- South America 2026
- Annex A
कार्यप्रणाली
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
विषय-सूची
- ·Edition home
- ·Executive summary
- 1South America’s risk travels through shared rivers, grids and gas
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Basin drought across the Paraná corridor and the Amazon
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- Aकार्यप्रणाली
- BData appendix
- CReferences and record
- ·Complete edition, for print
A.1पद्धतियाँ
The regional baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | परिणाम |
|---|---|---|---|
| (1) | Brazil’s share of the two members’ population, 2025 | 212.81 ÷ (212.81 + 45.85) | 82.3% |
| (2) | Brazil’s share of the two members’ emissions excluding land use, 2024 | 1,299.18 ÷ (1,299.18 + 374.34) | 77.6% |
| (3) | Brazil’s share of the two members’ GDP, 2025 | 2,279.92 ÷ (2,279.92 + 683.10) | 76.9% |
| (4) | Combined emissions excluding land use, 2024 | 1,299.18 + 374.34 | 1,673.5 Mt |
| Strength | परिभाषा |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at regional scale |
| लेबल | नियम |
|---|---|
| रिपोर्ट किया गया | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| अनुमानित | Nexus analytical value with stated method |
| परिदृश्य | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card: Regional System Model v0
- Model ID
- MDL-SAM-REGIONAL · v0.1
- उद्देश्य
- represent South America as coupled water, energy, food, health and biodiversity systems across member countries, with forcing and transmission layers
- परिवार
- graph-based system of systems
- इनपुट
- the cited sources of this edition; no proprietary data
- पद्धति
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- सत्यापन
- none yet, first validation against federation evidence in 2027
- अनिश्चितता
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- regional scale; not for national, basin or asset-level use
- पुनरुत्पादनीयता
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The regional baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- NQ-REG-SAM-2026-Q0-1
- प्रकार
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 50 cited sources, each at the edition and access date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- NQ-REG-SAM-2027-Q1-1 at the Q1 2027 close
वंशावली
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| तत्व | Baseline 2026 | 2027 regional annual |
|---|---|---|
| स्रोत | cited publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| मॉडल | Regional System Model v0 specification | model runs with receipts |
| निष्कर्ष | twelve baseline findings | findings re-bound to federation evidence |
| समीक्षा | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| संकेतक | प्रेक्षित | जारी | लय | Next release |
|---|---|---|---|---|
| जनसंख्या | 2025 | दर्ज नहीं | वार्षिक | वार्षिक |
| Gross domestic product | 2025 | दर्ज नहीं | वार्षिक | वार्षिक |
| Greenhouse gases excluding land use | 2024 | दर्ज नहीं | वार्षिक | वार्षिक |
| Renewable share of final energy | 2021 | दर्ज नहीं | वार्षिक | not bound |
| Electricity mix | 2025 | Dec 2025 (Argentina page) | वार्षिक | वार्षिक |
| वन क्षेत्र | 2024 | दर्ज नहीं | वार्षिक | वार्षिक |
| Protected areas | 2025 | दर्ज नहीं | वार्षिक | वार्षिक |
| WMO regional report | 2025 | मई 2026 | वार्षिक | वार्षिक |
| Rio Grande do Sul assessment | 2024 | Nov 2024 | one-off | not scheduled |
| प्रणाली | कवरेज | Thinnest dimension |
|---|---|---|
| जलवायु और संकट | PARTIAL | losses; net emissions |
| ऊर्जा | PARTIAL | plant output; cross-border flows |
| जल | THIN | low-water series; Argentine access |
| खाद्य | THIN | harvest and export volumes |
| स्वास्थ्य | THIN | dengue for 2025 |
| जैव विविधता | PARTIAL | deforestation at source |
| वित्त | THIN | insured and uninsured losses |
| डिजिटल | THIN | dependency mapping |
| क्षेत्र | Source that would fill it | Blocker |
|---|---|---|
| Share of Argentina’s population using safely managed drinking water | World Bank series8 and the Argentine national water authority | the World Bank series returned no value for Argentina for 2019 to 2024 |
| Renewable share of final energy after 2021, Brazil and Argentina | World Bank series4 and national energy balances23 | the series ended in 2021 in the query; the Brazilian 2026 balance was read for the electricity matrix only (86.8% renewable in 2025) |
| Net emissions including land use for Brazil and Argentina on one basis | national inventories and the SEEG system | the series read6 excludes land use and the pledges1920 use net bases |
| Official PRODES deforestation rates for the Amazon and Cerrado, read at source | National Institute for Space Research22 | the Amazon estimate was read in the INPE technical note of 15 October 2025 (5,796 km²); the Cerrado rate was not read at source |
| Paraná River low-water days and navigation depth by year | national water institutes and port authorities25 | not retrieved; the press accounts disagree on the length of the record |
| Annual output of Itaipú, Yacyretá and Salto Grande | binational plant operators41 | not retrieved |
| Deaths and economic losses of the 2023 and 2024 Amazon droughts | Brazil geological service and civil defence records24 | only press coverage of river levels was found |
| Deaths and losses of the March 2025 Bahía Blanca storm | municipal and national civil protection records29 | press counts rose over several days (16 confirmed deaths on 9 March 2025, per the mayor) and no final official total was read |
| Dengue cases and deaths for 2025 and 2026, Brazil and Argentina | PAHO dengue indicators and national health ministries1826 | not retrieved; the alert to epidemiological week 36 of 2024 was read, but full-year 2024 totals were not |
| Guarani aquifer area by country and abstraction | the aquifer agreement parties and transboundary aquifer assessments21 | search results gave conflicting area figures and no source was opened |
| Paraná–La Plata basin area and population by country | La Plata basin treaty bodies39 | not retrieved |
| Argentine submission record of the third national pledge | UNFCCC registry and Climate Action Tracker2030 | the announcement was read; Climate Action Tracker states that as of June 2026 Argentina had yet to submit its 2035 target |
| Monthly volumes of Argentine gas exported to Brazil through Bolivia | Bolivian state gas company and the Brazilian regulator28 | not retrieved; an import authorisation was read, not monthly volumes |
| Insured and uninsured losses of the 2024 and 2025 floods | insurers’ associations and reinsurers | not retrieved |
| Capability rungs: early warning, reserves, response, recovery, social protection, infrastructure, workforce | civil protection, weather services, utilities and ministries | not reviewed by evidence close |
A.5Evidence cards: two anchor sources
Issued by the World Bank, from national and United Nations sources. Annual. Role: binds the population figures in the profile and regional reading. Coverage is national totals for Brazil and Argentina.
EVD-SAM-001
Population, total1
Authored by the Inter-American Development Bank with ECLAC and the World Bank Group, as reported by Agência Brasil. One-off. Role: binds the flood loss finding. Coverage is Rio Grande do Sul.
EVD-SAM-002
Damage and loss assessment of the 2024 floods16
| Dimension | EVD-SAM-001 | EVD-SAM-002 |
|---|---|---|
| Completeness | Brazil and Argentina national totals | one Brazilian state |
| Timeliness | about 1 year after the reference year | about 6 months after the event |
| Revision | revised by the issuer; not tracked here | one-off |
| Method transparency | published methodology | press report of the assessment read; the report itself was not opened |
| External validation | not assessed in this edition | not assessed in this edition |
Evidence cards to follow in Q1 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| समूह | क्षेत्र | मद | उत्तीर्ण | N/A | लंबित |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- मानचित्र
- plates in Q2 2027
- Waivers
- कोई नहीं
A.7Status words
| स्थिति | इसका क्या अर्थ है |
|---|---|
| प्रेक्षित | Measured directly and published by the source. |
| रिपोर्ट किया गया | Published statistics of an official or institutional source. |
| घोषित | Stated by the body concerned; not independently measured. |
| अनुमानित | A Nexus estimate from cited evidence, with its method in Annex A. |
| मॉडल-आधारित | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| पूर्वानुमान | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| परिदृश्य | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| चरण | क्या होता है | स्रोत |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| शब्द | अर्थ |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| युग्मन | a typed dependency through which one system transmits to another |
| संरक्षण अंतराल | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| साक्ष्य निर्धारित सीमा | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| AR5 | IPCC Fifth Assessment Report |
| CAT | Climate Action Tracker |
| ECLAC | Economic Commission for Latin America and the Caribbean |
| EPE | Energy Research Company (Brazil) |
| IDB | Inter-American Development Bank |
| INPE | National Institute for Space Research (Brazil) |
| LULUCF | land use, land-use change and forestry |
| NASA | National Aeronautics and Space Administration |
| PAHO | Pan American Health Organization |
| PRODES | Amazon deforestation monitoring programme (Brazil) |
| UNFCCC | United Nations Framework Convention on Climate Change |
| WMO | विश्व मौसम विज्ञान संगठन |
A.10Technical annex
| मद | Annex | विषय-सूची | स्थिति |
|---|---|---|---|
| A.1 | Indicator definitions | the regional indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-SAM-DRY-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Member-country notes | atlas cards for every member country | Q2 2027 |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: emissions excluding land use
- Construct
- annual greenhouse gas emissions without land use, land-use change and forestry
- इकाई
- Mt CO₂e
- दायरा
- calendar year, AR5 global warming potentials
- स्रोत
- World Bank greenhouse gas series6
- Revision
- revised by the issuer; not tracked here
- ज्ञात सीमाएँ
- excludes land use, which is large in Brazil; differs from the net bases of the national pledges1920
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 8World Bank (ed.), People using safely managed drinking water services, % of population (SH.H2O.SMDW.ZS), Brazil and Argentina, World Development Indicators API (no value returned for Argentina). World Bank, Washington, DC. Observation year 2024. Accessed 2026-11-03.back
- 4World Bank (ed.), Renewable energy consumption, % of total final energy consumption (EG.FEC.RNEW.ZS), Brazil and Argentina, World Development Indicators API (latest value returned is 2021). World Bank, Washington, DC. Observation year 2021. Accessed 2026-11-03.back
- 23Empresa de Pesquisa Energética (ed.), Balanço Energético Nacional 2026: Summary Report, base year 2025 (share of renewables in the electricity matrix 86.8% in 2025). EPE, Rio de Janeiro, 2026. Observation year 2025. Accessed 2026-11-05.back
- 6World Bank (ed.), Total greenhouse gas emissions excluding LULUCF, Mt CO2e, AR5 basis (EN.GHG.ALL.MT.CE.AR5), Brazil, Argentina and Latin America & Caribbean aggregate, World Development Indicators API. World Bank, Washington, DC. Observation year 2024. Accessed 2026-11-03.back
- 19Climate Action Tracker (ed.), Brazil: targets (second NDC, 59% to 67% below 2005 by 2035, 850 to 1,050 Mt CO2e including land use, submitted 13 November 2024; page updated 30 June 2026). Climate Analytics and NewClimate Institute. Observation year 2024. Accessed 2026-11-03.back
- 20Subsecretaría de Ambiente, Presidencia de la Nación (ed.), Argentina presentó la tercera contribución determinada a nivel nacional (net emissions not above 375 Mt CO2e for 2030 and 2035, 3 November 2025). Government of Argentina, Buenos Aires. Observation year 2025. Accessed 2026-11-03.back
- 22Instituto Nacional de Pesquisas Espaciais (ed.), Estimativa de desmatamento na Amazônia Legal para 2025 é de 5.796 km2, technical note (5,796 km2 for 1 August 2024 to 31 July 2025, 11.08% below the consolidated PRODES 2024 rate of 6,518 km2). INPE, São José dos Campos, 15 October 2025. Observation year 2025. Accessed 2026-11-05.back
- 25Associated Press (ed.), V. Caivano and A. Calatrava, Drought hits South America river, threatening vast ecosystem (Paraná at its lowest level in nearly 80 years; Argentina’s National Water Institute called it the worst since 1944; reservoirs including Itaipú’s at their lowest in 91 years), 6 August 2021, as republished by Phys.org. AP, New York. Observation year 2021. Accessed 2026-11-05.back
- 41Governments of Brazil and Paraguay (eds.), Treaty of Itaipú on the hydroelectric use of the Paraná river, signed on 26 April 1973 (Itaipu Binacional page opened). Observation year 1973. Accessed 2026-11-05.back
- 24Portal Amazônia (ed.), Saiba quais foram as maiores vazantes do Rio Negro em Manaus (12.11 m at the Port of Manaus gauge on 9 October 2024, the lowest in 122 years of monitoring, which began in 1902; data of the Serviço Geológico do Brasil and the port). Portal Amazônia, Manaus, 10 October 2024. Observation year 2024. Accessed 2026-11-05.back
- 29Agence France-Presse (ed.), Argentina flooding death toll rises to 16, two girls missing (the mayor of Bahía Blanca reported 16 confirmed deaths and said more were likely), 9 March 2025, as republished by TerraDaily. AFP, Paris. Observation year 2025. Accessed 2026-11-05.back
- 18Pan American Health Organization (ed.), PAHO calls for collective action in response to record increase in dengue cases in the Americas (news release, 28 March 2024; data as of 26 March 2024). PAHO, Washington, DC. Observation year 2024. Accessed 2026-11-03.back
- 26Pan American Health Organization (ed.), Epidemiological alert: increase in dengue cases in the Americas Region, 7 October 2024 (11,732,921 cases to epidemiological week 36 of 2024; 6,650 deaths, of which Brazil 5,303 and Argentina 408). PAHO, Washington, DC. Observation year 2024. Accessed 2026-11-05.back
- 21F. Sindico, in M. Fitzmaurice, A. Tanzi and A. Papantoniou (eds.), The Guarani Aquifer Agreement 2010, in Multilateral Environmental Treaties, Elgar Encyclopedia of Environmental Law. Edward Elgar, Cheltenham, 2017, pp. 299–310 (catalogue page opened; parties Brazil, Argentina, Paraguay and Uruguay). Observation year 2017. Accessed 2026-11-03.back
- 39Governments of Argentina, Bolivia, Brazil, Paraguay and Uruguay (eds.), Treaty of the River Plate Basin (Tratado de la Cuenca del Plata), signed at Brasília on 23 April 1969 (text published by the basin’s coordinating committee, CIC Plata). Observation year 1969. Accessed 2026-11-05.back
- 30Climate Action Tracker (ed.), Argentina: targets (states that as of June 2026 Argentina had yet to submit its 2035 target; 2030 NDC ceiling of 349 Mt CO2e including land use; latest update 17 July 2026). Climate Analytics and NewClimate Institute. Observation year 2026. Accessed 2026-11-05.back
- 28Oil & Gas Journal (ed.), Petrobras authorised to import Vaca Muerta gas as Brazil pivots from Bolivian supply (route through Argentina, Bolivia and the Gasbol pipeline; ANP Resolution SIM-ANP No. 737/2025 allows up to 180 million m3 a year, with peak deliveries of up to 2 million m3 a day), 5 March 2026. Oil & Gas Journal. Observation year 2026. Accessed 2026-11-05.back
- 1World Bank (ed.), Population, total (SP.POP.TOTL), Brazil, Argentina and Latin America & Caribbean aggregate, World Development Indicators API. World Bank, Washington, DC. Observation year 2025. Accessed 2026-11-03.back
- 16Inter-American Development Bank, with ECLAC and the World Bank Group (eds.), Damage and loss assessment of the April and May 2024 floods in Rio Grande do Sul (BRL 88.9 billion), as reported by Agência Brasil on 29 November 2024; the assessment itself was not opened. IDB, Washington, DC. Observation year 2024. Accessed 2026-11-03.back
- 49S. Valadbaygi (ed.), Reports: The Foundational Edition, Volumes I and II. Reports series, Edition 2026–2030, V1.0. The Global Centre for Risk and Innovation (GCRI) for the Nexus Consortium, Toronto, 2026. Observation year 2026. Accessed 2026-11-03.back
- 50S. Valadbaygi (ed.), Global Systems Risk & Resilience Report 2026: Baseline Edition. GCRI for the Nexus Consortium, Toronto, 2026. Observation year 2026. Accessed 2026-11-03.back