Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

The 2027 agenda

Eight bounded questions open the 2027 National Agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due at the Q1 2027 cut.

6 min read0 figures6 tables4 notesNR-COUNTRY-ARE-2026-BASELINE

વિષયવસ્તુ
  1. ·Edition home
  2. ·Executive summary
  3. 1The United Arab Emirates’ risk is heat, water and supply at once
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Humid summer heat peak with grid and desalination stress
  8. 6Readings from the other desks
  9. 7The 2027 agenda
    1. 7.1 Questions for the operational series
    2. 7.2 Portfolio proposed for the Q1 2027 alignment
    3. 7.3 The pathway
    4. 7.4 Universe 2027, evidence pack for the candidate mission
    5. 7.5 Handoffs and routing
    6. 7.6 Feeds and signal register
  10. 8Systems in depth
  11. AMethodology
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

7.1Questions for the operational series

  1. A-01

    How would a humid summer heat peak load power, desalination and outdoor-work protection together, and how much margin exists in each?

    INI-ARE-CLI-01 · heat–power–water continuity; first output: dependency graph for two emirates.

  2. A-02

    How much of the water supply is non-renewable groundwater and how much is desalinated, emirate by emirate, and how fast is groundwater drawn down?

    INI-ARE-WAT-02 · groundwater and desalination; first output: supply-source register by emirate.

  3. A-03

    How much fuel is burned for power and desalination as nuclear and solar grow, and what does the 2026 generation mix show?

    INI-ARE-ENE-03 · power mix and gas transition; first output: generation and fuel table for 2026.

  4. A-04

    How concentrated are food imports, by commodity and origin, and how many days of reserves exist?

    INI-ARE-FOO-04 · import exposure; first output: commodity dependence table.

  5. A-05

    How is heat illness counted among residents and outdoor workers?

    INI-ARE-HLT-05 · heat and outdoor work; first output: definitions and counting-rule note.

  6. A-06

    How do flash floods and urban drainage interact across the emirates?

    INI-ARE-CLI-02 · workstream; first output: event register 2018–2026.

  7. A-07

    What would a quantified pathway from the 2022 inventory to the 2035 aim need from power, industry and buildings?

    To be admitted in Q1 2027; first output: scoping note.

  8. A-08

    Which capabilities have been tested in real events, and which are only planned?

    National capability register; first output: rung evidence for 15 functions.

7.2Portfolio proposed for the Q1 2027 alignment

Five initiatives and one Universe mission candidate are proposed for admission at the Q1 2027 alignment. They are programme objects, no partner, funder or member is attached to them in this edition.

Table 7.1Objects proposed for the first operational quarter
IDObjectKindપ્રશ્નરાજ્ય
INI-ARE-CLI-01Heat–power–water continuityInitiativeA-01PROPOSED
INI-ARE-WAT-02Groundwater and desalinationInitiativeA-02PROPOSED
INI-ARE-ENE-03Power mix and gas transitionInitiativeA-03PROPOSED
INI-ARE-FOO-04Food import exposureInitiativeA-04PROPOSED
INI-ARE-HLT-05Heat and outdoor workInitiativeA-05PROPOSED
PRJ-ARE-CLI-01aTwo-emirate heat, power and water dependency graphપ્રોજેક્ટA-01PROPOSED
MSN-ARE-2027-01Humid summer heat peak Universe missionમિશનA-01Candidate

7.3The pathway

United Arab Emirates is the national pathway through which the Nexus operating system will run in the United Arab Emirates from 2027. At baseline the pathway is designed and its records are prepared; its councils and working groups are constituted from Q1 2027. This page states what exists today and what comes next, nothing more.

  1. 01

    One National Agenda

    bounded national questions for the year

    DRAFT 2027 · agenda review at the Q1 alignment

  2. 02

    National Desk

    coordination, records, routing and continuity

    DESIGNED · constituted in Q1 2027

  3. 03

    National Model

    the country as a system of systems

    v0 SPECIFIED · v1 with the first Foundry cut

  4. 04

    National Portfolio

    risks, capabilities, initiatives, projects, missions

    7 PROPOSED · admission at the Q1 alignment

  5. 05

    Foundry

    continuous computational environment

    PREPARED · first sealed cut NQ-ARE-2027-Q1

  6. 06

    અહેવાલો

    quarterly and annual publication

    BASELINE ISSUED · Q1 2027 · State & Agenda

  7. 07

    બ્રહ્માંડ

    annual proving environment

    CANDIDATE MISSION · mandate set in 2027

  8. 08

    Evidence and correction

    after-action, correction and renewal

    OPEN · first correction cycle in Q2 2027

7.4Universe 2027, evidence pack for the candidate mission

  1. 01

    આદેશ

  2. 02

    Core Build · 1 month

  3. 03

    Action · 1 week

  4. 04

    Evidence seal

  5. 05

    Portfolio correction

  6. 06

    Next mandate

Table 7.2Universe 2027, evidence pack for the candidate mission
Itemરેકોર્ડરાજ્યTiming
F1Annual mandate recordPLANNEDafter the Q2 2027 alignment
F2Core Build recordPLANNEDone month before the exercise
F3Exercise evidencePLANNEDduring the Action week
F4Decision packetsPLANNEDexercise state only
F5Proof receiptsPLANNEDscoped to each recorded check
F6After-action reportPLANNEDwithin one quarter
F7Upgrade docketPLANNEDrouted to the Portfolio
F8Portfolio renewalPLANNEDQ4 2027 annual edition
F9Public synthesisPLANNEDpublic-safe extracts only

મિશન

ID
MSN-ARE-2027-01 · Humid summer heat peak Universe mission
Role spine
Leadership sponsor (NLC) · Institutional anchor (NNC) · Mission lead (NWG)
Receiving actors
to be identified with the mandate

7.5Handoffs and routing

Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.

Table 7.3Handoffs and routing
FindingRouted toPurposeClass
CLI-001 · emissionspublic recordreference for the 2027 seriesPUBLIC
CLI-002 · climate aimINI-ARE-ENE-03power mix and gas transitionPUBLIC
ENE-003 · generationINI-ARE-ENE-03power mix and gas transitionPUBLIC
WAT-005 · groundwaterINI-ARE-WAT-02supply-source registerPUBLIC
FOO-007 · food importsINI-ARE-FOO-04import exposurePUBLIC
HLT-009 · heat and outdoor workINI-ARE-HLT-05heat and outdoor workPUBLIC
FIN-011 · fuel revenueINI-ARE-CLI-01 · key F reviewfiscal exposurePUBLIC
SYS-012 · compound pathwayMSN-ARE-2027-01Universe candidateCONSORTIUM
Table 7.4Routing rules by publication class
ClassWhere it goesWho can see it
PUBLICthe published edition and its evidence bundleanyone
CONSORTIUMgoverned rooms of the national pathwayconsortium members under agreement
CONTROLLEDneed-to-know channelsnamed competent actors only

7.6Feeds and signal register

Table 7.5Feeds watched from Q1 2027
FeedProducerLatencyFeeds into
Weather alerts and rainfallNational Centre of Meteorologyreal timeRSK-ARE-CLI-003
Public emergency alertsNational Emergency Crisis and Disaster Management Authorityevent drivenRSK-ARE-CLI-003
Midday-break inspectionsMinistry of Human Resources and EmiratisationseasonalHLT-009
Generation and capacity dataEmber · IRENAannualENE-003
Population estimatesFCSC · Dubai Data and Statistics Establishmentannualprofile
Fiscal and growth outlookIMFannualFIN-011
Transparency reportsMinistry of Climate Change and EnvironmentbiennialCLI-001

Escalation routes

  • none · keep monitoring
  • research question
  • project
  • risk object
  • quarterly publication
  • signal report
Table 7.6Signals at baseline
IDSignalCorroborationપ્રણાલીઓમાર્ગ
SIG-ARE-001Gas share of generation fell from 97% to 68% between 2019 and 202517CORROBORATEDENEinitiative A-03
SIG-ARE-002Rain of 254 mm in under 24 hours in April 2024 was followed by an AED 30 billion drainage programme2327CORROBORATEDCLI · INFinitiative A-06
SIG-ARE-003A reading of 51.6 °C was reported in May 202525CORROBORATEDCLI · HLTinitiative A-05

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 17Ember (ed.), Yearly electricity data: generation by country and source (release_generation_yearly_global), United Arab Emirates 2019–2025. Ember, London, 2026. Observation year 2025. https://files.ember-energy.org/public-downloads/generation/outputs/release_generation_yearly_global.csv, accessed 2026-11-03.back
  2. 23National Centre of Meteorology (ed.), statement on the rainfall of 16 April 2024 (254 mm in under 24 hours at Khatm Al Shakla, highest since records began in 1949), reported in “UAE witnesses largest amount of rainfall in 75 years,” Gulf News, Dubai, April 2024. Observation year 2024. https://gulfnews.com/uae/weather/uae-witnesses-largest-amount-of-rainfall-in-75-years-1.1713319645595, accessed 2026-11-03.back
  3. 27Dubai Protocol Department (ed.), Mohammed bin Rashid launches the AED 30 billion Tasreef project to raise Dubai’s rainwater drainage capacity by 700%. Government of Dubai, Dubai, 24 June 2024. Observation years 2024–2033. https://protocol.dubai.ae/en/media-listing/news-events/mohammed-bin-rashid-approves-aed30-billion-tasreef-project-to-enhance-dubais-rainwater-drainage-capacity-by-700/, accessed 2026-11-03.back
  4. 25National Centre of Meteorology (ed.), statement that May 2025 was the hottest May on record (mean maximum 40.4 °C; 51.6 °C at Sweihan on 24 May 2025), reported in “UAE has hottest May on record after temperatures top 50C,” The National, Abu Dhabi, 3 June 2025. Observation year 2025. https://www.thenationalnews.com/news/uae/2025/06/03/uae-has-hottest-may-on-record-after-temperatures-top-50c, accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Print

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF116 pages1000 KBTagged, with bookmarks

      SHA-256 3dbf3b596a607c2f8ddfa7c96a03b6bdba4da4d2373ca71c4ff3e03fd70bbb5a

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF124 pages1014 KBTagged, with bookmarks

      SHA-256 3d6e3ee929cfe5145862d3aa29b3eb7c2c637fec37e97491874d8d83b8573db0

  • Web edition

  • Data bundle

    • Indicators, CSV

      30 indicators with unit, year, status and source

      NR-COUNTRY-ARE-2026-BASELINE-indicators.csv2 KB

      SHA-256 81c7d823734d0dc3373914ea644e2fba47d9456a3d323d17d3cbe7140a45056d

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-COUNTRY-ARE-2026-BASELINE-indicators.json3 KB

      SHA-256 ec72ca6bd271bd3da29db839f0aedc9cd94a350bb0873f666331d8d7059972e7

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-COUNTRY-ARE-2026-BASELINE-findings.csv3 KB

      SHA-256 6aab88663a224d773268a3890be783afcad1af29597da0eda086e89089d3ed32

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-COUNTRY-ARE-2026-BASELINE.bib1 KB

      SHA-256 5713cfba04663a08656338f2f1236256f01df66584c9270c47789dc58bd4b900

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-COUNTRY-ARE-2026-BASELINE.ris1 KB

      SHA-256 455f13d709d5c23a24ad51c817b10867519f988b2acda7610fb8dd873b316ca1

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-COUNTRY-ARE-2026-BASELINE.cff1 KB

      SHA-256 dbc2084b60a95ba396971cd99dbfde6496b690d7d7cfe25ce7779460a5ba36eb

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 7: The 2027 agenda. In United Arab Emirates Systems Risk and Resilience Report 2026: The State of the United Arab Emirates’ Interdependent Systems (Baseline Edition 2026, Report No. NR-COUNTRY-ARE-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

અહેવાલોયોગદાન આપો

Send evidence or a correction on United Arab Emirates.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems Evidence deskCountry Systems Risk and Resilience
Contribution form · reports.contribution.gcri

ક્યારેય વ્યક્તિગત ડેટા, સંવેદનશીલ માળખાકીય સુવિધાઓની વિગતો અથવા તમને શેર કરવાનો અધિકાર ન હોય તેવું કંઈપણ મોકલશો નહીં. ઉપયોગ પહેલાં દરેક યોગદાનની સમીક્ષા થાય છે; તે મોકલવાથી કોઈ લેખકત્વ અથવા સંપાદકીય અધિકારો મળતા નથી, અને પ્રાયોજકતા ક્યારેય કોઈ તારણ ખરીદી શકતી નથી.

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace