Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

First-plant fuel and licence set the pace

A conditional statement under stated assumptions, never a prediction.

2 min read0 figures0 tables3 notesNR-XTECH-FUSION-GLOBAL-2026-BASELINE

Indice dei contenuti
  1. ·Edition home
  2. ·Executive summary
  3. 1Fusion is an experiment record and a fuel-cycle question
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5First-plant fuel and licence set the pace
    1. 5.1 Assumptions
    2. 5.2 The cascade, step by step
    3. 5.3 The scenario as a table of steps
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. AMetodologia
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

5.1Ipotesi

Scenario SCN-XT14-FUE-01: what is assumed, and what is held constant.

Base di riferimento
the 2026 reference state in this edition
Fattori determinanti
first plants are announced for the 2030s while start-up tritium, lithium-6 and licensing remain open
Analogues
the slips in ITER baselines; the tritium supply range in 205572025
Interventions
none modelled: the specification describes the unmitigated case
Run state
narrative specification; quantified run scheduled for 2027

5.2The cascade, step by step

  1. 1

    MIN → INF

    start-up tritium for a first plant proves hard to contract

    2018

  2. 2

    MIN → INF

    blanket designs wait for enriched lithium

    2022

  3. 3

    GOV → FIN

    licence rules reach final form later than financing plans assume

    2026

  4. 4

    INF → FIN

    test results arrive but plant dates move to the later 2030s

    2026

  5. 5

    FIN → INF

    funding concentrates in a few devices and test facilities

    2026

  6. 6

    GOV → INF

    national plans diverge on siting and waste

    2026

5.3The scenario as a table of steps

How the shock in scenario SCN-XT14-FUE-01 would travel through Fusion and Frontier Energy’s coupled systems, step by step, under the assumptions the edition states.

PassaggioChe cosa succedeFonte
01 Minerals to infrastructureStart-up tritium for a first plant proves hard to contract. Analogue or source: 2018.Edition XT-14, scenario SCN-XT14-FUE-01, step 1
02 Minerals to infrastructureBlanket designs wait for enriched lithium. Analogue or source: 2022.Edition XT-14, scenario SCN-XT14-FUE-01, step 2
03 Governance to financeLicence rules reach final form later than financing plans assume. Analogue or source: 2026.Edition XT-14, scenario SCN-XT14-FUE-01, step 3
04 Infrastructure to financeTest results arrive but plant dates move to the later 2030s. Analogue or source: 2026.Edition XT-14, scenario SCN-XT14-FUE-01, step 4
05 Finance to infrastructureFunding concentrates in a few devices and test facilities. Analogue or source: 2026.Edition XT-14, scenario SCN-XT14-FUE-01, step 5
06 Governance to infrastructureNational plans diverge on siting and waste. Analogue or source: 2026.Edition XT-14, scenario SCN-XT14-FUE-01, step 6

A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Fusion and Frontier Energy 2026, scenario SCN-XT14-FUE-01 (2026); Fusion and Frontier Energy 2026, references (NR-CIT-1) (2026).

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 7ITER Organization (ed.), ITER in a few lines (project page; baseline reviewed by the ITER Council in November 2024; start of research operation 2034; deuterium-tritium operation 2039; Q of 10, 500 MW from 50 MW). ITER Organization, Saint-Paul-lez-Durance. Observation year 2026. Accessed 2026-11-03.back
  2. 20Coleman, M. and Kovari, M., Global supply of tritium for fusion R and D from heavy water reactors (conference paper, UK Atomic Energy Authority; abstract and introduction read from the PDF; 0 to 27.7 kg available in 2055 across scenarios; 7.4 kg for a demonstration reactor in 2055 in one case). UK Atomic Energy Authority, Abingdon. Observation year 2018. Accessed 2026-11-03.back
  3. 25Physics Today (ed.), ITER costs are pinned down with caveats (news report on the 2016 baseline review; review committee chaired by A. Wagner; estimate without contingencies). American Institute of Physics, College Park. Observation year 2016. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Stampa

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF111 pages1.0 MBTagged, with bookmarks

      SHA-256 95ea6260368aa0483c7600adb816df2588668e2705a7c61df26551a7f08196bb

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF116 pages1.0 MBTagged, with bookmarks

      SHA-256 cd6ff1ee3bd369d83af00d23585c1a820ed5f60753bd7d185413c8b374ed06cb

  • Web edition

  • Pacchetto di dati

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 15b48613596ef6658aea97b4be459048745680a4d5743420961925d0fb5fc184

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 795fb6485d15d0238d6969a29fb1d2b451f39e30a11e9a87798383945ad1c866

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 5b2f84ca06ea89262b5806ee57aea891732ba58210745e02cdc3bcb4b273e6c5

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 8645da30ee35054dbe86496623088e6daebdd4eb17a90b05301e2aefd365c195

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 97347fa5766ebe941471f6f388e39c48684f209b455c168d45b26089ab8a40a9

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-FUSION-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 13fea3d4003712c5aa7738f75bd93d0cac96aa4ee1e7f504f3eb76a8c627ecbb

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 5: First-plant fuel and licence set the pace. In Exponential Technology Report 2026: Fusion and Frontier Energy (Baseline Edition 2026, Report No. NR-XTECH-FUSION-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

RapportiContribuisci

Send evidence or a correction on Fusion and Frontier Energy.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

Redazione Systems Evidence del GCRITecnologia esponenziale

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Firma del settore

The sectors behind Fusion and Frontier Energy.

A reading aid: the sectors the findings run through and how strongly they depend on each other.

Seleziona gli angoli · passa il cursore sulle linee6 / 15 relazioni

Firma

L'energia e i suoi partner

L'energia fornisce elettricità per trasporti e telecomunicazioni alle infrastrutture (0.8), pompaggio e trattamento all'acqua (0.5) e fertilizzanti, macchinari e catene del freddo al cibo (0.5).

W · E · I · F · H · B

Settori
4 di 6
Relazioni
6 di 15
Accoppiamento
0.46 quota sul totale

Relazioni più forti in gioco

  • Energia → Infrastrutture · alimentazione di trasporti e telecomunicazioni0.8
  • Acqua → Energia · acqua di raffreddamento e idroelettrico0.6
  • Acqua → Cibo · irrigazione0.8
  • Infrastrutture → Acqua · condotte, dighe e impianti di trattamento0.6
Valori didattici per una città-regione tipo, non misure di un luogo. L'accoppiamento è la somma delle intensità delle relazioni in gioco, come quota delle quindici.
Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace