Risks and capability
Four 6G risk objects open the portfolio. Order carries no rank. Each is read across driver, exposure, vulnerability, capacity, cascade and consequence.
Inhalt
- ·Edition home
- ·Executive summary
- 1Connectivity is radio, compute and electricity
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Compute-heavy radio networks built ahead of Release 21
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodik
- BData appendix
- CReferences and record
- ·Complete edition, for print
4.1Risk objects
Each risk is read across the chain from hazard to consequence, with its status and evidence-quality level.
InferredEQL 3RSK-XT09-SPC-001
Spectrum timetable and fragmentation
Expert inputEQL 2RSK-XT09-CMP-002
Compute-heavy radio before standards settle
InferredEQL 3RSK-XT09-ENE-003
Network energy and AI load
InferredEQL 3RSK-XT09-SUP-004
Anbieterkonzentration
4.2Capability ladder
Existence is not readiness. Each of the fifteen capability functions is placed on the ladder by the strongest public evidence for 6G at the global level.
| Funktion | Rung | Stufe | Strongest public evidence at baseline |
|---|---|---|---|
| Prevention and mitigation | EXISTS | ITU security and resilience aims and 3GPP security study items14 | |
| Monitoring and observation | LISTED | no common tracker of AI-RAN claims or network energy | |
| Frühwarnung | LISTED | spectrum and standards watching by agencies is not consolidated | |
| Preparedness and planning | EXISTS | ITU and 3GPP timetables; EU proposal2311 | |
| Redundancy and reserves | LISTED | site power and supplier redundancy are not documented | |
| Reaktion | LISTED | no tested response to a sudden supplier or spectrum change | |
| Continuity of critical services | LISTED | network resilience is an ITU design aim; tests not reported1 | |
| Wiederaufbau | LISTED | not applicable at baseline; no event to recover from | |
| Adaptation | EXISTS | open interfaces and software upgrades are stated aims1310 | |
| Sozialer Schutz | LISTED | not applicable at baseline | |
| Finanzen und Versicherung | EXISTS | operator capital and EU research funding912 | |
| Institutional coordination | EXISTS | ITU, 3GPP, ETSI and the EU231511 | |
| Technical infrastructure | EXISTS | large 5G base and growing standalone share6 | |
| Workforce | LISTED | skills gaps not bound; no figure | |
| Research capacity | ADEQUATE | strong peer-reviewed base on sensing and open interfaces181920 | |
| A capability listed in policy is not a tested one; each rung is the strongest public evidence at baseline. | |||
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 2ITU-R (ed.), IMT-2030 process page of Working Party 5D (timeline; candidate proposal window February 2027 to February 2029; draft reports 5/116 and 5/119 completed in 2026 and due for SG 5 approval in December 2026). International Telecommunication Union, Geneva. Observation year 2026. Accessed 2026-11-03.back
- 25ITU (ed.), Resolution 256 (WRC-23), Sharing and compatibility studies and development of technical conditions for the use of IMT in the frequency bands 4400 to 4800 MHz, 7125 to 8400 MHz (or parts thereof) and 14.8 to 15.35 GHz for the terrestrial component of IMT, World Radiocommunication Conference, Dubai, 2023 (PDF of the resolution; studies to be completed in time for WRC-27, which is invited to consider identification of the bands; WRC-27 agenda item 1.7). International Telecommunication Union, Geneva. Observation year 2023. Accessed 2026-11-05.back
- 33GPP (ed.), Release 21 page (timetable agreed at the June 2026 TSG#112 plenaries; first normative 6G release; Stage-3 freeze December 2028; ASN.1 freeze March 2029). 3rd Generation Partnership Project, Sophia Antipolis. Observation year 2026. Accessed 2026-11-03.back
- 10NVIDIA and Nokia (eds.), NVIDIA to invest USD 1 billion in Nokia to accelerate AI-RAN innovation (joint company press release of 28 October 2025; USD 6.01 per share; ARC-Pro platform; T-Mobile field evaluations from 2026; company announcement, weak evidence). NVIDIA, Santa Clara, and Nokia, Espoo. Observation year 2025. Accessed 2026-11-03.back
- 13O-RAN Alliance (ed.), About page (founded February 2018 by AT&T, China Mobile, Deutsche Telekom, NTT DOCOMO and Orange; German entity since August 2018; no member count or AI statement on the page). O-RAN Alliance, Alfter. Observation year 2018. Accessed 2026-11-03.back
- 18Polese, M., Bonati, L., D’Oro, S., Basagni, S. and Melodia, T., Understanding O-RAN: Architecture, Interfaces, Algorithms, Security, and Research Challenges, arXiv:2202.01032, submitted 2 February 2022 (abstract page opened). arXiv, Ithaca. Observation year 2022. Accessed 2026-11-03.back
- 7Ericsson (ed.), Ericsson Mobility Report, June 2026, mobile traffic forecast (company forecast; 146 EB per month excluding FWA at the end of 2025; 328 EB per month in 2031; 22 GB per active smartphone per month in 2025). Ericsson, Stockholm. Observation year 2025. Accessed 2026-11-03.back
- 16Sthankiya, K., Saeed, N., McSorley, G., Jaber, M. and Clegg, R.G., A Survey on AI-driven Energy Optimisation in Terrestrial Next Generation Radio Access Networks, IEEE Access 12, 157540 to 157555, 2024 (arXiv:2411.02164, submitted 4 November 2024; abstract page opened). IEEE, Piscataway. Observation year 2024. Accessed 2026-11-03.back
- 22GSMA Intelligence (ed.), Energy and Towers Efficiency Benchmark, presentation by Tim Hatt, March 2026 (PDF slides; Telco Energy Benchmark 2026 covering 19 network operator groups and TowerCos, 118 networks in 76 countries; radio access network 87% of participating operators’ energy use, core and data centres 11%, others 2%; headline efficiency 0.08 kWh per GB; the full report is gated and was not opened). GSMA, London. Observation year 2026. Accessed 2026-11-05.back
- 9Dell’Oro Group (ed.), RAN market stabilised in 2025 (press release of 17 February 2026; analyst release; stable 2025 revenue; Huawei, Ericsson, Nokia, ZTE and Samsung in unchanged order; concentration at a ten-year high; 1% a year growth forecast 2025 to 2030; about a fifth of value lost 2022 to 2024). Dell’Oro Group, Redwood City. Observation year 2025. Accessed 2026-11-03.back
- 34IEA (ed.), Global Critical Minerals Outlook 2025 (PDF, May 2025; the 2026 edition returned access errors; average share of the top three mining countries for key energy minerals 77% in 2024; export restrictions on gallium, germanium and antimony, key minerals for semiconductor production, from December 2024; no figure taken from it in this edition). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05.back
- 11European Commission (ed.), Digital Networks Act policy page (proposal adopted 21 January 2026; single passport; EU satellite spectrum authorisation; copper phase-out plans; preparedness plan). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2026. Accessed 2026-11-03.back
- 35NIS Cooperation Group (ed.), Cybersecurity of 5G networks: EU Toolbox of risk mitigating measures, January 2020 (library page dated 23 January 2020; common set of measures to mitigate the main cybersecurity risks of 5G networks). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2020. Accessed 2026-11-05.back
- 1ITU-R (ed.), Recommendation ITU-R M.2160-0, Framework and overall objectives of the future development of IMT for 2030 and beyond, November 2023 (PDF opened; capability research targets in section 4). International Telecommunication Union, Geneva. Observation year 2023. Accessed 2026-11-03.back
- 43GPP (ed.), Release 20 page (5G-Advanced timeline; early 6G studies listed, including TR 22.870 and TR 38.914; work plan of March 2026). 3rd Generation Partnership Project, Sophia Antipolis. Observation year 2026. Accessed 2026-11-03.back
- 12European Commission (ed.), Smart Networks and Services Joint Undertaking policy page (at least EUR 1.8 billion for 2021 to 2027; EUR 900 million public contribution; 20 6G research projects with EUR 116 million announced March 2026). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2026. Accessed 2026-11-03.back
- 15ETSI (ed.), Industry Specification Group on Integrated Sensing and Communications, technology page (pre-standards coordination; reports ETSI GR ISC 003 announced 26 February 2026 and ETSI GR ISC 004 announced 2 March 2026). European Telecommunications Standards Institute, Sophia Antipolis. Observation year 2026. Accessed 2026-11-03.back
- 6Ericsson (ed.), Ericsson Mobility Report, June 2026, mobile subscriptions outlook (company report and forecast; 5G subscriptions close to 3.3 billion after Q2 2026; forecast 6.4 billion for 2031; over 90 providers with 5G standalone of about 390 with 5G; regional 5G penetration). Ericsson, Stockholm. Observation year 2026. Accessed 2026-11-03.back
- 19Liu, F., Cui, Y., Masouros, C., Xu, J., Han, T.X., Eldar, Y.C. and Buzzi, S., Integrated Sensing and Communications: Towards Dual-functional Wireless Networks for 6G and Beyond, arXiv:2108.07165, submitted 16 August 2021 (abstract page opened). arXiv, Ithaca. Observation year 2021. Accessed 2026-11-03.back
- 20Liu, A. et al., A Survey on Fundamental Limits of Integrated Sensing and Communication, arXiv:2104.09954, submitted 16 April 2021 (abstract page opened). arXiv, Ithaca. Observation year 2021. Accessed 2026-11-03.back