Fuel supply gap while first-of-a-kind units are delayed

A conditional statement under stated assumptions, never a prediction.

2 min read0 figures0 tables3 notesNR-XTECH-FISSION-GLOBAL-2026-BASELINE

Daftar isi
  1. ·Edition home
  2. ·Executive summary
  3. 1Advanced nuclear is firm infrastructure and a delivery test
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Fuel supply gap while first-of-a-kind units are delayed
    1. 5.1 Assumptions
    2. 5.2 The cascade, step by step
    3. 5.3 The scenario as a table of steps
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. AMetodologi
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

5.1Asumsi

Scenario SCN-XT15-FUE-01: what is assumed, and what is held constant.

Garis dasar
the 2026 reference state in this edition
Pendorong
several first-of-a-kind units reach fuel load in the same years while HALEU output stays below demand
Analogues
schedule and cost records of recent large units151720
Interventions
none modelled: the specification describes the unmitigated case
Run state
narrative specification; quantified run scheduled for 2027

5.2The cascade, step by step

  1. 1

    MIN → ENE

    HALEU output falls short of first-core needs for new designs

    2024

  2. 2

    TRD → MIN

    enrichment restrictions narrow supply options

    2025

  3. 3

    ENE → FIN

    first-of-a-kind schedules slip and costs rise

    2022

  4. 4

    FIN → INF

    lenders reprice later projects

    2026

  5. 5

    GOV → INF

    goals and licensing deadlines meet delivery limits

    2025

  6. 6

    INF → ENE

    firm capacity arrives later than plans assumed

    2026

5.3The scenario as a table of steps

How the shock in scenario SCN-XT15-FUE-01 would travel through Advanced Nuclear and Next-Generation Fission’s coupled systems, step by step, under the assumptions the edition states.

LangkahApa yang terjadiSumber
01 Minerals to energyHALEU output falls short of first-core needs for new designs. Analogue or source: 2024.Edition XT-15, scenario SCN-XT15-FUE-01, step 1
02 Trade to mineralsEnrichment restrictions narrow supply options. Analogue or source: 2025.Edition XT-15, scenario SCN-XT15-FUE-01, step 2
03 Energy to financeFirst-of-a-kind schedules slip and costs rise. Analogue or source: 2022.Edition XT-15, scenario SCN-XT15-FUE-01, step 3
04 Finance to infrastructureLenders reprice later projects. Analogue or source: 2026.Edition XT-15, scenario SCN-XT15-FUE-01, step 4
05 Governance to infrastructureGoals and licensing deadlines meet delivery limits. Analogue or source: 2025.Edition XT-15, scenario SCN-XT15-FUE-01, step 5
06 Infrastructure to energyFirm capacity arrives later than plans assumed. Analogue or source: 2026.Edition XT-15, scenario SCN-XT15-FUE-01, step 6

A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Advanced Nuclear and Next-Generation Fission 2026, scenario SCN-XT15-FUE-01 (2026); Advanced Nuclear and Next-Generation Fission 2026, references (NR-CIT-1) (2026).

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
  2. 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
  3. 20World Nuclear Association (ed.), Nuclear Power in France (country profile, first 100,000 characters read; 57 operable reactors; EPR2 six units, EUR 72.8 billion estimate of December 2025; Flamanville 3 grid connection December 2024, EUR 13.2 billion estimate of December 2022). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Cetak

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF115 pages1.1 MBTagged, with bookmarks

      SHA-256 22ffedb7adb2ae8c3d6966ed0c87a77d27eee4bf97895c2eba205ae25581bd16

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF119 pages1.1 MBTagged, with bookmarks

      SHA-256 8f561371af6b3081a346c773cd6cff47801df3fd8edf4915ae1ebe504666f0a1

  • Web edition

  • Data bundle

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 2ef816eb3345ec1ab90c3f78b56b59a22175c40aad1aca3fce650f72d8a47fbf

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 57737fec22e1c477892b03fc0ec9432254e46383f037fb23be5ac4975f64c703

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 90075a1b41fcbbc2d060c85b92b0fd6a969ac555e9e9937575ceb361e05da55c

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 92bc45d19e6305960d5ce961686c384f254f45b4e13fc12e5dc38c4c8ed4045b

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 c78d832647aaa2c07f4823182505accb83be04d82211f9ca68349f6a8891e5c0

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 27c7c9d6f1ee785004ff642c4407431ee5e5883e3ddfec1295791f69925ba4d9

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 5: Fuel supply gap while first-of-a-kind units are delayed. In Exponential Technology Report 2026: Advanced Nuclear and Next-Generation Fission (Baseline Edition 2026, Report No. NR-XTECH-FISSION-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

LaporanBerkontribusi

Send evidence or a correction on Advanced Nuclear and Next-Generation Fission.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

Meja Bukti Sistem GCRITeknologi Eksponensial

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace