Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

  • 報告書
  • ベースライン版 2026
  • Complete edition

英国システムリスク・レジリエンス報告書 2026

The State of the United Kingdom’s Interdependent Systems

The designed PDF, A4 or US Letter, is under Downloads below. To print this page instead, choose the paper in the print dialog. Review copies: the PDF with its DOI is issued at release.

United Kingdom 2026

Imprint

編集者
Saeed Valadbaygi, Chief Steward and Managing Editor, the Global Centre for Risk and Innovation (GCRI)
正式な発行者
The Global Centre for Risk and Innovation (GCRI) for the Nexus Consortium, Toronto
Report number
NR-COUNTRY-GBR-2026-BASELINE
エビデンス締め切り
30 September 2026, cut NQ-GBR-2026-Q0-1
ステータス
Draft under stewardship review; not yet released
DOI and UNI
Issued at deposit
ライセンス
CC BY 4.0 for Nexus-authored text, tables and figures; third-party material keeps its own licence
Cite as
Valadbaygi, S. (Ed.). (2026). United Kingdom Systems Risk and Resilience Report 2026: The State of the United Kingdom’s Interdependent Systems (Baseline Edition 2026, Report No. NR-COUNTRY-GBR-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI). https://therisk.global/nexus-reports/editions/gbr/

目次

  1. ·

    Executive summary

  2. 1

    Chapter 1. Britain’s risk is coupled, not cumulative

  3. 2

    Chapter 2. Key findings

  4. 3

    Chapter 3. Systems and sectors at baseline

  5. 4

    Chapter 4. Risks and capability

  6. 5

    Chapter 5. Hot, dry summer in southern England

  7. 6

    Chapter 6. Readings from the other desks

  8. 7

    Chapter 7. The 2027 agenda

  9. 8

    Chapter 8. Systems in depth

  10. A

    Annex A. Methodology

  11. B

    Annex B. Data appendix

  12. C

    Annex C. References and record

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • 印刷

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF96 pages785 KBTagged, with bookmarks

      SHA-256 bfa03982b0bc66e17245ddb7b3ecd02e69ab0ef3434eb6ba24284b59a7575b1a

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF104 pages796 KBTagged, with bookmarks

      SHA-256 9d0ab1240d96660d02e453970e8cdff103bab916e870f616af91ac847b173700

  • Web edition

  • データバンドル

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-COUNTRY-GBR-2026-BASELINE-indicators.csv1 KB

      SHA-256 db5359cdf7ec1dc879118fd08afc53943bf0aa4c3b0f2aa42245f471193d7daa

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-COUNTRY-GBR-2026-BASELINE-indicators.json2 KB

      SHA-256 a071c110d675b1cb1f725526b38e80c5544896398b69769107deaea7b940f1fa

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-COUNTRY-GBR-2026-BASELINE-findings.csv2 KB

      SHA-256 7f65cb9f1104a7893088607b4e5fc2e01628dffc67049551cf81e5457be812fa

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-COUNTRY-GBR-2026-BASELINE.bib1 KB

      SHA-256 7a98e9a4faf101d334a11ab009f6a928b280676d2e03a89a42397f3828909a7e

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-COUNTRY-GBR-2026-BASELINE.ris1 KB

      SHA-256 b6bbe6a6e4124f055200f083ffba35f78747a011966cd44724ecbc4c37e24986

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-COUNTRY-GBR-2026-BASELINE.cff1 KB

      SHA-256 80f398569acbb71816e364d9e21264230f46dadfd39f50cc93b9f99e2d21856d

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Executive summary

The edition on a few pages: the abstract, the key messages, the headline finding and what each steward reads in it.

5 min read1 figure0 tables15 notesNR-COUNTRY-GBR-2026-BASELINE

S.1Abstract

The United Kingdom enters 2027 having cut its territorial emissions by 53% since 1990, to 373 Mt CO₂e in 2024, and closed its last coal-fired power station in September 2024118. Its climate risks have moved from projection to record. 2022 was the first year with a UK mean temperature above 10 °C, and temperatures reached 40.3 °C on 19 July 20222829; about 2,985 heat-associated deaths were recorded in England that summer11. About 6.3 million properties in England are in areas at risk of flooding, potentially rising to around 8 million by 20508, and England faces a public water-supply shortfall of nearly 5 billion litres a day by 2055 without action9. The UK produces around 60% of the food it consumes14, and studied species have declined in abundance by 19% on average since 197015. This Baseline Edition fixes the reference state for the five core systems, maps the dependencies through which shocks travel, and sets the questions the first operational edition will answer in Q1 2027. It ranks nothing and decides nothing.

S.2Key messages

The eight questions this edition answers, each with its status and source.

  1. 373 Mt CO₂e in 2024, 53% below 1990.1

    Where do emissions stand?Reported

  2. 2022 was the first year above 10 °C; 40.3 °C was recorded in July 2022.2829

    Is the climate already changing?Reported

  3. Older people and those with chronic illness; about 2,985 heat-associated deaths in England in 2022.1112

    Who is most exposed to heat?Reported

  4. About 6.3 million properties in England, potentially 8 million by 2050.8

    How large is flood exposure?Reported

  5. England faces a shortfall of nearly 5 billion litres a day by 2055 without action.9

    Is water supply secure?Scenario

  6. The UK produces around 60% of the food it consumes.14

    How dependent is food on imports?Reported

  7. Species abundance down 19% on average since 1970.15

    How is nature faring?Reported

  8. A hot, dry summer loading health, water, rail and power at once. SCN-GBR-HDS-01

    What will Q1 2027 test first?Expert input

S.3Headline finding

ReportedEQL 4NRF-COUNTRY-GBR-2026-BASELINE-WAT-006

About 6.3 million properties in England, roughly one in four, are in areas at risk of flooding from rivers, the sea or surface water, potentially rising to around 8 million by 2050.

Figure S.1Properties at flood risk in England (million)
項目Bar, scaled to the largest value値
現在6.3
By 2050 (projection)≈8

Source: Environment Agency, NaFRA2 20248.

Surface-water flooding now drives most exposure and is the hardest to defend against with walls and barriers. As Flood Re moves towards risk-reflective pricing by 203921, affordability and cover in the most exposed homes become a fiscal and household question820.

S.4At a glance

68.3million

population, mid-202313

373Mt CO₂e

emissions, 20241

10.03°C

mean temperature, 2022 record29

≈60%

of food produced domestically14

89risks

in the National Risk Register7

61risks and opportunities

in CCRA34

S.5What each steward reads in it

GCRI · KEY T

Technical Truth

The evidence supports a coupled reading of British risk.

GRF · KEY M

Public Meaning

For most people risk arrives as a heatwave in a home built for cold, a flooded street or a hosepipe ban.

GRA · KEY F

Capital Meaning

Readiness implications only. Weather claims are high, flood cover rests on a transitional scheme until 2039, and the clean-power transition needs grid investment.

NEXUS

統合

The UK has cut emissions fast and observes its risks well, but adaptation lags.

S.6What this edition is, and is not

What this edition is

A baseline: the state of the United Kingdom’s water, energy, food, health and biodiversity systems in 2026, the dependencies between them, the risks that travel through them and the capabilities that hold them. It sets the questions the operational series will answer.

What it is not

Not a national risk assessment, an official warning or a rating. It decides nothing about any department, devolved government, regulator or company. Competent authorities across the four nations keep every mandate they hold.

What comes next

Q1 2027 opens the operational series with a sealed Foundry evidence cut. Each later edition reports what changed against this baseline, new observations, source revisions, method changes, scenario updates and corrections.

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1Department for Energy Security and Net Zero (ed.), 2024 UK Greenhouse Gas Emissions, Final Figures. DESNZ, London, 5 February 2026.back
  2. 18Department for Energy Security and Net Zero (ed.), “End of coal power”, closure of Ratcliffe-on-Soar power station. Press release, London, 30 September 2024.back
  3. 28Met Office (ed.), “Record high temperatures verified” (40.3 °C at Coningsby, 19 July 2022). Met Office, Exeter, 2022.back
  4. 29Met Office (ed.), “2022: the UK’s warmest year on record.” Met Office, Exeter, January 2023.back
  5. 11UK Health Security Agency (ed.), Heat Mortality Monitoring Report: 2022. UKHSA, London, 2023.back
  6. 8Environment Agency (ed.), National Assessment of Flood and Coastal Erosion Risk in England 2024. Environment Agency, Bristol, December 2024.back
  7. 9Environment Agency (ed.), National Framework for Water Resources 2025. Environment Agency, Bristol, 2025.back
  8. 14Department for Environment, Food and Rural Affairs (ed.), United Kingdom Food Security Report 2024. DEFRA, London, December 2024.back
  9. 15State of Nature Partnership (ed.), State of Nature 2023. State of Nature Partnership, UK, 2023.back
  10. 12UK Health Security Agency (ed.), Health Effects of Climate Change (HECC) in the UK: 2023 Report. UKHSA, London, 2023.back
  11. 21Flood Re (ed.), Annual Report and Accounts 2024 and Transition Plan to 2039. Flood Re, London, 2024.back
  12. 20Association of British Insurers (ed.), weather-related home insurance claims, 2023. ABI, London, 2024.back
  13. 13Office for National Statistics (ed.), Population estimates for the UK, England, Wales, Scotland and Northern Ireland: mid-2023. ONS, Newport, 2024.back
  14. 7Cabinet Office (ed.), National Risk Register 2023 edition. HM Government, London, 2023.back
  15. 4Climate Change Committee (ed.), Independent Assessment of UK Climate Risk: Advice to Government for the UK’s Third Climate Change Risk Assessment (CCRA3). CCC, London, 2021.back

Britain’s risk is coupled, not cumulative

Part I describes systems and their couplings. It assesses no authority and ranks no nation or region.

7 min read2 figures2 tables16 notesNR-COUNTRY-GBR-2026-BASELINE

1.1The questions this part answers

Key questions

  • Where is Canada’s risk concentrated, and in which systems?
  • Which couplings carry shocks from one system to the next?
  • Which capabilities hold under compound stress, and which are only documented?
  • What must the 2027 programme measure first?

In this part

  • Narrative
  • Headline finding
  • Lead figure
  • Twelve-domain reading
  • Sector screens
  • Dependency matrix
  • Risk objects
  • Capability ladder
  • シナリオ
  • Three lenses
  • ポートフォリオ

1.2The argument

The United Kingdom’s climate risks are usually discussed one at a time: a heatwave, a flood, a drought, a storm. This baseline reads them as one coupled system. On 19 July 2022 temperatures reached 40.3 °C for the first time28; the same summer brought drought, hosepipe bans, grassland fires and rail speed restrictions, and about 2,985 heat-associated deaths in England11.

The forcing is already measurable. 2022 was the first year with a UK mean temperature above 10 °C29, and the third climate risk assessment identified 61 risks and opportunities from climate change, eight of them priorities for action45. The Climate Change Committee has repeatedly found adaptation planning behind the pace of risk6.

Water sits at the centre of the coupling. About 6.3 million properties in England are in areas at risk of flooding, potentially around 8 million by 20508, while England faces a public water-supply shortfall of nearly 5 billion litres a day by 2055 without new action9. Storm overflows spilled more than 460,000 times in 202310, linking heavy rain to river quality and health.

The energy system has changed fastest. Territorial emissions fell to 373 Mt CO₂e in 2024, 53% below 1990, and the last coal-fired power station closed in September 2024118. The Clean Power 2030 plan sets out a largely clean electricity system by the end of the decade1617. Electrification makes the grid more central, and its single points of failure more consequential, as the substation fire that closed Heathrow in March 2025 showed19.

Food and nature carry slower but deeper exposures. The UK produces around 60% of the food it consumes, so import and energy-price shocks pass quickly to households14. Studied species have declined in abundance by 19% on average since 1970, and one in six is at risk of extinction in Great Britain15, weakening the ecosystems that regulate floods and water quality.

This edition therefore treats British risk as a property of couplings, between heat, water, grids, food and nature, rather than a list of separate hazards. The matrix, risk objects, capability ladder and scenario that follow ask where a shock travels next and who holds the capability to stop it.

Figure 1.1How far have UK emissions fallen? Territorial emissions (Mt CO₂e)

Emissions have more than halved since 1990, driven by the power sector. Transport is now the largest emitting sector, about 30% of the total1.

項目Bar, scaled to the largest value値
1990790
2023384
2024373

Source: as cited in the note to this figure. Year 2024.

Figure ID FIG-COUNTRY-GBR-2026-BASELINE-01-003

−53%

since 19901

−3%

2024 against 20231

2024Sept

last coal power station closed18

2030target

clean power plan16

1.3The six-sector nexus: twenty couplings across five assessed sectors

The United Kingdom matrix types the twenty couplings between the five core systems. Strengths are Nexus estimates from the cited evidence and analogue events; they set the starting graph that the Q1 2027 Foundry cut will test.

Figure 1.2Couplings across the six sectors

Each line is one coupling from one sector to another, drawn by the strength the edition assigns. Strengths are Nexus estimates from the cited evidence and analogue events. Infrastructure: not assessed in this edition’s coupling matrix, so it is drawn hollow with no couplings. The hexagon is the estate doctrine: six sectors and fifteen relations.

  • Strong
  • 中程度
  • Weak
  • Not assessed in this edition

Source: this edition’s coupling matrix (Table 1.1); status Estimated. Hexagon: the estate doctrine (Signature).

Table 1.1Coupling matrix: from the row system to the column system
From, toWATENEFOOHLTBIO
WAT 水·MODERATE
cooling · hydro in Scotland
STRONG
irrigation · rain-fed yield
MODERATE
drinking water
STRONG
flows · wetlands
ENE エネルギーMODERATE
pumping · treatment
·STRONG
fuel · fertiliser · cold chain
STRONG
facility power · cooling
MODERATE
reservoirs · land use
FOO 食料MODERATE
withdrawals · nutrients
WEAK
biofuel feedstock
·STRONG
nutrition · food safety
STRONG
土地転換
HLT 健康WEAK
workforce
WEAK
workforce
MODERATE
labour · disease
·WEAK
residues
BIO 生物多様性STRONG
regulation · filtration
MODERATE
fire on lines · biomass
STRONG
pollination · soils
MODERATE
zoonoses · smoke
·
Strength: strong, moderate or weak; a Nexus estimate (status Estimated) from cited evidence and analogue events. The scale is defined in Annex A.

Transmission paths

  1. 01

    CLI → WAT → HLT

    Heat and drought strain supply and river quality while health demand peaks.

    Reported summer 202211

  2. 02

    ENE → INF → DAT

    A single substation failure halts an airport and dependent services.

    Reported Heathrow, March 202519

  3. 03

    CLI → WAT → FIN

    Surface-water flooding lands on households with costly cover.

    Inferred NaFRA28

  4. 04

    ENE → FOO

    Energy and import prices pass into food prices.

    Inferred 2022 price shock14

  5. 05

    WAT → BIO

    Storm overflows and low flows degrade rivers.

    Reported 2023 spills10

1.4Reinforcing loops

A shock entering either system of a loop can return amplified through the other.

Table 1.2Pairs of systems where both directions are rated strong
LoopFirst directionSecond direction
WAT and BIOWater to biodiversity: flows · wetlandsBiodiversity to water: regulation · filtration
FOO and BIOFood to biodiversity: land conversionBiodiversity to food: pollination · soils
A causal-loop reading of the matrix (Sterman, Business Dynamics, 2000): structural, from estimated strengths, not a measured feedback.

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 28Met Office (ed.), “Record high temperatures verified” (40.3 °C at Coningsby, 19 July 2022). Met Office, Exeter, 2022.back
  2. 11UK Health Security Agency (ed.), Heat Mortality Monitoring Report: 2022. UKHSA, London, 2023.back
  3. 29Met Office (ed.), “2022: the UK’s warmest year on record.” Met Office, Exeter, January 2023.back
  4. 4Climate Change Committee (ed.), Independent Assessment of UK Climate Risk: Advice to Government for the UK’s Third Climate Change Risk Assessment (CCRA3). CCC, London, 2021.back
  5. 5HM Government (ed.), UK Climate Change Risk Assessment 2022. HM Government, London, January 2022.back
  6. 6Climate Change Committee (ed.), Progress in Adapting to Climate Change: 2025 Report to Parliament. CCC, London, 2025.back
  7. 8Environment Agency (ed.), National Assessment of Flood and Coastal Erosion Risk in England 2024. Environment Agency, Bristol, December 2024.back
  8. 9Environment Agency (ed.), National Framework for Water Resources 2025. Environment Agency, Bristol, 2025.back
  9. 10Environment Agency (ed.), Event Duration Monitoring: storm overflows annual data 2023. Environment Agency, Bristol, 2024.back
  10. 1Department for Energy Security and Net Zero (ed.), 2024 UK Greenhouse Gas Emissions, Final Figures. DESNZ, London, 5 February 2026.back
  11. 18Department for Energy Security and Net Zero (ed.), “End of coal power”, closure of Ratcliffe-on-Soar power station. Press release, London, 30 September 2024.back
  12. 16Department for Energy Security and Net Zero (ed.), Clean Power 2030 Action Plan: A New Era of Clean Electricity. DESNZ, London, December 2024.back
  13. 17National Energy System Operator (ed.), Clean Power 2030: Advice on Achieving Clean Power for Great Britain by 2030. NESO, Warwick, November 2024.back
  14. 19National Energy System Operator (ed.), North Hyde substation fire: review of the 21 March 2025 outage. NESO, Warwick, 2025.back
  15. 14Department for Environment, Food and Rural Affairs (ed.), United Kingdom Food Security Report 2024. DEFRA, London, December 2024.back
  16. 15State of Nature Partnership (ed.), State of Nature 2023. State of Nature Partnership, UK, 2023.back

Key findings

Twelve findings carry the baseline. They are grouped by system, never ranked. Each resolves to its source or, where Nexus analysis is involved, to its stated method.

3 min read1 figure0 tables15 notesNR-COUNTRY-GBR-2026-BASELINE

2.1Headline finding

ReportedEQL 4NRF-COUNTRY-GBR-2026-BASELINE-WAT-006

About 6.3 million properties in England, roughly one in four, are in areas at risk of flooding from rivers, the sea or surface water, potentially rising to around 8 million by 2050.

Figure 2.1Properties at flood risk in England (million)
項目Bar, scaled to the largest value値
現在6.3
By 2050 (projection)≈8

Source: Environment Agency, NaFRA2 20248.

Implication

Surface-water flooding now drives most exposure and is the hardest to defend against with walls and barriers. As Flood Re moves towards risk-reflective pricing by 203921, affordability and cover in the most exposed homes become a fiscal and household question820.

What would move it

Flood warnings in the 2026–27 winter, the Flood Re transition, and updated assessments for Scotland, Wales and Northern Ireland would each move this finding.

2.2Climate forcing

  1. ReportedEQL 5NRF-COUNTRY-GBR-2026-BASELINE-CLI-001

    Territorial greenhouse-gas emissions were 373 Mt CO₂e in 2024, 3% below 2023 and 53% below 1990.1

  2. ReportedEQL 5NRF-COUNTRY-GBR-2026-BASELINE-CLI-003

    2022 was the first year with a UK mean temperature above 10 °C, and 40.3 °C was recorded on 19 July 2022.2829

2.3エネルギー

  1. ReportedEQL 5NRF-COUNTRY-GBR-2026-BASELINE-ENE-002

    The UK’s last coal-fired power station closed in September 2024, ending 142 years of coal power.18

2.4健康

  1. ReportedEQL 4NRF-COUNTRY-GBR-2026-BASELINE-HLT-004

    About 2,985 heat-associated deaths were recorded in England in summer 2022.11

2.5水

  1. ScenarioEQL 3NRF-COUNTRY-GBR-2026-BASELINE-WAT-005

    England faces a public water-supply shortfall of nearly 5 billion litres a day by 2055 without new action.9

  2. ReportedEQL 4NRF-COUNTRY-GBR-2026-BASELINE-WAT-006

    About 6.3 million properties in England are in areas at risk of flooding, potentially around 8 million by 2050.8

  3. ReportedEQL 4NRF-COUNTRY-GBR-2026-BASELINE-WAT-007

    Storm overflows in England spilled more than 460,000 times in 2023.10

2.6食料

  1. ReportedEQL 4NRF-COUNTRY-GBR-2026-BASELINE-FOO-008

    The UK produces around 60% of the food it consumes.14

2.7生物多様性

  1. ReportedEQL 4NRF-COUNTRY-GBR-2026-BASELINE-BIO-009

    Studied species have declined in abundance by 19% on average since 1970; one in six is at risk of extinction in Great Britain.15

2.8インフラ

  1. ReportedEQL 4NRF-COUNTRY-GBR-2026-BASELINE-INF-010

    A substation fire closed Heathrow Airport for most of 21 March 2025, showing single points of failure in critical infrastructure.19

2.9ガバナンス

  1. ReportedEQL 4NRF-COUNTRY-GBR-2026-BASELINE-GOV-011

    The third UK climate risk assessment identified 61 risks and opportunities; the National Risk Register 2023 sets out 89 risks.47

2.10システミック

  1. Expert inputEQL 2NRF-COUNTRY-GBR-2026-BASELINE-SYS-012

    The leading compound pathway for 2027 testing is a hot, dry summer in which heat, drought, water shortage and grassland fires load health, water, rail and power at once. §9.3

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 8Environment Agency (ed.), National Assessment of Flood and Coastal Erosion Risk in England 2024. Environment Agency, Bristol, December 2024.back
  2. 21Flood Re (ed.), Annual Report and Accounts 2024 and Transition Plan to 2039. Flood Re, London, 2024.back
  3. 20Association of British Insurers (ed.), weather-related home insurance claims, 2023. ABI, London, 2024.back
  4. 1Department for Energy Security and Net Zero (ed.), 2024 UK Greenhouse Gas Emissions, Final Figures. DESNZ, London, 5 February 2026.back
  5. 28Met Office (ed.), “Record high temperatures verified” (40.3 °C at Coningsby, 19 July 2022). Met Office, Exeter, 2022.back
  6. 29Met Office (ed.), “2022: the UK’s warmest year on record.” Met Office, Exeter, January 2023.back
  7. 18Department for Energy Security and Net Zero (ed.), “End of coal power”, closure of Ratcliffe-on-Soar power station. Press release, London, 30 September 2024.back
  8. 11UK Health Security Agency (ed.), Heat Mortality Monitoring Report: 2022. UKHSA, London, 2023.back
  9. 9Environment Agency (ed.), National Framework for Water Resources 2025. Environment Agency, Bristol, 2025.back
  10. 10Environment Agency (ed.), Event Duration Monitoring: storm overflows annual data 2023. Environment Agency, Bristol, 2024.back
  11. 14Department for Environment, Food and Rural Affairs (ed.), United Kingdom Food Security Report 2024. DEFRA, London, December 2024.back
  12. 15State of Nature Partnership (ed.), State of Nature 2023. State of Nature Partnership, UK, 2023.back
  13. 19National Energy System Operator (ed.), North Hyde substation fire: review of the 21 March 2025 outage. NESO, Warwick, 2025.back
  14. 4Climate Change Committee (ed.), Independent Assessment of UK Climate Risk: Advice to Government for the UK’s Third Climate Change Risk Assessment (CCRA3). CCC, London, 2021.back
  15. 7Cabinet Office (ed.), National Risk Register 2023 edition. HM Government, London, 2023.back

Systems and sectors at baseline

5 min read0 figures2 tables20 notesNR-COUNTRY-GBR-2026-BASELINE

3.1Where each system stood at evidence close

WAT · Water

Projected public water-supply shortfall, England

≈5bn litres/day

by 2055 without new supply and demand action.

Scenario2055Environment Agency9

ENE · Energy

Territorial emissions

373Mt CO₂e

53% below 1990; the last coal plant closed in September 2024.

報告値2024DESNZ1

FOO · Food

Share of food consumed that is produced domestically

≈60%

the rest is imported, mainly from the EU.

報告値2023DEFRA14

HLT · Health

Heat-associated deaths, England

2,985deaths

in summer 2022, the year temperatures first reached 40 °C.

報告値2022UKHSA11

BIO · Biodiversity

Average change in abundance of studied species

−19%

since 1970; one in six species at risk of extinction in Great Britain.

Reported1970–2021State of Nature15

SYS · Cross-system

Properties at flood risk, England

6.3million

about one in four; potentially 8 million by 2050.

Reported2024Environment Agency8

3.2Domain posture

Each of the twelve coupled domains is read in words, not scored. The coupling column names the dependency that carries risk into other systems.

Table 3.1Each domain read in words, not scored
分野Posture at baseline結合ステータス
WATFlood exposure rising; supply shortfall projected in the South and East; river quality under strain.WAT → HLT · WAT → INFReported EQL 4
ENECoal ended in 2024; clean power planned for 2030; grid more central as demand electrifies.ENE → HLT · ENE → DATReported EQL 4
FOOAbout 60% of food produced domestically; exposed to import and energy prices.FOO ← ENE, TRDReported EQL 4
HLTHeat deaths rising; heat and cold load the NHS and social care.HLT ← CLI, ENEReported EQL 4
BIOSpecies abundance down 19% since 1970; habitats fragmented.BIO → WAT regulationReported EQL 4
CLIFirst year above 10 °C in 2022; 40.3 °C recorded.forcing on all five systemsReported EQL 5
INFLifelines interdependent; single points of failure exposed in 2025.INF → ENE, DAT, TRDReported EQL 3
FINWeather claims high; flood cover supported by Flood Re until 2039.FIN ← CLI · FIN → householdsReported EQL 3
DATData centres designated Critical National Infrastructure in 2024.DAT ← ENE · DAT → FINReported EQL 3
AICCompute growth adds load to grid connections.AIC → ENEInferred EQL 2
MINCritical minerals strategy in place; import reliance high.MIN → ENE transitionInferred EQL 2
TRDFood and energy import dependence passes price shocks to households.TRD → FOO, ENEInferred EQL 3

3.3Sector screens

All sixteen sectors are screened on the same grammar, so that later editions can say what changed. The evidence column describes coverage of the baseline evidence, not the performance of the sector.

Table 3.2Sectors: baseline evidence and the exposure to watch
コード部門Baseline evidenceExposure to watchEvidence coverage
GS-00Cross-system89 national risks; 61 climate risks and opportunities47compound hot, dry summersGOOD
GS-01水flood exposure and supply shortfall89drought and surface-water floodingGOOD
GS-02エネルギーcoal ended; clean power 20301618single points of failureGOOD
GS-03食料about 60% domestic production14import price shocksGOOD
GS-04健康heat deaths1112heat surge in NHS and carePARTIAL
GS-05金融weather claims; Flood Re to 20392021flood cover affordabilityPARTIAL
GS-06開発regional inequalities in exposurecost-of-living pressureTHIN
GS-07気候first year above 10 °C29heat and extreme rainfallGOOD
GS-08災害resilience framework in place27concurrent eventsPARTIAL
GS-09インフラHeathrow outage, 202519lifeline interdependencePARTIAL
GS-10都市London heat and surface waterurban heat; drainagePARTIAL
GS-11生物多様性abundance −19% since 197015habitat loss; water qualityGOOD
GS-12地球観測strong national monitoringdata integrationPARTIAL
GS-13サイバーとデジタルdata centres designated CNI22outages and attacksPARTIAL
GS-14政策Climate Change Act; Environment Act; 2025 water law242526implementationGOOD
GS-15科学deep research basetranslation into operationsTHIN

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 9Environment Agency (ed.), National Framework for Water Resources 2025. Environment Agency, Bristol, 2025.back
  2. 1Department for Energy Security and Net Zero (ed.), 2024 UK Greenhouse Gas Emissions, Final Figures. DESNZ, London, 5 February 2026.back
  3. 14Department for Environment, Food and Rural Affairs (ed.), United Kingdom Food Security Report 2024. DEFRA, London, December 2024.back
  4. 11UK Health Security Agency (ed.), Heat Mortality Monitoring Report: 2022. UKHSA, London, 2023.back
  5. 15State of Nature Partnership (ed.), State of Nature 2023. State of Nature Partnership, UK, 2023.back
  6. 8Environment Agency (ed.), National Assessment of Flood and Coastal Erosion Risk in England 2024. Environment Agency, Bristol, December 2024.back
  7. 4Climate Change Committee (ed.), Independent Assessment of UK Climate Risk: Advice to Government for the UK’s Third Climate Change Risk Assessment (CCRA3). CCC, London, 2021.back
  8. 7Cabinet Office (ed.), National Risk Register 2023 edition. HM Government, London, 2023.back
  9. 16Department for Energy Security and Net Zero (ed.), Clean Power 2030 Action Plan: A New Era of Clean Electricity. DESNZ, London, December 2024.back
  10. 18Department for Energy Security and Net Zero (ed.), “End of coal power”, closure of Ratcliffe-on-Soar power station. Press release, London, 30 September 2024.back
  11. 12UK Health Security Agency (ed.), Health Effects of Climate Change (HECC) in the UK: 2023 Report. UKHSA, London, 2023.back
  12. 20Association of British Insurers (ed.), weather-related home insurance claims, 2023. ABI, London, 2024.back
  13. 21Flood Re (ed.), Annual Report and Accounts 2024 and Transition Plan to 2039. Flood Re, London, 2024.back
  14. 29Met Office (ed.), “2022: the UK’s warmest year on record.” Met Office, Exeter, January 2023.back
  15. 27Cabinet Office (ed.), The UK Government Resilience Framework. HM Government, London, December 2022.back
  16. 19National Energy System Operator (ed.), North Hyde substation fire: review of the 21 March 2025 outage. NESO, Warwick, 2025.back
  17. 22Department for Science, Innovation and Technology (ed.), “Data centres designated Critical National Infrastructure.” Press release, London, September 2024.back
  18. 24UK Parliament (ed.), Climate Change Act 2008, as amended by the Climate Change Act 2008 (2050 Target Amendment) Order 2019. London.back
  19. 25UK Parliament (ed.), Environment Act 2021. London, 2021.back
  20. 26UK Parliament (ed.), Water (Special Measures) Act 2025. London, 2025.back

Risks and capability

Four risk objects open the portfolio. Order carries no rank. Each is read across driver, exposure, vulnerability, capacity, cascade and consequence.

3 min read0 figures1 table8 notesNR-COUNTRY-GBR-2026-BASELINE

4.1Risk objects

Each risk is read across the chain from hazard to consequence, with its status and evidence-quality level.

  1. ReportedEQL 4RSK-GBR-CLI-001

    極端な暑さ

    要因
    heatwaves above 35–40 °C
    曝露
    older people; care homes; dense cities
    脆弱性
    housing not designed for heat; limited cooling
    能力
    heat-health alerts; NHS surge planning
    カスケード
    CLI → HLT · CLI → INF rail and power
    ホライズン
    季節性の
  2. ReportedEQL 4RSK-GBR-CLI-002

    Surface-water and river flooding

    要因
    extreme rainfall; storm sequences
    曝露
    6.3 million properties in England8
    脆弱性
    urban drainage capacity; cover affordability
    能力
    flood warnings; defences; Flood Re21
    カスケード
    WAT → INF, HLT, FIN
    ホライズン
    年次
  3. ScenarioEQL 3RSK-GBR-WAT-003

    Drought and water-supply shortfall

    要因
    dry summers; population growth
    曝露
    South and East of England
    脆弱性
    leakage; limited storage
    能力
    new reservoirs; transfers; demand management9
    カスケード
    WAT → HLT, FOO, BIO
    ホライズン
    5–30 years
  4. ReportedEQL 3RSK-GBR-INF-004

    Single points of failure in lifelines

    要因
    fire, flood or cyber event at a critical node
    曝露
    airports, hospitals, data centres, rail
    脆弱性
    limited redundancy at key substations19
    能力
    resilience framework27; backup supply
    カスケード
    ENE → INF → DAT, TRD
    ホライズン
    any time

4.2Capability ladder

Existence is not readiness. Each of the fifteen capability functions is placed on the ladder by the strongest public evidence at baseline.

Table 4.1Capabilities on the ladder of evidence: listed, exists, demonstrated, tested
機能RungレベルStrongest public evidence at baseline
Prevention and mitigationEXISTSplanning rules and flood defences; adaptation behind risk6
Monitoring and observationDEMONSTRATEDMet Office and agency monitoring in continuous use
早期警報DEMONSTRATEDweather, flood and heat-health alerts in real events
Preparedness and planningEXISTSNational Risk Register7; Resilience Framework27
Redundancy and reservesEXISTSgrid and water redundancy uneven; single points of failure19
対応DEMONSTRATEDemergency response to storms, floods and heat
Continuity of critical servicesEXISTSdata centres designated CNI22; continuity tested event by event
復旧EXISTSrecovery schemes after major floods
AdaptationEXISTSnational adaptation programme; CCC finds gaps6
社会保障EXISTSwelfare and cost-of-living support
金融と保険EXISTSflood cover via Flood Re until 203921
Institutional coordinationEXISTSUK and devolved resilience structures
Technical infrastructureEXISTSageing water and drainage networks
労働力EXISTShealth and care workforce pressures documented
Research capacityADEQUATEstrong climate and environmental science
A capability listed in policy is not a tested one; each rung is the strongest public evidence at baseline.

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 8Environment Agency (ed.), National Assessment of Flood and Coastal Erosion Risk in England 2024. Environment Agency, Bristol, December 2024.back
  2. 21Flood Re (ed.), Annual Report and Accounts 2024 and Transition Plan to 2039. Flood Re, London, 2024.back
  3. 9Environment Agency (ed.), National Framework for Water Resources 2025. Environment Agency, Bristol, 2025.back
  4. 19National Energy System Operator (ed.), North Hyde substation fire: review of the 21 March 2025 outage. NESO, Warwick, 2025.back
  5. 27Cabinet Office (ed.), The UK Government Resilience Framework. HM Government, London, December 2022.back
  6. 6Climate Change Committee (ed.), Progress in Adapting to Climate Change: 2025 Report to Parliament. CCC, London, 2025.back
  7. 7Cabinet Office (ed.), National Risk Register 2023 edition. HM Government, London, 2023.back
  8. 22Department for Science, Innovation and Technology (ed.), “Data centres designated Critical National Infrastructure.” Press release, London, September 2024.back

Hot, dry summer in southern England

A conditional statement under stated assumptions, never a prediction.

2 min read0 figures0 tables2 notesNR-COUNTRY-GBR-2026-BASELINE

5.1前提

Scenario SCN-GBR-HDS-01: what is assumed, and what is held constant.

ベースライン
the 2026 reference state in this edition
要因
a dry winter and spring; a heatwave above 38 °C in July; grassland fires on the urban edge
Analogues
summer 20221128; 1976 drought
Interventions
none modelled, the specification describes the unmitigated case
Run state
narrative specification; quantified Foundry run scheduled for Q1 2027

5.2The cascade, step by step

  1. 1

    CLI → WAT

    low rainfall and heat cut river flows and reservoir levels

    2022

  2. 2

    CLI → HLT

    heat deaths and emergency demand rise

    202211

  3. 3

    CLI → BIO

    grassland and heath fires near cities

    2022

  4. 4

    CLI → INF

    rail speed restrictions and track failures

    2022

  5. 5

    WAT → HLT

    hosepipe bans; river quality falls

    2022

  6. 6

    ENE → HLT

    cooling demand meets constrained networks

    ,

5.3The scenario as a table of steps

How the shock in scenario SCN-GBR-HDS-01 would travel through United Kingdom’s coupled systems, step by step, under the assumptions the edition states.

ステップ何が起きるか出典
01 Climate to waterLow rainfall and heat cut river flows and reservoir levels. Analogue or source: 2022.Edition GBR, scenario SCN-GBR-HDS-01, step 1
02 Climate to healthHeat deaths and emergency demand rise. Analogue or source: 2022 [11].Edition GBR, scenario SCN-GBR-HDS-01, step 2
03 Climate to biodiversityGrassland and heath fires near cities. Analogue or source: 2022.Edition GBR, scenario SCN-GBR-HDS-01, step 3
04 Climate to infrastructureRail speed restrictions and track failures. Analogue or source: 2022.Edition GBR, scenario SCN-GBR-HDS-01, step 4
05 Water to healthHosepipe bans; river quality falls. Analogue or source: 2022.Edition GBR, scenario SCN-GBR-HDS-01, step 5
06 Energy to healthCooling demand meets constrained networks. Analogue or source: , .Edition GBR, scenario SCN-GBR-HDS-01, step 6

A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: United Kingdom 2026, scenario SCN-GBR-HDS-01 (2026); United Kingdom 2026, references (NR-CIT-1) (2026).

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 11UK Health Security Agency (ed.), Heat Mortality Monitoring Report: 2022. UKHSA, London, 2023.back
  2. 28Met Office (ed.), “Record high temperatures verified” (40.3 °C at Coningsby, 19 July 2022). Met Office, Exeter, 2022.back

Readings from the other desks

The baseline is read through each steward’s lens, then once as a whole. Each lens is a projection of reviewed findings, not a separate argument. The other desks’ own editions of this subject are listed first, as cross-references, not copies.

9 min read0 figures6 tables30 notesNR-COUNTRY-GBR-2026-BASELINE

6.1The other desks’ editions of this subject

Federation: each desk writes its own edition for the subjects in its remit. Until a desk releases, its edition shows its frame and the reading this edition printed for it.

デスク版状況識別子
GCRI Systems EvidenceSystems Evidence: United Kingdom 2026Drafted, in stewardship reviewNR-COUNTRY-GBR-2026-BASELINE-v1.0.0
GRF Public DeliberationPublic Deliberation: United Kingdom 2026準備中NR-GRF-GBR-2026-BASELINE (reserved)
GRA Capital ReadinessCapital Readiness: United Kingdom 2026準備中NR-GRA-GBR-2026-BASELINE (reserved)
Standards ProgressOutside this desk’s remitNot in remit
Academy CapabilityOutside this desk’s remitNot in remit
Index MeasurementMeasurement: United Kingdom 2026準備中NR-GRX-GBR-2026-BASELINE (reserved)

6.2Three lenses

One edition, read by each steward. The lens of this site comes first.

GCRI · KEY T

Technical Truth

The evidence supports a coupled reading of British risk. Heat, flooding and water shortage are already recorded, not projected; electrification makes the grid central; and food and nature carry slower exposures. Evidence is strongest for emissions and flood exposure, weakest for lifeline interdependence.

CLI-001 · WAT-006 · INF-010 · SYS-012

GRF · KEY M

Public Meaning

For most people risk arrives as a heatwave in a home built for cold, a flooded street or a hosepipe ban. The baseline asks that these be read as one system, and that debate weigh who carries the costs of flooding as cover changes.

HLT-004 · WAT-006 · WAT-005

GRA · KEY F

Capital Meaning

Readiness implications only. Weather claims are high, flood cover rests on a transitional scheme until 203921, and the clean-power transition needs grid investment16. These show where finance-readiness evidence will matter. Nothing here is advice, a rating or an approval.

WAT-006 · ENE-002

NEXUS

統合

The UK has cut emissions fast and observes its risks well, but adaptation lags. The 2027 programme should test the hot, dry summer pathway, map lifeline single points of failure, and measure flood cover where it lands.

SYS-012 · A-01 · A-03

6.3GCRI reading: the model card

GCRI’s reading of this edition is its model card: what the national model is, what it computes and where it stops. It is printed in full in Annex A, with the methods it belongs to. Annex A, methodology

6.4Global Risks Forum reading: editorial essays

Four signed essays by the Reports editorial team set out the positions this edition takes. They are interpretation, labelled as such; the evidence they draw on is in the findings register.

Britain’s homes, hospitals and railways were built for cold. The 40 °C summer of 2022 showed what happens when heat arrives in infrastructure designed for the opposite. Adapting to heat is now as much a building and transport question as a health one.

EDITORIAL ESSAY · 01

A cold-climate country in a hot summer

England faces more flood exposure and a projected supply shortfall at the same time. The same rain that floods streets in winter is missing from reservoirs in summer. Water policy has to manage both ends of the same system.

EDITORIAL ESSAY · 02

Water is both too much and too little

The end of coal and the plan for clean power by 2030 move more of daily life onto the grid. That raises the stakes of every single point of failure, as one substation fire at Heathrow made plain.

EDITORIAL ESSAY · 03

Clean power makes the grid the backbone

Wetlands, floodplains and healthy rivers absorb floods and clean water. With species abundance down by a fifth since 1970, the country has been running down a capability it now needs most.

EDITORIAL ESSAY · 04

Nature is the cheapest defence

6.5Global Risks Alliance reading: q1 2027 readiness pack

The registers that open the first operational quarter. At baseline each is initialised from this edition.

Table 6.1Q1 2027 readiness pack
項目登録State at baselineFirst Q1 2027 entry
E1National risk state deltabaseline set by this editionchanges against the baseline
E2WEFH+B state deltafive system readings setindicator updates and freshness
E3Agenda and Portfolio movementeight agenda items · six proposed objectsadmission decisions
E4NWG delivery registerno groups yetfirst monthly outputs
E5NNC capability registermembership opens in Q1 2027first contributions
E6NLC questions and challengesまだありませんfirst challenge log
E7Foundry technical stateenvironment preparedfirst sealed cut
E8Publication candidatestwelve findings carried forwardPUBLISH · HOLD dispositions
E9Universe readinessone candidate missionadmission and role spine
E10Correction registerなしfirst correction cycle

Publication dispositions

  • 公開
  • Hold
  • Needs evidence
  • 制限付き
  • 置き換え済み

6.6Nexus Standards reading: standards and regulatory watch

Instruments that shape the systems in this edition, by status on the retrieval date. The edition assesses no one’s compliance.

  • IN FORCE
  • 採択済み
  • PUBLISHED
  • UNDER REVIEW
Table 6.2Standards and regulatory watch
インストゥルメント機関対象範囲ステータス関連性
Climate Change Act 2008, net zero by 205024UK ParliamentUKIN FORCEemissions
Environment Act 202125UK ParliamentEngland (mainly)IN FORCEnature, water targets
Water (Special Measures) Act 202526UK ParliamentEngland and WalesIN FORCEwater companies
Clean Power 2030 Action Plan16DESNZGreat BritainPUBLISHED 2024power system
UK Government Resilience Framework27Cabinet OfficeUKPUBLISHED 2022resilience
Data centres as Critical National Infrastructure22DSITUKDESIGNATED 2024digital resilience
Critical Minerals Strategy23DBTUKPUBLISHED 2023supply security
Flood Re scheme to 203921Flood ReUKIN FORCEflood cover

Changed since 2024

  • The last coal power station closed in September 202418
  • The Water (Special Measures) Act became law in 202526
  • Data centres were designated Critical National Infrastructure22

To watch in 2027

  • The next climate change risk assessment cycle
  • Implementation of water-sector reform
  • Progress against the clean power 2030 milestones

6.7Risk Academy reading: literature and evidence review, science and assessments

The review behind this edition covers statutory assessments, peer-reviewed science and the institutional reports that bind its findings. Systematic reviews for each agenda item begin in Q1 2027.

Review protocol

問い
What does the published evidence establish about the United Kingdom’s coupled water, energy, food, health and biodiversity risks?
Sources searched
peer-reviewed literature; statutory assessments; official statistics; agency and industry data
期間
releases available at evidence close, 30 September 2026
選択
sources that bind or contextualise a finding in this edition
次の段階
systematic reviews for agenda items A-01 to A-05 in Q1 2027
Table 6.3Assessments and peer-reviewed science
参照番号Issuer年役割Used for
Kendon et al.3journal article2025supportsUK climate state
CCRA3 independent assessment4statutory assessment2021supportsclimate risks
CCRA3 government report5statutory assessment2022supportspriority risks
Adaptation progress6statutory report2025supportsadaptation gaps
Lee and Romero (eds.)31の評価2023contextglobal forcing
Zscheischler et al.32journal article2018枠組みcompound events
McElwee et al. (eds.)34の評価2024contextnexus interlinkages
Table 6.4Institutional reports
参照番号Issuer年役割Used for
National Risk Register7Cabinet Office2023supportsnational risks
Resilience Framework27Cabinet Office2022supportscapability
HECC report12UKHSA2023supportsclimate and health
Table 6.5Official statistics and agency data
参照番号Issuer年役割Used for
GHG emissions, final1DESNZ2026supportsemissions
Flood assessment8Environment Agency2024supportsflood exposure
Water resources framework9Environment Agency2025supportssupply shortfall
Storm overflows10Environment Agency2024supportsriver quality
Heat mortality11UKHSA2023supportsheat deaths
人口13ONS2024supportsプロファイル
食料安全保障14DEFRA2024supportsfood supply
Table 6.6Energy, nature and industry
参照番号Issuer年役割Used for
Clean Power 20301617DESNZ · NESO2024supportspower transition
Substation fire review19NESO2025supportssingle points of failure
State of Nature15partnership2023supportsspecies trends
Weather claims20ABI2024contextinsurance
Flood Re21Flood Re2024supportsflood cover
Catastrophe figures2Munich Re2026contextEuropean losses

Where the evidence agrees

  • Heat and flooding are already recorded, not projected38
  • Adaptation is behind the pace of risk6
  • Biodiversity continues to decline15

Where it is unsettled

  • How fast water demand and supply will diverge9
  • How flood cover will change after 203921
  • How electrification will change grid resilience17

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 21Flood Re (ed.), Annual Report and Accounts 2024 and Transition Plan to 2039. Flood Re, London, 2024.back
  2. 16Department for Energy Security and Net Zero (ed.), Clean Power 2030 Action Plan: A New Era of Clean Electricity. DESNZ, London, December 2024.back
  3. 24UK Parliament (ed.), Climate Change Act 2008, as amended by the Climate Change Act 2008 (2050 Target Amendment) Order 2019. London.back
  4. 25UK Parliament (ed.), Environment Act 2021. London, 2021.back
  5. 26UK Parliament (ed.), Water (Special Measures) Act 2025. London, 2025.back
  6. 27Cabinet Office (ed.), The UK Government Resilience Framework. HM Government, London, December 2022.back
  7. 22Department for Science, Innovation and Technology (ed.), “Data centres designated Critical National Infrastructure.” Press release, London, September 2024.back
  8. 23Department for Business and Trade (ed.), Resilience for the Future: The UK’s Critical Minerals Strategy. DBT, London, 2023.back
  9. 18Department for Energy Security and Net Zero (ed.), “End of coal power”, closure of Ratcliffe-on-Soar power station. Press release, London, 30 September 2024.back
  10. 3M. Kendon et al., “State of the UK Climate 2024,” International Journal of Climatology, vol. 45, 2025.back
  11. 4Climate Change Committee (ed.), Independent Assessment of UK Climate Risk: Advice to Government for the UK’s Third Climate Change Risk Assessment (CCRA3). CCC, London, 2021.back
  12. 5HM Government (ed.), UK Climate Change Risk Assessment 2022. HM Government, London, January 2022.back
  13. 6Climate Change Committee (ed.), Progress in Adapting to Climate Change: 2025 Report to Parliament. CCC, London, 2025.back
  14. 31H. Lee and J. Romero (eds.), Climate Change 2023: Synthesis Report. IPCC, Geneva, 2023.back
  15. 32J. Zscheischler, S. Westra, B. J. J. M. van den Hurk et al., “Future climate risk from compound events,” Nature Climate Change, vol. 8, pp. 469–477, 2018.back
  16. 34P. D. McElwee, P. A. Harrison, T. L. van Huysen et al. (eds.), Thematic Assessment Report on the Interlinkages among Biodiversity, Water, Food and Health. IPBES secretariat, Bonn, 2024. doi:10.5281/zenodo.13850054. doi:10.5281/zenodo.13850054back
  17. 7Cabinet Office (ed.), National Risk Register 2023 edition. HM Government, London, 2023.back
  18. 12UK Health Security Agency (ed.), Health Effects of Climate Change (HECC) in the UK: 2023 Report. UKHSA, London, 2023.back
  19. 1Department for Energy Security and Net Zero (ed.), 2024 UK Greenhouse Gas Emissions, Final Figures. DESNZ, London, 5 February 2026.back
  20. 8Environment Agency (ed.), National Assessment of Flood and Coastal Erosion Risk in England 2024. Environment Agency, Bristol, December 2024.back
  21. 9Environment Agency (ed.), National Framework for Water Resources 2025. Environment Agency, Bristol, 2025.back
  22. 10Environment Agency (ed.), Event Duration Monitoring: storm overflows annual data 2023. Environment Agency, Bristol, 2024.back
  23. 11UK Health Security Agency (ed.), Heat Mortality Monitoring Report: 2022. UKHSA, London, 2023.back
  24. 13Office for National Statistics (ed.), Population estimates for the UK, England, Wales, Scotland and Northern Ireland: mid-2023. ONS, Newport, 2024.back
  25. 14Department for Environment, Food and Rural Affairs (ed.), United Kingdom Food Security Report 2024. DEFRA, London, December 2024.back
  26. 17National Energy System Operator (ed.), Clean Power 2030: Advice on Achieving Clean Power for Great Britain by 2030. NESO, Warwick, November 2024.back
  27. 19National Energy System Operator (ed.), North Hyde substation fire: review of the 21 March 2025 outage. NESO, Warwick, 2025.back
  28. 15State of Nature Partnership (ed.), State of Nature 2023. State of Nature Partnership, UK, 2023.back
  29. 20Association of British Insurers (ed.), weather-related home insurance claims, 2023. ABI, London, 2024.back
  30. 2Munich Re (ed.), Natural disasters in 2025: NatCatSERVICE full-year figures. Munich Re, Munich, January 2026.back

The 2027 agenda

Eight bounded questions open the 2027 National Agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due at the Q1 2027 cut.

5 min read0 figures6 tables4 notesNR-COUNTRY-GBR-2026-BASELINE

7.1Questions for the operational series

  1. A-01

    How would a hot, dry summer load health services, water supply, rail and power in southern England at the same time?

    INI-GBR-HDS-01 · hot, dry summer; first output: dependency graph for three regions.

  2. A-02

    Where does surface-water flood risk fall on households, and how will cover change as Flood Re transitions by 2039?

    INI-GBR-FLD-02 · flood exposure and cover; first output: exposure–cover table by region.

  3. A-03

    Which substations, data centres and lifeline nodes are single points of failure for other critical services?

    INI-GBR-INF-03 · lifeline interdependence; first output: public-safe interdependence schematic.

  4. A-04

    How would a shock to imported food and energy pass into household prices and food security?

    INI-GBR-FOO-04 · import price transmission; first output: transmission model.

  5. A-05

    What surge capacity do the NHS and social care have for a 40 °C heatwave?

    INI-GBR-HLT-05 · heat surge readiness; first output: surge baseline for five regions.

  6. A-06

    How do storm overflows, drought and heat combine to degrade river water quality?

    With GS-01 Water; first output: basin note.

  7. A-07

    Which coastal communities face combined erosion, sea-level rise and storm surge?

    To be admitted in Q1 2027; first output: scoping note.

  8. A-08

    Which capabilities have been tested in real events, and which are only documented?

    National capability register; first output: rung evidence for 15 functions.

7.2Portfolio proposed for the Q1 2027 alignment

Five initiatives and one Universe mission candidate are proposed for admission at the Q1 2027 alignment. They are programme objects, no partner, funder or member is attached to them in this edition.

Table 7.1Objects proposed for the first operational quarter
IDオブジェクト種別問い状況
INI-GBR-HDS-01Hot, dry summer dependency modelInitiativeA-01提案中
INI-GBR-FLD-02Flood exposure and coverInitiativeA-02提案中
INI-GBR-INF-03Lifeline interdependence and single points of failureInitiativeA-03提案中
INI-GBR-FOO-04Import price transmissionInitiativeA-04提案中
INI-GBR-HLT-05Heat surge readinessInitiativeA-05提案中
MSN-GBR-2027-01Hot, dry summer Universe mission使命A-01Candidate

7.3The pathway

United Kingdom is the national pathway through which the Nexus operating system will run from 2027, across all four nations. At baseline the pathway is designed and its records are prepared; its councils and working groups are constituted from Q1 2027. This page states what exists today and what comes next, nothing more.

  1. 01

    One National Agenda

    bounded national questions for the year

    DRAFT 2027 · agenda review at the Q1 alignment

  2. 02

    ナショナル・デスク

    coordination, records, routing and continuity

    DESIGNED · constituted in Q1 2027

  3. 03

    国別モデル

    the country as a system of systems

    v0 SPECIFIED · v1 with the first Foundry cut

  4. 04

    国別ポートフォリオ

    risks, capabilities, initiatives, projects, missions

    7 PROPOSED · admission at the Q1 alignment

  5. 05

    地域ミッションで最も多く使われる Foundry の

    continuous computational environment

    PREPARED · first sealed cut NQ-GBR-2027-Q1

  6. 06

    報告書

    quarterly and annual publication

    BASELINE ISSUED · Q1 2027 · State & Agenda

  7. 07

    ユニバース

    annual proving environment

    CANDIDATE MISSION · mandate set in 2027

  8. 08

    エビデンスと訂正

    after-action, correction and renewal

    OPEN · first correction cycle in Q2 2027

7.4Universe 2027, evidence pack for the candidate mission

  1. 01

    任務

  2. 02

    Core Build · 1 month

  3. 03

    Action · 1 week

  4. 04

    Evidence seal

  5. 05

    Portfolio correction

  6. 06

    Next mandate

Table 7.2Universe 2027, evidence pack for the candidate mission
項目記録状況時期
F1Annual mandate recordPLANNEDafter the Q2 2027 alignment
F2Core Build recordPLANNEDone month before the exercise
F3演習の証拠PLANNEDduring the Action week
F4Decision packetsPLANNEDexercise state only
F5Proof receiptsPLANNEDscoped to each recorded check
F6After-action reportPLANNEDwithin one quarter
F7Upgrade docketPLANNEDrouted to the Portfolio
F8Portfolio renewalPLANNEDQ4 2027 annual edition
F9Public synthesisPLANNEDpublic-safe extracts only

使命

ID
MSN-GBR-2027-01 · hot, dry summer
Role spine
Leadership sponsor (NLC) · Institutional anchor (NNC) · Mission lead (NWG)
Receiving actors
to be identified with the mandate

7.5Handoffs and routing

Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.

Table 7.3Handoffs and routing
調査結果Routed to目的クラス
CLI-001 · emissionspublic recordreference for the 2027 seriesPUBLIC
HLT-004 · heat deathsINI-GBR-HLT-05heat surge readinessPUBLIC
WAT-005 · supply shortfallINI-GBR-HDS-01 · GS-01hot, dry summerPUBLIC
WAT-006 · flood exposureINI-GBR-FLD-02 · key F reviewexposure and coverPUBLIC
FOO-008 · food supplyINI-GBR-FOO-04import price transmissionPUBLIC
INF-010 · single points of failureINI-GBR-INF-03lifeline interdependencePUBLIC
BIO-009 · species declineGS-11 Biodiversity editioncondition baselinePUBLIC
SYS-012 · compound pathwayMSN-GBR-2027-01Universe candidateCONSORTIUM
Table 7.4Routing rules by publication class
クラスWhere it goesWho can see it
PUBLICthe published edition and its evidence bundleanyone
CONSORTIUMgoverned rooms of the national pathwayconsortium members under agreement
CONTROLLEDneed-to-know channelsnamed competent actors only

7.6Feeds and signal register

Table 7.5Feeds watched from Q1 2027
FeedProducerLatencyFeeds into
Weather warningsMet Officereal timeearly-warning rung
Flood warningsEnvironment Agency · SEPA · NRWreal timeRSK-GBR-CLI-002
Heat-health alertsUKHSAdaily in seasonRSK-GBR-CLI-001
Water situation reportsEnvironment Agency月次RSK-GBR-WAT-003
Storm overflow monitoringwater companies via the Environment Agencynear real timeWAT-007
Electricity system dataNESOreal timeENE findings
Catastrophe estimatesreinsurers and index providers事象ごとFIN findings

Escalation routes

  • none · keep monitoring
  • research question
  • project
  • risk object
  • quarterly publication
  • signal report
Table 7.6Signals at baseline
IDSignalCorroborationシステムルート
SIG-GBR-001Single points of failure in grid substations19CORROBORATEDENE · INFinitiative A-03
SIG-GBR-002Projected water-supply shortfall in the South and East9CORROBORATEDWAT · HLTinitiative A-01
SIG-GBR-003Rising heat-health burden1112CORROBORATEDHLT · CLIinitiative A-05

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 19National Energy System Operator (ed.), North Hyde substation fire: review of the 21 March 2025 outage. NESO, Warwick, 2025.back
  2. 9Environment Agency (ed.), National Framework for Water Resources 2025. Environment Agency, Bristol, 2025.back
  3. 11UK Health Security Agency (ed.), Heat Mortality Monitoring Report: 2022. UKHSA, London, 2023.back
  4. 12UK Health Security Agency (ed.), Health Effects of Climate Change (HECC) in the UK: 2023 Report. UKHSA, London, 2023.back

Systems in depth

One section per system: its state at evidence close, its exposures and what the operational series will watch.

6 min read0 figures5 tables16 notesNR-COUNTRY-GBR-2026-BASELINE

8.1Water, the baseline system chapter

Britain has too much water in winter and too little in summer. Flood exposure is rising while the South and East face a projected supply shortfall.

6.3million

properties at flood risk, England8

≈5bn litres/day

shortfall by 20559

>460kspills

storm overflows, 202310

Table 8.1State at baseline
構成要素状況エビデンスステータス
洪水へのエクスポージャーabout one in four properties in England8報告値
Supplyshortfall projected by 2055 without action9シナリオ
品質storm overflow spills; river condition10報告値
ガバナンスwater-sector reform law in 202526報告値

Couplings into other systems

  • WAT → HLT drinking water and river quality
  • WAT → INF flooding of networks
  • WAT → FIN uninsured flood losses

Evidence to bind in 2027

  • basin stress in the South and East
  • flood exposure in Scotland, Wales and Northern Ireland

Related editions

  • REG-EUR Europe
  • GLB Global Systems
  • GS-01 Water
  • GS-02 Energy
  • GS-05 Finance
  • XT-01 AI

8.2Energy, the baseline system chapter

The power system has changed fastest of all: coal ended in 2024 and clean power is planned for 2030. Electrification makes the grid the backbone of other systems.

373Mt CO₂e

emissions, 20241

2024Sept

last coal power station closed18

2030target

clean power plan16

Table 8.2State at baseline
構成要素状況エビデンスステータス
Emissions373 Mt CO₂e in 2024, 53% below 19901報告値
Coallast coal power station closed in September 202418報告値
Clean poweraction plan for 2030 published1617報告値
単一障害点substation fire closed Heathrow in 202519報告値

Couplings into other systems

  • ENE → HLT power for care and cooling
  • ENE → DAT data centres
  • ENE → INF transport and airports

Evidence to bind in 2027

  • substation and network redundancy
  • data-centre connection demand

Related editions

  • REG-EUR Europe
  • GLB Global Systems
  • GS-01 Water
  • GS-02 Energy
  • GS-05 Finance
  • XT-01 AI

8.3Food and agrifood, the baseline system chapter

The UK produces around 60% of the food it consumes. Import and energy prices pass quickly to households, and drought and heat cut domestic yields.

≈60%

of food produced domestically14

≈40%

imported (derived)14

2022shock

energy and food price rise

Table 8.3State at baseline
構成要素状況エビデンスステータス
Self-supplyaround 60% of food consumed14報告値
Importsmainly from Europe14報告値
気候drought and heat cut yields4報告値
価格energy costs pass into food prices14Inferred

Couplings into other systems

  • ENE → FOO inputs and prices
  • WAT → FOO irrigation in the East
  • TRD → FOO imports

Evidence to bind in 2027

  • household food access
  • price transmission from shocks

Related editions

  • REG-EUR Europe
  • GLB Global Systems
  • GS-01 Water
  • GS-02 Energy
  • GS-05 Finance
  • XT-01 AI

8.4Health and One Health, the baseline system chapter

Heat is the fastest-growing climate–health risk in a country built for cold. Floods and cold also load the NHS and social care.

2,985deaths

heat-associated, England, 202211

40.3°C

record temperature28

2023report

Health Effects of Climate Change12

Table 8.4State at baseline
構成要素状況エビデンスステータス
熱about 2,985 heat-associated deaths in 202211報告値
脆弱性older people and those with chronic illness12報告値
Floodinghealth effects of floods and displacement12報告値
Surge capacitynot consolidated nationally,Expert input

Couplings into other systems

  • CLI → HLT heat
  • ENE → HLT power for care
  • WAT → HLT water quality

Evidence to bind in 2027

  • NHS and care heat surge capacity
  • cooling in care homes

Related editions

  • REG-EUR Europe
  • GLB Global Systems
  • GS-01 Water
  • GS-02 Energy
  • GS-05 Finance
  • XT-01 AI

8.5Biodiversity and ecosystems, the baseline system chapter

The UK is among the most nature-depleted countries. Species abundance has fallen by a fifth since 1970, weakening natural flood and water regulation.

−19%

species abundance since 197015

1 in 6species

at risk of extinction, GB15

2021Act

Environment Act targets25

Table 8.5State at baseline
構成要素状況エビデンスステータス
Abundanceaverage decline of 19% since 197015報告値
Extinction riskone in six species in Great Britain15報告値
河川storm overflows and low flows10報告値
目標legally binding targets under the Environment Act25報告値

Couplings into other systems

  • BIO → WAT flood and water regulation
  • BIO → FOO pollination and soils
  • WAT → BIO river quality

Evidence to bind in 2027

  • habitat condition indicators
  • progress against Environment Act targets

Related editions

  • REG-EUR Europe
  • GLB Global Systems
  • GS-01 Water
  • GS-02 Energy
  • GS-05 Finance
  • XT-01 AI

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 8Environment Agency (ed.), National Assessment of Flood and Coastal Erosion Risk in England 2024. Environment Agency, Bristol, December 2024.back
  2. 9Environment Agency (ed.), National Framework for Water Resources 2025. Environment Agency, Bristol, 2025.back
  3. 10Environment Agency (ed.), Event Duration Monitoring: storm overflows annual data 2023. Environment Agency, Bristol, 2024.back
  4. 26UK Parliament (ed.), Water (Special Measures) Act 2025. London, 2025.back
  5. 1Department for Energy Security and Net Zero (ed.), 2024 UK Greenhouse Gas Emissions, Final Figures. DESNZ, London, 5 February 2026.back
  6. 18Department for Energy Security and Net Zero (ed.), “End of coal power”, closure of Ratcliffe-on-Soar power station. Press release, London, 30 September 2024.back
  7. 16Department for Energy Security and Net Zero (ed.), Clean Power 2030 Action Plan: A New Era of Clean Electricity. DESNZ, London, December 2024.back
  8. 17National Energy System Operator (ed.), Clean Power 2030: Advice on Achieving Clean Power for Great Britain by 2030. NESO, Warwick, November 2024.back
  9. 19National Energy System Operator (ed.), North Hyde substation fire: review of the 21 March 2025 outage. NESO, Warwick, 2025.back
  10. 14Department for Environment, Food and Rural Affairs (ed.), United Kingdom Food Security Report 2024. DEFRA, London, December 2024.back
  11. 4Climate Change Committee (ed.), Independent Assessment of UK Climate Risk: Advice to Government for the UK’s Third Climate Change Risk Assessment (CCRA3). CCC, London, 2021.back
  12. 11UK Health Security Agency (ed.), Heat Mortality Monitoring Report: 2022. UKHSA, London, 2023.back
  13. 28Met Office (ed.), “Record high temperatures verified” (40.3 °C at Coningsby, 19 July 2022). Met Office, Exeter, 2022.back
  14. 12UK Health Security Agency (ed.), Health Effects of Climate Change (HECC) in the UK: 2023 Report. UKHSA, London, 2023.back
  15. 15State of Nature Partnership (ed.), State of Nature 2023. State of Nature Partnership, UK, 2023.back
  16. 25UK Parliament (ed.), Environment Act 2021. London, 2021.back

方法論

How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.

9 min read0 figures12 tables6 notesNR-COUNTRY-GBR-2026-BASELINE

A.1手法

The baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.

Table A.1Methods
No.DerivationCalculation結果
(1)Emissions reduction since 1990417 ÷ (373 + 417)≈ 53%
(2)1990 emissions implied373 + 417≈ 790 Mt CO₂e
(3)Growth in flood-exposed properties by 20508.0 ÷ 6.3≈ 1.27×
(4)Imported share of food consumed100 − 60≈ 40%
Table A.2Coupling strength scale (matrix and model card)
Strength定義
STRONGa disruption in the source system has historically changed the target system’s service or output within one season
MODERATEan effect is documented but buffered or slower
WEAKan effect is plausible but not documented at national scale
Table A.3Status grammar
ラベル規則
報告値value as issued by its source, with year
Inferredreasoned from cited evidence; never a measurement
推定Nexus analytical value with stated method
シナリオconditional on stated assumptions
Expert inputstructured editorial judgement awaiting evidence

A.2Model card, National Model v0

Model ID
MDL-GBR-NATIONAL · v0.1
目的
represent the United Kingdom as coupled water, energy, food, health and biodiversity systems with forcing and transmission layers
ファミリー
graph-based system of systems
入力
the cited sources of this edition; no proprietary data
手法
expert-specified coupling strengths (STRONG · MODERATE · WEAK) from evidence and analogue events
検証
none yet, first validation against Q1 2027 Foundry evidence
不確実性
qualitative; strengths are hypotheses, not measurements
有効性の適用範囲
national scale; not for nation, region or asset-level use
再現性
strength table and sources published in this edition
20couplings

typed in v0

9strong

documented within one season

7moderate

documented, buffered

4weak

plausible, undocumented

A.3The baseline evidence cut

Every Nexus edition is published from a frozen evidence cut. The baseline cut is documentary: it pins the exact edition of every source cited. Model runs begin with the first Foundry cut in Q1 2027.

Cut ID
NQ-GBR-2026-Q0-1
種類
baseline documentary cut
Resolution policy
pinned · as of 30 September 2026
Sources pinned
40 cited sources, each at the edition and retrieval date in the references
Model runs
none at baseline, analytical values are stated with their method
Digest
computed at freeze and recorded in the publication record
Supersedes
nothing, first cut of the series
Superseded by
NQ-GBR-2027-Q1-1 at the Q1 2027 close

系譜

  1. 01

    source edition

  2. 02

    pinned citation

  3. 03

    finding

  4. 04

    page

  5. 05

    publication record

Table A.4From the baseline cut to the first Foundry cut
要素Baseline 2026Q1 2027
出典cited publications, pinned by editionqualified source bindings with versions
Analysisstated methods and editorial estimatestyped analysis specifications
モデルNational Model v0 specificationmodel runs with receipts
調査結果twelve baseline findingsfindings re-bound to the cut
審査five passes scheduledfive passes on the exact digest

A.4Evidence age and coverage

A 2026 edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.

Table A.5Evidence age and coverage
指標観測公開済み周期Next release
Territorial GHG emissions2024Feb 2026年次Feb 2027
UK mean temperature record2022Jan 2023年次年次
Heat-associated deaths20222023年次年次
Properties at flood risk2024Dec 2024定期的next assessment
Water-supply shortfallto 20552025定期的next framework
Storm overflow spills20232024年次年次
人口mid-20232024年次年次
Domestic food production share2023Dec 2024three-yearlynext report
Species abundance1970–20212023定期的next State of Nature
National risks20232023定期的next register
Table A.6Coverage by system at baseline
システム対象範囲Thinnest dimension
Climate forcingGOODregional extremes
エネルギーGOODnetwork single points of failure
水GOODScotland, Wales and Northern Ireland detail
食料GOODhousehold access
健康PARTIALheat surge capacity
生物多様性GOODhabitat condition
金融PARTIALflood cover after 2039
デジタルとサイバーTHINdependency mapping

A.5Evidence cards, two anchor sources

Issued by the Department for Energy Security and Net Zero as official statistics assessed by the Office for Statistics Regulation. UK coverage 1990–2024, revised each February. Role: binds CLI-001.

EVD-GBR-001

2024 UK Greenhouse Gas Emissions, Final Figures1

Issued by the Environment Agency from national flood models and local data. Coverage: England. Role: binds WAT-006 and the flood exposure figures.

EVD-GBR-002

National Assessment of Flood and Coastal Erosion Risk 20248

Table A.7Quality dimensions at baseline
DimensionEVD-CAN-001EVD-CAN-002
Completenessall sectors and gasesrivers, sea and surface water
Timelinessabout 13 months after the yearperiodic national update
Revisionannual back-revisionrevised with new models
Method transparencymethodology publishedmethods published
External validationUNFCCC expert reviewlocal authority review

Evidence cards to follow in Q1 2027

  • Water resources framework9, demand and supply projections
  • Heat mortality report11, excess-death method
  • State of Nature15, abundance index method
  • National Risk Register7, likelihood and impact scales

A.6Publication acceptance record

Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.

Table A.8Publication acceptance record
グループエリア項目合格N/A保留中
D1Identity and scope8800
D2Source and data12912
D3Analysis and models12381
D4Findings and claims9801
D5Figures, tables, maps10622
D6Editorial and citations10802
D7Review and approval130013
D8Artefact and design12705
D9Registry and release9009

Publication gate

Conditions met
14 of 23 at evidence close
Blocking problems
none recorded
Open conditions
reviews, approval of the exact digest, deposit, registry pointer

Not applicable at baseline

Model runs
first runs in Q1 2027
地図
plates in Q2 2027
Waivers
なし

A.7Status words

Table A.9The status every value carries
ステータス意味
観測Measured directly and published by the source.
報告値Published statistics of an official or institutional source.
申告済みStated by the body concerned; not independently measured.
推定A Nexus estimate from cited evidence, with its method in Annex A.
モデル化Produced by a stated model from cited inputs.
InferredReasoned from cited evidence; not measured.
予報A projection by the cited source.
SimulatedA simulation result under stated assumptions.
シナリオA conditional statement under stated assumptions; never a prediction.
Expert inputExpert judgement, recorded with its basis.
CandidateProposed for a later edition; not yet evidence.
Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject.

A.8How the edition is made, released and corrected

Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.

ステップ何が起きるか出典
01 Evidence arrives from the pillarsFoundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s.
02 The cut is sealedOn the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on.
03 The edition is assembledThe edition is drafted from its template and content pack. Agents may draft; they never publish and never decide.
04 The keys turnAt the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward.
05 The gate opensA named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit.
06 Signed and depositedThe PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI.
07 Published on its desk’s siteOnly then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part.
08 Corrections go to StandardsMethod and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut.

A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).

Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.

A.9Glossary and abbreviations

Table A.10Series terms
用語意味
Baseline Editionthe inaugural annual edition that fixes the reference state for the series
WEFH+Bwater, energy, food, health and biodiversity, the national nexus core
結合a typed dependency through which one system transmits to another
保障ギャップthe share of losses not covered by insurance
Capability ladderLISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED
EQLevidence-quality level, 1–5
証拠の区切りa frozen resolution of exact sources and versions
NNC・NLC・NWGNational Nexus Consortium · National Leadership Council · National Working Groups
Table A.11Abbreviations used in this edition
AbbreviationExpansion
ABIAssociation of British Insurers
CCC気候変動 委員会
CCRA3Third UK Climate Change Risk Assessment
CNICritical National Infrastructure
DEFRADepartment for Environment, Food and Rural Affairs
DESNZDepartment for Energy Security and Net Zero
DSITDepartment for Science, Innovation and Technology
EAEnvironment Agency
HECCHealth Effects of Climate Change report
NaFRA2National assessment of flood and coastal erosion risk, 2024
NESONational Energy System Operator
NRRNational Risk Register
ONSOffice for National Statistics
UKHSAUK Health Security Agency

A.10Technical annex

Table A.12Technical annex
項目Annex目次ステータス
A.1Indicator definitionsthe baseline indicator set, with units and sourcesIN THIS EDITION
A.2Coupling strengthsthe twenty-cell matrix and its rationaleIN THIS EDITION
A.3Scenario specificationSCN-GBR-HDS-01 assumptions and signpostsIN THIS EDITION
A.4Capability placementsrung evidence for fifteen functionsIN THIS EDITION
A.5Model diagnosticsfirst runs and validationQ1 2027
A.6感度分析influence of coupling strengthsQ2 2027
A.7Nation and region notesatlas cards for the four nations and English regionsQ2 2027
A.8Review statementspass-by-pass review recordAT RELEASE

A.1 · indicator definition, territorial greenhouse-gas emissions

Construct
annual greenhouse-gas emissions within UK territory, net of land use
単位
Mt CO₂e
対象範囲
territorial basis used for UK targets
出典
DESNZ final figures 20241
Revision
back-revised each February
既知の限界
excludes emissions embodied in imports

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1Department for Energy Security and Net Zero (ed.), 2024 UK Greenhouse Gas Emissions, Final Figures. DESNZ, London, 5 February 2026.back
  2. 8Environment Agency (ed.), National Assessment of Flood and Coastal Erosion Risk in England 2024. Environment Agency, Bristol, December 2024.back
  3. 9Environment Agency (ed.), National Framework for Water Resources 2025. Environment Agency, Bristol, 2025.back
  4. 11UK Health Security Agency (ed.), Heat Mortality Monitoring Report: 2022. UKHSA, London, 2023.back
  5. 15State of Nature Partnership (ed.), State of Nature 2023. State of Nature Partnership, UK, 2023.back
  6. 7Cabinet Office (ed.), National Risk Register 2023 edition. HM Government, London, 2023.back

Data appendix

The indicator set with its sources, the source registers, the licences of every kind of material and the formats of the edition.

7 min read0 figures7 tables16 notesNR-COUNTRY-GBR-2026-BASELINE

B.1The indicator set

Table B.1Baseline indicator set
指標値単位年状況出典
Territorial GHG emissions373Mt CO₂e2024報告値1
Change since 1990−53%2024報告値1
Last coal power station closedSept20242024報告値18
Record temperature40.3°C2022報告値28
Warmest year mean temperature10.03°C2022報告値29
Heat-associated deaths, England2,985deaths2022報告値11
Properties at flood risk, England6.3million2024報告値8
Properties at flood risk by 2050≈8million2050シナリオ8
Water-supply shortfall by 2055≈5bn litres/day2055シナリオ9
Storm overflow spills>460,000spills2023報告値10
人口68.3millionmid-2023報告値13
Domestic share of food consumed≈60%2023報告値14
Change in species abundance−19%1970–2021報告値15
Species at risk of extinction, GB≈16%2023報告値15
National risks in register89risks2023報告値7
Climate risks and opportunities61件2021報告値4

B.2National source register

The governed source set behind this edition. Each source keeps its authority, coverage, cadence and role; categories describe origin, not truth.

Domains bound by the register

  • WAT
  • ENE
  • FOO
  • HLT
  • BIO
  • CLI
  • INF
  • FIN
  • DAT
  • TRD
Table B.3National source register
出典カテゴリー対象範囲Period周期役割
GHG emissions statistics1official statisticsUK1990–2024年次CLI · ENE
State of the UK Climate3peer-reviewedUKto 2024年次CLI
CCRA345statutory assessmentUK2021–2022five-yearlyCLI
National Risk Register7governmentUK2023定期的all
Flood assessment8technical authorityイングランド2024定期的WAT
Water resources framework9technical authorityイングランドto 2055定期的WAT
Storm overflows10technical authorityイングランド2023年次WAT
Heat mortality11public health agencyイングランド2022年次HLT
人口13official statisticsUKmid-2023年次プロファイル
食料安全保障14governmentUK2023three-yearlyFOO
State of Nature15civil societyUK1970–2021定期的BIO
Substation fire review19system operatorGB2025one-offINF

B.3Regional reading, the four nations and English regions

Map plates for each nation and region follow in Q2 2027. This page gives the regional reading in table form, and ranks no nation or region.

Table B.4Regional reading, the four nations and English regions
エリアPrincipal hazardsSystems most exposedBaseline evidence
スコットランドstorms, river flooding, coastal erosionpower networks, rural transportCCRA34
北アイルランドstorms, floodingpower, water, agricultureCCRA34
ウェールズriver and surface-water floodingcommunities, transportCCRA34
North of Englandriver flooding, stormshousing, rail, industryflood assessment8
Midlandsriver flooding, heattransport hubs, agricultureflood assessment8
East of Englanddrought, coastal floodingagriculture, water supplywater framework9
London and South Eastheat, surface-water flooding, water stresshealth, transport, waterheat11 · water9
South Westcoastal flooding, stormscoasts, tourism, railflood assessment8

The leading compound pathway runs through the South and East: hot, dry summers, a projected supply shortfall and dense populations exposed to heat.

SOUTH AND EAST

Heat and water stress

Surface-water flooding drives most flood exposure and hits dense urban areas hardest.

CITIES

Surface water

Winter storms test power networks and rural transport in Scotland, Wales and Northern Ireland.

NATIONS

Storms and networks

B.4Atlas card, London

  • 都市
  • river basin
  • grid region
  • transport hub
Systems in view
health, water, transport, power
Defining events
40 °C heat in July 202228; surface-water flooding in 2021; Heathrow substation outage in March 202519
連動
CLI → HLT heat; WAT → INF surface water; ENE → INF single points of failure
Capability evidence
heat-health and flood warnings used in real events
ギャップ
heat surge capacity; drainage capacity; lifeline redundancy
Agenda items
A-01 · A-02 · A-03

London’s urban heat island amplifies heatwaves, and older residents in poorly ventilated homes face the highest risk [11] [12].

HEALTH

Heat in a dense city

Intense summer storms overwhelm drainage built for a cooler, smaller city.

WATER

Surface-water flooding

One substation fire halted Europe’s busiest airport for most of a day [19].

INFRASTRUCTURE

単一障害点

B.5United Kingdom system card

The card through which the United Kingdom appears in the Europe regional edition and the global series. It summarises; it does not rank.

Table B.5United Kingdom system card
システムBaseline stateCoupling to watch対象範囲
水flood exposure rising; supply shortfall projected暑熱と干ばつGOOD
エネルギーcoal ended; clean power plannedgrid single points of failureGOOD
食料about 60% domestic productionimport pricesGOOD
健康heat burden risingheat and care capacityPARTIAL
生物多様性long-run declinehabitat and water qualityGOOD

The UK card sits beside European neighbours; interconnectors, food trade and shared seas are read as one regional system.

EUROPE REGIONAL EDITION

One regional system

UK evidence enters the water, energy, food, finance and climate sector reports through the same finding identifiers.

GLOBAL SECTOR SERIES

Same findings, same IDs

In the global edition the UK is read against peer distributions and thresholds, never placed in a league table.

GLOBAL FLAGSHIP

Peers, not ranks

背景

Archetype
high-income island economy with a temperate maritime climate
人口
68.3 million (mid-2023)13
Emissions
53% below 1990 (2024)1
食料
about 60% produced domestically14

B.6ライセンス

Table B.6Licences of each kind of material
資料ライセンス
TextCC BY 4.0
データon the licence of each source; Nexus tables CC BY 4.0
数字Nexus figures CC BY 4.0; third-party as credited
地図boundary source and licence printed on each plate
メタデータCC0 1.0, as Zenodo publishes it
Third-party data, figures and textThe source’s own licence, credited where it is used; never relicensed
Nexus-authored text, tables and figures: CC BY 4.0 (SPDX CC-BY-4.0). Map plates print their boundary source and licence.

B.7Formats and provenance

Table B.7This edition in every format
形式種別状況概要識別子
Web editionHTMLこのサイトDraft in stewardship review; every value resolves to its source.NR-COUNTRY-GBR-2026-BASELINE-v1.0.0
Print editionPDFAt releaseA4 portrait · screen, print and archival PDF, signed with the web edition at release.NR-COUNTRY-GBR-2026-BASELINE-v1.0.0
Indicator dataCSV · JSONこのサイト16 indicators with unit, year, status and source; the machine-readable copy ships with the evidence bundle at release.NR-COUNTRY-GBR-2026-BASELINE data release v1
数字SVG · PNGこのサイト4 on the web edition: headline figure, figure 1.3, coupling instrument, capability ladder.FIG-COUNTRY-GBR-2026-BASELINE-*
SlidesPDF記録なしNo slide deck is recorded for this edition.
エビデンス・ブリーフHTML · PDF記録なしNo evidence brief is recorded for this edition.
Dataset with DOIDataCiteAt releaseConcept and version DOI are minted at deposit; none is recorded yet.

来歴

Edition pack
The edition’s content pack (JSON), from which the print and web editions are built
証拠の区切り
NQ-GBR-2026-Q0-1, closed 30 September 2026
再現性
sourced values cited; analytical values reproducible from stated parameters
Self-check
14 of 23 at evidence close; a fail on any item blocks release
審査
five passes scheduled before release (in Annex C)
正式な発行者
GCRI for the Nexus Consortium
訂正
Registry correction pathway; upheld corrections are published as notices with a new version

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1Department for Energy Security and Net Zero (ed.), 2024 UK Greenhouse Gas Emissions, Final Figures. DESNZ, London, 5 February 2026.back
  2. 18Department for Energy Security and Net Zero (ed.), “End of coal power”, closure of Ratcliffe-on-Soar power station. Press release, London, 30 September 2024.back
  3. 28Met Office (ed.), “Record high temperatures verified” (40.3 °C at Coningsby, 19 July 2022). Met Office, Exeter, 2022.back
  4. 29Met Office (ed.), “2022: the UK’s warmest year on record.” Met Office, Exeter, January 2023.back
  5. 11UK Health Security Agency (ed.), Heat Mortality Monitoring Report: 2022. UKHSA, London, 2023.back
  6. 8Environment Agency (ed.), National Assessment of Flood and Coastal Erosion Risk in England 2024. Environment Agency, Bristol, December 2024.back
  7. 9Environment Agency (ed.), National Framework for Water Resources 2025. Environment Agency, Bristol, 2025.back
  8. 10Environment Agency (ed.), Event Duration Monitoring: storm overflows annual data 2023. Environment Agency, Bristol, 2024.back
  9. 13Office for National Statistics (ed.), Population estimates for the UK, England, Wales, Scotland and Northern Ireland: mid-2023. ONS, Newport, 2024.back
  10. 14Department for Environment, Food and Rural Affairs (ed.), United Kingdom Food Security Report 2024. DEFRA, London, December 2024.back
  11. 15State of Nature Partnership (ed.), State of Nature 2023. State of Nature Partnership, UK, 2023.back
  12. 7Cabinet Office (ed.), National Risk Register 2023 edition. HM Government, London, 2023.back
  13. 4Climate Change Committee (ed.), Independent Assessment of UK Climate Risk: Advice to Government for the UK’s Third Climate Change Risk Assessment (CCRA3). CCC, London, 2021.back
  14. 3M. Kendon et al., “State of the UK Climate 2024,” International Journal of Climatology, vol. 45, 2025.back
  15. 5HM Government (ed.), UK Climate Change Risk Assessment 2022. HM Government, London, January 2022.back
  16. 19National Energy System Operator (ed.), North Hyde substation fire: review of the 21 March 2025 outage. NESO, Warwick, 2025.back

References and record

Every source the edition rests on, the publication record, the corrections log and the open record.

10 min read0 figures1 table0 notesNR-COUNTRY-GBR-2026-BASELINE

C.140 sources

NR-CIT-1, editor first. A DOI is linked where the source has one; Nexus records carry a UNI once the catalogue allocates it (NS-1).

  1. 1Department for Energy Security and Net Zero (ed.), 2024 UK Greenhouse Gas Emissions, Final Figures. DESNZ, London, 5 February 2026. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 6, chapter 8
  2. 2Munich Re (ed.), Natural disasters in 2025: NatCatSERVICE full-year figures. Munich Re, Munich, January 2026. Cited in chapter 6
  3. 3M. Kendon et al., “State of the UK Climate 2024,” International Journal of Climatology, vol. 45, 2025. Cited in chapter 6
  4. 4Climate Change Committee (ed.), Independent Assessment of UK Climate Risk: Advice to Government for the UK’s Third Climate Change Risk Assessment (CCRA3). CCC, London, 2021. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 6, chapter 8
  5. 5HM Government (ed.), UK Climate Change Risk Assessment 2022. HM Government, London, January 2022. Cited in chapter 1, chapter 6
  6. 6Climate Change Committee (ed.), Progress in Adapting to Climate Change: 2025 Report to Parliament. CCC, London, 2025. Cited in chapter 1, chapter 4, chapter 6
  7. 7Cabinet Office (ed.), National Risk Register 2023 edition. HM Government, London, 2023. Cited in the summary, chapter 2, chapter 3, chapter 4, chapter 6
  8. 8Environment Agency (ed.), National Assessment of Flood and Coastal Erosion Risk in England 2024. Environment Agency, Bristol, December 2024. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  9. 9Environment Agency (ed.), National Framework for Water Resources 2025. Environment Agency, Bristol, 2025. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  10. 10Environment Agency (ed.), Event Duration Monitoring: storm overflows annual data 2023. Environment Agency, Bristol, 2024. Cited in chapter 1, chapter 2, chapter 6, chapter 8
  11. 11UK Health Security Agency (ed.), Heat Mortality Monitoring Report: 2022. UKHSA, London, 2023. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 5, chapter 6, chapter 7, chapter 8
  12. 12UK Health Security Agency (ed.), Health Effects of Climate Change (HECC) in the UK: 2023 Report. UKHSA, London, 2023. Cited in the summary, chapter 3, chapter 6, chapter 7, chapter 8
  13. 13Office for National Statistics (ed.), Population estimates for the UK, England, Wales, Scotland and Northern Ireland: mid-2023. ONS, Newport, 2024. Cited in the summary, chapter 6
  14. 14Department for Environment, Food and Rural Affairs (ed.), United Kingdom Food Security Report 2024. DEFRA, London, December 2024. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 6, chapter 8
  15. 15State of Nature Partnership (ed.), State of Nature 2023. State of Nature Partnership, UK, 2023. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 6, chapter 8
  16. 16Department for Energy Security and Net Zero (ed.), Clean Power 2030 Action Plan: A New Era of Clean Electricity. DESNZ, London, December 2024. Cited in chapter 1, chapter 3, chapter 6, chapter 8
  17. 17National Energy System Operator (ed.), Clean Power 2030: Advice on Achieving Clean Power for Great Britain by 2030. NESO, Warwick, November 2024. Cited in chapter 1, chapter 6, chapter 8
  18. 18Department for Energy Security and Net Zero (ed.), “End of coal power”, closure of Ratcliffe-on-Soar power station. Press release, London, 30 September 2024. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 6, chapter 8
  19. 19National Energy System Operator (ed.), North Hyde substation fire: review of the 21 March 2025 outage. NESO, Warwick, 2025. Cited in chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  20. 20Association of British Insurers (ed.), weather-related home insurance claims, 2023. ABI, London, 2024. Cited in the summary, chapter 2, chapter 3, chapter 6
  21. 21Flood Re (ed.), Annual Report and Accounts 2024 and Transition Plan to 2039. Flood Re, London, 2024. Cited in the summary, chapter 2, chapter 3, chapter 4, chapter 6
  22. 22Department for Science, Innovation and Technology (ed.), “Data centres designated Critical National Infrastructure.” Press release, London, September 2024. Cited in chapter 3, chapter 4, chapter 6
  23. 23Department for Business and Trade (ed.), Resilience for the Future: The UK’s Critical Minerals Strategy. DBT, London, 2023. Cited in chapter 6
  24. 24UK Parliament (ed.), Climate Change Act 2008, as amended by the Climate Change Act 2008 (2050 Target Amendment) Order 2019. London. Cited in chapter 3, chapter 6
  25. 25UK Parliament (ed.), Environment Act 2021. London, 2021. Cited in chapter 3, chapter 6, chapter 8
  26. 26UK Parliament (ed.), Water (Special Measures) Act 2025. London, 2025. Cited in chapter 3, chapter 6, chapter 8
  27. 27Cabinet Office (ed.), The UK Government Resilience Framework. HM Government, London, December 2022. Cited in chapter 3, chapter 4, chapter 6
  28. 28Met Office (ed.), “Record high temperatures verified” (40.3 °C at Coningsby, 19 July 2022). Met Office, Exeter, 2022. Cited in the summary, chapter 1, chapter 2, chapter 5, chapter 8
  29. 29Met Office (ed.), “2022: the UK’s warmest year on record.” Met Office, Exeter, January 2023. Cited in the summary, chapter 1, chapter 2, chapter 3
  30. 30WMO (ed.), State of the Global Climate 2025, WMO-No. 1391. WMO, Geneva, March 2026.
  31. 31H. Lee and J. Romero (eds.), Climate Change 2023: Synthesis Report. IPCC, Geneva, 2023. Cited in chapter 6
  32. 32J. Zscheischler, S. Westra, B. J. J. M. van den Hurk et al., “Future climate risk from compound events,” Nature Climate Change, vol. 8, pp. 469–477, 2018. Cited in chapter 6
  33. 33S. V. Buldyrev, R. Parshani, G. Paul, H. E. Stanley and S. Havlin, “Catastrophic cascade of failures in interdependent networks,” Nature, vol. 464, pp. 1025–1028, 2010.
  34. 34P. D. McElwee, P. A. Harrison, T. L. van Huysen et al. (eds.), Thematic Assessment Report on the Interlinkages among Biodiversity, Water, Food and Health. IPBES secretariat, Bonn, 2024. doi:10.5281/zenodo.13850054. doi:10.5281/zenodo.13850054 Cited in chapter 6
  35. 35S. Valadbaygi (ed.), Reports, The Foundational Edition, Volumes I and II. Reports series, Edition 2026–2030, V1.0. GCRI for the Nexus Consortium, Toronto, 2026.
  36. 36S. Valadbaygi (ed.), Global Systems Risk & Resilience Report 2026, Baseline Edition. GCRI for the Nexus Consortium, Toronto, 2026.
  37. 37S. Valadbaygi (ed.), Global Water Risk & Resilience Report 2026, Baseline Edition. GCRI for the Nexus Consortium, Toronto, 2026.
  38. 38S. Valadbaygi (ed.), Exponential Technology Report 2026, AI and Agentic Systems, Baseline Edition. GCRI for the Nexus Consortium, Toronto, 2026.
  39. 39S. Valadbaygi (ed.), United States Systems Risk & Resilience Report 2026, Baseline Edition. GCRI for the Nexus Consortium, Toronto, 2026.
  40. 40S. Valadbaygi (ed.), Canada Systems Risk & Resilience Report 2026, Baseline Edition. GCRI for the Nexus Consortium, Toronto, 2026.

C.2Publication record

公開

タイトル
United Kingdom Systems Risk & Resilience Report 2026, Baseline Edition
シリーズ
Reports · Edition 2026–2030
版
Baseline Edition 2026 · inaugural annual
バージョン
v1.0.0 · draft for stewardship review
Publication ID
NR-COUNTRY-GBR-2026-BASELINE-v1.0.0
エビデンス締め切り
30 September 2026
Publication date
2026 年 10 月
DOI
concept and version DOI at deposit

発行者

正式な発行者
The Global Centre for Risk and Innovation (GCRI), for the Nexus Consortium
場所
Toronto
編集者
Saeed Valadbaygi, Chief Steward and Managing Editor
スチュワード
GCRI · technical truth · GRF · public meaning · GRA · capital meaning
ライセンス
text CC BY 4.0; data on the terms of each source
Copyright
© 2026 GCRI · Nexus Consortium
言語
English (en-GB) source edition
Correspondence
Registry correction pathway · editorial office

Colophon

形式
A4 portrait · screen, print and archival PDF
Typefaces
Space Grotesk (display) · Geist (text) · IBM Plex Sans Italic (standfirsts) · IBM Plex Mono (data)
Design standard
Reports Foundational Edition, Volume I, Part VII
アクセシビリティ
tagged PDF and HTML targets; text alternatives for every figure
生産
Reports editorial team, GCRI

Release path for this version

Table C.1Release path for this version
ステップ何が起きるかいつ
草案editorial self-check complete at evidence close2026 年 10 月
Steward reviewfive passes on the exact draft (keys T · M · F · N)Q4 2026
承認publication authority approves the exact digestbefore release
Depositconcept and version DOI minted; registry pointer setat release
承継the Q1 2027 edition reports changes against this baselineQ1 2027
Current version
v1.0.0 draft, stewardship review
Previous edition
none, first edition of the series
Next edition
NR-COUNTRY-GBR-2027-Q1-v1.0.0
Latest version
resolve the concept DOI or the registry record
Correction route
Registry correction pathway
Notice types
erratum · addendum · supersession · withdrawal

C.3訂正履歴

0correction notices. No edition has been released yet, so none can be corrected; the log below lists each edition’s current version.

版バージョン日付状況変化通知
GBRNR-COUNTRY-GBR-2026-BASELINE-v1.0.02026 年 10 月草案Baseline Edition 2026, inaugural annual edition,なし

Notice types: erratum, addendum, supersession, withdrawal. A correction is a new version with a published notice; the earlier version stays resolvable, and no edition is ever edited in silence.

C.4Open record

This edition’s open record

Publication ID
NR-COUNTRY-GBR-2026-BASELINE-v1.0.0
Desk identifier and series alias
NR-GCRI-GBR-2026-BASELINE-v1.0.0 · NR-NAT-GBR-2026-BL
Collection
NR-COL-2026-BASELINE and NR-COL-2026-BASELINE-GBR (IsPartOf at deposit)
DOI
Concept and version DOI at deposit, on Zenodo with DataCite metadata
版
Each correction is a new version (isNewVersionOf); the concept DOI resolves to the latest
Bundle
RO-Crate 1.2 with CITATION.cff, CodeMeta and PROV-O provenance; a signed manifest
ライセンス
CC BY 4.0 (SPDX CC-BY-4.0) for original material; metadata CC0 1.0

Credit and identity

ORCID
Your iD in the deposit and the contribution record; DataCite can then add the work to your ORCID record
ROR
Your organisation by its ROR identifier, never by a typed name alone
CRediT
Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualisation, Writing, review and editing
アカウント
None needed to contribute; never a password

Find and follow

Search the open indexes for United Kingdom; software is cited by its SWHID from Software Heritage, and a quantified scenario run is preregistered on OSF before it is run. Annotation is your choice: Hypothesis opens this page in its own viewer.

Mirrors and harvest

The DOI is canonical. At release each signed bundle is also given an IPFS content identifier and a bloxberg anchor as mirrors; both are listed in the record once they exist. Zenodo exposes every record over OAI-PMH, and reviews and endorsements can arrive through COAR Notify where the repository supports it.

InvenioRDM metadata for a contribution on United Kingdom, prefilled from this page
{
  "metadata": {
    "resource_type": {
      "id": "dataset"
    },
    "title": "Evidence on United Kingdom for Nexus Reports",
    "publication_date": "YYYY-MM-DD",
    "creators": [
      {
        "person_or_org": {
          "type": "personal",
          "family_name": "Your family name",
          "given_name": "Your given name",
          "identifiers": [
            {
              "scheme": "orcid",
              "identifier": "0000-0000-0000-0000"
            }
          ]
        },
        "affiliations": [
          {
            "id": "ROR identifier of your organisation"
          }
        ]
      }
    ],
    "description": "What it is, where its record is kept and how it bears on United Kingdom Systems Risk and Resilience Report 2026.",
    "rights": [
      {
        "id": "cc-by-4.0"
      }
    ],
    "subjects": [
      {
        "subject": "Nexus Reports"
      },
      {
        "subject": "United Kingdom"
      },
      {
        "subject": "Country Systems Risk & Resilience Report"
      }
    ],
    "related_identifiers": [
      {
        "identifier": "https://therisk.global/nexus-reports/editions/gbr/",
        "scheme": "url",
        "relation_type": {
          "id": "issupplementto"
        },
        "resource_type": {
          "id": "publication-report"
        }
      }
    ],
    "version": "1.0.0"
  },
  "custom_fields": {},
  "access": {
    "record": "public",
    "files": "public"
  },
  "files": {
    "enabled": true
  },
  "parent": {
    "communities": {
      "default": "nexusreports"
    }
  }
}

C.5Where this edition sits among the six pillars

Foundry seals the evidence and Universe tests it; Reports publishes it; Standards takes its corrections and Academy teaches from it.

  1. F03 Sealed observations and indicator series Foundry Sealed observations and indicator series behind a profile (closeout).
  2. F04 After-action and scenario findings for Universe After-action and scenario findings for chapters 10 and 13 (after action review).
  3. F05 National Portfolio movement for chapter Foundry National Portfolio movement for chapter 11 (after action review).
  4. Applied in editions Standards Nexus Standards: applied in editions.
  5. GBR edition Reports United Kingdom 2026, published in every format with its sources, citation and corrections.
  6. F06 Method and correction findings as change Standards Method and correction findings as change proposals (correction).
  7. F12 Q4 synthesis informs the next-year Universe Q4 synthesis informs the next-year mandate (renewal).
  8. Taught in the open Academy Risk Academy: taught in the open.

What Foundry and Universe hand to this edition, and what it hands to Standards, Universe and Academy. From the programme spine; GBR is a drafted Baseline Edition, so these handoffs run from its first operational quarter.

引き継ぎBetweenWhat crosses, and when
F03Foundry to ReportsSealed observations and indicator series behind a profile (closeout).
F04Universe to ReportsAfter-action and scenario findings for chapters 10 and 13 (after action review).
F05Foundry to ReportsNational Portfolio movement for chapter 11 (after action review).
RingNexus Standards to ReportsNexus Standards: applied in editions.
F06Reports to Nexus StandardsMethod and correction findings as change proposals (correction).
F12Reports to UniverseQ4 synthesis informs the next-year mandate (renewal).
RingReports to Risk AcademyRisk Academy: taught in the open.
報告書貢献する

Send evidence or a correction on United Kingdom.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the GCRI Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI システム・エビデンスデスク国のシステム・リスクとレジリエンス

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.