Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

The 2027 agenda

Eight bounded questions open the 2027 semiconductor and compute agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 semiconductor and compute edition.

5 min read0 figures6 tables3 notesNR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE

목차
  1. ·Edition home
  2. ·Executive summary
  3. 1AI compute is physical infrastructure built on a few chips and a few places
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Compute build-out meets local power, water and packaging limits
  8. 6Readings from the other desks
  9. 7The 2027 agenda
    1. 7.1 Questions for the operational series
    2. 7.2 Portfolio proposed for the Q1 2027 alignment
    3. 7.3 The pathway
    4. 7.4 Universe 2027: evidence pack for the semiconductor and compute candidate mission
    5. 7.5 Handoffs and routing
    6. 7.6 Feeds and signal register
  10. 8Systems in depth
  11. A방법론
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

7.1Questions for the operational series

  1. Q-01

    How much power and cooling water do advanced fabrication plants and AI data centres need, on a common basis, and where do the limits fall?

    INI-XT06-PWR-01 · power and water footprint; first output: footprint estimates by site type.

  2. Q-02

    What advanced packaging and high-bandwidth memory capacity exists, and in which places?

    INI-XT06-PKG-02 · packaging and memory; first output: capacity map.

  3. Q-03

    Which equipment and materials are single points of failure for advanced chips?

    INI-XT06-EQP-03 · equipment and materials; first output: dependence map.

  4. Q-04

    How far have announced subsidies become delivered plants and output?

    INI-XT06-SUB-04 · subsidy delivery; first output: award and outlay table.

  5. Q-05

    How can chip, system and compute counts be compared on a common basis?

    INI-XT06-BMK-05 · counts on a common basis; first output: benchmark table.

  6. Q-06

    Which national export-control and licensing rules apply to advanced computing items, and how do they differ?

    To be admitted in 2027; first output: rule overlay.

  7. Q-07

    What workforce exists for fabrication, packaging and data centre operation?

    To be admitted in 2027; first output: scoping note.

  8. Q-08

    Which readiness capabilities have been tested in real shortages or disruptions, and which are only planned?

    Readiness capability register; first output: rung evidence for 15 functions.

7.2Portfolio proposed for the Q1 2027 alignment

Five initiatives and one Universe mission candidate are proposed for the 2027 semiconductor and compute portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.

Table 7.1Objects proposed for the first operational quarter
ID객체유형질문상태
INI-XT06-PWR-01Power and water footprintInitiativeQ-01제안됨
INI-XT06-PKG-02Packaging and memoryInitiativeQ-02제안됨
INI-XT06-EQP-03Equipment and materialsInitiativeQ-03제안됨
INI-XT06-SUB-04Subsidy deliveryInitiativeQ-04제안됨
INI-XT06-BMK-05Counts on a common basisInitiativeQ-05제안됨
MSN-XT06-2027-01Local limits Universe mission임무Q-01Candidate

7.3The pathway

The semiconductor edition reads national readiness chapters, the coupled sector reports on energy, minerals and cybersecurity, and the global edition through one governed evidence graph. At baseline the federation is designed; the global energy and lifeline editions are drafted. This page states what exists today and what comes next.

  1. 01

    National readiness chapters

    fabrication, power and trade readiness in each national edition

    IN PREPARATION · national baselines

  2. 02

    Sector couplings

    GS-02 energy · SR-04 minerals · SR-03 supply chains

    GS-02 DRAFTED · sector baselines

  3. 03

    Technology system model

    fabrication, equipment, memory, power, water, governance

    v0 SPECIFIED · v1 with federation evidence

  4. 04

    Strategic links

    SR-13 strategic technology · XT-07 HPC

    PLANNED · strategic baselines

  5. 05

    유니버스

    annual proving environment

    CANDIDATE MISSION · mandate in 2027

  6. 06

    XT-06 report

    this series

    BASELINE DRAFT · 2027 annual edition

  7. 07

    근거와 정정

    one graph, many projections

    OPEN · first correction cycle in 2027

7.4Universe 2027: evidence pack for the semiconductor and compute candidate mission

  1. 01

    임무

  2. 02

    Core Build · 1 month

  3. 03

    Action · 1 week

  4. 04

    Evidence seal

  5. 05

    Portfolio correction

  6. 06

    Next mandate

Table 7.2Universe 2027: evidence pack for the semiconductor and compute candidate mission
항목기록상태시기
F1Annual mandate recordPLANNEDafter the Q2 2027 alignment
F2Core Build recordPLANNEDone month before the exercise
F3훈련 증거PLANNEDduring the Action week
F4Decision packetsPLANNEDexercise state only
F5Proof receiptsPLANNEDscoped to each recorded check
F6After-action reportPLANNEDwithin one quarter
F7Upgrade docketPLANNEDrouted to the Portfolio
F8Portfolio renewalPLANNED2027 global annual edition
F9Public synthesisPLANNEDpublic-safe extracts only

임무

ID
MSN-XT06-2027-01 · Local limits Universe mission
Role spine
Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
Receiving actors
to be identified with the mandate

7.5Handoffs and routing

Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.

Table 7.3Handoffs and routing
지적 사항Routed to목적등급
AIC-001 · AI supercomputer growthINI-XT06-BMK-05counts on a common basisPUBLIC
FIN-004 · chip salesINI-XT06-SUB-04subsidy deliveryPUBLIC
FIN-005 · equipment billingsINI-XT06-EQP-03equipment and materialsPUBLIC
INF-006 · foundry concentrationINI-XT06-PKG-02packaging and memoryPUBLIC
ENE-007 · US data centre energyINI-XT06-PWR-01 · key F reviewpower and water footprintPUBLIC
GOV-010 · EU Chips Actregional consortiarule overlayPUBLIC
TRD-011 · export controlsregional consortiarule overlayPUBLIC
SYS-012 · compound pathwayMSN-XT06-2027-01Universe candidateCONSORTIUM
Table 7.4Routing rules by publication class
등급Where it goesWho can see it
PUBLICthe published edition and its evidence bundleanyone
CONSORTIUMgoverned rooms of the federationconsortium members under agreement
CONTROLLEDneed-to-know channelsnamed competent actors only

7.6Feeds and signal register

Table 7.5Feeds watched from 2027
FeedProducerLatencyFeeds into
SIA monthly and annual sales releasesindustry association월별FIN-004
Equipment billings releasesSEMI분기별FIN-005
NIST CHIPS award pages (post-close, context only)NIST사건별GOV-009
European Commission Chips Act pages유럽연합 집행위원회배포마다GOV-010
US export-control noticesUS Department of Commerce사건별TRD-011
WSTS forecastsWSTStwice a yearFIN-004
Epoch AI data and reportsresearch organisation지속적AIC-002

Escalation routes

  • none · keep monitoring
  • research question
  • project
  • risk object
  • annual publication
  • signal report
Table 7.6Signals at baseline
IDSignalCorroboration시스템경로
SIG-XT06-001AI supercomputer performance doubling about every nine months1CORROBORATEDAIC · INFresearch question Q-05
SIG-XT06-002US data centre electricity projected at 325 to 580 TWh by 202815CORROBORATEDENE · AICresearch question Q-01
SIG-XT06-003EU second Chips Act proposed in June 202612PARTIALGOV · INFinitiative Q-04

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1Pilz, K.F., Sanders, J., Rahman, R. and Heim, L., Trends in AI Supercomputers, arXiv:2504.16026, submitted 22 April 2025 (abstract page: 500 systems from 2019 to 2025; performance doubling about every nine months; cost and power doubling about every year; one March 2025 system with about 200,000 chips, USD 7 billion and 300 MW; about 75% of performance in the United States). arXiv, Ithaca. Observation year 2025. Accessed 2026-11-03.back
  2. 15US Department of Energy (ed.), DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers, 20 December 2024 (176 TWh in 2023, about 4.4%; 325 to 580 TWh, about 6.7% to 12%, in 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
  3. 12European Commission (ed.), European Chips Act policy page (entered into force 21 September 2023; three pillars; more than EUR 33 billion across 19 State aid decisions; second Chips Act proposed June 2026). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2026. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • 인쇄

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF114 pages1.1 MBTagged, with bookmarks

      SHA-256 bdc959d4fc4bbbbe2e363defc329ac97d9895480df3e6b762719afe146821a42

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF120 pages1.1 MBTagged, with bookmarks

      SHA-256 f2682d99fd7abbacfb364f9320ec24c74e3ebeffd380abcd1deccee09126ca1a

  • Web edition

  • 데이터 번들

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 9e18c3135992ded96f25a598f2ede5d3ad8d1b5a0df4f9f6efeccb5249337c65

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 ee74b4b72f479a63d21a84e85cd8a5121fc308970edba28a7457e3e1e56877ef

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 de296c9e6a3741ffc53b236d4087dd5a4d769e91a11fa8172443c06ca1929be0

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 13bf3da1d45e1cb807d983784ccdef5c1281525183d0e09212282a1bf0e4cd9a

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 e6a42dc88ae3e72218740088af26ad62c05c649651cb4b04bbb37ce7f0e903d8

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 5f36eb94f8c7c05a3418147e4ab6dfbc437b0bc377a7961ad22e35d3d9f81be5

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 7: The 2027 agenda. In Exponential Technology Report 2026: Advanced Semiconductors and AI Compute (Baseline Edition 2026, Report No. NR-XTECH-SEMICONDUCTORS-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

보고서기여하기

Send evidence or a correction on Advanced Semiconductors and AI Compute.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI 시스템 증거 담당 부서기하급수 기술

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace