Fuel supply gap while first-of-a-kind units are delayed
A conditional statement under stated assumptions, never a prediction.
Contents
- ·Edition home
- ·Executive summary
- 1Advanced nuclear is firm infrastructure and a delivery test
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Fuel supply gap while first-of-a-kind units are delayed
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
5.1Assumptions
Scenario SCN-XT15-FUE-01: what is assumed, and what is held constant.
- Baseline
- the 2026 reference state in this edition
- Drivers
- several first-of-a-kind units reach fuel load in the same years while HALEU output stays below demand
- Analogues
- schedule and cost records of recent large units151720
- Interventions
- none modelled: the specification describes the unmitigated case
- Run state
- narrative specification; quantified run scheduled for 2027
5.2The cascade, step by step
- 1
MIN → ENE
HALEU output falls short of first-core needs for new designs
2024
- 2
TRD → MIN
enrichment restrictions narrow supply options
2025
- 3
ENE → FIN
first-of-a-kind schedules slip and costs rise
2022
- 4
FIN → INF
lenders reprice later projects
2026
- 5
GOV → INF
goals and licensing deadlines meet delivery limits
2025
- 6
INF → ENE
firm capacity arrives later than plans assumed
2026
5.3The scenario as a table of steps
How the shock in scenario SCN-XT15-FUE-01 would travel through Advanced Nuclear and Next-Generation Fission’s coupled systems, step by step, under the assumptions the edition states.
| Step | What happens | Source |
|---|---|---|
| 01 Minerals to energy | HALEU output falls short of first-core needs for new designs. Analogue or source: 2024. | Edition XT-15, scenario SCN-XT15-FUE-01, step 1 |
| 02 Trade to minerals | Enrichment restrictions narrow supply options. Analogue or source: 2025. | Edition XT-15, scenario SCN-XT15-FUE-01, step 2 |
| 03 Energy to finance | First-of-a-kind schedules slip and costs rise. Analogue or source: 2022. | Edition XT-15, scenario SCN-XT15-FUE-01, step 3 |
| 04 Finance to infrastructure | Lenders reprice later projects. Analogue or source: 2026. | Edition XT-15, scenario SCN-XT15-FUE-01, step 4 |
| 05 Governance to infrastructure | Goals and licensing deadlines meet delivery limits. Analogue or source: 2025. | Edition XT-15, scenario SCN-XT15-FUE-01, step 5 |
| 06 Infrastructure to energy | Firm capacity arrives later than plans assumed. Analogue or source: 2026. | Edition XT-15, scenario SCN-XT15-FUE-01, step 6 |
A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Advanced Nuclear and Next-Generation Fission 2026, scenario SCN-XT15-FUE-01 (2026); Advanced Nuclear and Next-Generation Fission 2026, references (NR-CIT-1) (2026).
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 20World Nuclear Association (ed.), Nuclear Power in France (country profile, first 100,000 characters read; 57 operable reactors; EPR2 six units, EUR 72.8 billion estimate of December 2025; Flamanville 3 grid connection December 2024, EUR 13.2 billion estimate of December 2022). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back