Methodology
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
Contents
- ·Edition home
- ·Executive summary
- 1HPC is power, cooling and policy before it is speed
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Power and siting limits meet fast-growing demand
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
A.1Methods
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | Result |
|---|---|---|---|
| (1) | Combined power of the five largest systems, June 2026 | 42,220 + 29,685 + 24,607 + 38,698 + 15,794 kW | 151,004 kW, about 151 MW |
| (2) | Growth of combined list performance in six months | 18.73 ÷ 14.99 | about 1.25 times |
| (3) | Share of listed systems that use accelerators | 276 ÷ 500 | 55.2% |
| (4) | Ratio of El Capitan HPL-MxP to Linpack | 16.7 ÷ 1.809 | about 9.2 times |
| Strength | Definition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| Label | Rule |
|---|---|
| Reported | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| Estimated | Nexus analytical value with stated method |
| Scenario | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, HPC System Model v0
- Model ID
- MDL-XT07-HPC · v0.1
- Purpose
- represent HPC and advanced computing as infrastructure coupled to electricity, cooling, chips, public funding, workforce and security policy
- Family
- graph-based system of systems
- Inputs
- the cited sources of this edition; no proprietary data
- Method
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- Validation
- none yet, first validation against federation evidence in 2027
- Uncertainty
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- global scale; not for asset-, site- or country-level use
- Reproducibility
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-XTECH-HPC-GLOBAL-2026-B0
- Type
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 43 cited sources, each at the edition and access date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 HPC annual cut
Lineage
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Element | Baseline 2026 | 2027 global annual |
|---|---|---|
| Sources | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Models | HPC System Model v0 specification | model runs with receipts |
| Findings | twelve baseline findings | findings re-bound to federation evidence |
| Review | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicator | Observed | Released | Cadence | Next release |
|---|---|---|---|---|
| Top-system results | 2026 | June 2026 | periodic | November 2026 list |
| Efficiency results | 2026 | June 2026 | periodic | November 2026 list |
| US data centre energy | 2023 | December 2024 | one-off | next national report |
| Export rule timeline | 2026 | April and May 2026 | per event | further guidance |
| EuroHPC budget | 2021 to 2027 | page read 2026-11-03 | continuous | regulation changes |
| Footprint papers | 2021 to 2024 | preprints and papers | one-off | new studies |
| MPI and OpenMP | 2024 to 2026 | June 2025 · July 2026 | periodic | OpenMP 6.1 |
| FugakuNEXT plan | 2025 | August 2025 | one-off | detailed design |
| System | Coverage | Thinnest dimension |
|---|---|---|
| Systems | GOOD | unlisted systems |
| Efficiency | PARTIAL | facility-level figures |
| Energy | PARTIAL | common basis for facilities |
| Governance | PARTIAL | text of rules and guidance |
| Investment | PARTIAL | public funding outside the US and EU |
| Supply | THIN | accelerator and memory supply |
| Skills | THIN | workforce numbers |
| Water | THIN | cooling-water use |
| Field | Source that would fill it | Blocker |
|---|---|---|
| Cooling-water use of large computing facilities | operators, national laboratories, regulators under the EU scheme | not retrieved; no primary figure read |
| Facility energy and demand on a common basis for HPC and for commercial AI workloads | national statistics, operators, IEA | one national figure read through a DOE news item12; the IEA report was not opened28 |
| IEA Energy and AI figures from the report itself | IEA Energy and AI28 | the report pages returned an access error; figures come from search summaries |
| Lawrence Berkeley report text, including water use | LBNL 2024 United States Data Center Energy Usage Report29 | report pages returned an access error; share and range come from a DOE news item12 |
| Power draw and cost of JUPITER from primary pages | EuroHPC, Jülich Supercomputing Centre | power and budget are not stated on the page read9; list value only1 |
| LineShine architecture and independent description | operator and peer-reviewed or institutional papers | list pages only; secondary reports not opened30 |
| Specifications and schedules of DOE Solstice, Equinox, Lux and Discovery | Argonne and Oak Ridge system pages31 | Argonne page returned an access error; Oak Ridge pages name the systems without specifications827; search summaries disagree on dates |
| El Capitan system description from the laboratory | Lawrence Livermore National Laboratory32 | page returned an access error; list values only1 |
| Text of the 2023 US advanced computing rule | Federal Register33 | page redirected; not opened |
| EU delegated regulations on data centre reporting and rating from the primary text | EUR-Lex3435 | EUR-Lex returned no content; details come from law firm summaries |
| Supply of accelerators, high-bandwidth memory and fabrication capacity for HPC | industry and trade statistics | not retrieved; no figure used |
| HPC workforce size and skills gaps | national statistics, OECD, industry surveys | not retrieved; capability rung stays LISTED |
| Survey data on data centre efficiency and density | Uptime Institute global survey42 | page returned an access error; no figure used |
| Public funding totals for HPC outside the US and EU | national strategies and ministries | not consolidated; UK plan gives no budget figure23 |
| Results of the November 2026 TOP500 list | TOP500 news and lists6 | not yet published at page read; the news page shows June 2026 as latest |
| Capability rungs beyond list monitoring, planning and funding | agencies, operators, laboratories | not reviewed |
A.5Evidence cards, two anchor sources
Published by the TOP500 project at ISC 2026 on 23 June 2026, 67th edition. Periodic. Role: binds INF-001 and the dashboard power figures. Coverage: systems that submit results.
EVD-XT07-001
TOP500 list of June 20261
Published by the TOP500 project on the same date. Periodic. Role: binds ENE-004. Coverage: listed systems that report power.
EVD-XT07-002
Green500 list of June 20263
| Dimension | EVD-XT07-001 | EVD-XT07-002 |
|---|---|---|
| Completeness | submitted systems only | listed systems that report power |
| Timeliness | twice a year | twice a year |
| Revision | new list replaces old | new list replaces old |
| Method transparency | benchmark method published | power method stated by the project |
| External validation | results reported by submitters | results reported by submitters |
Evidence cards to follow in 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| Group | Area | Items | Pass | N/A | Pending |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- Maps
- plates in Q2 2027
- Waivers
- none
A.7Status words
| Status | What it means |
|---|---|
| Observed | Measured directly and published by the source. |
| Reported | Published statistics of an official or institutional source. |
| Declared | Stated by the body concerned; not independently measured. |
| Estimated | A Nexus estimate from cited evidence, with its method in Annex A. |
| Modelled | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Forecast | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| Scenario | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| Step | What happens | Source |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Term | Meaning |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| Coupling | a typed dependency through which one system transmits to another |
| Protection gap | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| BIS | Bureau of Industry and Security |
| CPU | central processing unit |
| DOE | US Department of Energy |
| ECP | Exascale Computing Project |
| EF | exaflops |
| GPU | graphics processing unit |
| HBM | high-bandwidth memory |
| HPC | high-performance computing |
| HPCG | High Performance Conjugate Gradients benchmark |
| HPL-MxP | mixed-precision High Performance Linpack benchmark |
| PUE | power usage effectiveness |
| TWh | terawatt-hours |
A.10Technical annex
| Item | Annex | Contents | Status |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-XT07-PWR-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Cluster notes | cards for the major exascale and data centre clusters | 2027 |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: Linpack result (Rmax)
- Construct
- sustained speed of a dense linear solve at the largest size the system can run
- Unit
- floating-point operations per second, shown here in exaflops
- Method
- the Linpack benchmark run by the submitter and reported to the list
- Source
- TOP500 list, June 20261
- Uncertainty
- reported by submitters; not independently repeated here
- Known limits
- one benchmark; dense algebra only; not a measure of useful scientific output
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 28UNVERIFIED, not opened: IEA (ed.), Energy and AI (2025; about 415 TWh for data centres in 2024, about 945 TWh in 2030), taken from press and search-result summaries; the IEA pages returned an access error. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
- 29UNVERIFIED, not opened: Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, December 2024; figures taken from a DOE news item [12]; the report pages returned an access error. Observation year 2023. Accessed 2026-11-03.back
- 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
- 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 30UNVERIFIED, not opened: HPCwire (ed.), Surprise: Chinese LineShine takes number 1 on TOP500 (23 June 2026), and press coverage that China had stopped submitting to the list in 2023, taken from search-result summaries; the HPCwire page returned an access error. Observation year 2026. Accessed 2026-11-03.back
- 31UNVERIFIED, not opened: Argonne National Laboratory (ed.), Genesis Mission systems (Solstice and Equinox; reported plans of 100,000 and 10,000 NVIDIA Blackwell GPUs, vendor-stated AI performance figures), taken from search-result summaries that disagree on dates; the page returned an access error. Observation year 2026. Accessed 2026-11-03.back
- 8Oak Ridge Leadership Computing Facility (ed.), compute systems (index page; Lux and Discovery labelled as introduced; no specifications). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
- 27Oak Ridge National Laboratory (ed.), The Genesis Mission (page; Lux and Discovery listed with one-line descriptions only). Oak Ridge National Laboratory, Oak Ridge. Observation year 2026. Accessed 2026-11-03.back
- 32UNVERIFIED, not opened: Lawrence Livermore National Laboratory (ed.), El Capitan verified as world’s fastest supercomputer (news item, November 2024), not retrieved; list values only. Observation year 2024. Accessed 2026-11-03.back
- 33UNVERIFIED, not opened: US Department of Commerce Bureau of Industry and Security, Implementation of Additional Export Controls: Certain Advanced Computing Items; Supercomputer and Semiconductor End Use (Federal Register, 25 October 2023), not retrieved; the page redirected. Observation year 2023. Accessed 2026-11-03.back
- 34UNVERIFIED, not opened: European Commission, Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres (500 kW threshold, annual reporting by 15 May), taken from law firm summaries; EUR-Lex returned no content. Observation year 2024. Accessed 2026-11-03.back
- 35UNVERIFIED, not opened: POST-CLOSE, context only: Noerr (ed.), note of October 2026 on the proposal of 21 September 2026 for a delegated regulation on an EU data centre rating scheme with grades A to G from 2027, taken from search-result summaries; preparatory working draft (2026). Observation year 2026. Accessed 2026-11-03.back
- 42UNVERIFIED, not opened: Uptime Institute (ed.), Global Data Center Survey 2025, not retrieved; the page returned an access error; no figure used. Uptime Institute, New York. Observation year 2025. Accessed 2026-11-03.back
- 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back
- 6POST-CLOSE, context only: TOP500 (ed.), TOP500 news index (headlines and dates of the lists of November 2024, June 2025, November 2025 and June 2026; no November 2026 list at page read). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back