- United Arab Emirates 2026
- Chapter 7
The 2027 agenda
Eight bounded questions open the 2027 National Agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due at the Q1 2027 cut.
Contents
- ·Edition home
- ·Executive summary
- 1The United Arab Emirates’ risk is heat, water and supply at once
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Humid summer heat peak with grid and desalination stress
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
7.1Questions for the operational series
- A-01
How would a humid summer heat peak load power, desalination and outdoor-work protection together, and how much margin exists in each?
INI-ARE-CLI-01 · heat–power–water continuity; first output: dependency graph for two emirates.
- A-02
How much of the water supply is non-renewable groundwater and how much is desalinated, emirate by emirate, and how fast is groundwater drawn down?
INI-ARE-WAT-02 · groundwater and desalination; first output: supply-source register by emirate.
- A-03
How much fuel is burned for power and desalination as nuclear and solar grow, and what does the 2026 generation mix show?
INI-ARE-ENE-03 · power mix and gas transition; first output: generation and fuel table for 2026.
- A-04
How concentrated are food imports, by commodity and origin, and how many days of reserves exist?
INI-ARE-FOO-04 · import exposure; first output: commodity dependence table.
- A-05
How is heat illness counted among residents and outdoor workers?
INI-ARE-HLT-05 · heat and outdoor work; first output: definitions and counting-rule note.
- A-06
How do flash floods and urban drainage interact across the emirates?
INI-ARE-CLI-02 · workstream; first output: event register 2018–2026.
- A-07
What would a quantified pathway from the 2022 inventory to the 2035 aim need from power, industry and buildings?
To be admitted in Q1 2027; first output: scoping note.
- A-08
Which capabilities have been tested in real events, and which are only planned?
National capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for admission at the Q1 2027 alignment. They are programme objects, no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-ARE-CLI-01 | Heat–power–water continuity | Initiative | A-01 | PROPOSED |
| INI-ARE-WAT-02 | Groundwater and desalination | Initiative | A-02 | PROPOSED |
| INI-ARE-ENE-03 | Power mix and gas transition | Initiative | A-03 | PROPOSED |
| INI-ARE-FOO-04 | Food import exposure | Initiative | A-04 | PROPOSED |
| INI-ARE-HLT-05 | Heat and outdoor work | Initiative | A-05 | PROPOSED |
| PRJ-ARE-CLI-01a | Two-emirate heat, power and water dependency graph | Project | A-01 | PROPOSED |
| MSN-ARE-2027-01 | Humid summer heat peak Universe mission | Mission | A-01 | Candidate |
7.3The pathway
United Arab Emirates is the national pathway through which the Nexus operating system will run in the United Arab Emirates from 2027. At baseline the pathway is designed and its records are prepared; its councils and working groups are constituted from Q1 2027. This page states what exists today and what comes next, nothing more.
- 01
One National Agenda
bounded national questions for the year
DRAFT 2027 · agenda review at the Q1 alignment
- 02
National Desk
coordination, records, routing and continuity
DESIGNED · constituted in Q1 2027
- 03
National Model
the country as a system of systems
v0 SPECIFIED · v1 with the first Foundry cut
- 04
National Portfolio
risks, capabilities, initiatives, projects, missions
7 PROPOSED · admission at the Q1 alignment
- 05
Foundry
continuous computational environment
PREPARED · first sealed cut NQ-ARE-2027-Q1
- 06
quarterly and annual publication
BASELINE ISSUED · Q1 2027 · State & Agenda
- 07
Universe
annual proving environment
CANDIDATE MISSION · mandate set in 2027
- 08
Evidence and correction
after-action, correction and renewal
OPEN · first correction cycle in Q2 2027
7.4Universe 2027, evidence pack for the candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | Q4 2027 annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-ARE-2027-01 · Humid summer heat peak Universe mission
- Role spine
- Leadership sponsor (NLC) · Institutional anchor (NNC) · Mission lead (NWG)
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| CLI-001 · emissions | public record | reference for the 2027 series | PUBLIC |
| CLI-002 · climate aim | INI-ARE-ENE-03 | power mix and gas transition | PUBLIC |
| ENE-003 · generation | INI-ARE-ENE-03 | power mix and gas transition | PUBLIC |
| WAT-005 · groundwater | INI-ARE-WAT-02 | supply-source register | PUBLIC |
| FOO-007 · food imports | INI-ARE-FOO-04 | import exposure | PUBLIC |
| HLT-009 · heat and outdoor work | INI-ARE-HLT-05 | heat and outdoor work | PUBLIC |
| FIN-011 · fuel revenue | INI-ARE-CLI-01 · key F review | fiscal exposure | PUBLIC |
| SYS-012 · compound pathway | MSN-ARE-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the national pathway | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| Weather alerts and rainfall | National Centre of Meteorology | real time | RSK-ARE-CLI-003 |
| Public emergency alerts | National Emergency Crisis and Disaster Management Authority | event driven | RSK-ARE-CLI-003 |
| Midday-break inspections | Ministry of Human Resources and Emiratisation | seasonal | HLT-009 |
| Generation and capacity data | Ember · IRENA | annual | ENE-003 |
| Population estimates | FCSC · Dubai Data and Statistics Establishment | annual | profile |
| Fiscal and growth outlook | IMF | annual | FIN-011 |
| Transparency reports | Ministry of Climate Change and Environment | biennial | CLI-001 |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- quarterly publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-ARE-001 | Gas share of generation fell from 97% to 68% between 2019 and 202517 | CORROBORATED | ENE | initiative A-03 |
| SIG-ARE-002 | Rain of 254 mm in under 24 hours in April 2024 was followed by an AED 30 billion drainage programme2327 | CORROBORATED | CLI · INF | initiative A-06 |
| SIG-ARE-003 | A reading of 51.6 °C was reported in May 202525 | CORROBORATED | CLI · HLT | initiative A-05 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 17Ember (ed.), Yearly electricity data: generation by country and source (release_generation_yearly_global), United Arab Emirates 2019–2025. Ember, London, 2026. Observation year 2025. https://files.ember-energy.org/public-downloads/generation/outputs/release_generation_yearly_global.csv, accessed 2026-11-03.back
- 23National Centre of Meteorology (ed.), statement on the rainfall of 16 April 2024 (254 mm in under 24 hours at Khatm Al Shakla, highest since records began in 1949), reported in “UAE witnesses largest amount of rainfall in 75 years,” Gulf News, Dubai, April 2024. Observation year 2024. https://gulfnews.com/uae/weather/uae-witnesses-largest-amount-of-rainfall-in-75-years-1.1713319645595, accessed 2026-11-03.back
- 27Dubai Protocol Department (ed.), Mohammed bin Rashid launches the AED 30 billion Tasreef project to raise Dubai’s rainwater drainage capacity by 700%. Government of Dubai, Dubai, 24 June 2024. Observation years 2024–2033. https://protocol.dubai.ae/en/media-listing/news-events/mohammed-bin-rashid-approves-aed30-billion-tasreef-project-to-enhance-dubais-rainwater-drainage-capacity-by-700/, accessed 2026-11-03.back
- 25National Centre of Meteorology (ed.), statement that May 2025 was the hottest May on record (mean maximum 40.4 °C; 51.6 °C at Sweihan on 24 May 2025), reported in “UAE has hottest May on record after temperatures top 50C,” The National, Abu Dhabi, 3 June 2025. Observation year 2025. https://www.thenationalnews.com/news/uae/2025/06/03/uae-has-hottest-may-on-record-after-temperatures-top-50c, accessed 2026-11-03.back
