
EDITORIAL ESSAY · 04
The edge is the blind spot
6.6Global Risks Alliance reading: 2027 cloud readiness pack
The registers that open the 2027 global cycle. At baseline each is initialised from this edition.
| Item | Register | State at baseline | First 2027 entry |
|---|---|---|---|
| E1 | Cloud risk state delta | baseline set by this edition | changes against the baseline |
| E2 | WEFH+B state delta | five global system readings set | indicator updates and freshness |
| E3 | Agenda and Portfolio movement | eight agenda items · 6 proposed objects | admission decisions |
| E4 | Federation delivery register | national chapters in preparation | national chapters |
| E5 | Consortium capability register | national consortia forming | first contributions |
| E6 | Leadership questions and challenges | none yet | first challenge log |
| E7 | Foundry technical state | national environments prepared | first federation cut |
| E8 | Publication candidates | twelve findings carried forward | PUBLISH · HOLD dispositions |
| E9 | Universe readiness | one candidate mission | admission and role spine |
| E10 | Correction register | none | first federation-wide cycle |
Publication dispositions
- Publish
- Hold
- Needs evidence
- Restricted
- Superseded
6.7Nexus Standards reading: standards and regulatory watch
Instruments and published guidance that shape the systems in this edition, by status on the retrieval date. The edition assesses no one’s compliance.
- IN FORCE
- PUBLISHED
- PROPOSAL
- PUBLISHED · VOLUNTARY
| Instrument | Body | Scope | Status | Relevance |
|---|---|---|---|---|
| NIST SP 800-145, 800-146 and 500-292252627 | NIST | US, used globally | PUBLISHED 2011 AND 2012 | cloud definition and architecture |
| ISO/IEC 22123-142 | ISO and IEC | global | PUBLISHED · VOLUNTARY | cloud vocabulary |
| ISO/IEC 30134-241 | ISO and IEC | global | PUBLISHED · VOLUNTARY | PUE definition |
| EU Data Act151637 | European Union | EU | IN FORCE · APPLIES FROM 2025 | switching and data access |
| DORA1738 | European Union | EU financial sector | IN FORCE · APPLIES FROM 2025 | ICT third-party oversight |
| Energy Efficiency Directive data centre reporting193536 | European Union | EU | IN FORCE | energy and water reporting |
| FedRAMP 20x24 | US GSA | US federal | PROGRAMME ACTIVE | cloud authorisation |
| ETSI MEC specifications30 | ETSI | Europe | PUBLISHED · VOLUNTARY | edge computing |
| Cloud and AI Development Act18 | European Commission | EU | PROPOSAL 2026 | capacity, permits, sovereignty |
| Green Data Centre Roadmap43 | Singapore IMDA | Singapore | PUBLISHED | data centre growth and efficiency |
Changed since 2024
6.8Risk Academy reading: literature and evidence review, science and assessments
The review behind this edition covers cloud assessments, peer-reviewed science and the institutional reports that bind its findings. Systematic reviews for each agenda item begin in 2027.
Review protocol
- Question
- What does the published evidence establish about cloud, edge and distributed computing as infrastructure and its couplings?
- Sources searched
- foundational papers and standards; regulators and institutions; operator reports; national laboratories and statistics offices
- Window
- releases available at evidence close, 30 September 2026
- Selection
- sources that bind or contextualise a finding in this edition
- Next step
- systematic reviews for agenda items 01 to 05 in 2027
| Reference | Type | Year | Role | Used for |
|---|---|---|---|---|
| Armbrust et al.28 | technical report | 2009 | framework | cloud economics and obstacles |
| NIST SP 800-14525 | NIST | 2011 | framework | definition |
| NIST SP 800-14626 | NIST | 2012 | context | synopsis and recommendations |
| NIST SP 500-29227 | NIST | 2011 | context | reference architecture |
| Barroso, Clidaras and Hölzle34 | book | 2018 | context | warehouse-scale computers |
| Masanet et al.31 | journal article | 2020 | context | energy estimates |
| Li et al.8 | preprint | 2023 | supports | water projection |
| Reference | Issuer | Year | Role | Used for |
|---|---|---|---|---|
| Satyanarayanan32 | journal article | 2017 | framework | edge computing |
| Shi et al.33 | journal article | 2016 | framework | edge vision |
| CNCF annual survey29 | foundation survey | 2024 | context | cloud native adoption |
| ETSI MEC30 | ETSI | 2025 | context | edge specifications |
| ISO/IEC 22123-142 | ISO and IEC | 2023 | framework | vocabulary |
| Reference | Issuer | Year | Role | Used for |
|---|---|---|---|---|
| EU Data Act pages1516 | European Commission | 2025 | supports | switching rules |
| DORA page17 | ESMA | 2025 | supports | oversight timing |
| CMA market investigation11 | UK CMA | 2025 | supports | competition review |
| DMA cloud investigations12 | European Commission | 2025 | supports | competition review |
| FedRAMP 20x24 | US GSA | 2026 | context | authorisation reform |
| Reference | Issuer | Year | Role | Used for |
|---|---|---|---|---|
| Energy and AI1 | IEA | 2025 | supports | global electricity |
| US data centre report23 | LBNL and DOE | 2024 | supports | US electricity |
| Metered electricity4 | Irish CSO | 2025 | supports | grid share |
| Environmental reports567 | Google · Microsoft · Amazon | 2025 | context | company-reported |
| Cloud market release10 | Synergy Research | 2026 | supports | market shares |
| Global Data Center Survey9 | Uptime Institute | 2025 | context | PUE and outages |
Where the evidence agrees
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
- 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 25NIST (ed.), The NIST Definition of Cloud Computing, NIST SP 800-145 (publication page; September 2011; five essential characteristics, three service models and four deployment models). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03.back
- 26NIST (ed.), Cloud Computing Synopsis and Recommendations, NIST SP 800-146 (publication page; May 2012). National Institute of Standards and Technology, Gaithersburg. Observation year 2012. Accessed 2026-11-03.back
- 27NIST (ed.), NIST Cloud Computing Reference Architecture, NIST SP 500-292 (publication page; 8 September 2011). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03.back
- 42UNVERIFIED, not opened: ISO and IEC (eds.), ISO/IEC 22123-1 Cloud computing, part 1, vocabulary, cited from memory. International Organization for Standardization, Geneva. Observation year 2023. Accessed 2026-11-03.back
- 41UNVERIFIED, not opened: ISO and IEC (eds.), ISO/IEC 30134-2 Information technology, data centres, key performance indicators, part 2, power usage effectiveness (PUE), cited from memory. International Organization for Standardization, Geneva. Observation year 2016. Accessed 2026-11-03.back
- 15European Commission (ed.), Data Act (policy page; applicable from 12 September 2025; entered into force in January 2024). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 37UNVERIFIED, not opened: Regulation (EU) 2023/2854 (Data Act), Official Journal of the European Union, 2023, cited from memory; the page returned no content, and the policy pages [15] [16] were read instead. Observation year 2023. Accessed 2026-11-03.back
- 17European Securities and Markets Authority (ed.), Digital Operational Resilience Act (page; applies from 17 January 2025; lists materials on critical ICT third-party provider designation; no designations on the page). ESMA, Paris. Observation year 2025. Accessed 2026-11-03.back
- 38UNVERIFIED, not opened: Regulation (EU) 2022/2554 on digital operational resilience for the financial sector (DORA), Official Journal of the European Union, 2022, cited from memory; the ESMA page [17] was read instead. Observation year 2022. Accessed 2026-11-03.back
- 19European Commission (ed.), Energy Efficiency Directive (policy page; states a data centre energy efficiency package planned for the third quarter of 2026 and links to reporting of data centre energy consumption; no threshold or dates on the page). Directorate-General for Energy, Brussels. Observation year 2026. Accessed 2026-11-03.back
- 35UNVERIFIED, not opened: Directive (EU) 2023/1791 on energy efficiency, Article 12 on data centre reporting, Official Journal of the European Union, 2023, cited from memory; the page returned no content. Observation year 2023. Accessed 2026-11-03.back
- 36UNVERIFIED, not opened: Commission Delegated Regulation (EU) 2024/1364 on the first phase of the establishment of a common Union rating scheme for data centres, 2024, cited from memory; the page returned no content. Observation year 2024. Accessed 2026-11-03.back
- 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03.back
- 30ETSI (ed.), Multi-access Edge Computing (technology page; industry specification group; news item of 31 October 2025 on Phase 4 specifications and a white paper; no counts on the page). European Telecommunications Standards Institute, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03.back
- 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
- 43UNVERIFIED, not opened: Infocomm Media Development Authority (ed.), Green Data Centre Roadmap, Singapore, cited from memory; the page returned no content and no figure is used. IMDA, Singapore. Observation year 2024. Accessed 2026-11-03.back
- 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 28Armbrust, M. et al., Above the Clouds: A Berkeley View of Cloud Computing, Technical Report UCB/EECS-2009-28, 10 February 2009 (report page and abstract). University of California, Berkeley. Observation year 2009. Accessed 2026-11-03.back
- 34UNVERIFIED, not opened: Barroso, L.A., Clidaras, J. and Hölzle, U., The Datacenter as a Computer: Designing Warehouse-Scale Machines, third edition, Morgan and Claypool, 2018, cited from memory. Observation year 2018. Accessed 2026-11-03.back
- 31UNVERIFIED, not opened: Masanet, E., Shehabi, A., Lei, N., Smith, S. and Koomey, J., Recalibrating global data centre energy-use estimates, Science 367, 984 to 986, 2020, cited from memory; the page returned an access error. Observation year 2020. Accessed 2026-11-03.back
- 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
- 32UNVERIFIED, not opened: Satyanarayanan, M., The emergence of edge computing, Computer 50(1), 30 to 39, 2017, cited from memory. Observation year 2017. Accessed 2026-11-03.back
- 33UNVERIFIED, not opened: Shi, W., Cao, J., Zhang, Q., Li, Y. and Xu, L., Edge computing: vision and challenges, IEEE Internet of Things Journal 3(5), 637 to 646, 2016, cited from memory. Observation year 2016. Accessed 2026-11-03.back
- 29Cloud Native Computing Foundation (ed.), CNCF Annual Survey 2024 (report page; tenth annual survey; 750 respondents in fall 2024; Kubernetes percentage not on the page). CNCF, San Francisco. Observation year 2024. Accessed 2026-11-03.back
- 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
- 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
- 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
- 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
- 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
- 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
- 9UNVERIFIED, not opened: Uptime Institute (ed.), Global Data Center Survey 2025 (average PUE 1.54; power the cause of 45% of outages), taken from search-result summaries; the survey page returned an access error. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
The 2027 agenda
Eight bounded questions open the 2027 cloud agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 cloud edition.
7.1Questions for the operational series
- C-01
Which public and critical services depend on one provider, region or control plane, and what happens when it fails?
INI-XT08-DEP-01 · dependency map; first output: dependency register.
- C-02
What load do new facilities add to local grids, and how long do connections take?
INI-XT08-ENE-02 · grid and load; first output: site and grid table.
- C-03
Can operator water and efficiency figures be put on a common basis?
INI-XT08-WAT-03 · water and efficiency basis; first output: metric comparison.
- C-04
How many organisations have tested an exit or a switch between providers?
INI-XT08-EXT-04 · exit and switching tests; first output: test evidence table.
- C-05
How large is the edge layer in energy, sites and devices?
INI-XT08-EDG-05 · edge footprint; first output: edge inventory note.
- C-06
Which national rules on data location and sovereignty differ, and how?
To be admitted in 2027; first output: rule overlay.
- C-07
What workforce exists for data centres, cloud operations and resilience engineering?
To be admitted in 2027; first output: scoping note.
- C-08
Which readiness capabilities have been tested in real events, and which are only planned?
Readiness capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for the 2027 cloud portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-XT08-DEP-01 | Dependency map | Initiative | C-01 | PROPOSED |
| INI-XT08-ENE-02 | Grid and load | Initiative | C-02 | PROPOSED |
| INI-XT08-WAT-03 | Water and efficiency basis | Initiative | C-03 | PROPOSED |
| INI-XT08-EXT-04 | Exit and switching tests | Initiative | C-04 | PROPOSED |
| INI-XT08-EDG-05 | Edge footprint | Initiative | C-05 | PROPOSED |
| MSN-XT08-2027-01 | Shared control-plane fault Universe mission | Mission | C-01 | Candidate |
7.3The pathway
The cloud edition reads national readiness chapters, the coupled sector reports on energy, cyber and digital systems and infrastructure, and the global edition through one governed evidence graph. At baseline the federation is designed; the global energy and lifeline editions are drafted. This page states what exists today and what comes next.
- 01
National readiness chapters
cloud dependence and data centre load in each national edition
IN PREPARATION · national baselines
- 02
Sector couplings
GS-02 energy · GS-13 cyber and digital systems · SR-10 digital public infrastructure
GS-02 DRAFTED · sector baselines
- 03
Technology system model
facilities, grid, water, market, resilience, governance
v0 SPECIFIED · v1 with federation evidence
- 04
Strategic links
SR-02 lifeline systems · XT-06 semiconductors and compute
PLANNED · strategic baselines
- 05
Universe
annual proving environment
CANDIDATE MISSION · mandate in 2027
- 06
XT-08 report
this series
BASELINE DRAFT · 2027 annual edition
- 07
Evidence and correction
one graph, many projections
OPEN · first correction cycle in 2027
7.4Universe 2027: evidence pack for the cloud candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | 2027 global annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-XT08-2027-01 · Shared control-plane fault Universe mission
- Role spine
- Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| ENE-001 · global electricity | INI-XT08-ENE-02 | grid and load | PUBLIC |
| ENE-003 · Irish grid share | INI-XT08-ENE-02 | grid and load | PUBLIC |
| ENE-005 · PUE baselines | INI-XT08-WAT-03 | water and efficiency basis | PUBLIC |
| WAT-006 · water reports | INI-XT08-WAT-03 · key F review | water and efficiency basis | PUBLIC |
| FIN-008 · market shares | INI-XT08-DEP-01 | dependency map | PUBLIC |
| GOV-010 · switching rules | INI-XT08-EXT-04 | exit and switching tests | PUBLIC |
| INF-011 · outages | INI-XT08-DEP-01 | dependency map | PUBLIC |
| SYS-012 · compound pathway | MSN-XT08-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the federation | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| Operator status and post-event reports | AWS, Google Cloud, Cloudflare and others | per event | INF-011 |
| Global electricity and data centre reports | IEA | periodic | ENE-001 |
| National data centre electricity statistics | statistics offices and laboratories | annual | ENE-003 |
| Operator sustainability reports | Google, Microsoft, Amazon | annual | ENE-004 |
| Cloud market releases | industry analysts | quarterly | FIN-008 |
| EU competition and digital policy pages | European Commission | per release | GOV-009 |
| UK competition case page | UK CMA | per release | GOV-009 |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- annual publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-XT08-001 | Three providers held 63% of cloud infrastructure revenue in Q2 202610 | CORROBORATED | FIN · INF | research question C-01 |
| SIG-XT08-002 | Competition reviews of cloud opened in the UK and EU1112 | CORROBORATED | GOV · FIN | initiative C-04 |
| SIG-XT08-003 | Three large events in 2025 traced to internal faults202122 | PARTIAL | INF · DAT | research question C-01 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
- 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
- 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
Systems in depth
One section per system: its state at evidence close, its exposures and what the operational series will watch.
8.1Cloud, edge and distributed platforms
Cloud services run on a small number of very large platforms, with an edge layer that is defined in specifications but not counted. Evidence is strongest for market revenue and weakest for the edge.
| Component | State | Evidence | Status |
|---|---|---|---|
| Hyperscale cloud | three providers held 63% of infrastructure revenue; shares are an analyst estimate | 10 | Reported |
| Definitions | five essential characteristics, three service models and four deployment models | 252627 | Reported |
| Edge computing | specifications published; sites, devices and energy not bound | 303233 | Inferred |
| Cloud native software | tenth annual community survey, 750 respondents | 29 | Reported |
Couplings
- INF ↔ FIN platforms and revenue
- INF → DAT services and data
- GOV → INF rules and platforms
Evidence to bind in 2027
- edge sites, devices and energy
- provider-reported revenue on a common basis
Related editions
- GLB Global Systems
- GS-02 Energy
- GS-13 Cyber and Digital Systems
- SR-10 Digital Public Infrastructure and Systemic Cyber Risk
- XT-06 Advanced Semiconductors and AI Compute
- XT-07 HPC and Advanced Computing
8.2Electricity, cooling and water
Data centres are a visible and growing share of electricity in some systems. Operators report efficient fleets and water figures, on methods that differ.
| Component | State | Evidence | Status |
|---|---|---|---|
| Electricity | about 415 TWh in 2024; 945 TWh in the IEA 2030 base case | 1 | Reported |
| Efficiency | PUE of 1.09 (Google) and 1.15 (AWS), against baselines of 1.25 to 1.56 | 579 | Reported |
| Water | Microsoft 5,807 ML in fiscal 2024 after a method change; Google up 28%; AWS 0.15 L per kWh | 567 | Reported |
| Projection | modelling preprint: 4.2 to 6.6 billion cubic metres of withdrawal in 2027 | 8 | Reported |
Couplings
- ENE ↔ INF facility power
- WAT ↔ ENE cooling choice
- INF → CLI electricity growth
Evidence to bind in 2027
- site-level load on a common basis
- comparable water metrics
Related editions
- GLB Global Systems
- GS-02 Energy
- GS-13 Cyber and Digital Systems
- SR-10 Digital Public Infrastructure and Systemic Cyber Risk
- XT-06 Advanced Semiconductors and AI Compute
- XT-07 HPC and Advanced Computing
8.3Grid, hardware and siting
Growth depends on grid connection, permits and hardware. Public evidence on connection queues and hardware supply is thin in the sources read here.
| Component | State | Evidence | Status |
|---|---|---|---|
| Grid connection | high share in Ireland; queues not bound | 4 | Reported |
| Siting and permits | EU proposal for acceleration zones and strategic projects | 18 | Reported |
| Regional growth rules | Singapore roadmap on growth and efficiency, cited without figures | 43 | Inferred |
| Hardware and minerals | dependence not bound here | 18 | Expert input |
Couplings
- ENE → INF grid share
- GOV → INF permits
- MIN → INF hardware
Evidence to bind in 2027
- grid connection queues
- hardware and mineral dependence
Related editions
- GLB Global Systems
- GS-02 Energy
- GS-13 Cyber and Digital Systems
- SR-10 Digital Public Infrastructure and Systemic Cyber Risk
- XT-06 Advanced Semiconductors and AI Compute
- XT-07 HPC and Advanced Computing
8.4Economy, market structure and workforce
The cloud market is concentrated and growing fast, and regulators now review it. Workforce numbers are the thin part of the evidence.
| Component | State | Evidence | Status |
|---|---|---|---|
| Market structure | Amazon 28%, Microsoft 20%, Google 15% in Q2 2026 | 10 | Reported |
| Competition review | UK final decision on 31 July 2025; DMA investigations from 18 November 2025 | 111213 | Reported |
| Switching | charges removed from 12 January 2027 | 16 | Reported |
| Workforce | no figure bound | 28 | Expert input |
Couplings
- FIN → INF capacity
- GOV → FIN market rules
- HLT → INF workforce
Evidence to bind in 2027
- workforce size and skills gaps
- revenue outside infrastructure services
Related editions
- GLB Global Systems
- GS-02 Energy
- GS-13 Cyber and Digital Systems
- SR-10 Digital Public Infrastructure and Systemic Cyber Risk
- XT-06 Advanced Semiconductors and AI Compute
- XT-07 HPC and Advanced Computing
8.5Resilience, security and governance watch
The nearest risk of shared platforms is a fault that spreads. Rules on operational resilience, authorisation, switching and sovereignty are being set at the same time.
| Component | State | Evidence | Status |
|---|---|---|---|
| Operator events | three large events in 2025, each traced to an internal fault by its operator | 202122 | Reported |
| Financial sector oversight | DORA applies from 17 January 2025; no designations on the page read | 1738 | Reported |
| Authorisation | FedRAMP 20x in its wide-scale adoption phase in 2026 | 24 | Reported |
| Sovereignty | a company EU sovereign cloud and a proposed EU autonomy framework | 1823 | Reported |
Couplings
- INF → DAT shared-platform faults
- GOV → DAT switching and location rules
- GOV → TRD sovereignty rules
Evidence to bind in 2027
- dependence of public services
- customer impact of events
Related editions
- GLB Global Systems
- GS-02 Energy
- GS-13 Cyber and Digital Systems
- SR-10 Digital Public Infrastructure and Systemic Cyber Risk
- XT-06 Advanced Semiconductors and AI Compute
- XT-07 HPC and Advanced Computing
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
- 29Cloud Native Computing Foundation (ed.), CNCF Annual Survey 2024 (report page; tenth annual survey; 750 respondents in fall 2024; Kubernetes percentage not on the page). CNCF, San Francisco. Observation year 2024. Accessed 2026-11-03.back
- 25NIST (ed.), The NIST Definition of Cloud Computing, NIST SP 800-145 (publication page; September 2011; five essential characteristics, three service models and four deployment models). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03.back
- 26NIST (ed.), Cloud Computing Synopsis and Recommendations, NIST SP 800-146 (publication page; May 2012). National Institute of Standards and Technology, Gaithersburg. Observation year 2012. Accessed 2026-11-03.back
- 27NIST (ed.), NIST Cloud Computing Reference Architecture, NIST SP 500-292 (publication page; 8 September 2011). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03.back
- 30ETSI (ed.), Multi-access Edge Computing (technology page; industry specification group; news item of 31 October 2025 on Phase 4 specifications and a white paper; no counts on the page). European Telecommunications Standards Institute, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03.back
- 32UNVERIFIED, not opened: Satyanarayanan, M., The emergence of edge computing, Computer 50(1), 30 to 39, 2017, cited from memory. Observation year 2017. Accessed 2026-11-03.back
- 33UNVERIFIED, not opened: Shi, W., Cao, J., Zhang, Q., Li, Y. and Xu, L., Edge computing: vision and challenges, IEEE Internet of Things Journal 3(5), 637 to 646, 2016, cited from memory. Observation year 2016. Accessed 2026-11-03.back
- 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
- 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
- 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
- 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
- 9UNVERIFIED, not opened: Uptime Institute (ed.), Global Data Center Survey 2025 (average PUE 1.54; power the cause of 45% of outages), taken from search-result summaries; the survey page returned an access error. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
- 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
- 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
- 43UNVERIFIED, not opened: Infocomm Media Development Authority (ed.), Green Data Centre Roadmap, Singapore, cited from memory; the page returned no content and no figure is used. IMDA, Singapore. Observation year 2024. Accessed 2026-11-03.back
- 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 23Amazon Web Services (ed.), Opening the AWS European Sovereign Cloud (blog announcement of 14 January 2026; Brandenburg region; investment of EUR 7.8 billion stated; vendor announcement, weak evidence). Amazon Web Services, Seattle. Observation year 2026. Accessed 2026-11-03.back
- 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
- 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 13The Register (ed.), Brussels eyes AWS, Azure for gatekeeper tag in cloud clampdown (news article of 18 November 2025; possible obligations and fines up to 10% of worldwide turnover; trade press, secondary). Situation Publishing, London. Observation year 2025. Accessed 2026-11-03.back
- 28Armbrust, M. et al., Above the Clouds: A Berkeley View of Cloud Computing, Technical Report UCB/EECS-2009-28, 10 February 2009 (report page and abstract). University of California, Berkeley. Observation year 2009. Accessed 2026-11-03.back
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
- 17European Securities and Markets Authority (ed.), Digital Operational Resilience Act (page; applies from 17 January 2025; lists materials on critical ICT third-party provider designation; no designations on the page). ESMA, Paris. Observation year 2025. Accessed 2026-11-03.back
- 38UNVERIFIED, not opened: Regulation (EU) 2022/2554 on digital operational resilience for the financial sector (DORA), Official Journal of the European Union, 2022, cited from memory; the ESMA page [17] was read instead. Observation year 2022. Accessed 2026-11-03.back
- 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03.back
Methodology
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
A.1Methods
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | Result |
|---|---|---|---|
| (1) | Growth of Microsoft electricity consumed within the organisation, FY2023 to FY2024 | 29,829,540 ÷ 23,567,502 − 1 | 26.6% |
| (2) | Share of the three largest providers, and the remainder, Q2 2026 | 28 + 20 + 15; 100 − 63 | 63%; 37% |
| (3) | Duration of the AWS event, 11:48 PM to 2:20 PM PDT | 14 h 32 min = 14.53 h | ≈ 14.5 hours |
| (4) | Microsoft electricity consumed, FY2024 against FY2020 | 29,829,540 ÷ 10,770,714 | about 2.8 times |
| Strength | Definition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| Label | Rule |
|---|---|
| Reported | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| Estimated | Nexus analytical value with stated method |
| Scenario | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, Cloud System Model v0
- Model ID
- MDL-XT08-CLOUD · v0.1
- Purpose
- represent cloud, edge and distributed computing as infrastructure coupled to electricity, cooling water, finance, workforce and cyber resilience
- Family
- graph-based system of systems
- Inputs
- the cited sources of this edition; no proprietary data
- Method
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- Validation
- none yet, first validation against federation evidence in 2027
- Uncertainty
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- global scale; not for asset-, site- or country-level use
- Reproducibility
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-XTECH-CLOUD-GLOBAL-2026-B0
- Type
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 43 cited sources, each at the edition and access date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 cloud annual cut
Lineage
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Element | Baseline 2026 | 2027 global annual |
|---|---|---|
| Sources | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Models | Cloud System Model v0 specification | model runs with receipts |
| Findings | twelve baseline findings | findings re-bound to federation evidence |
| Review | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicator | Observed | Released | Cadence | Next release |
|---|---|---|---|---|
| US data centre report | 2023 | Dec 2024 | periodic | next national update |
| Global electricity report | 2024 | 2025 | periodic | next IEA update |
| Irish metered electricity | 2024 | June 2025 | annual | next CSO release |
| Operator environmental reports | 2024 | 2025 | annual | next annual reports |
| Cloud market release | Q2 2026 | July 2026 | quarterly | next quarter |
| UK competition decision | 2025 | July 2025 | one-off | strategic market status outcome |
| EU DMA investigations | 2025 | Nov 2025 | per release | designation decision |
| AWS event report | 2025 | Oct 2025 | per event | next post-event report |
| System | Coverage | Thinnest dimension |
|---|---|---|
| Electricity | PARTIAL | site-level load on a common basis |
| Water | THIN | comparable water metrics |
| Market and law | GOOD | outcomes of reviews and proposals |
| Resilience | PARTIAL | dependence of public services |
| Efficiency | PARTIAL | common PUE baseline |
| Edge | THIN | deployment and energy data |
| Skills | THIN | workforce numbers |
| Hardware and minerals | THIN | supply dependence |
| Field | Source that would fill it | Blocker |
|---|---|---|
| Site-level electricity, cooling and water use on a common basis | operators, regulators under EU reporting rules, national laboratories | operator reports use different boundaries and years; EU reported data not retrieved1935 |
| IEA Energy and AI figures from the report itself | IEA Energy and AI report1 | the report pages returned access errors; figures come from search summaries |
| Uptime Institute survey figures from the report itself | Uptime Institute Global Data Center Survey 20259 | the survey page returned an access error; PUE and outage shares come from search summaries and are not used in findings |
| Outcome of the UK strategic market status process for Microsoft and AWS | UK CMA and Digital Markets Unit publications1139 | the case page read gives a Q1 2026 decision point; the outcome was not retrieved |
| Commission preliminary findings on AWS and Azure under the DMA | European Commission press release1214 | reported in trade press summaries; the Commission text was not opened |
| Text of the proposed Cloud and AI Development Act | European Commission proposal18 | proposal read through a press report; target years differ across secondary sources |
| Designation of critical ICT third-party providers under DORA | European Supervisory Authorities1738 | the page read lists no designations; not retrieved |
| Dependence of public services on a few providers | national audit bodies, regulators, operators | no consolidated series found |
| Customer impact of the 2025 events | operators, customers, regulators202122 | incident reports state causes and times, not customer counts |
| Edge computing sites, devices and energy use | telecom operators, industry bodies30 | specifications read; no deployment figures retrieved |
| Grid connection queues and load forecasts for new facilities | grid operators and regulators | not retrieved |
| Hardware, chip and mineral dependence of data centres | industry and trade statistics | not retrieved; see the semiconductors edition for the chip layer |
| Cloud and data centre workforce size and skills gaps | national statistics, industry surveys | not retrieved; capability rung stays LISTED |
| Share of data centre electricity due to AI workloads | IEA, operators, national laboratories12 | not split in the sources read here |
A.5Evidence cards, two anchor sources
Published by Amazon Web Services. One-off post-event summary. Role: binds INF-011 and the resilience tiles. Coverage: one region, services listed with start and end times.
EVD-XT08-001
AWS summary of the us-east-1 event of 19 and 20 October 202520
Published by Lawrence Berkeley National Laboratory on 19 December 2024 and summarised by the US Department of Energy. Periodic. Role: binds ENE-002. Coverage: United States, 2014 to 2023 with a scenario range to 2028.
EVD-XT08-002
| Dimension | EVD-XT08-001 | EVD-XT08-002 |
|---|---|---|
| Completeness | services and times listed for one region | national total with a scenario range |
| Timeliness | about one week after the event | about one year after the data year |
| Revision | later revisions not checked | single edition read |
| Method transparency | cause described in prose | method in the full report, not opened |
| External validation | operator-reported only | laboratory report; peer review not stated |
Evidence cards to follow in 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| Group | Area | Items | Pass | N/A | Pending |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- Maps
- plates in Q2 2027
- Waivers
- none
A.7Status words
| Status | What it means |
|---|---|
| Observed | Measured directly and published by the source. |
| Reported | Published statistics of an official or institutional source. |
| Declared | Stated by the body concerned; not independently measured. |
| Estimated | A Nexus estimate from cited evidence, with its method in Annex A. |
| Modelled | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Forecast | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| Scenario | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| Step | What happens | Source |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Term | Meaning |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| Coupling | a typed dependency through which one system transmits to another |
| Protection gap | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| CADA | Cloud and AI Development Act |
| CMA | Competition and Markets Authority |
| DMA | Digital Markets Act |
| DNS | Domain Name System |
| DORA | Digital Operational Resilience Act |
| EDGE | computing at or near the data source |
| FY | fiscal year |
| MEC | Multi-access Edge Computing |
| ML | megalitre |
| PUE | power usage effectiveness |
| TWh | terawatt-hour |
| WUE | water use effectiveness |
A.10Technical annex
| Item | Annex | Contents | Status |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-XT08-DEP-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Cluster notes | cards for the major data centre and cloud region clusters | 2027 |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: power usage effectiveness
- Construct
- ratio of total facility energy to the energy used by IT equipment
- Unit
- ratio, 1.0 or higher
- Method
- continuous metering at the facility, as described by one operator5
- Source
- operator environmental reports57; definition in ISO/IEC 30134-241
- Uncertainty
- boundaries differ by operator; reported industry averages range from 1.25 to 1.56
- Known limits
- says nothing about water, carbon or the useful work done
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 19European Commission (ed.), Energy Efficiency Directive (policy page; states a data centre energy efficiency package planned for the third quarter of 2026 and links to reporting of data centre energy consumption; no threshold or dates on the page). Directorate-General for Energy, Brussels. Observation year 2026. Accessed 2026-11-03.back
- 35UNVERIFIED, not opened: Directive (EU) 2023/1791 on energy efficiency, Article 12 on data centre reporting, Official Journal of the European Union, 2023, cited from memory; the page returned no content. Observation year 2023. Accessed 2026-11-03.back
- 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
- 9UNVERIFIED, not opened: Uptime Institute (ed.), Global Data Center Survey 2025 (average PUE 1.54; power the cause of 45% of outages), taken from search-result summaries; the survey page returned an access error. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
- 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
- 39UNVERIFIED, not opened: UK Competition and Markets Authority (ed.), Cloud services market investigation final decision report, 31 July 2025 and 1 August 2025, cited from the case page [11]; the report documents were not opened. Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
- 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 14UNVERIFIED, not opened: trade press reports of mid-2026 that the Commission informed Amazon and Microsoft of a preliminary view that they should be designated as gatekeepers for cloud, taken from search-result summaries; the one article fetched returned an access error. Observation year 2026. Accessed 2026-11-03.back
- 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
- 17European Securities and Markets Authority (ed.), Digital Operational Resilience Act (page; applies from 17 January 2025; lists materials on critical ICT third-party provider designation; no designations on the page). ESMA, Paris. Observation year 2025. Accessed 2026-11-03.back
- 38UNVERIFIED, not opened: Regulation (EU) 2022/2554 on digital operational resilience for the financial sector (DORA), Official Journal of the European Union, 2022, cited from memory; the ESMA page [17] was read instead. Observation year 2022. Accessed 2026-11-03.back
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
- 30ETSI (ed.), Multi-access Edge Computing (technology page; industry specification group; news item of 31 October 2025 on Phase 4 specifications and a white paper; no counts on the page). European Telecommunications Standards Institute, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03.back
- 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
- 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
- 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
- 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
- 41UNVERIFIED, not opened: ISO and IEC (eds.), ISO/IEC 30134-2 Information technology, data centres, key performance indicators, part 2, power usage effectiveness (PUE), cited from memory. International Organization for Standardization, Geneva. Observation year 2016. Accessed 2026-11-03.back
Data appendix
The indicator set with its sources, the source registers, the licences of every kind of material and the formats of the edition.
B.1The indicator set
| Indicator | Value | Unit | Year | State | Source |
|---|---|---|---|---|---|
| Global data centre electricity use | 415 | TWh | 2024 | Reported | 1 |
| Share of global electricity | 1.5 | % | 2024 | Reported | 1 |
| IEA base case for data centre electricity | 945 | TWh | 2030 base case | Scenario | 1 |
| US data centre electricity use | 176 | TWh | 2023 | Reported | 2 |
| US data centre share of electricity | 4.4 | % | 2023 | Reported | 3 |
| US projected share, low to high | 6.7 to 12 | % | Scenario | Scenario | 3 |
| Ireland data centre share of metered electricity | 22 | % | 2024 | Reported | 4 |
| Google data centre electricity growth | 27 | % | 2024 | Reported | 5 |
| Google fleet PUE | 1.09 | ratio | 2024 | Reported | 5 |
| AWS PUE | 1.15 | ratio | 2024 | Reported | 7 |
| AWS water use effectiveness | 0.15 | L per kWh | 2024 | Reported | 7 |
| Microsoft electricity consumed within the organisation | 29.8 | TWh | FY2024 | Reported | 6 |
| Microsoft water consumption | 5,807 | megalitres | FY2024 | Reported | 6 |
| Cloud infrastructure revenue, quarter | 143.4 | USD billion | Q2 2026 | Reported | 10 |
| Cloud revenue growth on the year | 43 | % | Q2 2026 | Reported | 10 |
| AWS us-east-1 event duration | 14.5 | hours | 2025 | Reported | 20 |
B.2Global source register
The governed source set behind this edition. Each source keeps its authority, coverage, cadence and role; categories describe origin, not truth.
Domains bound by the register
- ENE
- INF
- FIN
- GOV
- WAT
- DAT
- AIC
- CLI
- TRD
- HLT
| Source | Category | Coverage | Period | Cadence | Role |
|---|---|---|---|---|---|
| IEA Energy and AI1 | intergovernmental agency | global | 2024 | periodic | electricity |
| LBNL report and DOE summary23 | national laboratory and ministry | US | 2023 | periodic | electricity |
| CSO metered electricity4 | national statistics office | Ireland | 2024 | annual | grid share |
| Google environmental report5 | operator report | global | 2024 | annual | electricity, PUE, water |
| Microsoft environmental fact sheet6 | operator report | global | FY2024 | annual | electricity, water |
| Amazon sustainability report7 | operator report | global | 2024 | annual | PUE, WUE |
| Synergy Research release10 | industry analyst | global | 2026 | quarterly | market shares |
| UK CMA case page11 | competition authority | UK | 2025 | one-off | competition |
| AWS, Google Cloud and Cloudflare reports202122 | operators | global | 2025 | per event | resilience |
| EU Data Act pages1516 | EU institution | EU | 2025 | continuous | switching |
B.3Regional reading, cloud across ten clusters
Regional plates follow with the regional editions. This page gives the regional reading of cloud and distributed computing in table form and ranks no region.
| Region | Principal hazards | Systems most exposed | Baseline evidence |
|---|---|---|---|
| North America | hyperscale hosting; federal authorisation reform | energy, resilience | LBNL2; FedRAMP24 |
| South America | regional evidence not bound | regional evidence (not bound) | regional evidence (not bound) |
| Europe | Data Act, DMA reviews, DORA and CADA proposal; high grid share in Ireland | regulation, grid | European Commission121618; CSO4 |
| Eurasia | regional evidence not bound | regional evidence (not bound) | regional evidence (not bound) |
| Middle East and North Africa | regional evidence not bound | regional evidence (not bound) | regional evidence (not bound) |
| Africa | regional evidence not bound | regional evidence (not bound) | regional evidence (not bound) |
| South Asia | regional evidence not bound | regional evidence (not bound) | regional evidence (not bound) |
| East Asia | regional evidence not bound | regional evidence (not bound) | regional evidence (not bound) |
| ASEAN | data centre growth and efficiency roadmap in Singapore | energy, siting | IMDA43 |
| Oceania-Pacific | regional evidence not bound | regional evidence (not bound) | regional evidence (not bound) |
B.4Cluster card: data centres in a national grid, Ireland
- grid
- electricity share
- permits
- efficiency rules
- Systems in view
- data centres, national grid, cloud regions
- Defining events
- data centres at 22% of metered electricity in 20244
- Couplings
- ENE → INF grid share; INF → ENE load
- Capability evidence
- EU reporting rules and a planned efficiency package19
- Gaps
- site-level load; connection queues; water use
- Agenda items
- C-02 · C-03
Data centres used 22% of metered electricity in Ireland in 2024 and 21% in 2023 [4].
GRID
Share of metered electricity
The Commission planned a data centre energy efficiency package for the third quarter of 2026 [19].
RULES
Reporting and efficiency
The proposed Cloud and AI Development Act sets a 12-month maximum permit procedure for projects under it, as reported [18].
PERMITS
Proposed permitting
B.5How countries appear in the cloud edition
Countries enter the cloud edition through the readiness chapters of their own national editions, on one card grammar. They are read against peer distributions and thresholds, never ranked.
| Card field | What it shows | Source |
|---|---|---|
| WEFH+B state | each core system against peer distribution bands | national edition |
| Couplings | the national dependency matrix | national edition |
| Risk objects | the national risk portfolio | national edition |
| Capability rungs | the national capability ladder | national edition |
| Evidence age | oldest and newest source dates | national source register |
Editions in the 2026 Baseline programme
countries and unions
clusters
flagship and sector
technology reports
How to read a country card
- Each system is shown against the distribution of its peers, with thresholds where they exist
- Couplings and risk objects come from the country’s own national edition
- Capability rungs record evidence, not a judgement of institutions
- Evidence age is printed, so older national data are visible as such
| Wave | Countries and unions | State |
|---|---|---|
| W0 | Canada | ISSUED |
| W1 | United States, United Kingdom, France, Germany, Italy, Japan, European Union, Switzerland | PLANNED |
| W2 | Mexico, Brazil, Argentina, Türkiye, Russian Federation, Saudi Arabia, United Arab Emirates, South Africa, Senegal, Kenya, African Union, India, China, Republic of Korea, Indonesia, Singapore, Australia | PLANNED |
B.6Licences
| Material | Licence |
|---|---|
| Text | CC BY 4.0 |
| Data | on the licence of each source; Nexus tables CC BY 4.0 |
| Figures | Nexus figures CC BY 4.0; third-party as credited |
| Maps | boundary source and licence printed on each plate |
| Metadata | CC0 1.0, as Zenodo publishes it |
| Third-party data, figures and text | The source’s own licence, credited where it is used; never relicensed |
| Nexus-authored text, tables and figures: CC BY 4.0 (SPDX CC-BY-4.0). Map plates print their boundary source and licence. | |
B.7Formats and provenance
| Format | Kind | State | What it is | Identifier |
|---|---|---|---|---|
| Web edition | HTML | On this site | Draft in stewardship review; every value resolves to its source. | NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0 |
| Print edition | At release | A4 portrait · screen, print and archival PDF, signed with the web edition at release. | NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0 | |
| Indicator data | CSV · JSON | On this site | 16 indicators with unit, year, status and source; the machine-readable copy ships with the evidence bundle at release. | NR-XTECH-CLOUD-GLOBAL-2026-BASELINE data release v1 |
| Figures | SVG · PNG | On this site | 4 on the web edition: headline figure, figure 1.3, coupling instrument, capability ladder. | FIG-XTECH-CLOUD-GLOBAL-2026-BASELINE-* |
| Slides | Not recorded | No slide deck is recorded for this edition. | ||
| Evidence brief | HTML · PDF | Not recorded | No evidence brief is recorded for this edition. | |
| Dataset with DOI | DataCite | At release | Concept and version DOI are minted at deposit; none is recorded yet. |
Provenance
- Edition pack
- The edition’s content pack (JSON), from which the print and web editions are built
- Evidence cut
- DC-XTECH-CLOUD-GLOBAL-2026-B0, closed 30 September 2026
- Reproducibility
- sourced values cited; analytical values reproducible from stated parameters
- Self-check
- 14 of 23 at evidence close; a fail on any item blocks release
- Review
- five passes scheduled before release (in Annex C)
- Publisher of record
- GCRI for the Nexus Consortium
- Corrections
- Registry correction pathway; upheld corrections are published as notices with a new version
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
- 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
- 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
- 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
- 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
- 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
- 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
- 15European Commission (ed.), Data Act (policy page; applicable from 12 September 2025; entered into force in January 2024). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03.back
- 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
- 43UNVERIFIED, not opened: Infocomm Media Development Authority (ed.), Green Data Centre Roadmap, Singapore, cited from memory; the page returned no content and no figure is used. IMDA, Singapore. Observation year 2024. Accessed 2026-11-03.back
- 19European Commission (ed.), Energy Efficiency Directive (policy page; states a data centre energy efficiency package planned for the third quarter of 2026 and links to reporting of data centre energy consumption; no threshold or dates on the page). Directorate-General for Energy, Brussels. Observation year 2026. Accessed 2026-11-03.back
References and record
Every source the edition rests on, the publication record, the corrections log and the open record.
C.143 sources
NR-CIT-1, editor first. A DOI is linked where the source has one; Nexus records carry a UNI once the catalogue allocates it (NS-1).
- 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Q Cited in the summary, chapter 2, chapter 3, chapter 4, chapter 6
- 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 6, chapter 8
- 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 4, chapter 6, chapter 8
- 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 9UNVERIFIED, not opened: Uptime Institute (ed.), Global Data Center Survey 2025 (average PUE 1.54; power the cause of 45% of outages), taken from search-result summaries; the survey page returned an access error. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 6, chapter 8
- 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
- 13The Register (ed.), Brussels eyes AWS, Azure for gatekeeper tag in cloud clampdown (news article of 18 November 2025; possible obligations and fines up to 10% of worldwide turnover; trade press, secondary). Situation Publishing, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 8
- 14UNVERIFIED, not opened: trade press reports of mid-2026 that the Commission informed Amazon and Microsoft of a preliminary view that they should be designated as gatekeepers for cloud, taken from search-result summaries; the one article fetched returned an access error. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2
- 15European Commission (ed.), Data Act (policy page; applicable from 12 September 2025; entered into force in January 2024). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 6
- 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
- 17European Securities and Markets Authority (ed.), Digital Operational Resilience Act (page; applies from 17 January 2025; lists materials on critical ICT third-party provider designation; no designations on the page). ESMA, Paris. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
- 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03. Cited in chapter 1, chapter 3, chapter 4, chapter 6, chapter 8
- 19European Commission (ed.), Energy Efficiency Directive (policy page; states a data centre energy efficiency package planned for the third quarter of 2026 and links to reporting of data centre energy consumption; no threshold or dates on the page). Directorate-General for Energy, Brussels. Observation year 2026. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 7, chapter 8
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 7, chapter 8
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 7, chapter 8
- 23Amazon Web Services (ed.), Opening the AWS European Sovereign Cloud (blog announcement of 14 January 2026; Brandenburg region; investment of EUR 7.8 billion stated; vendor announcement, weak evidence). Amazon Web Services, Seattle. Observation year 2026. Accessed 2026-11-03. Cited in chapter 4, chapter 8
- 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
- 25NIST (ed.), The NIST Definition of Cloud Computing, NIST SP 800-145 (publication page; September 2011; five essential characteristics, three service models and four deployment models). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
- 26NIST (ed.), Cloud Computing Synopsis and Recommendations, NIST SP 800-146 (publication page; May 2012). National Institute of Standards and Technology, Gaithersburg. Observation year 2012. Accessed 2026-11-03. Cited in chapter 6, chapter 8
- 27NIST (ed.), NIST Cloud Computing Reference Architecture, NIST SP 500-292 (publication page; 8 September 2011). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03. Cited in chapter 6, chapter 8
- 28Armbrust, M. et al., Above the Clouds: A Berkeley View of Cloud Computing, Technical Report UCB/EECS-2009-28, 10 February 2009 (report page and abstract). University of California, Berkeley. Observation year 2009. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
- 29Cloud Native Computing Foundation (ed.), CNCF Annual Survey 2024 (report page; tenth annual survey; 750 respondents in fall 2024; Kubernetes percentage not on the page). CNCF, San Francisco. Observation year 2024. Accessed 2026-11-03. Cited in chapter 3, chapter 6, chapter 8
- 30ETSI (ed.), Multi-access Edge Computing (technology page; industry specification group; news item of 31 October 2025 on Phase 4 specifications and a white paper; no counts on the page). European Telecommunications Standards Institute, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
- 31UNVERIFIED, not opened: Masanet, E., Shehabi, A., Lei, N., Smith, S. and Koomey, J., Recalibrating global data centre energy-use estimates, Science 367, 984 to 986, 2020, cited from memory; the page returned an access error. Observation year 2020. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 32UNVERIFIED, not opened: Satyanarayanan, M., The emergence of edge computing, Computer 50(1), 30 to 39, 2017, cited from memory. Observation year 2017. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
- 33UNVERIFIED, not opened: Shi, W., Cao, J., Zhang, Q., Li, Y. and Xu, L., Edge computing: vision and challenges, IEEE Internet of Things Journal 3(5), 637 to 646, 2016, cited from memory. Observation year 2016. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
- 34UNVERIFIED, not opened: Barroso, L.A., Clidaras, J. and Hölzle, U., The Datacenter as a Computer: Designing Warehouse-Scale Machines, third edition, Morgan and Claypool, 2018, cited from memory. Observation year 2018. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 35UNVERIFIED, not opened: Directive (EU) 2023/1791 on energy efficiency, Article 12 on data centre reporting, Official Journal of the European Union, 2023, cited from memory; the page returned no content. Observation year 2023. Accessed 2026-11-03. Cited in chapter 4, chapter 6
- 36UNVERIFIED, not opened: Commission Delegated Regulation (EU) 2024/1364 on the first phase of the establishment of a common Union rating scheme for data centres, 2024, cited from memory; the page returned no content. Observation year 2024. Accessed 2026-11-03. Cited in chapter 6
- 37UNVERIFIED, not opened: Regulation (EU) 2023/2854 (Data Act), Official Journal of the European Union, 2023, cited from memory; the page returned no content, and the policy pages [15] [16] were read instead. Observation year 2023. Accessed 2026-11-03. Cited in chapter 6
- 38UNVERIFIED, not opened: Regulation (EU) 2022/2554 on digital operational resilience for the financial sector (DORA), Official Journal of the European Union, 2022, cited from memory; the ESMA page [17] was read instead. Observation year 2022. Accessed 2026-11-03. Cited in chapter 6, chapter 8
- 39UNVERIFIED, not opened: UK Competition and Markets Authority (ed.), Cloud services market investigation final decision report, 31 July 2025 and 1 August 2025, cited from the case page [11]; the report documents were not opened. Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.
- 40UNVERIFIED, not opened: Microsoft (ed.), Azure Front Door incident reports of October 2025, cited from memory; the page returned an error and no figure is used. Microsoft, Redmond. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4
- 41UNVERIFIED, not opened: ISO and IEC (eds.), ISO/IEC 30134-2 Information technology, data centres, key performance indicators, part 2, power usage effectiveness (PUE), cited from memory. International Organization for Standardization, Geneva. Observation year 2016. Accessed 2026-11-03. Cited in chapter 6
- 42UNVERIFIED, not opened: ISO and IEC (eds.), ISO/IEC 22123-1 Cloud computing, part 1, vocabulary, cited from memory. International Organization for Standardization, Geneva. Observation year 2023. Accessed 2026-11-03. Cited in chapter 6
- 43UNVERIFIED, not opened: Infocomm Media Development Authority (ed.), Green Data Centre Roadmap, Singapore, cited from memory; the page returned no content and no figure is used. IMDA, Singapore. Observation year 2024. Accessed 2026-11-03. Cited in chapter 6, chapter 8
C.2Publication record
Publication
- Title
- Exponential Technology Report 2026: Cloud, Edge and Distributed Computing, Baseline Edition
- Series
- Reports · Exponential Technology Series XT-08
- Edition
- Baseline Edition 2026 · inaugural annual
- Version
- v1.0.0 · draft for stewardship review
- Publication ID
- NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0
- Evidence close
- 30 September 2026
- Publication date
- October 2026
- DOI
- concept and version DOI at deposit
Publisher
- Publisher of record
- The Global Centre for Risk and Innovation (GCRI), for the Nexus Consortium
- Place
- Toronto
- Editor
- Saeed Valadbaygi, Chief Steward and Managing Editor
- Stewards
- GCRI · technical truth · GRF · public meaning · GRA · capital meaning
- Licence
- text CC BY 4.0; data on the terms of each source
- Copyright
- © 2026 GCRI · Nexus Consortium
- Language
- English (en-GB) source edition
- Correspondence
- Registry correction pathway · editorial office
Colophon
- Format
- A4 portrait · screen, print and archival PDF
- Typefaces
- Space Grotesk (display) · Geist (text) · IBM Plex Sans Italic (standfirsts) · IBM Plex Mono (data)
- Design standard
- Reports Foundational Edition, Volume I, Part VII
- Accessibility
- tagged PDF and HTML targets; text alternatives for every figure
- Production
- Reports editorial team, GCRI
Release path for this version
| Step | What happens | When |
|---|---|---|
| Draft | editorial self-check complete at evidence close | October 2026 |
| Steward review | five passes on the exact draft (keys T · M · F · N) | Q4 2026 |
| Approval | publication authority approves the exact digest | before release |
| Deposit | concept and version DOI minted; registry pointer set | at release |
| Succession | the 2027 cloud edition reports changes against this baseline | 2027 |
- Current version
- v1.0.0 draft, stewardship review
- Previous edition
- none, first edition of the series
- Next edition
- NR-XTECH-CLOUD-GLOBAL-2027-v1.0.0
- Latest version
- resolve the concept DOI or the registry record
- Correction route
- Registry correction pathway
- Notice types
- erratum · addendum · supersession · withdrawal
C.3Corrections log
0correction notices. No edition has been released yet, so none can be corrected; the log below lists each edition’s current version.
| Edition | Version | Date | State | Change | Notice |
|---|---|---|---|---|---|
| XT-08 | NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0 | October 2026 | Draft | Baseline Edition 2026, inaugural annual edition, | None |
Notice types: erratum, addendum, supersession, withdrawal. A correction is a new version with a published notice; the earlier version stays resolvable, and no edition is ever edited in silence.
C.4Open record
This edition’s open record
- Publication ID
- NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0
- Desk identifier and series alias
- NR-XTC-XT-08-2026-BL
- Collection
- None
- DOI
- Concept and version DOI at deposit, on Zenodo with DataCite metadata
- Versions
- Each correction is a new version (isNewVersionOf); the concept DOI resolves to the latest
- Bundle
- RO-Crate 1.2 with CITATION.cff, CodeMeta and PROV-O provenance; a signed manifest
- Licence
- CC BY 4.0 (SPDX CC-BY-4.0) for original material; metadata CC0 1.0
Credit and identity
- ORCID
- Your iD in the deposit and the contribution record; DataCite can then add the work to your ORCID record
- ROR
- Your organisation by its ROR identifier, never by a typed name alone
- CRediT
- Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualisation, Writing, review and editing
- Account
- None needed to contribute; never a password
Find and follow
Search the open indexes for Cloud, Edge and Distributed Computing; software is cited by its SWHID from Software Heritage, and a quantified scenario run is preregistered on OSF before it is run. Annotation is your choice: Hypothesis opens this page in its own viewer.
Mirrors and harvest
The DOI is canonical. At release each signed bundle is also given an IPFS content identifier and a bloxberg anchor as mirrors; both are listed in the record once they exist. Zenodo exposes every record over OAI-PMH, and reviews and endorsements can arrive through COAR Notify where the repository supports it.
{
"metadata": {
"resource_type": {
"id": "dataset"
},
"title": "Evidence on Cloud, Edge and Distributed Computing for Nexus Reports",
"publication_date": "YYYY-MM-DD",
"creators": [
{
"person_or_org": {
"type": "personal",
"family_name": "Your family name",
"given_name": "Your given name",
"identifiers": [
{
"scheme": "orcid",
"identifier": "0000-0000-0000-0000"
}
]
},
"affiliations": [
{
"id": "ROR identifier of your organisation"
}
]
}
],
"description": "What it is, where its record is kept and how it bears on Exponential Technology Report 2026: Cloud, Edge and Distributed Computing.",
"rights": [
{
"id": "cc-by-4.0"
}
],
"subjects": [
{
"subject": "Nexus Reports"
},
{
"subject": "Cloud, Edge and Distributed Computing"
},
{
"subject": "Exponential Technology Report · XT-08"
}
],
"related_identifiers": [
{
"identifier": "https://therisk.global/nexus-reports/editions/xt-08/",
"scheme": "url",
"relation_type": {
"id": "issupplementto"
},
"resource_type": {
"id": "publication-report"
}
}
],
"version": "1.0.0"
},
"custom_fields": {},
"access": {
"record": "public",
"files": "public"
},
"files": {
"enabled": true
},
"parent": {
"communities": {
"default": "nexusreports"
}
}
}C.5Where this edition sits among the six pillars
Foundry seals the evidence and Universe tests it; Reports publishes it; Standards takes its corrections and Academy teaches from it.
- F03 Sealed observations and indicator series Foundry Sealed observations and indicator series behind a profile (closeout).
- F04 After-action and scenario findings for Universe After-action and scenario findings for chapters 10 and 13 (after action review).
- F05 National Portfolio movement for chapter Foundry National Portfolio movement for chapter 11 (after action review).
- Applied in editions Standards Nexus Standards: applied in editions.
- XT-08 edition Reports Cloud, Edge and Distributed Computing 2026, published in every format with its sources, citation and corrections.
- F06 Method and correction findings as change Standards Method and correction findings as change proposals (correction).
- F12 Q4 synthesis informs the next-year Universe Q4 synthesis informs the next-year mandate (renewal).
- Taught in the open Academy Risk Academy: taught in the open.
What Foundry and Universe hand to this edition, and what it hands to Standards, Universe and Academy. From the programme spine; XT-08 is a drafted Baseline Edition, so these handoffs run from its first operational quarter.
| Handoff | Between | What crosses, and when |
|---|---|---|
| F03 | Foundry to Reports | Sealed observations and indicator series behind a profile (closeout). |
| F04 | Universe to Reports | After-action and scenario findings for chapters 10 and 13 (after action review). |
| F05 | Foundry to Reports | National Portfolio movement for chapter 11 (after action review). |
| Ring | Nexus Standards to Reports | Nexus Standards: applied in editions. |
| F06 | Reports to Nexus Standards | Method and correction findings as change proposals (correction). |
| F12 | Reports to Universe | Q4 synthesis informs the next-year mandate (renewal). |
| Ring | Reports to Risk Academy | Risk Academy: taught in the open. |