Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

方法論

How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.

14 min read0 figures13 tables16 notesNR-XTECH-HPC-GLOBAL-2026-BASELINE

目次
  1. ·Edition home
  2. ·Executive summary
  3. 1HPC is power, cooling and policy before it is speed
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Power and siting limits meet fast-growing demand
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. A方法論
    1. A.1 Methods
    2. A.2 Model card, HPC System Model v0
    3. A.3 The baseline evidence cut
    4. A.4 Evidence age and coverage
    5. A.5 Evidence cards, two anchor sources
    6. A.6 Publication acceptance record
    7. A.7 Status words
    8. A.8 How the edition is made, released and corrected
    9. A.9 Glossary and abbreviations
    10. A.10 Technical annex
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

A.1手法

The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.

Table A.1Methods
No.DerivationCalculation結果
(1)Combined power of the five largest systems, June 202642,220 + 29,685 + 24,607 + 38,698 + 15,794 kW151,004 kW, about 151 MW
(2)Growth of combined list performance in six months18.73 ÷ 14.99about 1.25 times
(3)Share of listed systems that use accelerators276 ÷ 50055.2%
(4)Ratio of El Capitan HPL-MxP to Linpack16.7 ÷ 1.809about 9.2 times
Table A.2Coupling strength scale (matrix and model card)
Strength定義
STRONGa disruption in the source system has historically changed the target system’s service or output within one season, in more than one region
MODERATEan effect is documented but buffered or slower
WEAKan effect is plausible but not documented at global scale
Table A.3Status grammar
ラベル規則
報告値value as issued by its source, with year
Inferredreasoned from cited evidence; never a measurement
推定Nexus analytical value with stated method
シナリオconditional on stated assumptions
Expert inputstructured editorial judgement awaiting evidence

A.2Model card, HPC System Model v0

Model ID
MDL-XT07-HPC · v0.1
目的
represent HPC and advanced computing as infrastructure coupled to electricity, cooling, chips, public funding, workforce and security policy
ファミリー
graph-based system of systems
入力
the cited sources of this edition; no proprietary data
手法
expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
検証
none yet, first validation against federation evidence in 2027
不確実性
qualitative; strengths are hypotheses, not measurements
有効性の適用範囲
global scale; not for asset-, site- or country-level use
再現性
strength table and sources published in this edition
20couplings

typed in v0

0strong

documented within one season

0moderate

documented, buffered

20weak

plausible, undocumented

A.3The baseline evidence cut

Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.

Cut ID
DC-XTECH-HPC-GLOBAL-2026-B0
種類
baseline documentary cut
Resolution policy
pinned · as of 30 September 2026
Sources pinned
43 cited sources, each at the edition and access date in the references
Model runs
none at baseline, analytical values are stated with their method
Digest
computed at freeze and recorded in the publication record
Supersedes
nothing, first cut of the series
Superseded by
the 2027 HPC annual cut

系譜

  1. 01

    source edition

  2. 02

    pinned citation

  3. 03

    finding

  4. 04

    page

  5. 05

    publication record

Table A.4From the baseline cut to the federation cut
要素Baseline 20262027 global annual
出典cited global publications, pinned by editionnational, regional and sector cuts through one graph
Analysisstated methods and editorial estimatestyped analysis specifications
モデルHPC System Model v0 specificationmodel runs with receipts
調査結果twelve baseline findingsfindings re-bound to federation evidence
審査five passes scheduledfive passes on the exact digest

A.4Evidence age and coverage

A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.

Table A.5Evidence age and coverage
指標観測公開済み周期Next release
Top-system results2026June 2026定期的November 2026 list
Efficiency results2026June 2026定期的November 2026 list
US data centre energy2023December 2024one-offnext national report
Export rule timeline2026April and May 2026事象ごとfurther guidance
EuroHPC budget2021 to 2027page read 2026-11-03継続的regulation changes
Footprint papers2021 to 2024preprints and papersone-offnew studies
MPI and OpenMP2024 to 2026June 2025 · July 2026定期的OpenMP 6.1
FugakuNEXT plan2025August 2025one-offdetailed design
Table A.6Coverage by system at baseline
システム対象範囲Thinnest dimension
システムGOODunlisted systems
効率PARTIALfacility-level figures
エネルギーPARTIALcommon basis for facilities
ガバナンスPARTIALtext of rules and guidance
投資PARTIALpublic funding outside the US and EU
SupplyTHINaccelerator and memory supply
技能THINworkforce numbers
水THINcooling-water use
Table A.7Designed empty states: what is not bound, what would fill it and why
分野Source that would fill itBlocker
Cooling-water use of large computing facilitiesoperators, national laboratories, regulators under the EU schemenot retrieved; no primary figure read
Facility energy and demand on a common basis for HPC and for commercial AI workloadsnational statistics, operators, IEAUS figures read in the Berkeley Lab report29 and global figures in the IEA report28; no split between HPC and commercial AI
Data centre electricity by country outside the USIEA Energy and AI28, national statisticsglobal figures read in the report; national series not bound
Lawrence Berkeley report text, including water useLBNL 2024 United States Data Center Energy Usage Report29report read; its water estimates are not yet used in this edition
Power draw and cost of JUPITER from primary pagesEuroHPC, Jülich Supercomputing Centrepower and budget are not stated on the page read9; list value only1
LineShine architecture and independent descriptionoperator and peer-reviewed or institutional paperslist pages and one trade analysis30; no operator description
Specifications and schedules of DOE Solstice, Equinox, Lux and DiscoveryArgonne and Oak Ridge system pages; DOE announcement31the DOE announcement gives 100,000 and 10,000 Blackwell GPUs for Solstice and Equinox and 2026 delivery for Equinox, without performance figures31; Oak Ridge pages name Lux and Discovery without specifications827
El Capitan system description from the laboratoryLawrence Livermore National Laboratory32news item read: 1.742 exaflops on HPL and 2.79 exaflops peak in November 202432; current values from the list1
Text of the 2023 US advanced computing ruleFederal Register33Federal Register record and abstract read; full rule text not analysed
EU delegated regulations on data centre reporting and rating from the primary textEUR-Lex3435the 2024 regulation was read34; the 2026 rating proposal is known from a law firm note35
Supply of accelerators, high-bandwidth memory and fabrication capacity for HPCindustry and trade statisticsnot retrieved; no figure used
HPC workforce size and skills gapsnational statistics, OECD, industry surveysnot retrieved; capability rung stays LISTED
Survey data on data centre efficiency and densityUptime Institute global survey42report read; weighted average PUE of 1.54 in 2025; no figure used in the findings
Public funding totals for HPC outside the US and EUnational strategies and ministriesnot consolidated; UK plan gives no budget figure23
Results of the November 2026 TOP500 listTOP500 news and lists6not yet published at page read; the news page shows June 2026 as latest
Capability rungs beyond list monitoring, planning and fundingagencies, operators, laboratoriesnot reviewed

A.5Evidence cards, two anchor sources

Published by the TOP500 project at ISC 2026 on 23 June 2026, 67th edition. Periodic. Role: binds INF-001 and the dashboard power figures. Coverage: systems that submit results.

EVD-XT07-001

TOP500 list of June 20261

Published by the TOP500 project on the same date. Periodic. Role: binds ENE-004. Coverage: listed systems that report power.

EVD-XT07-002

Green500 list of June 20263

Table A.8Quality dimensions at baseline
DimensionEVD-XT07-001EVD-XT07-002
Completenesssubmitted systems onlylisted systems that report power
Timelinesstwice a yeartwice a year
Revisionnew list replaces oldnew list replaces old
Method transparencybenchmark method publishedpower method stated by the project
External validationresults reported by submittersresults reported by submitters

Evidence cards to follow in 2027

  • TOP5006: the November 2026 list
  • IEA28: report text on data centre demand
  • EUR-Lex3435: delegated regulations from the primary text
  • Argonne and Oak Ridge318: system specifications

A.6Publication acceptance record

Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.

Table A.9Publication acceptance record
グループエリア項目合格N/A保留中
D1Identity and scope8800
D2Source and data12912
D3Analysis and models12381
D4Findings and claims9801
D5Figures, tables, maps10622
D6Editorial and citations10802
D7Review and approval130013
D8Artefact and design12705
D9Registry and release9009

Publication gate

Conditions met
14 of 23 at evidence close
Blocking problems
none recorded
Open conditions
reviews, approval of the exact digest, deposit, registry pointer

Not applicable at baseline

Model runs
first runs in Q1 2027
地図
plates in Q2 2027
Waivers
なし

A.7Status words

Table A.10The status every value carries
ステータス意味
観測Measured directly and published by the source.
報告値Published statistics of an official or institutional source.
申告済みStated by the body concerned; not independently measured.
推定A Nexus estimate from cited evidence, with its method in Annex A.
モデル化Produced by a stated model from cited inputs.
InferredReasoned from cited evidence; not measured.
予報A projection by the cited source.
SimulatedA simulation result under stated assumptions.
シナリオA conditional statement under stated assumptions; never a prediction.
Expert inputExpert judgement, recorded with its basis.
CandidateProposed for a later edition; not yet evidence.
Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject.

A.8How the edition is made, released and corrected

Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.

ステップ何が起きるか出典
01 Evidence arrives from the pillarsFoundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s.
02 The cut is sealedOn the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on.
03 The edition is assembledThe edition is drafted from its template and content pack. Agents may draft; they never publish and never decide.
04 The keys turnAt the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward.
05 The gate opensA named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit.
06 Signed and depositedThe PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI.
07 Published on its desk’s siteOnly then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part.
08 Corrections go to StandardsMethod and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut.

A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).

Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.

A.9Glossary and abbreviations

Table A.11Series terms
用語意味
Baseline Editionthe inaugural annual edition that fixes the reference state for the series
WEFH+Bwater, energy, food, health and biodiversity, the national nexus core
結合a typed dependency through which one system transmits to another
保障ギャップthe share of losses not covered by insurance
Capability ladderLISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED
EQLevidence-quality level, 1–5
証拠の区切りa frozen resolution of exact sources and versions
NNC・NLC・NWGNational Nexus Consortium · National Leadership Council · National Working Groups
Table A.12Abbreviations used in this edition
AbbreviationExpansion
BISBureau of Industry and Security
CPUcentral processing unit
DOEUS Department of Energy
ECPExascale Computing Project
EFexaflops
GPUgraphics processing unit
HBMhigh-bandwidth memory
HPChigh-performance computing
HPCGHigh Performance Conjugate Gradients benchmark
HPL-MxPmixed-precision High Performance Linpack benchmark
PUEpower usage effectiveness
TWhterawatt-hours

A.10Technical annex

Table A.13Technical annex
項目Annex目次ステータス
A.1Indicator definitionsthe global indicator set, with units and sourcesIN THIS EDITION
A.2Coupling strengthsthe twenty-cell matrix and its rationaleIN THIS EDITION
A.3Scenario specificationSCN-XT07-PWR-01 assumptions and signpostsIN THIS EDITION
A.4Capability placementsrung evidence for fifteen functionsIN THIS EDITION
A.5Model diagnosticsfirst runs and validation2027
A.6感度分析influence of coupling strengths2027
A.7Cluster notescards for the major exascale and data centre clusters2027
A.8Review statementspass-by-pass review recordAT RELEASE

A.1 · indicator definition: Linpack result (Rmax)

Construct
sustained speed of a dense linear solve at the largest size the system can run
単位
floating-point operations per second, shown here in exaflops
手法
the Linpack benchmark run by the submitter and reported to the list
出典
TOP500 list, June 20261
不確実性
reported by submitters; not independently repeated here
既知の限界
one benchmark; dense algebra only; not a measure of useful scientific output

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 29Shehabi, A., Smith, S.J., Hubbard, A., Newkirk, A., Lei, N., Siddik, M.A.B., Holecek, B., Koomey, J., Masanet, E. and Sartor, D., 2024 United States Data Center Energy Usage Report, LBNL-2001637 (December 2024; report PDF read; 176 TWh in 2023, 4.4% of US electricity; about 325 to 580 TWh in 2028, 6.7% to 12.0%; direct water estimates included). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-05.back
  2. 28IEA (ed.), Energy and AI, World Energy Outlook Special Report (April 2025; report PDF read; around 415 TWh for data centres in 2024, about 1.5% of world electricity; around 945 TWh in 2030 in the Base Case). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05.back
  3. 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
  4. 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  5. 30Chips and Cheese (ed.), Cozma, G., TOP500 at ISC’26: We have a New Number 1 (25 June 2026; LineShine described as the first Chinese submission to the TOP500 in nine years; other Chinese exascale systems not listed); trade analysis, weak evidence. Chips and Cheese. Observation year 2026. Accessed 2026-11-05.back
  6. 31US Department of Energy, Office of Science (ed.), Energy Department Announces New Partnership with NVIDIA and Oracle to Build Largest DOE AI Supercomputer (bulletin, 28 October 2025; Solstice with 100,000 NVIDIA Blackwell GPUs; Equinox with 10,000 Blackwell GPUs, expected to be delivered in 2026; no performance figures stated). US Department of Energy, Washington. Observation year 2025. Accessed 2026-11-05.back
  7. 8Oak Ridge Leadership Computing Facility (ed.), compute systems (index page; Lux and Discovery labelled as introduced; no specifications). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
  8. 27Oak Ridge National Laboratory (ed.), The Genesis Mission (page; Lux and Discovery listed with one-line descriptions only). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
  9. 32Lawrence Livermore National Laboratory (ed.), Lawrence Livermore National Laboratory’s El Capitan verified as world’s fastest supercomputer (news item, 18 November 2024; 1.742 exaflops on HPL; 2.79 exaflops peak; more than 11,000 compute nodes). Lawrence Livermore National Laboratory, Livermore. Observation year 2024. Accessed 2026-11-05.back
  10. 33US Department of Commerce Bureau of Industry and Security (ed.), Implementation of Additional Export Controls: Certain Advanced Computing Items; Supercomputer and Semiconductor End Use; Updates and Corrections (interim final rule, 88 FR 73458, Federal Register document 2023-23055, 25 October 2023, effective 17 November 2023; Federal Register record and abstract read). Office of the Federal Register, Washington. Observation year 2023. Accessed 2026-11-05.back
  11. 34European Commission (ed.), Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres (OJ L series, 17 May 2024; text read via the Publications Office; operators with installed IT power demand of at least 500 kW report by 15 September 2024, then by 15 May 2025 and every year thereafter). Publications Office of the European Union, Luxembourg. Observation year 2024. Accessed 2026-11-05.back
  12. 35Latham & Watkins (ed.), European Commission Proposes Mandatory Sustainability Label for Data Centres (client note, 25 September 2026; Commission proposal of 21 September 2026 for a delegated regulation; A to G ratings for power and water usage effectiveness; labels issued annually from 15 August 2027; two-month scrutiny by Parliament and Council; data centres of 500 kW or above); law firm summary, the Commission text was not opened. Latham & Watkins. Observation year 2026. Accessed 2026-11-05.back
  13. 42Donnellan, D., Lawrence, A., Bizo, D., Rogers, O., Judge, P., Davis, J., Smolaks, M. and Weinschenk, R., Uptime Institute Global Data Center Survey 2025, UII Keynote Report 180 (July 2025; report PDF read; more than 800 owners and operators surveyed; weighted average annual PUE of 1.54 in 2025). Uptime Institute, New York. Observation year 2025. Accessed 2026-11-05.back
  14. 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back
  15. 6POST-CLOSE, context only: TOP500 (ed.), TOP500 news index (headlines and dates of the lists of November 2024, June 2025, November 2025 and June 2026; no November 2026 list at page read). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
  16. 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • 印刷

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF107 pages1020 KBTagged, with bookmarks

      SHA-256 c3c3e9d1277a616f4f8d597106a1c14752fc2e3fe68cacef0a05c65138510173

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF117 pages1.0 MBTagged, with bookmarks

      SHA-256 b1930c71db45cbcc42cecf8004ee9926a2476dd67c398f74e84a6649284e29b7

  • Web edition

  • データバンドル

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-HPC-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 2a89de21e69539d371d4fc87f1b6a46b8a8bd3ac8ec6f180005df9e20b461bcc

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-HPC-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 d7e1295f96aeff4d56015c654b1df24f835a8b689f65d5f432fab2ced10b8080

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-HPC-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 8fd5b0c4a509399a99a223dc468e03ac9eb73b4b26f18175f22c10129595b681

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-HPC-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 11175e84c9d4cb16ea1d2a4a3c566cc18b4922e2dd14d06cddb0f1c8437a040a

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-HPC-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 b6b328b31dc77b492f46a3e68222342a943ad922f15fb3d0806eae36667aca5d

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-HPC-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 6f312e18246515b489207b2877fb66a3e5b0c3abbe3e78400b57b865c30c1731

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this annex

Valadbaygi, S. (Ed.). (2026). Annex A: Methodology. In Exponential Technology Report 2026: HPC and Advanced Computing (Baseline Edition 2026, Report No. NR-XTECH-HPC-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

報告書貢献する

Send evidence or a correction on HPC and Advanced Computing.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI システム・エビデンスデスク指数関数的テクノロジー

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.