Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

Data appendix

The indicator set with its sources, the source registers, the licences of every kind of material and the formats of the edition.

11 min read0 figures8 tables19 notesNR-XTECH-CLOUD-GLOBAL-2026-BASELINE

المحتويات
  1. ·Edition home
  2. ·Executive summary
  3. 1Cloud is shared infrastructure with a physical footprint
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Shared control-plane fault with diverging sovereignty rules
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. Aالمنهجية
  12. BData appendix
    1. B.1 The indicator set
    2. B.2 Global source register
    3. B.3 Regional reading, cloud across ten clusters
    4. B.4 Cluster card: data centres in a national grid, Ireland
    5. B.5 How countries appear in the cloud edition
    6. B.6 Licences
    7. B.7 Formats and provenance
  13. CReferences and record
  14. ·Complete edition, for print

B.1The indicator set

Table B.1Global baseline indicator set
المؤشرالقيمةالوحدةالسنةالحالةالمصدر
Global data centre electricity use415TWh2024مُبلَّغ عنه1
Share of global electricity1.5%2024مُبلَّغ عنه1
IEA base case for data centre electricity945TWh2030 base caseالسيناريو1
US data centre electricity use176TWh2023مُبلَّغ عنه2
US data centre share of electricity4.4%2023مُبلَّغ عنه3
US projected share, low to high6.7 to 12%السيناريوالسيناريو3
Ireland data centre share of metered electricity22%2024مُبلَّغ عنه4
Google data centre electricity growth27%2024مُبلَّغ عنه5
Google fleet PUE1.09نسبة2024مُبلَّغ عنه5
AWS PUE1.15نسبة2024مُبلَّغ عنه7
AWS water use effectiveness0.15L per kWh2024مُبلَّغ عنه7
Microsoft electricity consumed within the organisation29.8TWhFY2024مُبلَّغ عنه6
Microsoft water consumption5,807megalitresFY2024مُبلَّغ عنه6
Cloud infrastructure revenue, quarter143.4USD billionQ2 2026مُبلَّغ عنه10
Cloud revenue growth on the year43%Q2 2026مُبلَّغ عنه10
AWS us-east-1 event duration14.5ساعات2025مُبلَّغ عنه20

B.2Global source register

The governed source set behind this edition. Each source keeps its authority, coverage, cadence and role; categories describe origin, not truth.

Domains bound by the register

  • ENE
  • INF
  • FIN
  • GOV
  • WAT
  • DAT
  • AIC
  • CLI
  • TRD
  • HLT
Table B.3Global source register
المصدرالفئةالتغطيةPeriodوتيرة الإصدارالدور
IEA Energy and AI1intergovernmental agencyglobal2024دوريelectricity
LBNL report and DOE summary23national laboratory and ministryUS2023دوريelectricity
CSO metered electricity4national statistics officeآيرلندا2024سنويgrid share
Google environmental report5operator reportglobal2024سنويelectricity, PUE, water
Microsoft environmental fact sheet6operator reportglobalFY2024سنويelectricity, water
Amazon sustainability report7operator reportglobal2024سنويPUE, WUE
Synergy Research release10industry analystglobal2026فصليmarket shares
UK CMA case page11competition authorityUK2025one-offcompetition
AWS, Google Cloud and Cloudflare reports202122operatorsglobal2025لكل حدثresilience
EU Data Act pages1516EU institutionEU2025مستمرswitching

B.3Regional reading, cloud across ten clusters

Regional plates follow with the regional editions. This page gives the regional reading of cloud and distributed computing in table form and ranks no region.

Table B.4Regional reading, cloud across ten clusters
المنطقةPrincipal hazardsSystems most exposedBaseline evidence
أمريكا الشماليةhyperscale hosting; federal authorisation reformenergy, resilienceLBNL2; FedRAMP24
أمريكا الجنوبيةregional evidence not boundregional evidence (not bound)regional evidence (not bound)
أوروباData Act, DMA reviews, DORA and CADA proposal; high grid share in Irelandregulation, gridEuropean Commission121618; CSO4
Eurasiaregional evidence not boundregional evidence (not bound)regional evidence (not bound)
الشرق الأوسط وشمال أفريقياregional evidence not boundregional evidence (not bound)regional evidence (not bound)
أفريقياregional evidence not boundregional evidence (not bound)regional evidence (not bound)
جنوب آسياregional evidence not boundregional evidence (not bound)regional evidence (not bound)
شرق آسياregional evidence not boundregional evidence (not bound)regional evidence (not bound)
ASEANdata centre growth and efficiency roadmap in Singaporeenergy, sitingIMDA43
Oceania-Pacificregional evidence not boundregional evidence (not bound)regional evidence (not bound)

B.4Cluster card: data centres in a national grid, Ireland

  • grid
  • electricity share
  • permits
  • efficiency rules
Systems in view
data centres, national grid, cloud regions
Defining events
data centres at 22% of metered electricity in 20244
الاقترانات
ENE → INF grid share; INF → ENE load
Capability evidence
EU reporting rules and a planned efficiency package19
الفجوات
site-level load; connection queues; water use
Agenda items
C-02 · C-03

Data centres used 22% of metered electricity in Ireland in 2024 and 21% in 2023 [4].

GRID

Share of metered electricity

The Commission planned a data centre energy efficiency package for the third quarter of 2026 [19].

RULES

Reporting and efficiency

The proposed Cloud and AI Development Act sets a 12-month maximum permit procedure for projects under it, as reported [18].

PERMITS

Proposed permitting

B.5How countries appear in the cloud edition

Countries enter the cloud edition through the readiness chapters of their own national editions, on one card grammar. They are read against peer distributions and thresholds, never ranked.

Table B.5How countries appear in the cloud edition
Card fieldما يُظهرهالمصدر
WEFH+B stateeach core system against peer distribution bandsnational edition
الاقتراناتthe national dependency matrixnational edition
Risk objectsthe national risk portfolionational edition
Capability rungsthe national capability laddernational edition
Evidence ageoldest and newest source datesnational source register

Editions in the 2026 Baseline programme

26وطني

countries and unions

10regional

clusters

16global

flagship and sector

14strategic

النظم التقارير

20frontier

technology reports

How to read a country card

  • Each system is shown against the distribution of its peers, with thresholds where they exist
  • Couplings and risk objects come from the country’s own national edition
  • Capability rungs record evidence, not a judgement of institutions
  • Evidence age is printed, so older national data are visible as such
Table B.6National Baseline Editions in the 2026 programme
الموجةCountries and unionsالحالة
W0كنداISSUED
W1United States, United Kingdom, France, Germany, Italy, Japan, European Union, SwitzerlandPLANNED
W2Mexico, Brazil, Argentina, Türkiye, Russian Federation, Saudi Arabia, United Arab Emirates, South Africa, Senegal, Kenya, African Union, India, China, Republic of Korea, Indonesia, Singapore, AustraliaPLANNED

B.6التراخيص

Table B.7Licences of each kind of material
المادةالترخيص
النص⁨CC BY 4.0⁩
البياناتon the licence of each source; Nexus tables CC BY 4.0
الأرقامNexus figures CC BY 4.0; third-party as credited
الخرائطboundary source and licence printed on each plate
البيانات الوصفيةCC0 1.0, as Zenodo publishes it
Third-party data, figures and textThe source’s own licence, credited where it is used; never relicensed
Nexus-authored text, tables and figures: CC BY 4.0 (SPDX CC-BY-4.0). Map plates print their boundary source and licence.

B.7Formats and provenance

Table B.8This edition in every format
الصيغةالنوعالحالةما هوالمعرّف
Web editionHTMLفي هذا الموقعDraft in stewardship review; every value resolves to its source.NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0
Print editionPDFAt releaseA4 portrait · screen, print and archival PDF, signed with the web edition at release.NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-v1.0.0
Indicator dataCSV · JSONفي هذا الموقع16 indicators with unit, year, status and source; the machine-readable copy ships with the evidence bundle at release.NR-XTECH-CLOUD-GLOBAL-2026-BASELINE data release v1
الأرقامSVG · PNGفي هذا الموقع4 on the web edition: headline figure, figure 1.3, coupling instrument, capability ladder.FIG-XTECH-CLOUD-GLOBAL-2026-BASELINE-*
SlidesPDFغير مسجّلNo slide deck is recorded for this edition.
موجز الأدلةHTML · PDFغير مسجّلNo evidence brief is recorded for this edition.
Dataset with DOIDataCiteAt releaseConcept and version DOI are minted at deposit; none is recorded yet.

بيان المصدر

Edition pack
The edition’s content pack (JSON), from which the print and web editions are built
Evidence cut
DC-XTECH-CLOUD-GLOBAL-2026-B0, closed 30 September 2026
قابلية إعادة الإنتاج
sourced values cited; analytical values reproducible from stated parameters
Self-check
14 of 23 at evidence close; a fail on any item blocks release
المراجعة
five passes scheduled before release (in Annex C)
الناشر الرسمي
The Global Centre for Risk and Innovation (GCRI) for the Nexus Consortium
التصحيحات
Registry correction pathway; upheld corrections are published as notices with a new version

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1IEA (ed.), Energy and AI in East Asia, revised version April 2026, prepared with the Korea Energy Economics Institute (PDF; restates the base case of the IEA report Energy and AI of April 2025: data centres about 415 TWh in 2024, 1.5% of global electricity consumption, more than doubling to about 945 TWh by 2030, about 3% of global demand; the main report pages returned access errors, so the figures are read in this IEA report). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05.back
  2. 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
  3. 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  4. 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
  5. 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
  6. 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
  7. 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
  8. 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
  9. 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
  10. 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
  11. 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
  12. 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
  13. 15European Commission (ed.), Data Act (policy page; applicable from 12 September 2025; entered into force in January 2024). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  14. 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  15. 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03.back
  16. 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
  17. 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
  18. 43Infocomm Media Development Authority (ed.), Green Data Centre Roadmap (programme page; charts a pathway for data centre growth in Singapore and aims to provide at least 300 MW of additional capacity in the near term, with more through green energy deployments; no figure used in this edition). IMDA, Singapore. Observation year 2024. Accessed 2026-11-05.back
  19. 19European Commission (ed.), Energy Efficiency Directive (policy page; states a data centre energy efficiency package planned for the third quarter of 2026 and links to reporting of data centre energy consumption; no threshold or dates on the page). Directorate-General for Energy, Brussels. Observation year 2026. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • طباعة

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF115 pages1.1 MBTagged, with bookmarks

      SHA-256 b8c74526d8ce5619125874e61a6c1fe938215436dddf2a3a8130ff9012e82526

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF123 pages1.1 MBTagged, with bookmarks

      SHA-256 77b162e9d87c793cd2f726e7d3a91fa7c4242ff23074b42a94a6e9884a77d407

  • Web edition

  • Data bundle

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 38bf2aba6a33a347d0b3df668d63e5288e2a9296bee0b74fed49be5ebaf2c43e

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 cf5e784e97436bd1329553161f45313d2c79a2b1638aeb29247f76b8e4e2a593

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-CLOUD-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 0a14eafb83ed51a14d2d13fd375d3f3131c66d01d6ebd4ee4b17f8531b711442

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-CLOUD-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 38e285b3ae2e6ee407a91a137b2f658b3d9ad636f3144d2823dfe892c13b780f

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-CLOUD-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 b2d86e7e72e9dcf5d9419469ca33bbefd07778a4d8dafe6b3c140adc4f68c25c

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-CLOUD-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 09b3a7beed73dafe296dcb1b095c307e7ba8fef97b9f16728cae0e01b092c102

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this annex

Valadbaygi, S. (Ed.). (2026). Annex B: Data appendix. In Exponential Technology Report 2026: Cloud, Edge and Distributed Computing (Baseline Edition 2026, Report No. NR-XTECH-CLOUD-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

التقاريرساهم

Send evidence or a correction on Cloud, Edge and Distributed Computing.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the GCRI Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

مكتب أدلة النظم في GCRIالتقنيات الأسية

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.