Data appendix
The indicator set with its sources, the source registers, the licences of every kind of material and the formats of the edition.
فهرست مطالب
- ·Edition home
- ·Executive summary
- 1Climate technology is infrastructure with a measurement problem
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Planned storage outruns delivered storage
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- Aروششناسی
- BData appendix
- CReferences and record
- ·Complete edition, for print
B.1The indicator set
| نشانگر | مقدار | واحد | سال | وضعیت | منبع |
|---|---|---|---|---|---|
| Global temperature above pre-industrial | 1.47 | degrees C | 2025 | گزارششده | 12 |
| Fossil CO2 emissions growth, projected | 1.1 | % | 2025 | گزارششده | 3 |
| Total anthropogenic CO2 emissions, projected | 42.2 | GtCO2 | 2025 | گزارششده | 3 |
| Remaining 1.5 degrees C budget, 2025 edition | 170 | GtCO2 | 2025 | گزارششده | 3 |
| Remaining 1.5 degrees C budget, 2024 edition | 235 | GtCO2 | 2024 | گزارششده | 2 |
| Atmospheric CO2, September monthly mean | 426.07 | ppm | 2026 | گزارششده | 16 |
| Solar generation | 2,778 | TWh | 2025 | گزارششده | 5 |
| Solar generation growth | 30 | % | 2025 | گزارششده | 5 |
| Commercial CCS projects in operation | 113 | projects | 2026 | گزارششده | 6 |
| Operating capture capacity | 68 | Mtpa | 2026 | گزارششده | 6 |
| Capture capacity under construction, 2025 edition | 44 | Mtpa | 2025 | گزارششده | 7 |
| Brevik design capture | 400,000 | تن در سال | 2025 | گزارششده | 8 |
| Northern Lights phase 1 storage | 1.5 | Mtpa | 2025 | گزارششده | 10 |
| Total carbon removal | 2.2 | GtCO2 per year | 2025 | گزارششده | 1 |
| Novel carbon removal | ≈2 | MtCO2 per year | 2025 | گزارششده | 1 |
| Gap between pledges and scenarios, 2050 | 5.2 | GtCO2 per year | 2050 | سناریو | 1 |
| Carbon pricing revenue | >107 | USD billion | 2025 | گزارششده | 13 |
| Share of global emissions under direct carbon pricing | 29 | % | 2025 | گزارششده | 13 |
| Removal purchase commitment by 2040 | 1.8 | USD billion | 2026 | گزارششده | 20 |
| Durable removal contracted, cumulative | 50.6 | million tonnes | 2026 | گزارششده | 21 |
B.2Global source register
The governed source set behind this edition. Each source keeps its authority, coverage, cadence and role; categories describe origin, not truth.
Domains bound by the register
- CLI
- INF
- FIN
- ENE
- DAT
- TRD
- MIN
- WAT
- BIO
- FOO
| منبع | رده | پوشش | Period | تناوب | نقش |
|---|---|---|---|---|---|
| State of CDR third edition1 | research assessment | global | 2025 | دورهای | removal |
| Global Carbon Budget23 | research project | global | 2024 to 2025 | سالانه | budget |
| Copernicus and NOAA pages1216 | agencies | global | 2025 to 2026 | ماهانه | climate state |
| Ember reviews45 | think tank | global | 2024 to 2025 | سالانه | power |
| Global CCS Institute678 | institute | global | 2025 to 2026 | سالانه | capture |
| Operator and company pages91011 | operators and companies | projects | 2025 | برای هر رخداد | projects |
| World Bank report13 | development bank | global | 2025 | سالانه | pricing |
| US agency pages1419 | agencies | US | 2024 to 2026 | پیوسته | permits and hubs |
| EU pages1722 | EU institution | EU | 2026 | پیوسته | policy |
| Frontier and CDR.fyi2021 | buyer group and dashboard | global | 2026 | پیوسته | removal market |
B.3Regional reading, climate technology across ten clusters
Regional plates follow with the regional editions. This page gives the regional reading of climate technology infrastructure and exposure in table form and ranks no region.
| منطقه | Principal hazards | Systems most exposed | Baseline evidence |
|---|---|---|---|
| آمریکای شمالی | direct air capture projects; storage permitting; capture incentives | storage, finance | EPA19; operator11; DOE14 |
| آمریکای جنوبی | land-based removal at large scale | removal | removal assessment1 |
| اروپا | shared storage in operation; border mechanism; removal framework | storage, trade | Northern Lights10; Commission1722 |
| Eurasia | land-based removal; regional evidence thin | removal | removal assessment1 |
| خاورمیانه و شمال آفریقا | regional evidence not bound | capture, storage | regional evidence (not bound) |
| آفریقا | skills and access; land-based removal | workforce, removal | regional evidence (not bound) |
| جنوب آسیا | new carbon market schemes; clean power growth | finance, power | بانک جهانی13 |
| شرق آسیا | largest contributions to conventional removal; clean power build | removal, power | removal assessment1; Ember5 |
| ASEAN | regional evidence not bound | power, finance | regional evidence (not bound) |
| Oceania-Pacific | regional evidence not bound | removal, workforce | regional evidence (not bound) |
B.4Cluster card: shared CO2 transport and storage in the North Sea
- storage
- transport
- cement capture
- shared infrastructure
- Systems in view
- cement capture, ship transport, receiving terminal, subsea storage
- Defining events
- Brevik capture began in June 20258; phase 1 storage operational10
- پیوندها
- INF → CLI storage; FIN → INF funding and premium sales
- Capability evidence
- phase 2 expansion to 5 Mtpa reported as under construction8
- شکافها
- actual injected volumes; further customers; permit status
- Agenda items
- C-01 · C-05
The Brevik plant is designed to capture about 400,000 tonnes of CO2 per year, around half of its emissions, using an amine-based process [8] [9].
CAPTURE
Cement plant capture
Northern Lights phase 1 has a storage capacity of 1.5 Mtpa and is operational; it is open to third parties [10] [8].
STORAGE
Shared store
CO2 has been separated from produced gas at Sleipner since 1996, and more than 19 million tonnes had been stored by the end of 2020 [25].
PATH
Sleipner precedent
B.5How countries appear in the climate technology edition
Countries enter the climate technology edition through the readiness chapters of their own national editions, on one card grammar. They are read against peer distributions and thresholds, never ranked.
| Card field | آنچه نشان میدهد | منبع |
|---|---|---|
| WEFH+B state | each core system against peer distribution bands | national edition |
| پیوندها | the national dependency matrix | national edition |
| Risk objects | the national risk portfolio | national edition |
| Capability rungs | the national capability ladder | national edition |
| Evidence age | oldest and newest source dates | national source register |
Editions in the 2026 Baseline programme
countries and unions
clusters
flagship and sector
technology reports
How to read a country card
- Each system is shown against the distribution of its peers, with thresholds where they exist
- Couplings and risk objects come from the country’s own national edition
- Capability rungs record evidence, not a judgement of institutions
- Evidence age is printed, so older national data are visible as such
| موج | Countries and unions | وضعیت |
|---|---|---|
| W0 | کانادا | ISSUED |
| W1 | United States, United Kingdom, France, Germany, Italy, Japan, European Union, Switzerland | PLANNED |
| W2 | Mexico, Brazil, Argentina, Türkiye, Russian Federation, Saudi Arabia, United Arab Emirates, South Africa, Senegal, Kenya, African Union, India, China, Republic of Korea, Indonesia, Singapore, Australia | PLANNED |
B.6پروانهها
| محتوا | پروانه |
|---|---|
| Text | CC BY 4.0 |
| داده | on the licence of each source; Nexus tables CC BY 4.0 |
| ارقام | Nexus figures CC BY 4.0; third-party as credited |
| نقشهها | boundary source and licence printed on each plate |
| فراداده | CC0 1.0, as Zenodo publishes it |
| Third-party data, figures and text | The source’s own licence, credited where it is used; never relicensed |
| Nexus-authored text, tables and figures: CC BY 4.0 (SPDX CC-BY-4.0). Map plates print their boundary source and licence. | |
B.7Formats and provenance
| قالب | گونه | وضعیت | چیست | شناسه |
|---|---|---|---|---|
| Web edition | HTML | در این وبسایت | Draft in stewardship review; every value resolves to its source. | NR-XTECH-CLIMATETECH-GLOBAL-2026-BASELINE-v1.0.0 |
| Print edition | At release | A4 portrait · screen, print and archival PDF, signed with the web edition at release. | NR-XTECH-CLIMATETECH-GLOBAL-2026-BASELINE-v1.0.0 | |
| Indicator data | CSV · JSON | در این وبسایت | 20 indicators with unit, year, status and source; the machine-readable copy ships with the evidence bundle at release. | NR-XTECH-CLIMATETECH-GLOBAL-2026-BASELINE data release v1 |
| ارقام | SVG · PNG | در این وبسایت | 4 on the web edition: headline figure, figure 1.3, coupling instrument, capability ladder. | FIG-XTECH-CLIMATETECH-GLOBAL-2026-BASELINE-* |
| Slides | ثبت نشده | No slide deck is recorded for this edition. | ||
| گزارش مختصر شواهد | HTML · PDF | ثبت نشده | No evidence brief is recorded for this edition. | |
| Dataset with DOI | DataCite | At release | Concept and version DOI are minted at deposit; none is recorded yet. |
خاستگاه
- Edition pack
- The edition’s content pack (JSON), from which the print and web editions are built
- Evidence cut
- DC-XTECH-CLIMATETECH-GLOBAL-2026-B0, closed 30 September 2026
- بازتولیدپذیری
- sourced values cited; analytical values reproducible from stated parameters
- Self-check
- 14 of 23 at evidence close; a fail on any item blocks release
- بازبینی
- five passes scheduled before release (in Annex C)
- ناشر ثبتشده
- The Global Centre for Risk and Innovation (GCRI) for the Nexus Consortium
- اصلاحیهها
- Registry correction pathway; upheld corrections are published as notices with a new version
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 12Copernicus Climate Change Service and ECMWF (eds.), 2025 was the third-warmest year on record (news item, 14 January 2026; 1.47 degrees C above pre-industrial; 2023 to 2025 average above 1.5 degrees C). ECMWF, Reading. Observation year 2025. Accessed 2026-11-03.back
- 3Global Carbon Project (ed.), Global Carbon Budget 2025 release (news page dated 13 November 2025; fossil CO2 up 1.1% in 2025; total emissions 42.2 GtCO2; remaining 1.5 degrees C budget 170 GtCO2; CO2 425.7 ppm). Global Carbon Project, Tsukuba. Observation year 2025. Accessed 2026-11-03.back
- 2Friedlingstein, P. et al., Global Carbon Budget 2024, Earth System Science Data 17, 965 to 1039, 2025 (abstract page: fossil CO2 about 37.4 GtCO2 in 2024; 235 GtCO2 remaining for 1.5 degrees C from the start of 2025). Copernicus Publications, Gottingen. Observation year 2024. Accessed 2026-11-03.back
- 16NOAA Global Monitoring Laboratory (ed.), Trends in atmospheric carbon dioxide (page; Mauna Loa monthly mean 426.07 ppm for September 2026 and 424.37 ppm for September 2025). NOAA, Boulder. Observation year 2026. Accessed 2026-11-03.back
- 5Ember (ed.), Global Electricity Review 2026 (2025 data: solar generation 2,778 TWh, up 636 TWh or 30%; fossil generation down 38 TWh; renewables 33.8% of generation). Ember, London. Observation year 2025. Accessed 2026-11-03.back
- 6Global CCS Institute (ed.), Global Status of CCS 2026 (status page: 113 commercial CCS projects in operation and 68 Mtpa operating capture capacity as at 31 July 2026; capacity is not the same as actual annual capture). Global CCS Institute, Melbourne. Observation year 2026. Accessed 2026-11-03.back
- 7Global CCS Institute (ed.), Global Status of CCS 2025 media release (9 October 2025; 77 operational facilities, up 54% from 50; 47 projects under construction with 44 Mtpa; 513 Mtpa operating and in development). Global CCS Institute, Melbourne. Observation year 2025. Accessed 2026-11-03.back
- 8Global CCS Institute (ed.), Brevik CCS Facility Profile (2026; operation began June 2025; capture capacity 400,000 tonnes per year; Northern Lights phase 1 1.5 Mtpa operational, phase 2 5 Mtpa under construction; capital cost and abatement cost are secondary figures cited in the profile and are not used). Global CCS Institute, Melbourne. Observation year 2025. Accessed 2026-11-03.back
- 10Northern Lights JV (ed.), About the Longship project (operator page; phase 1 storage up to 1.5 million tonnes of CO2 per year; owners Equinor, Shell and TotalEnergies). Operator statement, weak evidence. Northern Lights JV, Stavanger. Observation year 2025. Accessed 2026-11-03.back
- 1Smith, S.M. et al. (eds.), The State of Carbon Dioxide Removal, third edition (report and data portal, 2 June 2026; total removal 2.2 GtCO2 per year; novel removal about 2 MtCO2 per year; pledge gaps of 0.3, 1.2 and 5.2 GtCO2 per year in 2030, 2035 and 2050). Opened as the downloaded PDF. University of Oxford and partners, Oxford. Observation year 2025. Accessed 2026-11-03.back
- 13World Bank (ed.), Direct carbon pricing covers nearly one third of global emissions (press release on State and Trends of Carbon Pricing 2026, 19 May 2026; about 29% coverage; revenue above USD 107 billion in 2025; 87 instruments; average price near USD 21 per tonne). World Bank, Washington. Observation year 2025. Accessed 2026-11-03.back
- 20Frontier Climate (ed.), Frontier home page (advance market commitment of USD 1.8 billion of permanent carbon removal by 2040; buyer group page, weak evidence for market size). Frontier Climate, San Francisco. Observation year 2026. Accessed 2026-11-03.back
- 21CDR.fyi (ed.), CDR.fyi public dashboard (headline metrics: 50.6 million tonnes contracted, 1.7 million tonnes delivered, weighted average price USD 340 per tonne; no as-of date on the page; dashboard, weak evidence). CDR.fyi, online. Observation year 2026. Accessed 2026-11-03.back
- 4Ember (ed.), Global Electricity Review 2025 (2024 data: solar 6.9% and wind 8.1% of electricity; low-carbon share 40.9%; solar generation up 29%; fossil generation up 1.4%). Ember, London. Observation year 2024. Accessed 2026-11-03.back
- 9Heidelberg Materials (ed.), World premiere at Heidelberg Materials: opening of CCS facility in Norway (company release, 18 June 2025; about 400,000 tonnes of CO2 per year, 50% of plant emissions). Company statement, weak evidence. Heidelberg Materials, Heidelberg. Observation year 2025. Accessed 2026-11-03.back
- 11Occidental and 1PointFive (eds.), Occidental and 1PointFive secure Class VI permits for the STRATOS direct air capture facility (company release, 7 April 2025; capacity up to 500,000 tonnes per year; stated on track to begin operations in 2025). Company statement, weak evidence. 1PointFive, Houston. Observation year 2025. Accessed 2026-11-03.back
- 14US Department of Energy Office of Clean Energy Demonstrations (ed.), Regional Direct Air Capture Hubs (programme page; four hubs with potential of at least 1 million tonnes per year each; USD 3.5 billion announcement of December 2022 and USD 1.8 billion announcement of December 2024; no awardees named on the page). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03.back
- 19US Environmental Protection Agency (ed.), Class VI wells used for geologic sequestration of CO2 (page updated 18 August 2026; no permit counts on the page). US EPA, Washington. Observation year 2026. Accessed 2026-11-03.back
- 17European Commission (ed.), Carbon Border Adjustment Mechanism (page; transitional phase 2023 to 2025; definitive period from 1 January 2026; six sectors). Directorate-General for Taxation and Customs Union, Brussels. Observation year 2026. Accessed 2026-11-03.back
- 22European Commission (ed.), Carbon removals and carbon farming (policy page; framework names methodologies and schemes; no criteria or dates on the page). Directorate-General for Climate Action, Brussels. Observation year 2026. Accessed 2026-11-03.back