- Brazil 2026
- Chapter 7
The 2027 agenda
Eight bounded questions open the 2027 National Agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due at the Q1 2027 cut.
目次
- ·Edition home
- ·Executive summary
- 1Brazil’s risk runs through water, forest and fire
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Strong El Niño drought across rivers, hydropower and fire
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- A方法論
- BData appendix
- CReferences and record
- ·Complete edition, for print
7.1Questions for the operational series
- A-01
How would a strong El Niño drought lower Amazon rivers and hydropower, and how long would navigation, supply and power margins take to recover?
INI-BRA-CLI-01 · drought and river compound test; first output: dependency graph for two basins.
- A-02
How much hydropower and reservoir margin remains before thermal dispatch must rise, and at what emissions and cost?
INI-BRA-ENE-02 · hydro and thermal resilience; first output: storage and dispatch register.
- A-03
How exposed are fertiliser, feed and export logistics to river lows and port disruption?
INI-BRA-FOO-03 · food logistics exposure; first output: commodity and route table.
- A-04
How large is the heat, smoke and dengue load on health services in a hot, dry year?
INI-BRA-HLT-04 · heat, smoke and vector load; first output: surge baseline for five states.
- A-05
Where do flood and drought losses fall on the uninsured and on public budgets?
INI-BRA-FIN-05 · protection gap; first output: peril-by-state loss table.
- A-06
How do forest loss, degradation and fire interact with regional rainfall?
INI-BRA-BIO-01 · workstream; first output: biome interaction note.
- A-07
How resilient are river-basin cities to heavy rain after the 2024 floods?
To be admitted in Q1 2027; first output: scoping note.
- A-08
Which capabilities have been tested in real events, and which are only listed?
National capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for admission at the Q1 2027 alignment. They are programme objects, no partner, funder or member is attached to them in this edition.
| ID | オブジェクト | 種別 | 問い | 状況 |
|---|---|---|---|---|
| INI-BRA-CLI-01 | Drought and river compound test | Initiative | A-01 | 提案中 |
| INI-BRA-ENE-02 | Hydropower and thermal dispatch resilience | Initiative | A-02 | 提案中 |
| INI-BRA-FOO-03 | Food logistics and input exposure | Initiative | A-03 | 提案中 |
| INI-BRA-HLT-04 | Heat, smoke and vector load | Initiative | A-04 | 提案中 |
| INI-BRA-FIN-05 | 災害 保護ギャップ | Initiative | A-05 | 提案中 |
| PRJ-BRA-CLI-01a | Two-basin drought dependency graph | プロジェクト | A-01 | 提案中 |
| MSN-BRA-2027-01 | Drought, river and hydropower Universe mission | 使命 | A-01 | Candidate |
7.3The pathway
Brazil is the national pathway through which the Nexus operating system will run in Brazil from 2027. At baseline the pathway is designed and its records are prepared; its councils and working groups are constituted from Q1 2027. This page states what exists today and what comes next, nothing more.
- 01
One National Agenda
bounded national questions for the year
DRAFT 2027 · agenda review at the Q1 alignment
- 02
ナショナル・デスク
coordination, records, routing and continuity
DESIGNED · constituted in Q1 2027
- 03
国別モデル
the country as a system of systems
v0 SPECIFIED · v1 with the first Foundry cut
- 04
国別ポートフォリオ
risks, capabilities, initiatives, projects, missions
7 PROPOSED · admission at the Q1 alignment
- 05
地域ミッションで最も多く使われる Foundry の
continuous computational environment
PREPARED · first sealed cut NQ-BRA-2027-Q1
- 06
quarterly and annual publication
BASELINE ISSUED · Q1 2027 · State & Agenda
- 07
ユニバース
annual proving environment
CANDIDATE MISSION · mandate set in 2027
- 08
エビデンスと訂正
after-action, correction and renewal
OPEN · first correction cycle in Q2 2027
7.4Universe 2027, evidence pack for the candidate mission
- 01
任務
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| 項目 | 記録 | 状況 | 時期 |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | 演習の証拠 | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | Q4 2027 annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
使命
- ID
- MSN-BRA-2027-01 · Drought, river and hydropower Universe mission
- Role spine
- Leadership sponsor (NLC) · Institutional anchor (NNC) · Mission lead (NWG)
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| 調査結果 | Routed to | 目的 | クラス |
|---|---|---|---|
| CLI-001 · emissions | public record | reference for the 2027 series | PUBLIC |
| WAT-006 · river lows | INI-BRA-CLI-01 | two-basin graph | PUBLIC |
| WAT-007 · floods | INI-BRA-FIN-05 · key F review | 保護ギャップ | PUBLIC |
| ENE-005 · power mix | INI-BRA-ENE-02 | hydro and thermal resilience | PUBLIC |
| FOO-008 · harvest | INI-BRA-FOO-03 | logistics exposure | PUBLIC |
| HLT-010 · dengue | INI-BRA-HLT-04 | heat, smoke and vector load | PUBLIC |
| BIO-003 · deforestation | INI-BRA-BIO-01 | biome interaction note | PUBLIC |
| SYS-012 · compound pathway | MSN-BRA-2027-01 | Universe candidate | CONSORTIUM |
| クラス | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the national pathway | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| Deforestation alerts (DETER) | INPE | 日次 | BIO findings |
| Fire foci | INPE | 日次 | BIO-004 |
| Natural hazard alerts | Cemaden | real time | RSK-BRA-CLI-001 |
| River-level bulletins, Amazon basin | Geological Service of Brazil | 日次 | WAT-006 |
| Grid operation and storage | National Electric System Operator | 日次 | ENE-005 |
| Arbovirus monitoring panel | Ministry of Health | 毎週 | HLT-010 |
| Energy balance and monthly bulletins | EPE | 月次 | ENE findings |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- quarterly publication
- signal report
| ID | Signal | Corroboration | システム | ルート |
|---|---|---|---|---|
| SIG-BRA-001 | Strong El Niño outlook for August to October 202619 | CORROBORATED | CLI · WAT · ENE | risk object RSK-BRA-CLI-002 |
| SIG-BRA-002 | Record river lows at Manaus in 2023 and 20242144 | CORROBORATED | WAT · INF | research question A-01 |
| SIG-BRA-003 | Hydropower down 4.8% and gas generation up 22.7% in 202510 | CORROBORATED | ENE · WAT | initiative A-02 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 19World Meteorological Organization (ed.), “Strong El Niño expected to intensify,” news release. WMO, Geneva, 31 July 2026. Observation year: 2026.back
- 21Serviço Geológico do Brasil (ed.), Negro River gauge at the port of Manaus, level of 12.66 m on 4 October 2024, as reported by the Associated Press, “Drought has dried a major Amazon River tributary to its lowest level in over 122 years,” October 2024. SGB, Manaus. Observation year: 2024.back
- 44J.-C. Espinoza, J. C. Jimenez, J. A. Marengo et al., “The new record of drought and warmth in the Amazon in 2023 related to regional and global climatic features,” Scientific Reports, vol. 14, article 8107, 2024. Observation year: 2023.back
- 10Empresa de Pesquisa Energética (ed.), Balanço Energético Nacional 2026: Relatório Síntese, ano base 2025. EPE and Ministério de Minas e Energia, Rio de Janeiro, 3 June 2026, updated 31 July 2026. Observation year: 2025.back