Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

The 2027 agenda

Eight bounded questions open the 2027 National Agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due at the Q1 2027 cut.

5 min read0 figures6 tables4 notesNR-COUNTRY-BRA-2026-BASELINE

Contenido
  1. ·Edition home
  2. ·Executive summary
  3. 1Brazil’s risk runs through water, forest and fire
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Strong El Niño drought across rivers, hydropower and fire
  8. 6Readings from the other desks
  9. 7The 2027 agenda
    1. 7.1 Questions for the operational series
    2. 7.2 Portfolio proposed for the Q1 2027 alignment
    3. 7.3 The pathway
    4. 7.4 Universe 2027, evidence pack for the candidate mission
    5. 7.5 Handoffs and routing
    6. 7.6 Feeds and signal register
  10. 8Systems in depth
  11. AMetodología
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

7.1Questions for the operational series

  1. A-01

    How would a strong El Niño drought lower Amazon rivers and hydropower, and how long would navigation, supply and power margins take to recover?

    INI-BRA-CLI-01 · drought and river compound test; first output: dependency graph for two basins.

  2. A-02

    How much hydropower and reservoir margin remains before thermal dispatch must rise, and at what emissions and cost?

    INI-BRA-ENE-02 · hydro and thermal resilience; first output: storage and dispatch register.

  3. A-03

    How exposed are fertiliser, feed and export logistics to river lows and port disruption?

    INI-BRA-FOO-03 · food logistics exposure; first output: commodity and route table.

  4. A-04

    How large is the heat, smoke and dengue load on health services in a hot, dry year?

    INI-BRA-HLT-04 · heat, smoke and vector load; first output: surge baseline for five states.

  5. A-05

    Where do flood and drought losses fall on the uninsured and on public budgets?

    INI-BRA-FIN-05 · protection gap; first output: peril-by-state loss table.

  6. A-06

    How do forest loss, degradation and fire interact with regional rainfall?

    INI-BRA-BIO-01 · workstream; first output: biome interaction note.

  7. A-07

    How resilient are river-basin cities to heavy rain after the 2024 floods?

    To be admitted in Q1 2027; first output: scoping note.

  8. A-08

    Which capabilities have been tested in real events, and which are only listed?

    National capability register; first output: rung evidence for 15 functions.

7.2Portfolio proposed for the Q1 2027 alignment

Five initiatives and one Universe mission candidate are proposed for admission at the Q1 2027 alignment. They are programme objects, no partner, funder or member is attached to them in this edition.

Table 7.1Objects proposed for the first operational quarter
IDObjetoTipoPreguntaEstado
INI-BRA-CLI-01Drought and river compound testInitiativeA-01PROPUESTA
INI-BRA-ENE-02Hydropower and thermal dispatch resilienceInitiativeA-02PROPUESTA
INI-BRA-FOO-03Food logistics and input exposureInitiativeA-03PROPUESTA
INI-BRA-HLT-04Heat, smoke and vector loadInitiativeA-04PROPUESTA
INI-BRA-FIN-05Disaster protection gapInitiativeA-05PROPUESTA
PRJ-BRA-CLI-01aTwo-basin drought dependency graphProyectoA-01PROPUESTA
MSN-BRA-2027-01Drought, river and hydropower Universe missionMisiónA-01Candidate

7.3The pathway

Brazil is the national pathway through which the Nexus operating system will run in Brazil from 2027. At baseline the pathway is designed and its records are prepared; its councils and working groups are constituted from Q1 2027. This page states what exists today and what comes next, nothing more.

  1. 01

    One National Agenda

    bounded national questions for the year

    DRAFT 2027 · agenda review at the Q1 alignment

  2. 02

    Mesa Nacional

    coordination, records, routing and continuity

    DESIGNED · constituted in Q1 2027

  3. 03

    Modelo Nacional

    the country as a system of systems

    v0 SPECIFIED · v1 with the first Foundry cut

  4. 04

    Cartera Nacional

    risks, capabilities, initiatives, projects, missions

    7 PROPOSED · admission at the Q1 alignment

  5. 05

    Foundry

    continuous computational environment

    PREPARED · first sealed cut NQ-BRA-2027-Q1

  6. 06

    serie Reports

    quarterly and annual publication

    BASELINE ISSUED · Q1 2027 · State & Agenda

  7. 07

    Universo

    annual proving environment

    CANDIDATE MISSION · mandate set in 2027

  8. 08

    Evidencia y corrección

    after-action, correction and renewal

    OPEN · first correction cycle in Q2 2027

7.4Universe 2027, evidence pack for the candidate mission

  1. 01

    Mandato

  2. 02

    Core Build · 1 month

  3. 03

    Action · 1 week

  4. 04

    Evidence seal

  5. 05

    Portfolio correction

  6. 06

    Next mandate

Table 7.2Universe 2027, evidence pack for the candidate mission
ElementoRegistroEstadoPlazos
F1Annual mandate recordPLANNEDafter the Q2 2027 alignment
F2Core Build recordPLANNEDone month before the exercise
F3Evidencia de los ejerciciosPLANNEDduring the Action week
F4Decision packetsPLANNEDexercise state only
F5Proof receiptsPLANNEDscoped to each recorded check
F6After-action reportPLANNEDwithin one quarter
F7Upgrade docketPLANNEDrouted to the Portfolio
F8Portfolio renewalPLANNEDQ4 2027 annual edition
F9Public synthesisPLANNEDpublic-safe extracts only

Misión

ID
MSN-BRA-2027-01 · Drought, river and hydropower Universe mission
Role spine
Leadership sponsor (NLC) · Institutional anchor (NNC) · Mission lead (NWG)
Receiving actors
to be identified with the mandate

7.5Handoffs and routing

Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.

Table 7.3Handoffs and routing
HallazgoDirigido aFinalidadClase
CLI-001 · emissionspublic recordreference for the 2027 seriesPUBLIC
WAT-006 · river lowsINI-BRA-CLI-01two-basin graphPUBLIC
WAT-007 · floodsINI-BRA-FIN-05 · key F reviewprotection gapPUBLIC
ENE-005 · power mixINI-BRA-ENE-02hydro and thermal resiliencePUBLIC
FOO-008 · harvestINI-BRA-FOO-03logistics exposurePUBLIC
HLT-010 · dengueINI-BRA-HLT-04heat, smoke and vector loadPUBLIC
BIO-003 · deforestationINI-BRA-BIO-01biome interaction notePUBLIC
SYS-012 · compound pathwayMSN-BRA-2027-01Universe candidateCONSORTIUM
Table 7.4Routing rules by publication class
ClaseWhere it goesWho can see it
PUBLICthe published edition and its evidence bundleanyone
CONSORTIUMgoverned rooms of the national pathwayconsortium members under agreement
CONTROLLEDneed-to-know channelsnamed competent actors only

7.6Feeds and signal register

Table 7.5Feeds watched from Q1 2027
FeedProducerLatenciaFeeds into
Deforestation alerts (DETER)INPEdiarioBIO findings
Fire fociINPEdiarioBIO-004
Natural hazard alertsCemadenreal timeRSK-BRA-CLI-001
River-level bulletins, Amazon basinGeological Service of BrazildiarioWAT-006
Grid operation and storageNational Electric System OperatordiarioENE-005
Arbovirus monitoring panelMinistry of HealthsemanalHLT-010
Energy balance and monthly bulletinsEPEmensualENE findings

Escalation routes

  • none · keep monitoring
  • research question
  • project
  • risk object
  • quarterly publication
  • signal report
Table 7.6Signals at baseline
IDSignalCorroborationsistemasRuta
SIG-BRA-001Strong El Niño outlook for August to October 202619CORROBORATEDCLI · WAT · ENErisk object RSK-BRA-CLI-002
SIG-BRA-002Record river lows at Manaus in 2023 and 20242144CORROBORATEDWAT · INFresearch question A-01
SIG-BRA-003Hydropower down 4.8% and gas generation up 22.7% in 202510CORROBORATEDENE · WATinitiative A-02

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 19World Meteorological Organization (ed.), “Strong El Niño expected to intensify,” news release. WMO, Geneva, 31 July 2026. Observation year: 2026.back
  2. 21Serviço Geológico do Brasil (ed.), Negro River gauge at the port of Manaus, level of 12.66 m on 4 October 2024, as reported by the Associated Press, “Drought has dried a major Amazon River tributary to its lowest level in over 122 years,” October 2024. SGB, Manaus. Observation year: 2024.back
  3. 44J.-C. Espinoza, J. C. Jimenez, J. A. Marengo et al., “The new record of drought and warmth in the Amazon in 2023 related to regional and global climatic features,” Scientific Reports, vol. 14, article 8107, 2024. Observation year: 2023.back
  4. 10Empresa de Pesquisa Energética (ed.), Balanço Energético Nacional 2026: Relatório Síntese, ano base 2025. EPE and Ministério de Minas e Energia, Rio de Janeiro, 3 June 2026, updated 31 July 2026. Observation year: 2025.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Imprimir

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF107 pages890 KBTagged, with bookmarks

      SHA-256 f63d56a64be7e3a9449ca0c4b396e017661834d893a25de329aa3b28ffae9725

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF113 pages897 KBTagged, with bookmarks

      SHA-256 bd342249f3451f82ab6f36876dd882db0fae42012c7a2dc3a5de9f782821dc01

  • Web edition

  • Paquete de datos

    • Indicators, CSV

      27 indicators with unit, year, status and source

      NR-COUNTRY-BRA-2026-BASELINE-indicators.csv2 KB

      SHA-256 4fd74174d7184424f382db015dd40863921daf7de8f2006d735d844b85ffdd21

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-COUNTRY-BRA-2026-BASELINE-indicators.json3 KB

      SHA-256 2cbebdf5d4a6fc2e21db60126ce6070a6993e6270fad9f5c3a415416a152c739

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-COUNTRY-BRA-2026-BASELINE-findings.csv3 KB

      SHA-256 214cfcff0b4c4c388f82881bd012a4b7d260f5a4f72a09231b9e6212a0991f42

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-COUNTRY-BRA-2026-BASELINE.bib1 KB

      SHA-256 a93074649bff0166f80ac1302ebff6e74346fb145a5b43a8d0996b7e17ed4f7e

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-COUNTRY-BRA-2026-BASELINE.ris1 KB

      SHA-256 cd648254a752adfe0c85c07bfe442eb04f6a2f25366b80fbe87751900f34e5f0

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-COUNTRY-BRA-2026-BASELINE.cff1 KB

      SHA-256 51cc3daf7ff1dae910386f648c5a8eba67500f5fc6a5b7a9ebbb12cbccceb484

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 7: The 2027 agenda. In Brazil Systems Risk and Resilience Report 2026: The State of Brazil’s Interdependent Systems (Baseline Edition 2026, Report No. NR-COUNTRY-BRA-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

serie ReportsContribuir

Send evidence or a correction on Brazil.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

Oficina de Evidencia de Sistemas del GCRIRiesgo y Resiliencia de los Sistemas Nacionales

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace