Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

Power loss that overlaps a telecom or cloud failure

A conditional statement under stated assumptions, never a prediction.

2 min read0 figures0 tables2 notesNR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE

विषय-सूची
  1. ·Edition home
  2. ·Executive summary
  3. 1Lifelines fail together
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Power loss that overlaps a telecom or cloud failure
    1. 5.1 Assumptions
    2. 5.2 The cascade, step by step
    3. 5.3 The scenario as a table of steps
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. Aकार्यप्रणाली
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

5.1धारणाएँ

Scenario SCN-SR02-PWR-01: what is assumed, and what is held constant.

आधार-रेखा
the 2026 reference state in this edition
चालक कारक
a regional power loss during a heat wave, coinciding with a software or cloud outage at a shared vendor
Analogues
Iberian blackout, 2025; global software outage, 202414
Interventions
none modelled: the specification describes the unmitigated case
Run state
narrative specification; quantified run scheduled for 2027

5.2The cascade, step by step

  1. 1

    ENE → INF

    voltage and frequency events trip generation; the grid separates

    2025

  2. 2

    INF → DAT

    exchanges and data centres run on batteries and generators

    2025

  3. 3

    DAT → INF

    a vendor outage removes remote management and payment services

    2024

  4. 4

    INF → WAT

    pumping and treatment stop or run on reserves

    2026

  5. 5

    INF → HLT

    hospitals move to emergency power; dispatch and records degrade

    2024 · 2025

  6. 6

    INF → FIN

    payments and markets pause; losses accumulate

    2024

5.3The scenario as a table of steps

How the shock in scenario SCN-SR02-PWR-01 would travel through Critical Infrastructure and Lifeline Systems‘s coupled systems, step by step, under the assumptions the edition states.

चरणक्या होता हैस्रोत
01 Energy to infrastructureVoltage and frequency events trip generation; the grid separates. Analogue or source: 2025.Edition SR-02, scenario SCN-SR02-PWR-01, step 1
02 Infrastructure to datExchanges and data centres run on batteries and generators. Analogue or source: 2025.Edition SR-02, scenario SCN-SR02-PWR-01, step 2
03 DAT to infrastructureA vendor outage removes remote management and payment services. Analogue or source: 2024.Edition SR-02, scenario SCN-SR02-PWR-01, step 3
04 Infrastructure to waterPumping and treatment stop or run on reserves. Analogue or source: 2026.Edition SR-02, scenario SCN-SR02-PWR-01, step 4
05 Infrastructure to healthHospitals move to emergency power; dispatch and records degrade. Analogue or source: 2024 · 2025.Edition SR-02, scenario SCN-SR02-PWR-01, step 5
06 Infrastructure to financePayments and markets pause; losses accumulate. Analogue or source: 2024.Edition SR-02, scenario SCN-SR02-PWR-01, step 6

A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Critical Infrastructure and Lifeline Systems 2026, scenario SCN-SR02-PWR-01 (2026); Critical Infrastructure and Lifeline Systems 2026, references (NR-CIT-1) (2026).

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
  2. 4Microsoft (ed.), Helping our customers through the CrowdStrike outage (blog post of 20 July 2024; estimate of 8.5 million Windows devices). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • प्रिंट करें

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF108 pages974 KBTagged, with bookmarks

      SHA-256 a001b18049034b26b3b46681e6a6f94a52bcfa1f036a7c5ea8f5c47a0c384d7e

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF115 pages979 KBTagged, with bookmarks

      SHA-256 132c29e03fd217138c54985f06a73f8934b58dafa34147c61cd392cf57bbd9bf

  • Web edition

  • डेटा बंडल

    • Indicators, CSV

      15 indicators with unit, year, status and source

      NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 5fca87fb40442be1fa3dd40b9f606fbd327392ab968bc3d7b091f9adcf905973

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 84a98b8e1bfd4b1c830bc9dcedc29a2f26badce65dd579232b1a19357914995b

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 dd84af93ff1227f865673e4a6e8cefebf186c950c83af875a7abd7fa0e73ed53

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 6bddfc7da88e6e3e56512894e64c6c638a2219ffb11c5da174ddb1dc119f4d45

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 8eff86b5383c0cecdf24c4f9cc2fdabdfa6dc8f7402227eb950e47633d4d68e3

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 f968482ca7d3c050c6e092cde70c7287cad11378e0e7c7a1e76f69e8680f6f1f

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 5: Power loss that overlaps a telecom or cloud failure. In Strategic Systems Report 2026: Critical Infrastructure and Lifeline Systems (Baseline Edition 2026, Report No. NR-STRATEGIC-LIFELINES-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

रिपोर्टयोगदान दें

Send evidence or a correction on Critical Infrastructure and Lifeline Systems.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI प्रणाली साक्ष्य डेस्करणनीतिक प्रणालियाँ
Contribution form · reports.contribution.gcri

व्यक्तिगत डेटा, संवेदनशील अवसंरचना का विवरण या ऐसी कोई भी सामग्री कभी न भेजें जिसे साझा करने का आपको अधिकार नहीं है। उपयोग से पहले योगदान की समीक्षा होती है; इसे भेजने से लेखकत्व या संपादकीय अधिकार नहीं मिलते, और प्रायोजन कभी किसी निष्कर्ष को नहीं खरीदता।

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

क्षेत्रक हस्ताक्षर

The sectors behind Critical Infrastructure and Lifeline Systems.

A reading aid: the sectors the findings run through and how strongly they depend on each other.

कोने चुनें · रेखाओं पर कर्सर ले जाएँ6 / 15 संबंध

संदर्भ

Infrastructure and its partners

Infrastructure gives pipes, dams and treatment works to water (0.6), transmission and fuel logistics to energy (0.6) and access to care to health (0.5).

W · E · I · F · H · B

क्षेत्रक
4 6 में से
संबंध
6 15 में से
युग्मन
0.46 कुल का हिस्सा

सक्रिय सबसे मज़बूत संबंध

  • ऊर्जा → अवसंरचना · परिवहन और दूरसंचार के लिए बिजली0.8
  • जल → ऊर्जा · शीतलन जल और जलविद्युत0.6
  • अवसंरचना → जल · पाइप, बाँध और उपचार संयंत्र0.6
  • जल → स्वास्थ्य · पेयजल और स्वच्छता0.7
एक विशिष्ट शहर-क्षेत्र के लिए शिक्षण मान, किसी स्थान के माप नहीं। युग्मन कार्यरत संबंधों की कुल शक्ति है, सभी पंद्रह के अनुपात के रूप में।
Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace