Exponential Technology Report 2026: Cloud, Edge and Distributed Computing

Edition home

Choose A4 or Letter in the print dialog; running heads and page numbers are added in print. This is a review copy: the signed PDF with its DOI is issued at release.

ReportsXT-08

Exponential Technology

Cloud, Edge and Distributed Computing 2026

Baseline Edition 2026NR-XTECH-CLOUD-GLOBAL-2026-BASELINEGCRI for the Nexus Consortium

Imprint

Editor
Saeed Valadbaygi, Chief Steward and Managing Editor, the Global Centre for Risk and Innovation (GCRI)
Publisher of record
The Global Centre for Risk and Innovation (GCRI) for the Nexus Consortium, Toronto
Report number
NR-XTECH-CLOUD-GLOBAL-2026-BASELINE
Evidence close
30 September 2026, cut DC-XTECH-CLOUD-GLOBAL-2026-B0
Status
Draft under stewardship review; not yet released
DOI and UNI
Issued at deposit
Licence
CC BY 4.0 for Nexus-authored text, tables and figures; third-party material keeps its own licence
Cite as
Valadbaygi, S. (Ed.). (2026). Exponential Technology Report 2026: Cloud, Edge and Distributed Computing (Baseline Edition 2026, Report No. NR-XTECH-CLOUD-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI). https://therisk.global/nexus-reports/editions/xt-08/

Contents

  1. ·

    Executive summary

  2. 1

    Chapter 1. Cloud is shared infrastructure with a physical footprint

  3. 2

    Chapter 2. Key findings

  4. 3

    Chapter 3. Systems and sectors at baseline

  5. 4

    Chapter 4. Risks and capability

  6. 5

    Chapter 5. Shared control-plane fault with diverging sovereignty rules

  7. 6

    Chapter 6. Readings from the other desks

  8. 7

    Chapter 7. The 2027 agenda

  9. 8

    Chapter 8. Systems in depth

  10. A

    Annex A. Methodology

  11. B

    Annex B. Data appendix

  12. C

    Annex C. References and record

Executive summary

The edition on a few pages: the abstract, the key messages, the headline finding and what each steward reads in it.

7 min read1 figure0 tables15 notesNR-XTECH-CLOUD-GLOBAL-2026-BASELINE

S.1Abstract

Cloud, edge and distributed computing matter to the Nexus programme because other infrastructure now runs on them. They are also physical: data centres draw electricity, reject heat and, in some designs, consume water. The IEA reports that data centres used about 415 TWh in 2024, 1.5% of global electricity, and shows 945 TWh in its 2030 base case1. In the United States the share was 4.4% in 2023, with 6.7 to 12% projected for 202823. In Ireland it was 22% of metered electricity in 20244. Three providers held 63% of cloud infrastructure revenue in the second quarter of 2026, according to an industry analyst10. Market power is now a regulatory subject. The UK competition authority recommended further investigation of Microsoft and AWS in July 202511, and the European Commission opened three cloud market investigations on 18 November 202512. The EU Data Act removes switching charges from 12 January 202716. Concentration shows in outages: a fault in one regional database service disrupted AWS services for 14 hours 32 minutes in October 202520. Operator reports on efficiency and water are company-reported and use different baselines. This baseline sets out what the evidence supports and where it is thin. It forecasts no demand or outage and ranks no country or provider.

S.2Key messages

Six readings that frame the cloud baseline, and the eight questions this edition answers, each with its status and source.

  1. About 415 TWh worldwide in 2024, 1.5% of the total, per the IEA.1

    How much electricity do data centres use?Reported

  2. In Ireland data centres used 22% of metered electricity in 2024; in the US 4.4% in 2023.34

    Is it a national issue?Reported

  3. Operators report PUE of 1.09 to 1.15, against baselines that differ.57

    How efficient are the large operators?Reported

  4. Operator figures exist but use different methods; one projection is modelled.68

    What about water?Reported

  5. Three providers held 63% of cloud infrastructure revenue in Q2 2026.10

    How concentrated is the market?Reported

  6. Competition reviews in the UK and EU, and the Data Act switching rules.111216

    What are regulators doing?Reported

  7. A single regional fault disrupted AWS services for 14 hours 32 minutes in 2025.20

    Do outages cascade?Reported

  8. A fault in a shared control plane while dependence is concentrated. SCN-XT08-DEP-01

    What will 2027 test first?Expert input

S.3Headline finding

ReportedEQL 4NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-INF-011

Three large cloud and network events in 2025 lasted from 3 hours 10 minutes to 14 hours 32 minutes, each traced by its operator to an internal fault.

Figure S.1Duration of three operator-reported events (hours)
ItemBar, scaled to the largest valueValue
AWS us-east-1, 19 to 20 October 202514.5
Google Cloud, 12 June 20257.5
Cloudflare, 18 November 2025, to core traffic restored3.2

Sources: AWS20; Google Cloud21; Cloudflare22. Durations are derived from stated times, method (3). The events differ in scope and are not comparable.

Each operator traced its event to an internal fault: a latent race condition in a DNS system for a regional database service at AWS20, blank fields in policy data that crashed a control service at Google Cloud21, and a feature file that doubled in size at Cloudflare, which stated that no cyber attack was involved22. Services built on these platforms failed together. The reports do not say how many customers or public services were affected.

S.4At a glance

415TWh

global data centres, 20241

4.4%

US electricity share, 20233

22%

Ireland metered share, 20244

63%

top three cloud revenue share, Q2 202610

14.5hours

AWS us-east-1 event, 202520

2027year

EU switching charges end16

S.5What each steward reads in it

GCRI · KEY T

Technical Truth

The evidence supports reading cloud and distributed computing as shared infrastructure with a measurable physical footprint.

GRF · KEY M

Public Meaning

For most people the cloud arrives as an app that stops working or a headline about energy and water.

GRA · KEY F

Capital Meaning

Readiness implications only. Revenue is concentrated, switching charges end in 2027, and recovery from large events falls on customers as well as providers.

NEXUS

Synthesis

Cloud is well described by single events and dated rules and thinly measured as a system.

S.6What this edition is, and is not

What this edition is

A baseline: the 2026 state of cloud, edge and distributed computing as infrastructure and the couplings through which it carries risk into other systems. It synthesises published evidence and ranks no country, company or asset.

What it is not

Not a forecast of demand or outages, a provider ranking, an endorsement of any vendor or an assessment of any programme. Competition, resilience and energy rules are decisions of competent authorities.

What comes next

National, regional and sector evidence feeds the 2027 cloud edition through the federation. Each edition reports what changed against this baseline: observations, source revisions, method changes, scenario updates and corrections.

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
  2. 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
  3. 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  4. 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
  5. 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
  6. 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
  7. 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  8. 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  9. 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
  10. 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
  11. 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
  12. 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
  13. 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
  14. 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
  15. 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back

Cloud is shared infrastructure with a physical footprint

Part I describes systems and their couplings. It ranks no country or operator and assesses no authority.

7 min read2 figures1 table14 notesNR-XTECH-CLOUD-GLOBAL-2026-BASELINE

1.1The questions this part answers

Key questions

  • Where is cloud risk concentrated?
  • Which couplings carry cloud shocks into other systems?
  • Which cloud capabilities hold under compound stress?
  • What must 2027 evidence measure first?

In this part

  • Narrative
  • Headline finding
  • Lead figure
  • Five footprint and governance chapters
  • Twelve-domain reading
  • Sector screens
  • Dependency matrix
  • Risk objects
  • Capability ladder
  • Scenario
  • Three lenses
  • Portfolio

1.2The argument

Cloud computing is usually discussed as a service. The 2026 evidence reads it as shared infrastructure: facilities that draw electricity and reject heat, a few providers that carry much of the market, and a set of rules that are only now catching up11016.

The electricity evidence is clear in direction and uneven in method. Data centres used about 415 TWh in 20241, 4.4% of US electricity in 20233 and 22% of metered electricity in Ireland in 20244. Operators report efficient fleets, but their baselines differ57.

The market evidence is concentrated. Three providers held 63% of cloud infrastructure revenue in the second quarter of 202610. Competition authorities in the UK and EU have opened cloud reviews1112, and the Data Act removes switching charges in January 202716.

The resilience evidence comes from operators. One regional fault disrupted AWS services for 14 hours 32 minutes in 202520; a policy data error and a configuration file fault caused two other large events2122. Dependence of public services is not measured.

Figure 1.1Who holds the cloud infrastructure market? Share of revenue, Q2 2026, percent

Three providers hold about two thirds of cloud infrastructure revenue, and the analyst reports that the market grew 43% in a year. The shares cover infrastructure and platform services and hosted private cloud, not all cloud revenue10.

ItemBar, scaled to the largest valueValue
Amazon28
Microsoft20
Google15
All others (derived)37

Source: as cited in the note to this figure. Year 2026.

Figure ID FIG-XTECH-CLOUD-GLOBAL-2026-BASELINE-01-003

28%

Amazon share, Q2 202610

20%

Microsoft share, Q2 202610

15%

Google share, Q2 202610

143USD billion

quarterly revenue, Q2 202610

1.3Twenty couplings between five systems

The cloud-centred matrix types the twenty couplings between the five core systems, read for their cloud content. Strengths are Nexus estimates (ESTIMATED) from the cited evidence and analogue events; they set the graph that 2027 evidence will test.

Figure 1.2Couplings between the five systems

Each line is one coupling from one system to another, drawn by the strength the edition assigns. Strengths are Nexus estimates from the cited evidence and analogue events.

  • Strong
  • Moderate
  • Weak

Source: this edition’s coupling matrix (Table 1.1); status Estimated.

Table 1.1Coupling matrix: from the row system to the column system
From, toWATENEFOOHLTBIO
WAT Water·MODERATE
cooling choice and power
WEAK
no documented link
WEAK
no documented link
WEAK
no documented link
ENE EnergyMODERATE
power and cooling water
·WEAK
no documented link
WEAK
hosted health services, not bound
WEAK
no documented link
FOO FoodWEAK
no documented link
WEAK
no documented link
·WEAK
no documented link
WEAK
no documented link
HLT HealthWEAK
no documented link
WEAK
no documented link
WEAK
no documented link
·WEAK
no documented link
BIO BiodiversityWEAK
no documented link
WEAK
no documented link
WEAK
no documented link
WEAK
no documented link
·
Strength: strong, moderate or weak; a Nexus estimate (status Estimated) from cited evidence and analogue events. The scale is defined in Annex A.

Transmission paths

  1. 01

    ENE → INF

    Local grid share limits siting and growth of facilities.

    Reported Ireland 22% of metered electricity4

  2. 02

    INF → DAT

    A fault in one provider control plane interrupts many dependent services.

    Reported AWS and Google Cloud reports2021

  3. 03

    FIN → INF

    Revenue concentration funds capacity and raises dependence.

    Reported top three 63%10

  4. 04

    WAT → ENE

    Cooling method trades water use against electricity use.

    Inferred operator reports56

  5. 05

    GOV → DAT

    Switching and sovereignty rules change where data and workloads sit.

    Reported Data Act and CADA proposal1618

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
  2. 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
  3. 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  4. 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  5. 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
  6. 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
  7. 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
  8. 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
  9. 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  10. 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
  11. 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
  12. 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
  13. 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
  14. 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back

Key findings

Twelve findings carry the cloud baseline. They are grouped by coupling and never ranked. Each resolves to its source or, where Nexus analysis is involved, to its stated method.

7 min read1 figure0 tables19 notesNR-XTECH-CLOUD-GLOBAL-2026-BASELINE

2.1Headline finding

ReportedEQL 4NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-INF-011

Three large cloud and network events in 2025 lasted from 3 hours 10 minutes to 14 hours 32 minutes, each traced by its operator to an internal fault.

Figure 2.1Duration of three operator-reported events (hours)
ItemBar, scaled to the largest valueValue
AWS us-east-1, 19 to 20 October 202514.5
Google Cloud, 12 June 20257.5
Cloudflare, 18 November 2025, to core traffic restored3.2

Sources: AWS20; Google Cloud21; Cloudflare22. Durations are derived from stated times, method (3). The events differ in scope and are not comparable.

Implication

Each operator traced its event to an internal fault: a latent race condition in a DNS system for a regional database service at AWS20, blank fields in policy data that crashed a control service at Google Cloud21, and a feature file that doubled in size at Cloudflare, which stated that no cyber attack was involved22. Services built on these platforms failed together. The reports do not say how many customers or public services were affected.

What would move it

Further post-event reports, any regulator reporting of cloud incidents and provider dependence registers would each move this finding.

2.2Energy

  1. ReportedEQL 3NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-ENE-001

    The IEA reports that data centres used about 415 TWh of electricity in 2024, 1.5% of global electricity, and shows 945 TWh in its 2030 base case, with the United States the largest share of growth.1

  2. ReportedEQL 4NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-ENE-002

    US data centres used about 176 TWh in 2023, 4.4% of US electricity, up from 58 TWh in 2014; the national laboratory projects 6.7 to 12% of US electricity in 2028.23

  3. ReportedEQL 4NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-ENE-003

    Data centres used 22% of metered electricity in Ireland in 2024, up from 21% in 2023.4

  4. ReportedEQL 3NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-ENE-004

    Google reports that its data centre electricity use grew 27% in 2024 while its data centre energy emissions fell 12%, and Microsoft reports company-wide electricity use of 29.8 TWh in fiscal 2024, up from 23.6 TWh.56

  5. ReportedEQL 3NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-ENE-005

    Operators report fleet efficiency, with Google at a PUE of 1.09 and AWS at 1.15 in 2024, but each compares itself with a different industry average, from 1.25 to 1.56.579

2.3Water

  1. ReportedEQL 3NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-WAT-006

    Microsoft reports water consumption of 5,807 megalitres in fiscal 2024, down from 7,844 after a change of estimation method, and 46% of its withdrawals in areas of water stress; Google reports water consumption up 28% in 2024.56

  2. ReportedEQL 2NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-WAT-007

    A modelling preprint projects that global AI demand could need 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; it is a projection, not a measurement.8

2.4Finance

  1. ReportedEQL 3NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-FIN-008

    Three providers held 63% of cloud infrastructure revenue in the second quarter of 2026, which was USD 143.4 billion and 43% above the year before, according to an industry analyst.10

2.5Governance

  1. ReportedEQL 4NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-GOV-009

    The UK competition authority published its final cloud market decision on 31 July 2025 and recommended strategic market status investigations of Microsoft and AWS; the European Commission opened three DMA cloud market investigations on 18 November 2025.11121314

  2. ReportedEQL 5NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-GOV-010

    The EU Data Act has applied since 12 September 2025 and removes cloud switching and data egress charges from 12 January 2027.1516

2.6Infrastructure

  1. ReportedEQL 4NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-INF-011

    Operator reports describe three large events: AWS us-east-1 for 14 hours 32 minutes in October 2025, Google Cloud for about 7 hours 27 minutes in June 2025, and Cloudflare for 3 hours 10 minutes until core traffic was largely restored in November 2025.202122

2.7Systemic

  1. Expert inputEQL 2NRF-XTECH-CLOUD-GLOBAL-2026-BASELINE-SYS-012

    The leading compound pathway for 2027 testing is a fault in a shared provider control plane while dependence is concentrated and sovereignty rules diverge. § scenario

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
  2. 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
  3. 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
  4. 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
  5. 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
  6. 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  7. 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
  8. 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
  9. 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
  10. 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
  11. 9UNVERIFIED, not opened: Uptime Institute (ed.), Global Data Center Survey 2025 (average PUE 1.54; power the cause of 45% of outages), taken from search-result summaries; the survey page returned an access error. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
  12. 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
  13. 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
  14. 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
  15. 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  16. 13The Register (ed.), Brussels eyes AWS, Azure for gatekeeper tag in cloud clampdown (news article of 18 November 2025; possible obligations and fines up to 10% of worldwide turnover; trade press, secondary). Situation Publishing, London. Observation year 2025. Accessed 2026-11-03.back
  17. 14UNVERIFIED, not opened: trade press reports of mid-2026 that the Commission informed Amazon and Microsoft of a preliminary view that they should be designated as gatekeepers for cloud, taken from search-result summaries; the one article fetched returned an access error. Observation year 2026. Accessed 2026-11-03.back
  18. 15European Commission (ed.), Data Act (policy page; applicable from 12 September 2025; entered into force in January 2024). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  19. 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back

Systems and sectors at baseline

7 min read0 figures2 tables19 notesNR-XTECH-CLOUD-GLOBAL-2026-BASELINE

3.1Where each system stood at evidence close

ENE · Energy

Global data centre electricity use

415TWh

1.5% of global electricity; 945 TWh in the 2030 base case.

Reported2024IEA1

ENE · Energy

US data centre share of electricity

4.4%

176 TWh in 2023; 6.7 to 12% projected for 2028.

Reported2023LBNL, DOE23

ENE · Grid

Data centre share of metered electricity, Ireland

22%

21% in 2023.

Reported2024CSO4

FIN · Market

Top three providers share of cloud revenue

63%

Amazon 28, Microsoft 20, Google 15; sum is method (2).

Reported2026Synergy10

INF · Resilience

Duration of the AWS us-east-1 event

14.5hours

fault in a regional database service DNS.

Reported2025AWS20

GOV · Governance

EU switching charges removed from

2027January

Data Act, 12 January 2027.

Reported2025European Commission16

3.2Domain posture

Each of the twelve coupled domains is read through cloud, in words, not scored. The coupling column names the dependency that carries cloud risk into each domain.

Table 3.1Each domain read in words, not scored
DomainPosture at baselineCouplingStatus
WATOperators report water use on different methods; cooling choice trades water against power.WAT ↔ ENEReported EQL 3
ENEData centres used about 415 TWh in 2024; shares are high in some grids, such as Ireland at 22%.ENE ↔ INFReported EQL 4
FOONo documented coupling at baseline; platform use in agrifood is not evidenced here.none documentedExpert input EQL 1
HLTHealth records and services run on cloud platforms; no figure bound here.INF → HLTExpert input EQL 1
BIONo documented coupling at baseline.none documentedExpert input EQL 1
CLIOperator emissions and electricity growth are reported; no sector total is bound.INF → CLIReported EQL 3
INFThe core system: shared facilities and platforms, with large operator-reported events in 2025.the core systemReported EQL 4
FINThree providers held 63% of cloud infrastructure revenue in Q2 2026.FIN → INFReported EQL 3
DATData location, switching and sovereignty rules are changing in the EU.GOV → DATReported EQL 5
AICAI demand is a stated driver of data centre electricity growth; shares are not split here.AIC → ENEReported EQL 3
MINHardware and mineral dependence of data centres is not bound here.none documentedExpert input EQL 1
TRDSovereignty and procurement rules shape where workloads may run.INF ↔ TRDInferred EQL 2

3.3Sector screens

All sixteen sectors are screened for their dependence on cloud, on the same grammar as every national edition. The evidence column describes coverage of the baseline evidence, not the performance of the sector.

Table 3.2Sectors: baseline evidence and the exposure to watch
CodeSectorBaseline evidenceExposure to watchEvidence coverage
GS-00Cross-systemcloud couples to energy, water, finance and cyber systemsshared control-plane faultTHIN
GS-01Wateroperator water figures on different methods68cooling in water-stressed areasTHIN
GS-02Energydata centre electricity reported134local grid loadPARTIAL
GS-03Foodno documented couplingnone documentedTHIN
GS-04Healthhealth services run on cloud; no figure boundservice outageTHIN
GS-05Financemarket concentration reported10provider dependencePARTIAL
GS-06Developmentaccess to capacity and skillswidening gapsTHIN
GS-07Climateoperator emissions reported5electricity growthTHIN
GS-08Disasterno documented couplingnone documentedTHIN
GS-09Infrastructurefacilities, grids and networks418single-region dependencePARTIAL
GS-10Citiessiting near load centres; not boundgrid competitionTHIN
GS-11Biodiversityno documented couplingnone documentedTHIN
GS-12Earth observationplatform use not evidenced herenone documentedTHIN
GS-13Cyber and digitalincident reports and authorisation rules20212224shared-platform faultsGOOD
GS-14Policycompetition and data rules11121618outcomes pendingGOOD
GS-15Sciencedefinitions and surveys252829common metricsPARTIAL

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
  2. 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
  3. 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  4. 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
  5. 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
  6. 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
  7. 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  8. 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
  9. 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
  10. 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
  11. 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
  12. 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
  13. 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
  14. 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03.back
  15. 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
  16. 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  17. 25NIST (ed.), The NIST Definition of Cloud Computing, NIST SP 800-145 (publication page; September 2011; five essential characteristics, three service models and four deployment models). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03.back
  18. 28Armbrust, M. et al., Above the Clouds: A Berkeley View of Cloud Computing, Technical Report UCB/EECS-2009-28, 10 February 2009 (report page and abstract). University of California, Berkeley. Observation year 2009. Accessed 2026-11-03.back
  19. 29Cloud Native Computing Foundation (ed.), CNCF Annual Survey 2024 (report page; tenth annual survey; 750 respondents in fall 2024; Kubernetes percentage not on the page). CNCF, San Francisco. Observation year 2024. Accessed 2026-11-03.back

Risks and capability

Four cloud risk objects open the portfolio. Order carries no rank. Each is read across driver, exposure, vulnerability, capacity, cascade and consequence.

8 min read0 figures1 table28 notesNR-XTECH-CLOUD-GLOBAL-2026-BASELINE

4.1Risk objects

Each risk is read across the chain from hazard to consequence, with its status and evidence-quality level.

  1. InferredEQL 4RSK-XT08-INF-001

    Shared control-plane failure

    Driver
    internal faults at large providers202122
    Exposure
    services that depend on one provider or region
    Vulnerability
    hidden dependencies; single-region designs
    Capacity
    operator post-event reports; DORA oversight1720
    Cascade
    INF → DAT → FIN, HLT
    Horizon
    1 to 5 years
  2. InferredEQL 3RSK-XT08-ENE-002

    Local grid constraint

    Driver
    rising data centre load124
    Exposure
    regions with high data centre share
    Vulnerability
    slow grid connection; local opposition
    Capacity
    permitting proposals; efficiency reporting1819
    Cascade
    ENE → INF
    Horizon
    1 to 5 years
  3. Expert inputEQL 2RSK-XT08-WAT-003

    Water stress at cooling sites

    Driver
    cooling demand and warm climates68
    Exposure
    facilities in water-stressed areas
    Vulnerability
    non-comparable water metrics
    Capacity
    operator replenishment and air-cooling choices56
    Cascade
    WAT → ENE → INF
    Horizon
    1 to 10 years
  4. InferredEQL 3RSK-XT08-GOV-004

    Fragmented sovereignty and concentration

    Driver
    competition reviews and sovereignty rules111218
    Exposure
    cross-border workloads; public procurement
    Vulnerability
    diverging rules; lock-in before switching charges end16
    Capacity
    Data Act switching rights; sovereign offerings1623
    Cascade
    GOV → INF, FIN
    Horizon
    1 to 5 years

4.2Capability ladder

Existence is not readiness. Each of the fifteen capability functions is placed on the ladder by the strongest public evidence for cloud at the global level.

Table 4.1Capabilities on the ladder of evidence: listed, exists, demonstrated, tested
FunctionRungLevelStrongest public evidence at baseline
Prevention and mitigationEXISTSoperator efficiency programmes and EU reporting rules5735
Monitoring and observationLISTEDoperators publish reports; no common cross-provider record2021
Early warningLISTEDno consolidated early warning of provider faults
Preparedness and planningEXISTSDORA and FedRAMP programmes1724
Redundancy and reservesLISTEDmulti-region designs exist; 2025 events show shared dependencies2021
ResponseEXISTSoperators restored services within hours in three reported events202122
Continuity of critical servicesLISTEDno consolidated evidence of tested failover or exit16
RecoveryEXISTSfull recovery was reported in each of the three events202122
AdaptationLISTEDpost-event changes reported by operators; not reviewed here40
Social protectionLISTEDnot applicable at baseline
Finance and insuranceLISTEDnot reviewed
Institutional coordinationEXISTScompetition authorities and EU institutions111217
Technical infrastructureEXISTSlarge installed base and standards2102530
WorkforceLISTEDno figure bound
Research capacityADEQUATEstrong literature on cloud and edge2831323334
A capability listed in policy is not a tested one; each rung is the strongest public evidence at baseline.

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
  2. 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
  3. 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
  4. 17European Securities and Markets Authority (ed.), Digital Operational Resilience Act (page; applies from 17 January 2025; lists materials on critical ICT third-party provider designation; no designations on the page). ESMA, Paris. Observation year 2025. Accessed 2026-11-03.back
  5. 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
  6. 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
  7. 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
  8. 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
  9. 19European Commission (ed.), Energy Efficiency Directive (policy page; states a data centre energy efficiency package planned for the third quarter of 2026 and links to reporting of data centre energy consumption; no threshold or dates on the page). Directorate-General for Energy, Brussels. Observation year 2026. Accessed 2026-11-03.back
  10. 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
  11. 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
  12. 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
  13. 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
  14. 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  15. 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  16. 23Amazon Web Services (ed.), Opening the AWS European Sovereign Cloud (blog announcement of 14 January 2026; Brandenburg region; investment of EUR 7.8 billion stated; vendor announcement, weak evidence). Amazon Web Services, Seattle. Observation year 2026. Accessed 2026-11-03.back
  17. 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
  18. 35UNVERIFIED, not opened: Directive (EU) 2023/1791 on energy efficiency, Article 12 on data centre reporting, Official Journal of the European Union, 2023, cited from memory; the page returned no content. Observation year 2023. Accessed 2026-11-03.back
  19. 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03.back
  20. 40UNVERIFIED, not opened: Microsoft (ed.), Azure Front Door incident reports of October 2025, cited from memory; the page returned an error and no figure is used. Microsoft, Redmond. Observation year 2025. Accessed 2026-11-03.back
  21. 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
  22. 25NIST (ed.), The NIST Definition of Cloud Computing, NIST SP 800-145 (publication page; September 2011; five essential characteristics, three service models and four deployment models). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03.back
  23. 30ETSI (ed.), Multi-access Edge Computing (technology page; industry specification group; news item of 31 October 2025 on Phase 4 specifications and a white paper; no counts on the page). European Telecommunications Standards Institute, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03.back
  24. 28Armbrust, M. et al., Above the Clouds: A Berkeley View of Cloud Computing, Technical Report UCB/EECS-2009-28, 10 February 2009 (report page and abstract). University of California, Berkeley. Observation year 2009. Accessed 2026-11-03.back
  25. 31UNVERIFIED, not opened: Masanet, E., Shehabi, A., Lei, N., Smith, S. and Koomey, J., Recalibrating global data centre energy-use estimates, Science 367, 984 to 986, 2020, cited from memory; the page returned an access error. Observation year 2020. Accessed 2026-11-03.back
  26. 32UNVERIFIED, not opened: Satyanarayanan, M., The emergence of edge computing, Computer 50(1), 30 to 39, 2017, cited from memory. Observation year 2017. Accessed 2026-11-03.back
  27. 33UNVERIFIED, not opened: Shi, W., Cao, J., Zhang, Q., Li, Y. and Xu, L., Edge computing: vision and challenges, IEEE Internet of Things Journal 3(5), 637 to 646, 2016, cited from memory. Observation year 2016. Accessed 2026-11-03.back
  28. 34UNVERIFIED, not opened: Barroso, L.A., Clidaras, J. and Hölzle, U., The Datacenter as a Computer: Designing Warehouse-Scale Machines, third edition, Morgan and Claypool, 2018, cited from memory. Observation year 2018. Accessed 2026-11-03.back

Shared control-plane fault with diverging sovereignty rules

A conditional statement under stated assumptions, never a prediction.

2 min read0 figures0 tables3 notesNR-XTECH-CLOUD-GLOBAL-2026-BASELINE

5.1Assumptions

Scenario SCN-XT08-DEP-01: what is assumed, and what is held constant.

Baseline
the 2026 reference state in this edition
Drivers
a fault in a shared provider control plane lasts many hours while public services depend on it and sovereignty rules limit failover
Analogues
the 2025 events at AWS, Google Cloud and Cloudflare202122
Interventions
none modelled: the specification describes the unmitigated case
Run state
narrative specification; quantified run scheduled for 2027

5.2The cascade, step by step

  1. 1

    INF → DAT

    a control-plane fault interrupts dependent services in one region

    2025

  2. 2

    DAT → FIN

    payment and business services stall until recovery

    2025

  3. 3

    DAT → HLT

    hosted records and booking services become unavailable

    2025

  4. 4

    GOV → INF

    sovereignty rules limit moves between providers or regions

    2026

  5. 5

    ENE → INF

    recovery load meets local grid limits at the host region

    2024

  6. 6

    FIN → INF

    customers re-weigh dependence as switching charges end

    2025

5.3The scenario as a table of steps

How the shock in scenario SCN-XT08-DEP-01 would travel through Cloud, Edge and Distributed Computing’s coupled systems, step by step, under the assumptions the edition states.

StepWhat happensSource
01 Infrastructure to datA control-plane fault interrupts dependent services in one region. Analogue or source: 2025.Edition XT-08, scenario SCN-XT08-DEP-01, step 1
02 DAT to financePayment and business services stall until recovery. Analogue or source: 2025.Edition XT-08, scenario SCN-XT08-DEP-01, step 2
03 DAT to healthHosted records and booking services become unavailable. Analogue or source: 2025.Edition XT-08, scenario SCN-XT08-DEP-01, step 3
04 Governance to infrastructureSovereignty rules limit moves between providers or regions. Analogue or source: 2026.Edition XT-08, scenario SCN-XT08-DEP-01, step 4
05 Energy to infrastructureRecovery load meets local grid limits at the host region. Analogue or source: 2024.Edition XT-08, scenario SCN-XT08-DEP-01, step 5
06 Finance to infrastructureCustomers re-weigh dependence as switching charges end. Analogue or source: 2025.Edition XT-08, scenario SCN-XT08-DEP-01, step 6

A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Cloud, Edge and Distributed Computing 2026, scenario SCN-XT08-DEP-01 (2026); Cloud, Edge and Distributed Computing 2026, references (NR-CIT-1) (2026).

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
  2. 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
  3. 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back

Readings from the other desks

The cloud baseline is read through each steward’s lens, then once as a whole. Each lens is a projection of reviewed findings, not a separate argument. The other desks’ own editions of this subject are listed first, as cross-references, not copies.

16 min read0 figures8 tables38 notesNR-XTECH-CLOUD-GLOBAL-2026-BASELINE

6.1The other desks’ editions of this subject

Federation: each desk writes its own edition for the subjects in its remit. Until a desk releases, its edition shows its frame and the reading this edition printed for it.

DeskEditionStateIdentifier
GCRI Systems EvidenceNo edition of this subject at this desk in the 2026 Baseline cycleNot in this cycle
GRF Public DeliberationOutside this desk’s remitNot in remit
GRA Capital ReadinessOutside this desk’s remitNot in remit
Standards ProgressNo edition of this subject at this desk in the 2026 Baseline cycleNot in this cycle
Academy CapabilityNo edition of this subject at this desk in the 2026 Baseline cycleNot in this cycle
Index MeasurementOutside this desk’s remitNot in remit

6.2Three lenses

One edition, read by each steward. The lens of this site comes first.

GCRI · KEY T

Technical Truth

The evidence supports reading cloud and distributed computing as shared infrastructure with a measurable physical footprint. Electricity use is reported and rising, the market is concentrated, and large events have been traced to internal faults. Evidence is strongest for single events and dated rules, and weakest for dependence, water and edge.

ENE-001 · ENE-002 · INF-011 · SYS-012

GRF · KEY M

Public Meaning

For most people the cloud arrives as an app that stops working or a headline about energy and water. The baseline asks that public debate separate measured use from projections and company claims, and keep the dependence of public services in view.

ENE-003 · INF-011 · WAT-007

GRA · KEY F

Capital Meaning

Readiness implications only. Revenue is concentrated, switching charges end in 2027, and recovery from large events falls on customers as well as providers1016. These show where finance-readiness evidence will matter. Nothing here is advice, a rating or an approval.

FIN-008 · GOV-010

NEXUS

Synthesis

Cloud is well described by single events and dated rules and thinly measured as a system. The 2027 programme should map dependence of public services, put operator metrics on a common basis and test exit before the next large event.

SYS-012 · C-01 · C-03

6.3Standards, Academy and steward contributions

How the Nexus Standards drafts, the Risk Academy and the three stewards feed each quarterly edition for cloud. The standards are a preparatory working draft (2026) and are cited as drafts, never as adopted standards.

Table 6.1The quarterly rhythm every edition follows
QuarterEditionQuestionBoundary
Q1State and AgendaWhat matters this year, and what is the starting position?observed baseline stays distinct from planned work
Q2Evidence and BuildWhat new evidence and capability exist?a configured capability is not a validated result
Q3Stress Test and ReadinessWhat do scenarios and tests show?simulated loss or performance is not observed impact
Q4Annual Synthesis and RenewalWhat changed in the year, and what renews?release follows review, not event publicity deadlines
Table 6.2Who contributes what each quarter
Steward or bodyRoleContribution route
GCRI CanadaLead Institution and Consortium Secretariat; publisher of record; technical truth (key T)science and practice communities · GCRI gateway
The Global Risks Forum (GRF)leadership, dialogue and the Universe programme; public meaning (key M)policy, Universe and national adoption · GRF gateway
The Global Risks Alliance (GRA)finance, insurance and development readiness; capital meaning (key F)finance and insurance · GRA gateway
Nexus Standardspreparatory drafts on vocabulary, hazards, indicators and methodsStandards site · working groups HAZ, IND, MTH, FIN, AI
Risk Academylearning pathways tied to the agenda questionsAcademy gateway · learning by review
Nexus Standards and Academytechnology chapter inputs: GCRI evidence, NXS standards, RA capabilitytechnology editorial board

Standards drafts used in this edition

  • Risk vocabulary NRS-C1 (424 terms) for terms in the glossary
  • Hazard atlas NHS-1 1.1.0 (905 hazards in 120 families) for risk objects
  • Seven risk classes: global, catastrophic, existential, emerging, planetary, exponential, frontier-tech

Standards calendar to watch

  • Founding calls from 20 October 2026; working groups meet from 5 November 2026
  • Inaugural Global Standards Council session, 12 January 2027
  • Quarterly reviews in March, June, September and December, aligned with each edition

6.4GCRI reading: the model card

GCRI’s reading of this edition is its model card: what the national model is, what it computes and where it stops. It is printed in full in Annex A, with the methods it belongs to. Annex A, methodology

6.5Global Risks Forum reading: editorial essays

Four signed essays by the Reports editorial team set out the positions this edition takes. They are interpretation, labelled as such; the evidence they draw on is in the findings register.

Cloud services run on facilities owned by a few companies and used by almost every sector. That makes them infrastructure in effect, and the evidence on dependence is the thinnest part of the picture.

EDITORIAL ESSAY · 01

Shared infrastructure, private operators

Operators report PUE and water use, and each picks its own baseline. A common basis would show whether growth is limited by grids, water or money.

EDITORIAL ESSAY · 02

Footprints need a common basis

The Data Act, DORA, the DMA reviews and the Cloud and AI Development Act proposal address different parts of one market. Their order and overlap will shape 2027.

EDITORIAL ESSAY · 03

Rules arrive in sequence

Edge computing is defined in specifications and papers, but sites, devices and energy use are not counted in the sources read here.

EDITORIAL ESSAY · 04

The edge is the blind spot

6.6Global Risks Alliance reading: 2027 cloud readiness pack

The registers that open the 2027 global cycle. At baseline each is initialised from this edition.

Table 6.32027 cloud readiness pack
ItemRegisterState at baselineFirst 2027 entry
E1Cloud risk state deltabaseline set by this editionchanges against the baseline
E2WEFH+B state deltafive global system readings setindicator updates and freshness
E3Agenda and Portfolio movementeight agenda items · 6 proposed objectsadmission decisions
E4Federation delivery registernational chapters in preparationnational chapters
E5Consortium capability registernational consortia formingfirst contributions
E6Leadership questions and challengesnone yetfirst challenge log
E7Foundry technical statenational environments preparedfirst federation cut
E8Publication candidatestwelve findings carried forwardPUBLISH · HOLD dispositions
E9Universe readinessone candidate missionadmission and role spine
E10Correction registernonefirst federation-wide cycle

Publication dispositions

  • Publish
  • Hold
  • Needs evidence
  • Restricted
  • Superseded

6.7Nexus Standards reading: standards and regulatory watch

Instruments and published guidance that shape the systems in this edition, by status on the retrieval date. The edition assesses no one’s compliance.

  • IN FORCE
  • PUBLISHED
  • PROPOSAL
  • PUBLISHED · VOLUNTARY
Table 6.4Standards and regulatory watch
InstrumentBodyScopeStatusRelevance
NIST SP 800-145, 800-146 and 500-292252627NISTUS, used globallyPUBLISHED 2011 AND 2012cloud definition and architecture
ISO/IEC 22123-142ISO and IECglobalPUBLISHED · VOLUNTARYcloud vocabulary
ISO/IEC 30134-241ISO and IECglobalPUBLISHED · VOLUNTARYPUE definition
EU Data Act151637European UnionEUIN FORCE · APPLIES FROM 2025switching and data access
DORA1738European UnionEU financial sectorIN FORCE · APPLIES FROM 2025ICT third-party oversight
Energy Efficiency Directive data centre reporting193536European UnionEUIN FORCEenergy and water reporting
FedRAMP 20x24US GSAUS federalPROGRAMME ACTIVEcloud authorisation
ETSI MEC specifications30ETSIEuropePUBLISHED · VOLUNTARYedge computing
Cloud and AI Development Act18European CommissionEUPROPOSAL 2026capacity, permits, sovereignty
Green Data Centre Roadmap43Singapore IMDASingaporePUBLISHEDdata centre growth and efficiency

Changed since 2024

  • The Commission proposed the Cloud and AI Development Act in June 202618
  • FedRAMP 20x entered its wide-scale adoption phase in 202624
  • The Commission opened DMA cloud market investigations on 18 November 202512

To watch in 2027

  • The EU data centre energy efficiency package planned for the third quarter of 202619
  • The end of EU switching charges on 12 January 202716
  • Designation of critical ICT third-party providers under DORA1738

6.8Risk Academy reading: literature and evidence review, science and assessments

The review behind this edition covers cloud assessments, peer-reviewed science and the institutional reports that bind its findings. Systematic reviews for each agenda item begin in 2027.

Review protocol

Question
What does the published evidence establish about cloud, edge and distributed computing as infrastructure and its couplings?
Sources searched
foundational papers and standards; regulators and institutions; operator reports; national laboratories and statistics offices
Window
releases available at evidence close, 30 September 2026
Selection
sources that bind or contextualise a finding in this edition
Next step
systematic reviews for agenda items 01 to 05 in 2027
Table 6.5Foundational papers and definitions
ReferenceTypeYearRoleUsed for
Armbrust et al.28technical report2009frameworkcloud economics and obstacles
NIST SP 800-14525NIST2011frameworkdefinition
NIST SP 800-14626NIST2012contextsynopsis and recommendations
NIST SP 500-29227NIST2011contextreference architecture
Barroso, Clidaras and Hölzle34book2018contextwarehouse-scale computers
Masanet et al.31journal article2020contextenergy estimates
Li et al.8preprint2023supportswater projection
Table 6.6Edge and systems literature
ReferenceIssuerYearRoleUsed for
Satyanarayanan32journal article2017frameworkedge computing
Shi et al.33journal article2016frameworkedge vision
CNCF annual survey29foundation survey2024contextcloud native adoption
ETSI MEC30ETSI2025contextedge specifications
ISO/IEC 22123-142ISO and IEC2023frameworkvocabulary
Table 6.7Standards, policy and regulation
ReferenceIssuerYearRoleUsed for
EU Data Act pages1516European Commission2025supportsswitching rules
DORA page17ESMA2025supportsoversight timing
CMA market investigation11UK CMA2025supportscompetition review
DMA cloud investigations12European Commission2025supportscompetition review
FedRAMP 20x24US GSA2026contextauthorisation reform
Table 6.8Operator, market and energy reports
ReferenceIssuerYearRoleUsed for
Energy and AI1IEA2025supportsglobal electricity
US data centre report23LBNL and DOE2024supportsUS electricity
Metered electricity4Irish CSO2025supportsgrid share
Environmental reports567Google · Microsoft · Amazon2025contextcompany-reported
Cloud market release10Synergy Research2026supportsmarket shares
Global Data Center Survey9Uptime Institute2025contextPUE and outages

Where the evidence agrees

  • Data centre electricity use is rising and is a visible share of some grids134
  • Cloud markets are concentrated and under regulatory review101112
  • Large events trace to internal faults at operators202122

Where it is unsettled

  • How fast data centre electricity use will grow, and how much is AI12
  • How operator PUE and water figures compare on a common basis5679
  • How far public services depend on a few providers2021

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
  2. 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  3. 25NIST (ed.), The NIST Definition of Cloud Computing, NIST SP 800-145 (publication page; September 2011; five essential characteristics, three service models and four deployment models). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03.back
  4. 26NIST (ed.), Cloud Computing Synopsis and Recommendations, NIST SP 800-146 (publication page; May 2012). National Institute of Standards and Technology, Gaithersburg. Observation year 2012. Accessed 2026-11-03.back
  5. 27NIST (ed.), NIST Cloud Computing Reference Architecture, NIST SP 500-292 (publication page; 8 September 2011). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03.back
  6. 42UNVERIFIED, not opened: ISO and IEC (eds.), ISO/IEC 22123-1 Cloud computing, part 1, vocabulary, cited from memory. International Organization for Standardization, Geneva. Observation year 2023. Accessed 2026-11-03.back
  7. 41UNVERIFIED, not opened: ISO and IEC (eds.), ISO/IEC 30134-2 Information technology, data centres, key performance indicators, part 2, power usage effectiveness (PUE), cited from memory. International Organization for Standardization, Geneva. Observation year 2016. Accessed 2026-11-03.back
  8. 15European Commission (ed.), Data Act (policy page; applicable from 12 September 2025; entered into force in January 2024). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  9. 37UNVERIFIED, not opened: Regulation (EU) 2023/2854 (Data Act), Official Journal of the European Union, 2023, cited from memory; the page returned no content, and the policy pages [15] [16] were read instead. Observation year 2023. Accessed 2026-11-03.back
  10. 17European Securities and Markets Authority (ed.), Digital Operational Resilience Act (page; applies from 17 January 2025; lists materials on critical ICT third-party provider designation; no designations on the page). ESMA, Paris. Observation year 2025. Accessed 2026-11-03.back
  11. 38UNVERIFIED, not opened: Regulation (EU) 2022/2554 on digital operational resilience for the financial sector (DORA), Official Journal of the European Union, 2022, cited from memory; the ESMA page [17] was read instead. Observation year 2022. Accessed 2026-11-03.back
  12. 19European Commission (ed.), Energy Efficiency Directive (policy page; states a data centre energy efficiency package planned for the third quarter of 2026 and links to reporting of data centre energy consumption; no threshold or dates on the page). Directorate-General for Energy, Brussels. Observation year 2026. Accessed 2026-11-03.back
  13. 35UNVERIFIED, not opened: Directive (EU) 2023/1791 on energy efficiency, Article 12 on data centre reporting, Official Journal of the European Union, 2023, cited from memory; the page returned no content. Observation year 2023. Accessed 2026-11-03.back
  14. 36UNVERIFIED, not opened: Commission Delegated Regulation (EU) 2024/1364 on the first phase of the establishment of a common Union rating scheme for data centres, 2024, cited from memory; the page returned no content. Observation year 2024. Accessed 2026-11-03.back
  15. 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03.back
  16. 30ETSI (ed.), Multi-access Edge Computing (technology page; industry specification group; news item of 31 October 2025 on Phase 4 specifications and a white paper; no counts on the page). European Telecommunications Standards Institute, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03.back
  17. 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
  18. 43UNVERIFIED, not opened: Infocomm Media Development Authority (ed.), Green Data Centre Roadmap, Singapore, cited from memory; the page returned no content and no figure is used. IMDA, Singapore. Observation year 2024. Accessed 2026-11-03.back
  19. 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  20. 28Armbrust, M. et al., Above the Clouds: A Berkeley View of Cloud Computing, Technical Report UCB/EECS-2009-28, 10 February 2009 (report page and abstract). University of California, Berkeley. Observation year 2009. Accessed 2026-11-03.back
  21. 34UNVERIFIED, not opened: Barroso, L.A., Clidaras, J. and Hölzle, U., The Datacenter as a Computer: Designing Warehouse-Scale Machines, third edition, Morgan and Claypool, 2018, cited from memory. Observation year 2018. Accessed 2026-11-03.back
  22. 31UNVERIFIED, not opened: Masanet, E., Shehabi, A., Lei, N., Smith, S. and Koomey, J., Recalibrating global data centre energy-use estimates, Science 367, 984 to 986, 2020, cited from memory; the page returned an access error. Observation year 2020. Accessed 2026-11-03.back
  23. 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
  24. 32UNVERIFIED, not opened: Satyanarayanan, M., The emergence of edge computing, Computer 50(1), 30 to 39, 2017, cited from memory. Observation year 2017. Accessed 2026-11-03.back
  25. 33UNVERIFIED, not opened: Shi, W., Cao, J., Zhang, Q., Li, Y. and Xu, L., Edge computing: vision and challenges, IEEE Internet of Things Journal 3(5), 637 to 646, 2016, cited from memory. Observation year 2016. Accessed 2026-11-03.back
  26. 29Cloud Native Computing Foundation (ed.), CNCF Annual Survey 2024 (report page; tenth annual survey; 750 respondents in fall 2024; Kubernetes percentage not on the page). CNCF, San Francisco. Observation year 2024. Accessed 2026-11-03.back
  27. 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
  28. 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
  29. 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
  30. 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  31. 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
  32. 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
  33. 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
  34. 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
  35. 9UNVERIFIED, not opened: Uptime Institute (ed.), Global Data Center Survey 2025 (average PUE 1.54; power the cause of 45% of outages), taken from search-result summaries; the survey page returned an access error. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
  36. 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
  37. 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
  38. 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back

The 2027 agenda

Eight bounded questions open the 2027 cloud agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 cloud edition.

6 min read0 figures6 tables6 notesNR-XTECH-CLOUD-GLOBAL-2026-BASELINE

7.1Questions for the operational series

  1. C-01

    Which public and critical services depend on one provider, region or control plane, and what happens when it fails?

    INI-XT08-DEP-01 · dependency map; first output: dependency register.

  2. C-02

    What load do new facilities add to local grids, and how long do connections take?

    INI-XT08-ENE-02 · grid and load; first output: site and grid table.

  3. C-03

    Can operator water and efficiency figures be put on a common basis?

    INI-XT08-WAT-03 · water and efficiency basis; first output: metric comparison.

  4. C-04

    How many organisations have tested an exit or a switch between providers?

    INI-XT08-EXT-04 · exit and switching tests; first output: test evidence table.

  5. C-05

    How large is the edge layer in energy, sites and devices?

    INI-XT08-EDG-05 · edge footprint; first output: edge inventory note.

  6. C-06

    Which national rules on data location and sovereignty differ, and how?

    To be admitted in 2027; first output: rule overlay.

  7. C-07

    What workforce exists for data centres, cloud operations and resilience engineering?

    To be admitted in 2027; first output: scoping note.

  8. C-08

    Which readiness capabilities have been tested in real events, and which are only planned?

    Readiness capability register; first output: rung evidence for 15 functions.

7.2Portfolio proposed for the Q1 2027 alignment

Five initiatives and one Universe mission candidate are proposed for the 2027 cloud portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.

Table 7.1Objects proposed for the first operational quarter
IDObjectKindQuestionState
INI-XT08-DEP-01Dependency mapInitiativeC-01PROPOSED
INI-XT08-ENE-02Grid and loadInitiativeC-02PROPOSED
INI-XT08-WAT-03Water and efficiency basisInitiativeC-03PROPOSED
INI-XT08-EXT-04Exit and switching testsInitiativeC-04PROPOSED
INI-XT08-EDG-05Edge footprintInitiativeC-05PROPOSED
MSN-XT08-2027-01Shared control-plane fault Universe missionMissionC-01Candidate

7.3The pathway

The cloud edition reads national readiness chapters, the coupled sector reports on energy, cyber and digital systems and infrastructure, and the global edition through one governed evidence graph. At baseline the federation is designed; the global energy and lifeline editions are drafted. This page states what exists today and what comes next.

  1. 01

    National readiness chapters

    cloud dependence and data centre load in each national edition

    IN PREPARATION · national baselines

  2. 02

    Sector couplings

    GS-02 energy · GS-13 cyber and digital systems · SR-10 digital public infrastructure

    GS-02 DRAFTED · sector baselines

  3. 03

    Technology system model

    facilities, grid, water, market, resilience, governance

    v0 SPECIFIED · v1 with federation evidence

  4. 04

    Strategic links

    SR-02 lifeline systems · XT-06 semiconductors and compute

    PLANNED · strategic baselines

  5. 05

    Universe

    annual proving environment

    CANDIDATE MISSION · mandate in 2027

  6. 06

    XT-08 report

    this series

    BASELINE DRAFT · 2027 annual edition

  7. 07

    Evidence and correction

    one graph, many projections

    OPEN · first correction cycle in 2027

7.4Universe 2027: evidence pack for the cloud candidate mission

  1. 01

    Mandate

  2. 02

    Core Build · 1 month

  3. 03

    Action · 1 week

  4. 04

    Evidence seal

  5. 05

    Portfolio correction

  6. 06

    Next mandate

Table 7.2Universe 2027: evidence pack for the cloud candidate mission
ItemRecordStateTiming
F1Annual mandate recordPLANNEDafter the Q2 2027 alignment
F2Core Build recordPLANNEDone month before the exercise
F3Exercise evidencePLANNEDduring the Action week
F4Decision packetsPLANNEDexercise state only
F5Proof receiptsPLANNEDscoped to each recorded check
F6After-action reportPLANNEDwithin one quarter
F7Upgrade docketPLANNEDrouted to the Portfolio
F8Portfolio renewalPLANNED2027 global annual edition
F9Public synthesisPLANNEDpublic-safe extracts only

Mission

ID
MSN-XT08-2027-01 · Shared control-plane fault Universe mission
Role spine
Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
Receiving actors
to be identified with the mandate

7.5Handoffs and routing

Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.

Table 7.3Handoffs and routing
FindingRouted toPurposeClass
ENE-001 · global electricityINI-XT08-ENE-02grid and loadPUBLIC
ENE-003 · Irish grid shareINI-XT08-ENE-02grid and loadPUBLIC
ENE-005 · PUE baselinesINI-XT08-WAT-03water and efficiency basisPUBLIC
WAT-006 · water reportsINI-XT08-WAT-03 · key F reviewwater and efficiency basisPUBLIC
FIN-008 · market sharesINI-XT08-DEP-01dependency mapPUBLIC
GOV-010 · switching rulesINI-XT08-EXT-04exit and switching testsPUBLIC
INF-011 · outagesINI-XT08-DEP-01dependency mapPUBLIC
SYS-012 · compound pathwayMSN-XT08-2027-01Universe candidateCONSORTIUM
Table 7.4Routing rules by publication class
ClassWhere it goesWho can see it
PUBLICthe published edition and its evidence bundleanyone
CONSORTIUMgoverned rooms of the federationconsortium members under agreement
CONTROLLEDneed-to-know channelsnamed competent actors only

7.6Feeds and signal register

Table 7.5Feeds watched from 2027
FeedProducerLatencyFeeds into
Operator status and post-event reportsAWS, Google Cloud, Cloudflare and othersper eventINF-011
Global electricity and data centre reportsIEAperiodicENE-001
National data centre electricity statisticsstatistics offices and laboratoriesannualENE-003
Operator sustainability reportsGoogle, Microsoft, AmazonannualENE-004
Cloud market releasesindustry analystsquarterlyFIN-008
EU competition and digital policy pagesEuropean Commissionper releaseGOV-009
UK competition case pageUK CMAper releaseGOV-009

Escalation routes

  • none · keep monitoring
  • research question
  • project
  • risk object
  • annual publication
  • signal report
Table 7.6Signals at baseline
IDSignalCorroborationSystemsRoute
SIG-XT08-001Three providers held 63% of cloud infrastructure revenue in Q2 202610CORROBORATEDFIN · INFresearch question C-01
SIG-XT08-002Competition reviews of cloud opened in the UK and EU1112CORROBORATEDGOV · FINinitiative C-04
SIG-XT08-003Three large events in 2025 traced to internal faults202122PARTIALINF · DATresearch question C-01

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
  2. 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
  3. 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  4. 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
  5. 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
  6. 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back

Systems in depth

One section per system: its state at evidence close, its exposures and what the operational series will watch.

11 min read0 figures5 tables30 notesNR-XTECH-CLOUD-GLOBAL-2026-BASELINE

8.1Cloud, edge and distributed platforms

Cloud services run on a small number of very large platforms, with an edge layer that is defined in specifications but not counted. Evidence is strongest for market revenue and weakest for the edge.

143USD billion

quarterly cloud infrastructure revenue, Q2 202610

43%

year-on-year growth, Q2 202610

750respondents

cloud native community survey, fall 202429

Table 8.1State at baseline
ComponentStateEvidenceStatus
Hyperscale cloudthree providers held 63% of infrastructure revenue; shares are an analyst estimate10Reported
Definitionsfive essential characteristics, three service models and four deployment models252627Reported
Edge computingspecifications published; sites, devices and energy not bound303233Inferred
Cloud native softwaretenth annual community survey, 750 respondents29Reported

Couplings

  • INF ↔ FIN platforms and revenue
  • INF → DAT services and data
  • GOV → INF rules and platforms

Evidence to bind in 2027

  • edge sites, devices and energy
  • provider-reported revenue on a common basis

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • GS-13 Cyber and Digital Systems
  • SR-10 Digital Public Infrastructure and Systemic Cyber Risk
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-07 HPC and Advanced Computing

8.2Electricity, cooling and water

Data centres are a visible and growing share of electricity in some systems. Operators report efficient fleets and water figures, on methods that differ.

415TWh

global data centre electricity, 20241

4.4%

US share of electricity, 20233

22%

Ireland share of metered electricity, 20244

Table 8.2State at baseline
ComponentStateEvidenceStatus
Electricityabout 415 TWh in 2024; 945 TWh in the IEA 2030 base case1Reported
EfficiencyPUE of 1.09 (Google) and 1.15 (AWS), against baselines of 1.25 to 1.56579Reported
WaterMicrosoft 5,807 ML in fiscal 2024 after a method change; Google up 28%; AWS 0.15 L per kWh567Reported
Projectionmodelling preprint: 4.2 to 6.6 billion cubic metres of withdrawal in 20278Reported

Couplings

  • ENE ↔ INF facility power
  • WAT ↔ ENE cooling choice
  • INF → CLI electricity growth

Evidence to bind in 2027

  • site-level load on a common basis
  • comparable water metrics

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • GS-13 Cyber and Digital Systems
  • SR-10 Digital Public Infrastructure and Systemic Cyber Risk
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-07 HPC and Advanced Computing

8.3Grid, hardware and siting

Growth depends on grid connection, permits and hardware. Public evidence on connection queues and hardware supply is thin in the sources read here.

22%

Ireland share of metered electricity, 20244

12months

proposed maximum permit procedure, as reported18

3times

proposed aim for EU data centre capacity within five to seven years, as reported18

Table 8.3State at baseline
ComponentStateEvidenceStatus
Grid connectionhigh share in Ireland; queues not bound4Reported
Siting and permitsEU proposal for acceleration zones and strategic projects18Reported
Regional growth rulesSingapore roadmap on growth and efficiency, cited without figures43Inferred
Hardware and mineralsdependence not bound here18Expert input

Couplings

  • ENE → INF grid share
  • GOV → INF permits
  • MIN → INF hardware

Evidence to bind in 2027

  • grid connection queues
  • hardware and mineral dependence

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • GS-13 Cyber and Digital Systems
  • SR-10 Digital Public Infrastructure and Systemic Cyber Risk
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-07 HPC and Advanced Computing

8.4Economy, market structure and workforce

The cloud market is concentrated and growing fast, and regulators now review it. Workforce numbers are the thin part of the evidence.

63%

top three share of cloud revenue, Q2 202610

2027year

EU switching charges end16

7.8EUR billion

investment stated by AWS for its EU sovereign cloud, a company announcement23

Table 8.4State at baseline
ComponentStateEvidenceStatus
Market structureAmazon 28%, Microsoft 20%, Google 15% in Q2 202610Reported
Competition reviewUK final decision on 31 July 2025; DMA investigations from 18 November 2025111213Reported
Switchingcharges removed from 12 January 202716Reported
Workforceno figure bound28Expert input

Couplings

  • FIN → INF capacity
  • GOV → FIN market rules
  • HLT → INF workforce

Evidence to bind in 2027

  • workforce size and skills gaps
  • revenue outside infrastructure services

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • GS-13 Cyber and Digital Systems
  • SR-10 Digital Public Infrastructure and Systemic Cyber Risk
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-07 HPC and Advanced Computing

8.5Resilience, security and governance watch

The nearest risk of shared platforms is a fault that spreads. Rules on operational resilience, authorisation, switching and sovereignty are being set at the same time.

14.5hours

AWS us-east-1 event, October 202520

7.5hours

Google Cloud incident, June 202521

3.2hours

Cloudflare event until core traffic restored, November 202522

Table 8.5State at baseline
ComponentStateEvidenceStatus
Operator eventsthree large events in 2025, each traced to an internal fault by its operator202122Reported
Financial sector oversightDORA applies from 17 January 2025; no designations on the page read1738Reported
AuthorisationFedRAMP 20x in its wide-scale adoption phase in 202624Reported
Sovereigntya company EU sovereign cloud and a proposed EU autonomy framework1823Reported

Couplings

  • INF → DAT shared-platform faults
  • GOV → DAT switching and location rules
  • GOV → TRD sovereignty rules

Evidence to bind in 2027

  • dependence of public services
  • customer impact of events

Related editions

  • GLB Global Systems
  • GS-02 Energy
  • GS-13 Cyber and Digital Systems
  • SR-10 Digital Public Infrastructure and Systemic Cyber Risk
  • XT-06 Advanced Semiconductors and AI Compute
  • XT-07 HPC and Advanced Computing

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
  2. 29Cloud Native Computing Foundation (ed.), CNCF Annual Survey 2024 (report page; tenth annual survey; 750 respondents in fall 2024; Kubernetes percentage not on the page). CNCF, San Francisco. Observation year 2024. Accessed 2026-11-03.back
  3. 25NIST (ed.), The NIST Definition of Cloud Computing, NIST SP 800-145 (publication page; September 2011; five essential characteristics, three service models and four deployment models). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03.back
  4. 26NIST (ed.), Cloud Computing Synopsis and Recommendations, NIST SP 800-146 (publication page; May 2012). National Institute of Standards and Technology, Gaithersburg. Observation year 2012. Accessed 2026-11-03.back
  5. 27NIST (ed.), NIST Cloud Computing Reference Architecture, NIST SP 500-292 (publication page; 8 September 2011). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03.back
  6. 30ETSI (ed.), Multi-access Edge Computing (technology page; industry specification group; news item of 31 October 2025 on Phase 4 specifications and a white paper; no counts on the page). European Telecommunications Standards Institute, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03.back
  7. 32UNVERIFIED, not opened: Satyanarayanan, M., The emergence of edge computing, Computer 50(1), 30 to 39, 2017, cited from memory. Observation year 2017. Accessed 2026-11-03.back
  8. 33UNVERIFIED, not opened: Shi, W., Cao, J., Zhang, Q., Li, Y. and Xu, L., Edge computing: vision and challenges, IEEE Internet of Things Journal 3(5), 637 to 646, 2016, cited from memory. Observation year 2016. Accessed 2026-11-03.back
  9. 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
  10. 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  11. 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
  12. 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
  13. 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
  14. 9UNVERIFIED, not opened: Uptime Institute (ed.), Global Data Center Survey 2025 (average PUE 1.54; power the cause of 45% of outages), taken from search-result summaries; the survey page returned an access error. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
  15. 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
  16. 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
  17. 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
  18. 43UNVERIFIED, not opened: Infocomm Media Development Authority (ed.), Green Data Centre Roadmap, Singapore, cited from memory; the page returned no content and no figure is used. IMDA, Singapore. Observation year 2024. Accessed 2026-11-03.back
  19. 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  20. 23Amazon Web Services (ed.), Opening the AWS European Sovereign Cloud (blog announcement of 14 January 2026; Brandenburg region; investment of EUR 7.8 billion stated; vendor announcement, weak evidence). Amazon Web Services, Seattle. Observation year 2026. Accessed 2026-11-03.back
  21. 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
  22. 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  23. 13The Register (ed.), Brussels eyes AWS, Azure for gatekeeper tag in cloud clampdown (news article of 18 November 2025; possible obligations and fines up to 10% of worldwide turnover; trade press, secondary). Situation Publishing, London. Observation year 2025. Accessed 2026-11-03.back
  24. 28Armbrust, M. et al., Above the Clouds: A Berkeley View of Cloud Computing, Technical Report UCB/EECS-2009-28, 10 February 2009 (report page and abstract). University of California, Berkeley. Observation year 2009. Accessed 2026-11-03.back
  25. 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
  26. 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
  27. 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
  28. 17European Securities and Markets Authority (ed.), Digital Operational Resilience Act (page; applies from 17 January 2025; lists materials on critical ICT third-party provider designation; no designations on the page). ESMA, Paris. Observation year 2025. Accessed 2026-11-03.back
  29. 38UNVERIFIED, not opened: Regulation (EU) 2022/2554 on digital operational resilience for the financial sector (DORA), Official Journal of the European Union, 2022, cited from memory; the ESMA page [17] was read instead. Observation year 2022. Accessed 2026-11-03.back
  30. 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03.back

Methodology

How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.

15 min read0 figures13 tables22 notesNR-XTECH-CLOUD-GLOBAL-2026-BASELINE

A.1Methods

The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.

Table A.1Methods
No.DerivationCalculationResult
(1)Growth of Microsoft electricity consumed within the organisation, FY2023 to FY202429,829,540 ÷ 23,567,502 − 126.6%
(2)Share of the three largest providers, and the remainder, Q2 202628 + 20 + 15; 100 − 6363%; 37%
(3)Duration of the AWS event, 11:48 PM to 2:20 PM PDT14 h 32 min = 14.53 h≈ 14.5 hours
(4)Microsoft electricity consumed, FY2024 against FY202029,829,540 ÷ 10,770,714about 2.8 times
Table A.2Coupling strength scale (matrix and model card)
StrengthDefinition
STRONGa disruption in the source system has historically changed the target system’s service or output within one season, in more than one region
MODERATEan effect is documented but buffered or slower
WEAKan effect is plausible but not documented at global scale
Table A.3Status grammar
LabelRule
Reportedvalue as issued by its source, with year
Inferredreasoned from cited evidence; never a measurement
EstimatedNexus analytical value with stated method
Scenarioconditional on stated assumptions
Expert inputstructured editorial judgement awaiting evidence

A.2Model card, Cloud System Model v0

Model ID
MDL-XT08-CLOUD · v0.1
Purpose
represent cloud, edge and distributed computing as infrastructure coupled to electricity, cooling water, finance, workforce and cyber resilience
Family
graph-based system of systems
Inputs
the cited sources of this edition; no proprietary data
Method
expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
Validation
none yet, first validation against federation evidence in 2027
Uncertainty
qualitative; strengths are hypotheses, not measurements
Domain of validity
global scale; not for asset-, site- or country-level use
Reproducibility
strength table and sources published in this edition
20couplings

typed in v0

0strong

documented within one season

2moderate

documented, buffered

18weak

plausible, undocumented

A.3The baseline evidence cut

Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.

Cut ID
DC-XTECH-CLOUD-GLOBAL-2026-B0
Type
baseline documentary cut
Resolution policy
pinned · as of 30 September 2026
Sources pinned
43 cited sources, each at the edition and access date in the references
Model runs
none at baseline, analytical values are stated with their method
Digest
computed at freeze and recorded in the publication record
Supersedes
nothing, first cut of the series
Superseded by
the 2027 cloud annual cut

Lineage

  1. 01

    source edition

  2. 02

    pinned citation

  3. 03

    finding

  4. 04

    page

  5. 05

    publication record

Table A.4From the baseline cut to the federation cut
ElementBaseline 20262027 global annual
Sourcescited global publications, pinned by editionnational, regional and sector cuts through one graph
Analysisstated methods and editorial estimatestyped analysis specifications
ModelsCloud System Model v0 specificationmodel runs with receipts
Findingstwelve baseline findingsfindings re-bound to federation evidence
Reviewfive passes scheduledfive passes on the exact digest

A.4Evidence age and coverage

A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.

Table A.5Evidence age and coverage
IndicatorObservedReleasedCadenceNext release
US data centre report2023Dec 2024periodicnext national update
Global electricity report20242025periodicnext IEA update
Irish metered electricity2024June 2025annualnext CSO release
Operator environmental reports20242025annualnext annual reports
Cloud market releaseQ2 2026July 2026quarterlynext quarter
UK competition decision2025July 2025one-offstrategic market status outcome
EU DMA investigations2025Nov 2025per releasedesignation decision
AWS event report2025Oct 2025per eventnext post-event report
Table A.6Coverage by system at baseline
SystemCoverageThinnest dimension
ElectricityPARTIALsite-level load on a common basis
WaterTHINcomparable water metrics
Market and lawGOODoutcomes of reviews and proposals
ResiliencePARTIALdependence of public services
EfficiencyPARTIALcommon PUE baseline
EdgeTHINdeployment and energy data
SkillsTHINworkforce numbers
Hardware and mineralsTHINsupply dependence
Table A.7Designed empty states: what is not bound, what would fill it and why
FieldSource that would fill itBlocker
Site-level electricity, cooling and water use on a common basisoperators, regulators under EU reporting rules, national laboratoriesoperator reports use different boundaries and years; EU reported data not retrieved1935
IEA Energy and AI figures from the report itselfIEA Energy and AI report1the report pages returned access errors; figures come from search summaries
Uptime Institute survey figures from the report itselfUptime Institute Global Data Center Survey 20259the survey page returned an access error; PUE and outage shares come from search summaries and are not used in findings
Outcome of the UK strategic market status process for Microsoft and AWSUK CMA and Digital Markets Unit publications1139the case page read gives a Q1 2026 decision point; the outcome was not retrieved
Commission preliminary findings on AWS and Azure under the DMAEuropean Commission press release1214reported in trade press summaries; the Commission text was not opened
Text of the proposed Cloud and AI Development ActEuropean Commission proposal18proposal read through a press report; target years differ across secondary sources
Designation of critical ICT third-party providers under DORAEuropean Supervisory Authorities1738the page read lists no designations; not retrieved
Dependence of public services on a few providersnational audit bodies, regulators, operatorsno consolidated series found
Customer impact of the 2025 eventsoperators, customers, regulators202122incident reports state causes and times, not customer counts
Edge computing sites, devices and energy usetelecom operators, industry bodies30specifications read; no deployment figures retrieved
Grid connection queues and load forecasts for new facilitiesgrid operators and regulatorsnot retrieved
Hardware, chip and mineral dependence of data centresindustry and trade statisticsnot retrieved; see the semiconductors edition for the chip layer
Cloud and data centre workforce size and skills gapsnational statistics, industry surveysnot retrieved; capability rung stays LISTED
Share of data centre electricity due to AI workloadsIEA, operators, national laboratories12not split in the sources read here

A.5Evidence cards, two anchor sources

Published by Amazon Web Services. One-off post-event summary. Role: binds INF-011 and the resilience tiles. Coverage: one region, services listed with start and end times.

EVD-XT08-001

AWS summary of the us-east-1 event of 19 and 20 October 202520

Published by Lawrence Berkeley National Laboratory on 19 December 2024 and summarised by the US Department of Energy. Periodic. Role: binds ENE-002. Coverage: United States, 2014 to 2023 with a scenario range to 2028.

EVD-XT08-002

2024 United States Data Center Energy Usage Report23

Table A.8Quality dimensions at baseline
DimensionEVD-XT08-001EVD-XT08-002
Completenessservices and times listed for one regionnational total with a scenario range
Timelinessabout one week after the eventabout one year after the data year
Revisionlater revisions not checkedsingle edition read
Method transparencycause described in prosemethod in the full report, not opened
External validationoperator-reported onlylaboratory report; peer review not stated

Evidence cards to follow in 2027

  • Synergy10: provider definitions and method
  • IEA1: report text and scenarios
  • European Commission18: proposal text
  • Operator reports567: boundaries for PUE and water

A.6Publication acceptance record

Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.

Table A.9Publication acceptance record
GroupAreaItemsPassN/APending
D1Identity and scope8800
D2Source and data12912
D3Analysis and models12381
D4Findings and claims9801
D5Figures, tables, maps10622
D6Editorial and citations10802
D7Review and approval130013
D8Artefact and design12705
D9Registry and release9009

Publication gate

Conditions met
14 of 23 at evidence close
Blocking problems
none recorded
Open conditions
reviews, approval of the exact digest, deposit, registry pointer

Not applicable at baseline

Model runs
first runs in Q1 2027
Maps
plates in Q2 2027
Waivers
none

A.7Status words

Table A.10The status every value carries
StatusWhat it means
ObservedMeasured directly and published by the source.
ReportedPublished statistics of an official or institutional source.
DeclaredStated by the body concerned; not independently measured.
EstimatedA Nexus estimate from cited evidence, with its method in Annex A.
ModelledProduced by a stated model from cited inputs.
InferredReasoned from cited evidence; not measured.
ForecastA projection by the cited source.
SimulatedA simulation result under stated assumptions.
ScenarioA conditional statement under stated assumptions; never a prediction.
Expert inputExpert judgement, recorded with its basis.
CandidateProposed for a later edition; not yet evidence.
Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject.

A.8How the edition is made, released and corrected

Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.

StepWhat happensSource
01 Evidence arrives from the pillarsFoundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s.
02 The cut is sealedOn the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on.
03 The edition is assembledThe edition is drafted from its template and content pack. Agents may draft; they never publish and never decide.
04 The keys turnAt the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward.
05 The gate opensA named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit.
06 Signed and depositedThe PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI.
07 Published on its desk’s siteOnly then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part.
08 Corrections go to StandardsMethod and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut.

A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).

Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.

A.9Glossary and abbreviations

Table A.11Series terms
TermMeaning
Baseline Editionthe inaugural annual edition that fixes the reference state for the series
WEFH+Bwater, energy, food, health and biodiversity, the national nexus core
Couplinga typed dependency through which one system transmits to another
Protection gapthe share of losses not covered by insurance
Capability ladderLISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED
EQLevidence-quality level, 1–5
Evidence cuta frozen resolution of exact sources and versions
NNC · NLC · NWGNational Nexus Consortium · National Leadership Council · National Working Groups
Table A.12Abbreviations used in this edition
AbbreviationExpansion
CADACloud and AI Development Act
CMACompetition and Markets Authority
DMADigital Markets Act
DNSDomain Name System
DORADigital Operational Resilience Act
EDGEcomputing at or near the data source
FYfiscal year
MECMulti-access Edge Computing
MLmegalitre
PUEpower usage effectiveness
TWhterawatt-hour
WUEwater use effectiveness

A.10Technical annex

Table A.13Technical annex
ItemAnnexContentsStatus
A.1Indicator definitionsthe global indicator set, with units and sourcesIN THIS EDITION
A.2Coupling strengthsthe twenty-cell matrix and its rationaleIN THIS EDITION
A.3Scenario specificationSCN-XT08-DEP-01 assumptions and signpostsIN THIS EDITION
A.4Capability placementsrung evidence for fifteen functionsIN THIS EDITION
A.5Model diagnosticsfirst runs and validation2027
A.6Sensitivity analysesinfluence of coupling strengths2027
A.7Cluster notescards for the major data centre and cloud region clusters2027
A.8Review statementspass-by-pass review recordAT RELEASE

A.1 · indicator definition: power usage effectiveness

Construct
ratio of total facility energy to the energy used by IT equipment
Unit
ratio, 1.0 or higher
Method
continuous metering at the facility, as described by one operator5
Source
operator environmental reports57; definition in ISO/IEC 30134-241
Uncertainty
boundaries differ by operator; reported industry averages range from 1.25 to 1.56
Known limits
says nothing about water, carbon or the useful work done

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 19European Commission (ed.), Energy Efficiency Directive (policy page; states a data centre energy efficiency package planned for the third quarter of 2026 and links to reporting of data centre energy consumption; no threshold or dates on the page). Directorate-General for Energy, Brussels. Observation year 2026. Accessed 2026-11-03.back
  2. 35UNVERIFIED, not opened: Directive (EU) 2023/1791 on energy efficiency, Article 12 on data centre reporting, Official Journal of the European Union, 2023, cited from memory; the page returned no content. Observation year 2023. Accessed 2026-11-03.back
  3. 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
  4. 9UNVERIFIED, not opened: Uptime Institute (ed.), Global Data Center Survey 2025 (average PUE 1.54; power the cause of 45% of outages), taken from search-result summaries; the survey page returned an access error. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
  5. 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
  6. 39UNVERIFIED, not opened: UK Competition and Markets Authority (ed.), Cloud services market investigation final decision report, 31 July 2025 and 1 August 2025, cited from the case page [11]; the report documents were not opened. Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
  7. 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  8. 14UNVERIFIED, not opened: trade press reports of mid-2026 that the Commission informed Amazon and Microsoft of a preliminary view that they should be designated as gatekeepers for cloud, taken from search-result summaries; the one article fetched returned an access error. Observation year 2026. Accessed 2026-11-03.back
  9. 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
  10. 17European Securities and Markets Authority (ed.), Digital Operational Resilience Act (page; applies from 17 January 2025; lists materials on critical ICT third-party provider designation; no designations on the page). ESMA, Paris. Observation year 2025. Accessed 2026-11-03.back
  11. 38UNVERIFIED, not opened: Regulation (EU) 2022/2554 on digital operational resilience for the financial sector (DORA), Official Journal of the European Union, 2022, cited from memory; the ESMA page [17] was read instead. Observation year 2022. Accessed 2026-11-03.back
  12. 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
  13. 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
  14. 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
  15. 30ETSI (ed.), Multi-access Edge Computing (technology page; industry specification group; news item of 31 October 2025 on Phase 4 specifications and a white paper; no counts on the page). European Telecommunications Standards Institute, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03.back
  16. 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
  17. 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  18. 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
  19. 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
  20. 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
  21. 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
  22. 41UNVERIFIED, not opened: ISO and IEC (eds.), ISO/IEC 30134-2 Information technology, data centres, key performance indicators, part 2, power usage effectiveness (PUE), cited from memory. International Organization for Standardization, Geneva. Observation year 2016. Accessed 2026-11-03.back

Data appendix

The indicator set with its sources, the source registers, the licences of every kind of material and the formats of the edition.

11 min read0 figures8 tables19 notesNR-XTECH-CLOUD-GLOBAL-2026-BASELINE

B.1The indicator set

Table B.1Global baseline indicator set
IndicatorValueUnitYearStateSource
Global data centre electricity use415TWh2024Reported1
Share of global electricity1.5%2024Reported1
IEA base case for data centre electricity945TWh2030 base caseScenario1
US data centre electricity use176TWh2023Reported2
US data centre share of electricity4.4%2023Reported3
US projected share, low to high6.7 to 12%ScenarioScenario3
Ireland data centre share of metered electricity22%2024Reported4
Google data centre electricity growth27%2024Reported5
Google fleet PUE1.09ratio2024Reported5
AWS PUE1.15ratio2024Reported7
AWS water use effectiveness0.15L per kWh2024Reported7
Microsoft electricity consumed within the organisation29.8TWhFY2024Reported6
Microsoft water consumption5,807megalitresFY2024Reported6
Cloud infrastructure revenue, quarter143.4USD billionQ2 2026Reported10
Cloud revenue growth on the year43%Q2 2026Reported10
AWS us-east-1 event duration14.5hours2025Reported20

B.2Global source register

The governed source set behind this edition. Each source keeps its authority, coverage, cadence and role; categories describe origin, not truth.

Domains bound by the register

  • ENE
  • INF
  • FIN
  • GOV
  • WAT
  • DAT
  • AIC
  • CLI
  • TRD
  • HLT
Table B.3Global source register
SourceCategoryCoveragePeriodCadenceRole
IEA Energy and AI1intergovernmental agencyglobal2024periodicelectricity
LBNL report and DOE summary23national laboratory and ministryUS2023periodicelectricity
CSO metered electricity4national statistics officeIreland2024annualgrid share
Google environmental report5operator reportglobal2024annualelectricity, PUE, water
Microsoft environmental fact sheet6operator reportglobalFY2024annualelectricity, water
Amazon sustainability report7operator reportglobal2024annualPUE, WUE
Synergy Research release10industry analystglobal2026quarterlymarket shares
UK CMA case page11competition authorityUK2025one-offcompetition
AWS, Google Cloud and Cloudflare reports202122operatorsglobal2025per eventresilience
EU Data Act pages1516EU institutionEU2025continuousswitching

B.3Regional reading, cloud across ten clusters

Regional plates follow with the regional editions. This page gives the regional reading of cloud and distributed computing in table form and ranks no region.

Table B.4Regional reading, cloud across ten clusters
RegionPrincipal hazardsSystems most exposedBaseline evidence
North Americahyperscale hosting; federal authorisation reformenergy, resilienceLBNL2; FedRAMP24
South Americaregional evidence not boundregional evidence (not bound)regional evidence (not bound)
EuropeData Act, DMA reviews, DORA and CADA proposal; high grid share in Irelandregulation, gridEuropean Commission121618; CSO4
Eurasiaregional evidence not boundregional evidence (not bound)regional evidence (not bound)
Middle East and North Africaregional evidence not boundregional evidence (not bound)regional evidence (not bound)
Africaregional evidence not boundregional evidence (not bound)regional evidence (not bound)
South Asiaregional evidence not boundregional evidence (not bound)regional evidence (not bound)
East Asiaregional evidence not boundregional evidence (not bound)regional evidence (not bound)
ASEANdata centre growth and efficiency roadmap in Singaporeenergy, sitingIMDA43
Oceania-Pacificregional evidence not boundregional evidence (not bound)regional evidence (not bound)

B.4Cluster card: data centres in a national grid, Ireland

  • grid
  • electricity share
  • permits
  • efficiency rules
Systems in view
data centres, national grid, cloud regions
Defining events
data centres at 22% of metered electricity in 20244
Couplings
ENE → INF grid share; INF → ENE load
Capability evidence
EU reporting rules and a planned efficiency package19
Gaps
site-level load; connection queues; water use
Agenda items
C-02 · C-03

Data centres used 22% of metered electricity in Ireland in 2024 and 21% in 2023 [4].

GRID

Share of metered electricity

The Commission planned a data centre energy efficiency package for the third quarter of 2026 [19].

RULES

Reporting and efficiency

The proposed Cloud and AI Development Act sets a 12-month maximum permit procedure for projects under it, as reported [18].

PERMITS

Proposed permitting

B.5How countries appear in the cloud edition

Countries enter the cloud edition through the readiness chapters of their own national editions, on one card grammar. They are read against peer distributions and thresholds, never ranked.

Table B.5How countries appear in the cloud edition
Card fieldWhat it showsSource
WEFH+B stateeach core system against peer distribution bandsnational edition
Couplingsthe national dependency matrixnational edition
Risk objectsthe national risk portfolionational edition
Capability rungsthe national capability laddernational edition
Evidence ageoldest and newest source datesnational source register

Editions in the 2026 Baseline programme

26national

countries and unions

10regional

clusters

16global

flagship and sector

14strategic

systems reports

20frontier

technology reports

How to read a country card

  • Each system is shown against the distribution of its peers, with thresholds where they exist
  • Couplings and risk objects come from the country’s own national edition
  • Capability rungs record evidence, not a judgement of institutions
  • Evidence age is printed, so older national data are visible as such
Table B.6National Baseline Editions in the 2026 programme
WaveCountries and unionsState
W0CanadaISSUED
W1United States, United Kingdom, France, Germany, Italy, Japan, European Union, SwitzerlandPLANNED
W2Mexico, Brazil, Argentina, Türkiye, Russian Federation, Saudi Arabia, United Arab Emirates, South Africa, Senegal, Kenya, African Union, India, China, Republic of Korea, Indonesia, Singapore, AustraliaPLANNED

B.6Licences

Table B.7Licences of each kind of material
MaterialLicence
TextCC BY 4.0
Dataon the licence of each source; Nexus tables CC BY 4.0
FiguresNexus figures CC BY 4.0; third-party as credited
Mapsboundary source and licence printed on each plate
MetadataCC0 1.0, as Zenodo publishes it
Third-party data, figures and textThe source’s own licence, credited where it is used; never relicensed
Nexus-authored text, tables and figures: CC BY 4.0 (SPDX CC-BY-4.0). Map plates print their boundary source and licence.

B.7Formats and provenance

Table B.8This edition in every format
FormatKindStateWhat it isIdentifier
Web editionHTMLOn this siteDraft in stewardship review; every value resolves to its source.NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0
Print editionPDFAt releaseA4 portrait · screen, print and archival PDF, signed with the web edition at release.NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0
Indicator dataCSV · JSONOn this site16 indicators with unit, year, status and source; the machine-readable copy ships with the evidence bundle at release.NR-XTECH-CLOUD-GLOBAL-2026-BASELINE data release v1
FiguresSVG · PNGOn this site4 on the web edition: headline figure, figure 1.3, coupling instrument, capability ladder.FIG-XTECH-CLOUD-GLOBAL-2026-BASELINE-*
SlidesPDFNot recordedNo slide deck is recorded for this edition.
Evidence briefHTML · PDFNot recordedNo evidence brief is recorded for this edition.
Dataset with DOIDataCiteAt releaseConcept and version DOI are minted at deposit; none is recorded yet.

Provenance

Edition pack
The edition’s content pack (JSON), from which the print and web editions are built
Evidence cut
DC-XTECH-CLOUD-GLOBAL-2026-B0, closed 30 September 2026
Reproducibility
sourced values cited; analytical values reproducible from stated parameters
Self-check
14 of 23 at evidence close; a fail on any item blocks release
Review
five passes scheduled before release (in Annex C)
Publisher of record
GCRI for the Nexus Consortium
Corrections
Registry correction pathway; upheld corrections are published as notices with a new version

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
  2. 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
  3. 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  4. 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
  5. 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
  6. 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
  7. 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
  8. 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
  9. 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
  10. 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
  11. 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
  12. 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
  13. 15European Commission (ed.), Data Act (policy page; applicable from 12 September 2025; entered into force in January 2024). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  14. 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  15. 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03.back
  16. 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  17. 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
  18. 43UNVERIFIED, not opened: Infocomm Media Development Authority (ed.), Green Data Centre Roadmap, Singapore, cited from memory; the page returned no content and no figure is used. IMDA, Singapore. Observation year 2024. Accessed 2026-11-03.back
  19. 19European Commission (ed.), Energy Efficiency Directive (policy page; states a data centre energy efficiency package planned for the third quarter of 2026 and links to reporting of data centre energy consumption; no threshold or dates on the page). Directorate-General for Energy, Brussels. Observation year 2026. Accessed 2026-11-03.back

References and record

Every source the edition rests on, the publication record, the corrections log and the open record.

15 min read0 figures1 table0 notesNR-XTECH-CLOUD-GLOBAL-2026-BASELINE

C.143 sources

NR-CIT-1, editor first. A DOI is linked where the source has one; Nexus records carry a UNI once the catalogue allocates it (NS-1).

  1. 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  2. 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Q Cited in the summary, chapter 2, chapter 3, chapter 4, chapter 6
  3. 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 6, chapter 8
  4. 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  5. 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  6. 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  7. 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 4, chapter 6, chapter 8
  8. 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  9. 9UNVERIFIED, not opened: Uptime Institute (ed.), Global Data Center Survey 2025 (average PUE 1.54; power the cause of 45% of outages), taken from search-result summaries; the survey page returned an access error. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 6, chapter 8
  10. 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  11. 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  12. 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  13. 13The Register (ed.), Brussels eyes AWS, Azure for gatekeeper tag in cloud clampdown (news article of 18 November 2025; possible obligations and fines up to 10% of worldwide turnover; trade press, secondary). Situation Publishing, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 8
  14. 14UNVERIFIED, not opened: trade press reports of mid-2026 that the Commission informed Amazon and Microsoft of a preliminary view that they should be designated as gatekeepers for cloud, taken from search-result summaries; the one article fetched returned an access error. Observation year 2026. Accessed 2026-11-03. Cited in chapter 2
  15. 15European Commission (ed.), Data Act (policy page; applicable from 12 September 2025; entered into force in January 2024). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 6
  16. 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  17. 17European Securities and Markets Authority (ed.), Digital Operational Resilience Act (page; applies from 17 January 2025; lists materials on critical ICT third-party provider designation; no designations on the page). ESMA, Paris. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
  18. 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03. Cited in chapter 1, chapter 3, chapter 4, chapter 6, chapter 8
  19. 19European Commission (ed.), Energy Efficiency Directive (policy page; states a data centre energy efficiency package planned for the third quarter of 2026 and links to reporting of data centre energy consumption; no threshold or dates on the page). Directorate-General for Energy, Brussels. Observation year 2026. Accessed 2026-11-03. Cited in chapter 4, chapter 6
  20. 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 7, chapter 8
  21. 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 7, chapter 8
  22. 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6, chapter 7, chapter 8
  23. 23Amazon Web Services (ed.), Opening the AWS European Sovereign Cloud (blog announcement of 14 January 2026; Brandenburg region; investment of EUR 7.8 billion stated; vendor announcement, weak evidence). Amazon Web Services, Seattle. Observation year 2026. Accessed 2026-11-03. Cited in chapter 4, chapter 8
  24. 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
  25. 25NIST (ed.), The NIST Definition of Cloud Computing, NIST SP 800-145 (publication page; September 2011; five essential characteristics, three service models and four deployment models). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
  26. 26NIST (ed.), Cloud Computing Synopsis and Recommendations, NIST SP 800-146 (publication page; May 2012). National Institute of Standards and Technology, Gaithersburg. Observation year 2012. Accessed 2026-11-03. Cited in chapter 6, chapter 8
  27. 27NIST (ed.), NIST Cloud Computing Reference Architecture, NIST SP 500-292 (publication page; 8 September 2011). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03. Cited in chapter 6, chapter 8
  28. 28Armbrust, M. et al., Above the Clouds: A Berkeley View of Cloud Computing, Technical Report UCB/EECS-2009-28, 10 February 2009 (report page and abstract). University of California, Berkeley. Observation year 2009. Accessed 2026-11-03. Cited in chapter 3, chapter 4, chapter 6, chapter 8
  29. 29Cloud Native Computing Foundation (ed.), CNCF Annual Survey 2024 (report page; tenth annual survey; 750 respondents in fall 2024; Kubernetes percentage not on the page). CNCF, San Francisco. Observation year 2024. Accessed 2026-11-03. Cited in chapter 3, chapter 6, chapter 8
  30. 30ETSI (ed.), Multi-access Edge Computing (technology page; industry specification group; news item of 31 October 2025 on Phase 4 specifications and a white paper; no counts on the page). European Telecommunications Standards Institute, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
  31. 31UNVERIFIED, not opened: Masanet, E., Shehabi, A., Lei, N., Smith, S. and Koomey, J., Recalibrating global data centre energy-use estimates, Science 367, 984 to 986, 2020, cited from memory; the page returned an access error. Observation year 2020. Accessed 2026-11-03. Cited in chapter 4, chapter 6
  32. 32UNVERIFIED, not opened: Satyanarayanan, M., The emergence of edge computing, Computer 50(1), 30 to 39, 2017, cited from memory. Observation year 2017. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
  33. 33UNVERIFIED, not opened: Shi, W., Cao, J., Zhang, Q., Li, Y. and Xu, L., Edge computing: vision and challenges, IEEE Internet of Things Journal 3(5), 637 to 646, 2016, cited from memory. Observation year 2016. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
  34. 34UNVERIFIED, not opened: Barroso, L.A., Clidaras, J. and Hölzle, U., The Datacenter as a Computer: Designing Warehouse-Scale Machines, third edition, Morgan and Claypool, 2018, cited from memory. Observation year 2018. Accessed 2026-11-03. Cited in chapter 4, chapter 6
  35. 35UNVERIFIED, not opened: Directive (EU) 2023/1791 on energy efficiency, Article 12 on data centre reporting, Official Journal of the European Union, 2023, cited from memory; the page returned no content. Observation year 2023. Accessed 2026-11-03. Cited in chapter 4, chapter 6
  36. 36UNVERIFIED, not opened: Commission Delegated Regulation (EU) 2024/1364 on the first phase of the establishment of a common Union rating scheme for data centres, 2024, cited from memory; the page returned no content. Observation year 2024. Accessed 2026-11-03. Cited in chapter 6
  37. 37UNVERIFIED, not opened: Regulation (EU) 2023/2854 (Data Act), Official Journal of the European Union, 2023, cited from memory; the page returned no content, and the policy pages [15] [16] were read instead. Observation year 2023. Accessed 2026-11-03. Cited in chapter 6
  38. 38UNVERIFIED, not opened: Regulation (EU) 2022/2554 on digital operational resilience for the financial sector (DORA), Official Journal of the European Union, 2022, cited from memory; the ESMA page [17] was read instead. Observation year 2022. Accessed 2026-11-03. Cited in chapter 6, chapter 8
  39. 39UNVERIFIED, not opened: UK Competition and Markets Authority (ed.), Cloud services market investigation final decision report, 31 July 2025 and 1 August 2025, cited from the case page [11]; the report documents were not opened. Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.
  40. 40UNVERIFIED, not opened: Microsoft (ed.), Azure Front Door incident reports of October 2025, cited from memory; the page returned an error and no figure is used. Microsoft, Redmond. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4
  41. 41UNVERIFIED, not opened: ISO and IEC (eds.), ISO/IEC 30134-2 Information technology, data centres, key performance indicators, part 2, power usage effectiveness (PUE), cited from memory. International Organization for Standardization, Geneva. Observation year 2016. Accessed 2026-11-03. Cited in chapter 6
  42. 42UNVERIFIED, not opened: ISO and IEC (eds.), ISO/IEC 22123-1 Cloud computing, part 1, vocabulary, cited from memory. International Organization for Standardization, Geneva. Observation year 2023. Accessed 2026-11-03. Cited in chapter 6
  43. 43UNVERIFIED, not opened: Infocomm Media Development Authority (ed.), Green Data Centre Roadmap, Singapore, cited from memory; the page returned no content and no figure is used. IMDA, Singapore. Observation year 2024. Accessed 2026-11-03. Cited in chapter 6, chapter 8

C.2Publication record

Publication

Title
Exponential Technology Report 2026: Cloud, Edge and Distributed Computing, Baseline Edition
Series
Reports · Exponential Technology Series XT-08
Edition
Baseline Edition 2026 · inaugural annual
Version
v1.0.0 · draft for stewardship review
Publication ID
NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0
Evidence close
30 September 2026
Publication date
October 2026
DOI
concept and version DOI at deposit

Publisher

Publisher of record
The Global Centre for Risk and Innovation (GCRI), for the Nexus Consortium
Place
Toronto
Editor
Saeed Valadbaygi, Chief Steward and Managing Editor
Stewards
GCRI · technical truth · GRF · public meaning · GRA · capital meaning
Licence
text CC BY 4.0; data on the terms of each source
Copyright
© 2026 GCRI · Nexus Consortium
Language
English (en-GB) source edition
Correspondence
Registry correction pathway · editorial office

Colophon

Format
A4 portrait · screen, print and archival PDF
Typefaces
Space Grotesk (display) · Geist (text) · IBM Plex Sans Italic (standfirsts) · IBM Plex Mono (data)
Design standard
Reports Foundational Edition, Volume I, Part VII
Accessibility
tagged PDF and HTML targets; text alternatives for every figure
Production
Reports editorial team, GCRI

Release path for this version

Table C.1Release path for this version
StepWhat happensWhen
Drafteditorial self-check complete at evidence closeOctober 2026
Steward reviewfive passes on the exact draft (keys T · M · F · N)Q4 2026
Approvalpublication authority approves the exact digestbefore release
Depositconcept and version DOI minted; registry pointer setat release
Successionthe 2027 cloud edition reports changes against this baseline2027
Current version
v1.0.0 draft, stewardship review
Previous edition
none, first edition of the series
Next edition
NR-XTECH-CLOUD-GLOBAL-2027-v1.0.0
Latest version
resolve the concept DOI or the registry record
Correction route
Registry correction pathway
Notice types
erratum · addendum · supersession · withdrawal

C.3Corrections log

0correction notices. No edition has been released yet, so none can be corrected; the log below lists each edition’s current version.

EditionVersionDateStateChangeNotice
XT-08NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0October 2026DraftBaseline Edition 2026, inaugural annual edition,None

Notice types: erratum, addendum, supersession, withdrawal. A correction is a new version with a published notice; the earlier version stays resolvable, and no edition is ever edited in silence.

C.4Open record

This edition’s open record

Publication ID
NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0
Desk identifier and series alias
NR-XTC-XT-08-2026-BL
Collection
None
DOI
Concept and version DOI at deposit, on Zenodo with DataCite metadata
Versions
Each correction is a new version (isNewVersionOf); the concept DOI resolves to the latest
Bundle
RO-Crate 1.2 with CITATION.cff, CodeMeta and PROV-O provenance; a signed manifest
Licence
CC BY 4.0 (SPDX CC-BY-4.0) for original material; metadata CC0 1.0

Credit and identity

ORCID
Your iD in the deposit and the contribution record; DataCite can then add the work to your ORCID record
ROR
Your organisation by its ROR identifier, never by a typed name alone
CRediT
Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualisation, Writing, review and editing
Account
None needed to contribute; never a password

Find and follow

Search the open indexes for Cloud, Edge and Distributed Computing; software is cited by its SWHID from Software Heritage, and a quantified scenario run is preregistered on OSF before it is run. Annotation is your choice: Hypothesis opens this page in its own viewer.

Mirrors and harvest

The DOI is canonical. At release each signed bundle is also given an IPFS content identifier and a bloxberg anchor as mirrors; both are listed in the record once they exist. Zenodo exposes every record over OAI-PMH, and reviews and endorsements can arrive through COAR Notify where the repository supports it.

InvenioRDM metadata for a contribution on Cloud, Edge and Distributed Computing, prefilled from this page
{
  "metadata": {
    "resource_type": {
      "id": "dataset"
    },
    "title": "Evidence on Cloud, Edge and Distributed Computing for Nexus Reports",
    "publication_date": "YYYY-MM-DD",
    "creators": [
      {
        "person_or_org": {
          "type": "personal",
          "family_name": "Your family name",
          "given_name": "Your given name",
          "identifiers": [
            {
              "scheme": "orcid",
              "identifier": "0000-0000-0000-0000"
            }
          ]
        },
        "affiliations": [
          {
            "id": "ROR identifier of your organisation"
          }
        ]
      }
    ],
    "description": "What it is, where its record is kept and how it bears on Exponential Technology Report 2026: Cloud, Edge and Distributed Computing.",
    "rights": [
      {
        "id": "cc-by-4.0"
      }
    ],
    "subjects": [
      {
        "subject": "Nexus Reports"
      },
      {
        "subject": "Cloud, Edge and Distributed Computing"
      },
      {
        "subject": "Exponential Technology Report · XT-08"
      }
    ],
    "related_identifiers": [
      {
        "identifier": "https://therisk.global/nexus-reports/editions/xt-08/",
        "scheme": "url",
        "relation_type": {
          "id": "issupplementto"
        },
        "resource_type": {
          "id": "publication-report"
        }
      }
    ],
    "version": "1.0.0"
  },
  "custom_fields": {},
  "access": {
    "record": "public",
    "files": "public"
  },
  "files": {
    "enabled": true
  },
  "parent": {
    "communities": {
      "default": "nexusreports"
    }
  }
}

C.5Where this edition sits among the six pillars

Foundry seals the evidence and Universe tests it; Reports publishes it; Standards takes its corrections and Academy teaches from it.

  1. F03 Sealed observations and indicator series Foundry Sealed observations and indicator series behind a profile (closeout).
  2. F04 After-action and scenario findings for Universe After-action and scenario findings for chapters 10 and 13 (after action review).
  3. F05 National Portfolio movement for chapter Foundry National Portfolio movement for chapter 11 (after action review).
  4. Applied in editions Standards Nexus Standards: applied in editions.
  5. XT-08 edition Reports Cloud, Edge and Distributed Computing 2026, published in every format with its sources, citation and corrections.
  6. F06 Method and correction findings as change Standards Method and correction findings as change proposals (correction).
  7. F12 Q4 synthesis informs the next-year Universe Q4 synthesis informs the next-year mandate (renewal).
  8. Taught in the open Academy Risk Academy: taught in the open.

What Foundry and Universe hand to this edition, and what it hands to Standards, Universe and Academy. From the programme spine; XT-08 is a drafted Baseline Edition, so these handoffs run from its first operational quarter.

HandoffBetweenWhat crosses, and when
F03Foundry to ReportsSealed observations and indicator series behind a profile (closeout).
F04Universe to ReportsAfter-action and scenario findings for chapters 10 and 13 (after action review).
F05Foundry to ReportsNational Portfolio movement for chapter 11 (after action review).
RingNexus Standards to ReportsNexus Standards: applied in editions.
F06Reports to Nexus StandardsMethod and correction findings as change proposals (correction).
F12Reports to UniverseQ4 synthesis informs the next-year mandate (renewal).
RingReports to Risk AcademyRisk Academy: taught in the open.
ReportsContribute

Send evidence or a correction on Cloud, Edge and Distributed Computing.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the GCRI Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems Evidence deskExponential Technology

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

The Global Centre for Risk and Innovation

Science · evidence · measurement

Not for profit

Our articles, maps and twins are free to read and free to republish. Readers and partners keep it that way.

Partner with us

Who funds us

GCRI is a not-for-profit institution. To ask who funds a piece of work, use the funding questions form.

Independence

Editors and the expert reviewers named on each article decide what we publish. Funders and partners do not review or approve articles before publication.

Licence

Articles: CC BY 4.0. Figures, maps, twins and data: CC BY 4.0. Other uses: ask through the permissions form.