Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

References and record

Every source the edition rests on, the publication record, the corrections log and the open record.

16 min read0 figures1 table0 notesNR-XTECH-FUSION-GLOBAL-2026-BASELINE

ناوەڕۆک
  1. ·Edition home
  2. ·Executive summary
  3. 1Fusion is an experiment record and a fuel-cycle question
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5First-plant fuel and licence set the pace
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. Aمیتۆدۆلۆژی
  12. BData appendix
  13. CReferences and record
    1. C.1 46 sources
    2. C.2 Publication record
    3. C.3 Corrections log
    4. C.4 Open record
    5. C.5 Where this edition sits among the six pillars
  14. ·Complete edition, for print

C.146 sources

NR-CIT-1, editor first. A DOI is linked where the source has one; Nexus records carry a UNI once the catalogue allocates it (NS-1).

  1. 1CEA IRFM (ed.), WEST sets a new plasma duration record (news page; plasma 61299, 12 February 2025, 1,337 seconds, 2 MW lower hybrid heating, 2.6 GJ injected and extracted). Commissariat a l energie atomique et aux energies alternatives, Cadarache. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  2. 2Physics World (ed.), China experimental advanced superconducting tokamak smashes fusion confinement record (news report; EAST 1066 seconds in high confinement, January 2025; earlier 403 seconds in 2023). IOP Publishing, Bristol. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 8
  3. 3World Nuclear News (ed.), Wendelstein 7-X sets new fusion performance records (news report of 4 June 2025; long-pulse triple product held for 43 seconds; announcement by the research institute and EUROfusion; peer-reviewed article not yet published at announcement). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 8
  4. 4World Nuclear News (ed.), New world record set in JET final fusion experiments (news report of 9 February 2024; 69 MJ over 5 seconds from 0.2 milligrams of fuel; 59 MJ in 2021). World Nuclear Association, London. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  5. 5Lawrence Livermore National Laboratory (ed.), National Ignition Facility 2025 (annual report page; 8.6 MJ on 7 April 2025 from 2.08 MJ delivered, target gain 4.13; refurbishment and enhanced yield capability to 2.6 MJ). Lawrence Livermore National Laboratory, Livermore. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  6. 6Lawrence Livermore National Laboratory (ed.), NIF fusion ignition shot hailed as historic scientific feat (news page; shot of 5 December 2022, 3.15 MJ from 2.05 MJ; announced 13 December 2022). Lawrence Livermore National Laboratory, Livermore. Observation year 2022. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 8
  7. 7ITER Organization (ed.), ITER in a few lines (project page; baseline reviewed by the ITER Council in November 2024; start of research operation 2034; deuterium-tritium operation 2039; Q of 10, 500 MW from 50 MW). ITER Organization, Saint-Paul-lez-Durance. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 5, chapter 6
  8. 8ITER Organization (ed.), ITER Newsline issue 473 (item on the IAEA World Fusion Outlook 2025, dated 14 October 2025). ITER Organization, Saint-Paul-lez-Durance. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6
  9. 9World Nuclear News (ed.), Fusion entering implementation phase, says Grossi (report on the IAEA World Fusion Outlook 2025; more than 160 devices; private investment above USD 10 billion; October 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 4, chapter 6, chapter 8
  10. 10World Nuclear News (ed.), Fusion industry raised USD4.5 billion in past year, report says (14 July 2026; Fusion Industry Association 2026 survey: USD 4.48 billion in 12 months, USD 14.24 billion cumulative, 56 companies; an industry survey, weak evidence). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  11. 11World Nuclear News (ed.), Access to funding remains a major issue for fusion, says FIA (report on the Fusion Industry Association 2025 survey of 23 July 2025: USD 2.64 billion, USD 9.766 billion cumulative, 53 companies; an industry survey, weak evidence). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 6
  12. 12US Department of Energy (ed.), Energy Department announces Fusion Science and Technology Roadmap to accelerate commercial fusion power (announcement of 16 October 2025; Build-Innovate-Grow; power on the grid by the mid-2030s; no funding commitment). US Department of Energy, Washington. Observation year 2025. Accessed 2026-11-03. Cited in chapter 1, chapter 2, chapter 4, chapter 6, chapter 8
  13. 13American Nuclear Society (ed.), DOE picks eight fusion companies to design pilot power plants (news report of 2 June 2023; USD 46 million milestone programme; the page was read to the paywall). American Nuclear Society, La Grange Park. Observation year 2023. Accessed 2026-11-03. Cited in chapter 8
  14. 14US Nuclear Regulatory Commission (ed.), Federal Register notice of 26 February 2026, proposed rule on regulatory framework for fusion machines (10 CFR part 30; comments due 27 May 2026; the first 100,000 of 168,363 characters were read). Office of the Federal Register, Washington. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  15. 15UK Department for Energy Security and Net Zero (ed.), A new energy revolution: the UK plan for delivering fusion energy (policy paper of 16 March 2026; over GBP 2.5 billion over five years; GBP 1.3 billion for STEP and UK Fusion Energy; the first 100,000 of 127,790 characters were read). UK Government, London. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  16. 16Clean Energy Wire (ed.), German government pledges more than EUR 2 bln for nuclear fusion (news report of 2 October 2025; cabinet plan of 1 October 2025). Clean Energy Wire, Berlin. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  17. 17World Nuclear News (ed.), Germany boosts funding for fusion research (news report; Fusion Action Plan of October 2025; more than EUR 2 billion by 2029; about EUR 1.7 billion public research funding and up to EUR 755 million from an infrastructure fund). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 6
  18. 18European Commission (ed.), Commission launches call for evidence to support first-ever EU-wide fusion strategy (news item of 6 June 2025; call open to 1 July 2025; strategy then programmed for the end of 2025). Directorate-General for Energy, Brussels. Observation year 2025. Accessed 2026-11-03. Cited in chapter 4, chapter 6, chapter 8
  19. 19American Nuclear Society (ed.), China launches fusion-focused company (news report of 30 July 2025; China Fusion Energy Co., 15 billion yuan registered capital, subsidiary of a state nuclear group; BEST tokamak in Hefei hoped for 2027). American Nuclear Society, La Grange Park. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 8
  20. 20Coleman, M. and Kovari, M., Global supply of tritium for fusion R and D from heavy water reactors (conference paper, UK Atomic Energy Authority; abstract and introduction read from the PDF; 0 to 27.7 kg available in 2055 across scenarios; 7.4 kg for a demonstration reactor in 2055 in one case). UK Atomic Energy Authority, Abingdon. Observation year 2018. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 4, chapter 5, chapter 6, chapter 8
  21. 21Pearson, R.J., The availability and supply of critical natural resources for the realisation of a fusion pilot plant: fuels for fusion (presentation to the US Department of Energy fusion workshop, 1 to 3 June 2022; lithium-6 is 7.4% of natural lithium; blankets need 30 to 90%; supply effectively zero; a company presentation, weak evidence). Kyoto Fusioneering, London. Observation year 2022. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 4, chapter 6, chapter 8
  22. 22Theiding, T., Tritium: a few kilograms can make or break nuclear fusion (policy blog post of 6 March 2025; about 25 kg of civilian tritium in 2024; a student fellow commentary, weak evidence). Kleinman Center for Energy Policy, University of Pennsylvania, Philadelphia. Observation year 2024. Accessed 2026-11-03. Cited in chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  23. 23Commonwealth Fusion Systems and Eni (eds.), Eni and CFS sign over USD 1 billion power purchase agreement (joint company release of 22 September 2025; 400 MW ARC plant in Chesterfield County, Virginia; grid connection in the early 2030s; a vendor announcement, weak evidence). Commonwealth Fusion Systems, Devens. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 6, chapter 8
  24. 24Helion (ed.), Orion, the first fusion power plant (company page; Malaga, Washington; construction from 2025; initial operations stated for 2028; Microsoft agreement for 50 MW; a vendor announcement, weak evidence). Helion Energy, Everett. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 6, chapter 8
  25. 25Physics Today (ed.), ITER costs are pinned down with caveats (news report on the 2016 baseline review; review committee chaired by A. Wagner; estimate without contingencies). American Institute of Physics, College Park. Observation year 2016. Accessed 2026-11-03. Cited in chapter 1, chapter 2, chapter 4, chapter 5
  26. 26The Register (ed.), ITER delays first plasma for world’s biggest fusion power rig by a decade (news report of 4 July 2024 by S. Sharwood on the proposed 2024 baseline; an extra EUR 5 billion needed, under consideration by ITER members; start of research operation 2033 and deuterium-tritium operation 2039 as proposed; a press report, weak evidence). Situation Publishing, London. Observation year 2024. Accessed 2026-11-05.
  27. 27Commonwealth Fusion Systems (ed.), Google and Commonwealth Fusion Systems sign strategic partnership (company release of 30 June 2025; power purchase agreement for 200 MW from the first ARC plant in Chesterfield County, Virginia; power on the grid in the early 2030s; financial terms not disclosed; a vendor announcement, weak evidence). Commonwealth Fusion Systems, Devens. Observation year 2025. Accessed 2026-11-05.
  28. 28Helion (ed.), Starting to build the world’s first fusion power plant in Malaga, WA (company post of 22 July 2025 by D. Kirtley; initial earthwork and construction begun on the Orion site; at least 50 MW to Microsoft) and Announcing Helion’s fusion power purchase agreement with Microsoft (company post of 28 August 2023; first plant scheduled for deployment in 2028); vendor announcements, weak evidence. Helion Energy, Everett. Observation year 2025. Accessed 2026-11-05. Cited in chapter 2
  29. 29Commonwealth Fusion Systems (ed.), SPARC progress, DOE Milestone approvals reflect CFS power plant maturity (company blog post of 5 August 2026 by J. Ganten; SPARC almost 80% complete; magnets being installed; support systems operating) and Why CFS is confident we’ll demonstrate net fusion energy: Q>1 (company blog post of 28 August 2026; SPARC operation and first plasma expected in coming months, no year stated); vendor statements, weak evidence. Commonwealth Fusion Systems, Devens. Observation year 2026. Accessed 2026-11-05. Cited in chapter 8
  30. 30Fusion Industry Association (ed.), The Global Fusion Industry in 2026: Fusion Companies Survey by the Fusion Industry Association (report of July 2026; USD 4,476,143,000 raised in the last 12 months; USD 14,242,143,000 total to date; 56 companies; an industry survey, weak evidence). Fusion Industry Association, Washington. Observation year 2026. Accessed 2026-11-05.
  31. 31ITER Organization (ed.), New IAEA publication: World Fusion Outlook 2025 (ITER Newsline, 14 October 2025, read; notice of the release of IAEA World Fusion Outlook 2025, Crossref DOI 10.61092/iaea.agh6-zpih: it discusses for the first time the global outlook for fusion energy deployment, outlines fusion plant concepts at various stages of development, and gives special focus to high-temperature superconductors; no figures; stands in for the IAEA publication, whose pages could not be opened at verification; device count and investment figures in this edition come from the news report [9]). ITER Organization, Saint-Paul-lez-Durance. Observation year 2025. Accessed 2026-11-05. doi:10.61092/iaea.agh6-zpih: Cited in chapter 6
  32. 32Gong, X., Huang, J. et al., Overview of recent experimental results on EAST in support of ITER new research plan (overview presentation, 30th IAEA Fusion Energy Conference, Chengdu, 13 to 18 October 2025; slides read; H-mode plasma over 1066 seconds with injected energy up to 3.05 GJ). Institute of Plasma Physics, Chinese Academy of Sciences, Hefei. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  33. 33Ward, S.H., Pearson, R.J., Scott, T.B. and Lopes Cardozo, N.J., Lithium enrichment threatens to curb fusion deployment, Joule 9, 101997, 2025 (abstract read; also posted as arXiv:2605.04707 in May 2026; stored lithium inventory of 50 to 100 tonnes per plant; enrichment technologies of today too expensive, not scalable and environmentally risky). Observation year 2025. Accessed 2026-11-05. Cited in chapter 2, chapter 4, chapter 6, chapter 8
  34. 34Lawson, J.D., Some criteria for a power producing thermonuclear reactor, Proceedings of the Physical Society, Section B 70, 6 to 10, 1957. Observation year 1957. Accessed 2026-11-05. Cited in chapter 6
  35. 35Zylstra, A.B. et al., Burning plasma achieved in inertial fusion, Nature 601, 542 to 548, 2022. Observation year 2022. Accessed 2026-11-05. Cited in chapter 4, chapter 6
  36. 36Abu-Shawareb, H. et al., Achievement of target gain larger than unity in an inertial fusion experiment, Physical Review Letters 132, 065102, 2024. Observation year 2024. Accessed 2026-11-05. Cited in chapter 4, chapter 6
  37. 37Creely, A.J. et al., Overview of the SPARC tokamak, Journal of Plasma Physics 86, 865860502, 2020. Observation year 2020. Accessed 2026-11-05. Cited in chapter 6
  38. 38Sorbom, B.N. et al., ARC: a compact, high-field, fusion nuclear science facility and demonstration power plant with demountable magnets, Fusion Engineering and Design 100, 378 to 405, 2015. Observation year 2015. Accessed 2026-11-05. Cited in chapter 6
  39. 39Abdou, M. et al., Physics and technology considerations for the deuterium-tritium fuel cycle and conditions for tritium fuel self sufficiency, Nuclear Fusion 61, 013001, 2021. Observation year 2021. Accessed 2026-11-05. Cited in chapter 6, chapter 8
  40. 40Federici, G. et al., Overview of the DEMO staged design approach in Europe, Nuclear Fusion 59, 066013, 2019. Observation year 2019. Accessed 2026-11-05. Cited in chapter 6
  41. 41Knaster, J., Moeslang, A. and Muroga, T., Materials research for fusion, Nature Physics 12, 424 to 434, 2016. Observation year 2016. Accessed 2026-11-05. Cited in chapter 6, chapter 8
  42. 42Beidler, C.D. et al., Demonstration of reduced neoclassical energy transport in Wendelstein 7-X, Nature 596, 221 to 226, 2021. Observation year 2021. Accessed 2026-11-05. Cited in chapter 6, chapter 8
  43. 43Pearson, R.J., Antoniazzi, A.B. and Nuttall, W.J., Tritium supply and use: a key issue for the development of nuclear fusion energy, Fusion Engineering and Design 136, 1140 to 1148, 2018. Observation year 2018. Accessed 2026-11-05. Cited in chapter 6
  44. 44Integrated Innovation Strategy Promotion Council (ed.), Fusion Energy Innovation Strategy (provisional translation of the national strategy of 14 April 2023; industrialisation of fusion energy as the core vision). Cabinet Office, Tokyo. Observation year 2023. Accessed 2026-11-05. Cited in chapter 6
  45. 45National Academies of Sciences, Engineering, and Medicine (eds.), Bringing Fusion to the U.S. Grid (consensus study report, 2021; goals and innovations needed for a US fusion pilot plant). National Academies Press, Washington. Observation year 2021. Accessed 2026-11-05. Cited in chapter 6
  46. 46Maslov, M. et al., JET D-T scenario with optimised non-thermal fusion, Nuclear Fusion 63, 112002, 2023. Observation year 2023. Accessed 2026-11-05. Cited in chapter 4, chapter 6

C.2Publication record

بڵاوکراوە

Title
Exponential Technology Report 2026: Fusion and Frontier Energy, Baseline Edition
زنجیرە
Reports · Exponential Technology Series XT-14
وەشان
Baseline Edition 2026 · inaugural annual
وەشان
v1.0.0 · draft for stewardship review
Publication ID
NR-XTECH-FUSION-GLOBAL-2026-BASELINE-v1.0.0
Evidence close
30 September 2026
Publication date
October 2026
DOI
concept and version DOI at deposit

بڵاوکەرەوە

Publisher of record
The Global Centre for Risk and Innovation (GCRI), for the Nexus Consortium
شوێن
Toronto
Editor
Saeed Valadbaygi, Chief Steward and Managing Editor
پارێزەران
GCRI · technical truth · the Global Risks Forum (GRF) · public meaning · the Global Risks Alliance (GRA) · capital meaning
مۆڵەت
text CC BY 4.0; data on the terms of each source
Copyright
© 2026 GCRI · Nexus Consortium
زمان
English (en-GB) source edition
Correspondence
Registry correction pathway · editorial office

Colophon

فۆرمات
A4 portrait · screen, print and archival PDF
Typefaces
Space Grotesk (display) · Geist (text) · IBM Plex Sans Italic (standfirsts) · IBM Plex Mono (data)
Design standard
Reports Foundational Edition, Volume I, Part VII
دەستگەیشتن
tagged PDF and HTML targets; text alternatives for every figure
Production
Reports editorial team, GCRI

Release path for this version

Table C.1Release path for this version
هەنگاوWhat happensWhen
پێشنووسeditorial self-check complete at evidence closeOctober 2026
Steward reviewfive passes on the exact draft (keys T · M · F · N)Q4 2026
Approvalpublication authority approves the exact digestbefore release
Depositconcept and version DOI minted; registry pointer setat release
جێگرتنەوەthe 2027 fusion edition reports changes against this baseline2027
Current version
v1.0.0 draft, stewardship review
Previous edition
none, first edition of the series
Next edition
NR-XTECH-FUSION-GLOBAL-2027-v1.0.0
Latest version
resolve the concept DOI or the registry record
Correction route
Registry correction pathway
Notice types
erratum · addendum · supersession · withdrawal

C.3Corrections log

0correction notices. No edition has been released yet, so none can be corrected; the log below lists each edition’s current version.

وەشانوەشانDateدۆخگۆڕانکاریNotice
XT-14NR-XTECH-FUSION-GLOBAL-2026-BASELINE-v1.0.0October 2026پێشنووسBaseline Edition 2026, inaugural annual edition,هیچ

Notice types: erratum, addendum, supersession, withdrawal. A correction is a new version with a published notice; the earlier version stays resolvable, and no edition is ever edited in silence.

C.4Open record

This edition’s open record

Publication ID
NR-XTECH-FUSION-GLOBAL-2026-BASELINE-v1.0.0
Desk identifier and series alias
NR-GCRI-XT-14-2026-BASELINE-v1.0.0 · NR-XTC-XT-14-2026-BL
Collection
NR-COL-2026-BASELINE (IsPartOf at deposit)
DOI
Concept and version DOI at deposit, on Zenodo with DataCite metadata
Versions
Each correction is a new version (isNewVersionOf); the concept DOI resolves to the latest
Bundle
RO-Crate 1.2 with CITATION.cff, CodeMeta and PROV-O provenance; a signed manifest
مۆڵەت
CC BY 4.0 (SPDX CC-BY-4.0) for original material; metadata CC0 1.0

Credit and identity

ORCID
Your iD in the deposit and the contribution record; DataCite can then add the work to your ORCID record
ROR
Your organisation by its ROR identifier, never by a typed name alone
CRediT
Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualisation, Writing, review and editing
هەژمار
None needed to contribute; never a password

Find and follow

Search the open indexes for Fusion and Frontier Energy; software is cited by its SWHID from Software Heritage, and a quantified scenario run is preregistered on OSF before it is run. Annotation is your choice: Hypothesis opens this page in its own viewer.

Mirrors and harvest

The DOI is canonical. At release each signed bundle is also given an IPFS content identifier and a bloxberg anchor as mirrors; both are listed in the record once they exist. Zenodo exposes every record over OAI-PMH, and reviews and endorsements can arrive through COAR Notify where the repository supports it.

InvenioRDM metadata for a contribution on Fusion and Frontier Energy, prefilled from this page
{
  "metadata": {
    "resource_type": {
      "id": "dataset"
    },
    "title": "Evidence on Fusion and Frontier Energy for Nexus Reports",
    "publication_date": "YYYY-MM-DD",
    "creators": [
      {
        "person_or_org": {
          "type": "personal",
          "family_name": "Your family name",
          "given_name": "Your given name",
          "identifiers": [
            {
              "scheme": "orcid",
              "identifier": "0000-0000-0000-0000"
            }
          ]
        },
        "affiliations": [
          {
            "id": "ROR identifier of your organisation"
          }
        ]
      }
    ],
    "description": "What it is, where its record is kept and how it bears on Exponential Technology Report 2026: Fusion and Frontier Energy.",
    "rights": [
      {
        "id": "cc-by-4.0"
      }
    ],
    "subjects": [
      {
        "subject": "Nexus Reports"
      },
      {
        "subject": "Fusion and Frontier Energy"
      },
      {
        "subject": "Exponential Technology Report · XT-14"
      }
    ],
    "related_identifiers": [
      {
        "identifier": "https://therisk.global/nexus-reports/editions/xt-14/",
        "scheme": "url",
        "relation_type": {
          "id": "issupplementto"
        },
        "resource_type": {
          "id": "publication-report"
        }
      }
    ],
    "version": "1.0.0"
  },
  "custom_fields": {},
  "access": {
    "record": "public",
    "files": "public"
  },
  "files": {
    "enabled": true
  },
  "parent": {
    "communities": {
      "default": "nexusreports"
    }
  }
}

C.5Where this edition sits among the six pillars

Foundry seals the evidence and Universe tests it; Reports publishes it; Standards takes its corrections and Academy teaches from it.

  1. F03 Sealed observations and indicator series Foundry Sealed observations and indicator series behind a profile (closeout).
  2. F04 After-action and scenario findings for Universe After-action and scenario findings for chapters 10 and 13 (after action review).
  3. F05 National Portfolio movement for chapter Foundry National Portfolio movement for chapter 11 (after action review).
  4. Applied in editions Standards Nexus Standards: applied in editions.
  5. XT-14 edition Reports Fusion and Frontier Energy 2026, published in every format with its sources, citation and corrections.
  6. F06 Method and correction findings as change Standards Method and correction findings as change proposals (correction).
  7. F12 Q4 synthesis informs the next-year Universe Q4 synthesis informs the next-year mandate (renewal).
  8. Taught in the open Academy Risk Academy: taught in the open.

What Foundry and Universe hand to this edition, and what it hands to Standards, Universe and Academy. From the programme spine; XT-14 is a drafted Baseline Edition, so these handoffs run from its first operational quarter.

ڕادەستکردنBetweenWhat crosses, and when
F03Foundry to ReportsSealed observations and indicator series behind a profile (closeout).
F04Universe to ReportsAfter-action and scenario findings for chapters 10 and 13 (after action review).
F05Foundry to ReportsNational Portfolio movement for chapter 11 (after action review).
RingNexus Standards to ReportsNexus Standards: applied in editions.
F06Reports to Nexus StandardsMethod and correction findings as change proposals (correction).
F12Reports to UniverseQ4 synthesis informs the next-year mandate (renewal).
RingReports to Risk AcademyRisk Academy: taught in the open.

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Print

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF111 pages1.0 MBTagged, with bookmarks

      SHA-256 95ea6260368aa0483c7600adb816df2588668e2705a7c61df26551a7f08196bb

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF116 pages1.0 MBTagged, with bookmarks

      SHA-256 cd6ff1ee3bd369d83af00d23585c1a820ed5f60753bd7d185413c8b374ed06cb

  • Web edition

  • Data bundle

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 15b48613596ef6658aea97b4be459048745680a4d5743420961925d0fb5fc184

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 795fb6485d15d0238d6969a29fb1d2b451f39e30a11e9a87798383945ad1c866

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 5b2f84ca06ea89262b5806ee57aea891732ba58210745e02cdc3bcb4b273e6c5

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 8645da30ee35054dbe86496623088e6daebdd4eb17a90b05301e2aefd365c195

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 97347fa5766ebe941471f6f388e39c48684f209b455c168d45b26089ab8a40a9

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 13fea3d4003712c5aa7738f75bd93d0cac96aa4ee1e7f504f3eb76a8c627ecbb

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this annex

Valadbaygi, S. (Ed.). (2026). Annex C: References and record. In Exponential Technology Report 2026: Fusion and Frontier Energy (Baseline Edition 2026, Report No. NR-XTECH-FUSION-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

ڕاپۆرتەکانبەشداربە

Send evidence or a correction on Fusion and Frontier Energy.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the GCRI Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

مێزی بەڵگەی سیستەمەکانی GCRIتەکنەلۆجیای ئێکسپۆنێنشیاڵ

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

واژۆی کەرت

The sectors behind Fusion and Frontier Energy.

A reading aid: the sectors the findings run through and how strongly they depend on each other.

گۆشەکان هەڵبژێرە · بەسەر هێڵەکاندا ڕابوەستە6 / 15 پەیوەندی

واژۆ

وزە و هاوبەشەکانی

وزە هێز بۆ گواستنەوە و پەیوەندییەکان دەداتە ژێرخان (0.8)، پەمپکردن و پاڵاوتن بۆ ئاو (0.5) و پەین، ئامێر و زنجیرەی سارد بۆ خۆراک (0.5).

W · E · I · F · H · B

کەرتەکان
4 لە 6
پەیوەندییەکان
6 لە 15
هاوبەستی
0.46 بەشی کۆی گشتی

بەهێزترین پەیوەندییەکانی لە کاردا

  • Energy → Infrastructure · power for transport and telecoms0.8
  • ئاو → وزە · ئاوی ساردکەرەوە و هێزی کارەبای ئاوی0.6
  • ئاو → خۆراک · ئاودێری0.8
  • ژێرخان → ئاو · بۆری، بەربەست و پاڵاوگە0.6
بەهای فێرکاری بۆ ناوچە-شارێکی ئاسایی، نەک پێوانە بۆ هیچ شوێنێک. هاوبەستی کۆی بەهێزی ئەو پەیوەندییانەیە کە لە کاردان، وەک بەشێک لە هەر پانزەکە.