Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

The 2027 agenda

Eight bounded questions open the 2027 additive manufacturing agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 additive manufacturing edition.

5 min read0 figures6 tables3 notesNR-XTECH-MANUFACTURING-GLOBAL-2026-BASELINE

Indice dei contenuti
  1. ·Edition home
  2. ·Executive summary
  3. 1Additive manufacturing is production infrastructure that is still being qualified
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Defence demand outruns part acceptance and supply
  8. 6Readings from the other desks
  9. 7The 2027 agenda
    1. 7.1 Questions for the operational series
    2. 7.2 Portfolio proposed for the Q1 2027 alignment
    3. 7.3 The pathway
    4. 7.4 Universe 2027: evidence pack for the additive manufacturing candidate mission
    5. 7.5 Handoffs and routing
    6. 7.6 Feeds and signal register
  10. 8Systems in depth
  11. AMetodologia
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

7.1Questions for the operational series

  1. M-01

    How fast can defence and aerospace qualify materials and processes, and what limits the rate?

    INI-XT13-QAL-01 · part acceptance; first output: part acceptance register by sector.

  2. M-02

    What do metal machines need in energy and inert gas per kilogram of part, on a common basis?

    INI-XT13-ENE-02 · process footprint; first output: footprint estimates by process.

  3. M-03

    How large is the supply of qualified metal powder, and where are the chokepoints?

    INI-XT13-PWD-03 · powder supply; first output: supply map.

  4. M-04

    Which machines, materials and software are single points of failure for production lines?

    INI-XT13-DEP-04 · dependence; first output: dependence map.

  5. M-05

    How can production claims, yield and scrap be compared on a common basis?

    INI-XT13-BMK-05 · claims on a common basis; first output: benchmark table.

  6. M-06

    Which national controls and strategies set rules for machines, feedstock and files, and how do they differ?

    To be admitted in 2027; first output: controls overlay.

  7. M-07

    What workforce exists for operating, qualifying and finishing additive parts?

    To be admitted in 2027; first output: scoping note.

  8. M-08

    Which readiness capabilities have been tested in real production, and which are only planned?

    Readiness capability register; first output: rung evidence for 15 functions.

7.2Portfolio proposed for the Q1 2027 alignment

Five initiatives and one Universe mission candidate are proposed for the 2027 additive manufacturing portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.

Table 7.1Objects proposed for the first operational quarter
IDOggettoTipoDomandaStato
INI-XT13-QAL-01Part acceptanceInitiativeM-01PROPOSTO
INI-XT13-ENE-02Process footprintInitiativeM-02PROPOSTO
INI-XT13-PWD-03Powder supplyInitiativeM-03PROPOSTO
INI-XT13-DEP-04DependenceInitiativeM-04PROPOSTO
INI-XT13-BMK-05Claims on a common basisInitiativeM-05PROPOSTO
MSN-XT13-2027-01Defence demand Universe missionMissioneM-01Candidate

7.3The pathway

The additive manufacturing edition reads national industrial readiness chapters, the coupled sector reports on infrastructure, minerals and supply chains, and the global edition through one governed evidence graph. At baseline the federation is designed; the global energy and lifeline editions are drafted. This page states what exists today and what comes next.

  1. 01

    National readiness chapters

    industrial and defence production readiness in each national edition

    IN PREPARATION · national baselines

  2. 02

    Sector couplings

    GS-02 energy · GS-09 infrastructure · SR-04 minerals

    GS-02 DRAFTED · sector baselines

  3. 03

    Technology system model

    machines, feedstock, energy, part acceptance, workforce, governance

    v0 SPECIFIED · v1 with federation evidence

  4. 04

    Strategic links

    SR-03 supply chains and chokepoints · SR-13 strategic technology

    PLANNED · strategic baselines

  5. 05

    Universo

    annual proving environment

    CANDIDATE MISSION · mandate in 2027

  6. 06

    XT-13 report

    this series

    BASELINE DRAFT · 2027 annual edition

  7. 07

    Evidenze e correzioni

    one graph, many projections

    OPEN · first correction cycle in 2027

7.4Universe 2027: evidence pack for the additive manufacturing candidate mission

  1. 01

    Mandato

  2. 02

    Core Build · 1 month

  3. 03

    Action · 1 week

  4. 04

    Evidence seal

  5. 05

    Portfolio correction

  6. 06

    Next mandate

Table 7.2Universe 2027: evidence pack for the additive manufacturing candidate mission
VoceRegistrazioneStatoTempistica
F1Annual mandate recordPLANNEDafter the Q2 2027 alignment
F2Core Build recordPLANNEDone month before the exercise
F3Evidenze delle esercitazioniPLANNEDduring the Action week
F4Decision packetsPLANNEDexercise state only
F5Proof receiptsPLANNEDscoped to each recorded check
F6After-action reportPLANNEDwithin one quarter
F7Upgrade docketPLANNEDrouted to the Portfolio
F8Portfolio renewalPLANNED2027 global annual edition
F9Public synthesisPLANNEDpublic-safe extracts only

Missione

ID
MSN-XT13-2027-01 · Defence demand Universe mission
Role spine
Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
Receiving actors
to be identified with the mandate

7.5Handoffs and routing

Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.

Table 7.3Handoffs and routing
RilievoInstradato aFinalitàClasse
FIN-002 · market sizeINI-XT13-BMK-05claims on a common basisPUBLIC
FIN-003 · machine-maker resultsINI-XT13-DEP-04dependencePUBLIC
GOV-007 · Navy partsINI-XT13-QAL-01part acceptancePUBLIC
ENE-008 · process energyINI-XT13-ENE-02 · key F reviewprocess footprintPUBLIC
HLT-009 · powder exposureINI-XT13-ENE-02process footprintPUBLIC
GOV-010 · export controlsregional consortiacontrols overlayPUBLIC
INF-011 · benchmarksINI-XT13-BMK-05claims on a common basisPUBLIC
SYS-012 · compound pathwayMSN-XT13-2027-01Universe candidateCONSORTIUM
Table 7.4Routing rules by publication class
ClasseWhere it goesWho can see it
PUBLICthe published edition and its evidence bundleanyone
CONSORTIUMgoverned rooms of the federationconsortium members under agreement
CONTROLLEDneed-to-know channelsnamed competent actors only

7.6Feeds and signal register

Table 7.5Feeds watched from 2027
FeedProducerLatencyFeeds into
Wohlers Report and trade presscommercial surveyannualeFIN-002
Listed company resultscompaniestrimestraleFIN-003
Navy and DoD releasesUS governmentper eventoGOV-007
NIST additive manufacturing pagesNISTper rilascioINF-011
NIOSH evaluationsNIOSHper rilascioHLT-009
Federal Register export-control rulesBISper ruleGOV-010
Critical minerals outlookIEAannualeMIN-010

Escalation routes

  • none · keep monitoring
  • research question
  • project
  • risk object
  • annual publication
  • signal report
Table 7.6Signals at baseline
IDSignalCorroborationsistemiPercorso
SIG-XT13-001Revenue growth of 10.9% in 20252PARTIALFINresearch question M-05
SIG-XT13-002Machine-maker Chapter 11 filing in 20255CORROBORATEDFIN · INFinitiative M-04
SIG-XT13-003Navy parts installed in 20267PARTIALGOV · INFresearch question M-01

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 2Voulpiotis, F. (3Dnatives), Wohlers Report 2026: growth continues, but caution defines the AM market (trade article, 17 February 2026; weak evidence: a trade summary of a commercial report; reports 2025 revenue USD 24.231 billion, up 10.9%, services up 15.5% with 48% share, machine sales up 3.6%, Asia-Pacific up 19.8%, Europe and the Americas up 9%). 3Dnatives, Paris. Observation year 2025. Accessed 2026-11-03.back
  2. 5Nano Dimension Ltd. (ed.), Annual report on Form 10-K for the year ended 31 December 2025 (first 100,000 characters read; Desktop Metal Chapter 11 filing on 28 July 2025; Markforged acquisition closed 25 April 2025; revenue tables not read). Nano Dimension, Waltham. Observation year 2025. Accessed 2026-11-03.back
  3. 7Jones, M. (NAVSUP Weapon Systems Support), Shattering bottlenecks: NAVSUP WSS partners with DLA and NAVSEA on submarine advanced manufacturing (official release via the Defense Visual Information Distribution Service, 30 June 2026; nearly 120 additive parts in development, 20 installed, more than 1,400 cumulative days of delay removed, lead times cut by up to 70% for some components; not independently audited). US Navy, Mechanicsburg. Observation year 2026. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Stampa

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF113 pages1.0 MBTagged, with bookmarks

      SHA-256 9f9c0bdd112c9edd155a42b7deb0eb16a83972daf6aec20f918c9a6922d6a487

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF118 pages1.1 MBTagged, with bookmarks

      SHA-256 c5ba6a27b592bc5d4e5fc9678986c1ea05dc4babaca6d264fe12924a87a0f417

  • Web edition

  • Pacchetto di dati

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-MANUFACTURING-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 ec47045da100257a326321c531b49ec523a5f9c59161000e0c8d1978ca168b69

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-MANUFACTURING-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 e578505481cdacf1ca29fcbcad3010be8d9b2541e4721bc2eb8304d90412c885

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-MANUFACTURING-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 ac3ad24fc5cc470e585bd6806a983db4c2224f62f35c653e1c9852511e02a925

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-MANUFACTURING-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 af46b873e727338fcfbee92dfb1a02521c9d3ab443debfe0dd537fcdb45b0df1

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-MANUFACTURING-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 8de9cef71c5448dc0b204326d1399f299e681eec8cb4b05fadb79cb6cd0fb600

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-MANUFACTURING-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 13283b08157f9aa4185284587c66dec81aece9e75d2ca6a40564a630aeba9282

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 7: The 2027 agenda. In Exponential Technology Report 2026: Additive and Advanced Manufacturing (Baseline Edition 2026, Report No. NR-XTECH-MANUFACTURING-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

RapportiContribuisci

Send evidence or a correction on Additive and Advanced Manufacturing.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

Redazione Systems Evidence del GCRITecnologia esponenziale

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace