Systems and sectors at baseline

6 min read0 figures2 tables15 notesNR-XTECH-FISSION-GLOBAL-2026-BASELINE

목차
  1. ·Edition home
  2. ·Executive summary
  3. 1Advanced nuclear is firm infrastructure and a delivery test
  4. 2Key findings
  5. 3Systems and sectors at baseline
    1. 3.1 Where each system stood at evidence close
    2. 3.2 Domain posture
    3. 3.3 Sector screens
  6. 4Risks and capability
  7. 5Fuel supply gap while first-of-a-kind units are delayed
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. A방법론
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

3.1Where each system stood at evidence close

INF · Fleet

Operable reactors, world

443reactors

405,667 MWe net, about 9% of world electricity.

보고값2025WNA1

INF · Demonstration

Reactors critical under the DOE pilot program

4test reactors

zero-power tests, by 4 July 2026.

보고값2026DOE7

INF · Licensing

Natrium reactor under a construction permit

345MWe

sodium-cooled; storage lifts output to 500 MW.

보고값2026DOE8

MIN · Fuel

DOE estimate of US HALEU demand by 2035

50tonnes a year

an estimate of what demand could reach.

보고값2024DOE11

TRD · Supply

Rosatom share of world enrichment capacity, 2025

42.8%

derived from the capacity table, method (1).

추정2025WNA12

FIN · Cost

Vogtle 3 and 4 total cost estimate, May 2022

30.34USD billion

against an initial estimate of 14.

보고값2022WNA15

3.2Domain posture

Each of the twelve coupled domains is read through advanced nuclear, in words, not scored. The coupling column names the dependency that carries advanced nuclear risk into each domain.

Table 3.1Each domain read in words, not scored
영역Posture at baseline연계상태
WATCooling-water use and site siting of new reactors were not bound in the sources opened.ENE → WATExpert input EQL 1
ENEThe core system: 443 operable reactors, 405,667 MWe, about 9% of world electricity, and 80 under construction.the core systemReported EQL 4
FOONo documented coupling at baseline; process-heat and desalination uses are not evidenced here.none documentedExpert input EQL 1
HLTNo documented coupling at baseline; an isotope test reactor reached criticality in 2026 but isotope supply is not evidenced here.none documentedExpert input EQL 1
BIONo documented coupling at baseline.none documentedExpert input EQL 1
CLILow-carbon generation is the climate role; life-cycle emission figures were not opened.ENE → CLIExpert input EQL 1
INFConstruction, licensing and first-of-a-kind delivery: a construction permit, test criticality and one planned unit in construction in Canada.ENE ↔ INFReported EQL 4
FINRecent large units ran far over first estimates; small-reactor costs are modelled and contested.FIN → ENEReported EQL 4
DATNo documented coupling at baseline; digital controls and records are not evidenced here.none documentedExpert input EQL 1
AICNo documented coupling opened at baseline; data-centre supply agreements were not opened.none documentedExpert input EQL 1
MINUranium, enrichment and HALEU: demand estimates are far above current supply of HALEU.MIN → ENEReported EQL 3
TRDEnrichment capacity is concentrated and the US restricts Russian low-enriched uranium imports.ENE ↔ TRDReported EQL 4

3.3Sector screens

All sixteen sectors are screened for their dependence on advanced nuclear, on the same grammar as every national edition. The evidence column describes coverage of the baseline evidence, not the performance of the sector.

Table 3.2Sectors: baseline evidence and the exposure to watch
코드부문Baseline evidenceExposure to watchEvidence coverage
GS-00Cross-systemfission couples to energy, fuel supply and financedelivery against scheduleTHIN
GS-01물cooling-water use of new sites not boundsite sitingTHIN
GS-02에너지fleet of 443 reactors and 80 under construction1first-of-a-kind deliveryGOOD
GS-03식량no documented couplingnone documentedTHIN
GS-04보건no documented couplingnone documentedTHIN
GS-05금융cost overruns on large units1517financing of first-of-a-kind unitsPARTIAL
GS-06개발export projects reported19access to fuel and financeTHIN
GS-07기후life-cycle emissions not openednone documentedTHIN
GS-08재난no documented couplingnone documentedTHIN
GS-09인프라sites, repositories and fabrication2122long project lead timesPARTIAL
GS-10도시no documented couplingnone documentedTHIN
GS-11생물다양성no documented couplingnone documentedTHIN
GS-12지구 관측no documented couplingnone documentedTHIN
GS-13사이버와 디지털no documented couplingnone documentedTHIN
GS-14정책executive orders and the Part 53 rule3410goals against deliveryPARTIAL
GS-15과학peer-reviewed cost and waste studies2527common benchmarksPARTIAL

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1World Nuclear Association (ed.), Nuclear Power in the World Today (information library page; 443 operable reactors, 405,667 MWe net, about 9% of world electricity, 80 under construction with 87,813 MWe gross; electricity data for 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
  2. 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
  3. 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
  4. 11US Department of Energy, Office of Nuclear Energy (ed.), What is high-assay low-enriched uranium (HALEU)? (article of 3 December 2024; enrichment 5% to less than 20% U-235; demand could reach 50 metric tons a year by 2035; Piketon more than 100 kg enriched). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03.back
  5. 12World Nuclear Association (ed.), Uranium Enrichment (information library page; capacity table from the WNA Nuclear Fuel Report 2025: 68.076 million SWU in 2025, Rosatom 29.133, Urenco 17.300, CNNC 13.789 estimated, Orano 7.500; US ban on Russian low-enriched uranium from August 2024). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
  6. 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
  7. 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
  8. 19World Nuclear Association (ed.), Nuclear Power in South Korea (country profile; 26 operable units, 25,609 MWe; i-SMR 170 MWe design, standard design approval application February 2026, approval targeted 2028; Barakah units in operation, last in September 2024). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
  9. 21POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Finland (country profile; Olkiluoto 3 contract of EUR 3.2 billion for mid-2009, regular production April 2023; Onkalo operating licence granted October 2026 valid to the end of 2070, after the 30 September evidence close). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
  10. 22World Nuclear Association (ed.), Storage and Disposal of Radioactive Wastes (information library page; Finland, Sweden, France and US repository milestones; Cigéo commissioning planned for 2050; Yucca Mountain suspended). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
  11. 3The White House (ed.), Ordering the Reform of the Nuclear Regulatory Commission, Executive Order 14300, 23 May 2025 (goal of 400 GW by 2050 from about 100 GW in 2024; 18-month limit for new reactor decisions; 1-year limit for continued operation). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
  12. 4The White House (ed.), Reinvigorating the Nuclear Industrial Base, Executive Order 14302, 23 May 2025 (5 GW of uprates; 10 new large reactors with complete designs under construction by 2030; fuel, enrichment and spent fuel directions). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
  13. 10US Nuclear Regulatory Commission (ed.), 10 CFR Part 53 rulemaking page (final rule 91 FR 15696; risk-informed, performance-based, technology-inclusive framework; background in NEIMA and the ADVANCE Act). US Nuclear Regulatory Commission, Rockville. Observation year 2026. Accessed 2026-11-03.back
  14. 25Steigerwald, B., Weibezahn, J., Slowik, M. and von Hirschhausen, C., Uncertainties in estimating production costs of future nuclear technologies: a model-based analysis of small modular reactors, Energy 281, 128204, 2023 (abstract page read). Elsevier, Amsterdam. Observation year 2023. Accessed 2026-11-03.back
  15. 27Krall, L.M., Macfarlane, A.M. and Ewing, R.C., Nuclear waste from small modular reactors, Proceedings of the National Academy of Sciences 119(23), e2111833119, 2022 (open-access full text, abstract and conclusions read; waste volume factors of 2 to 30; three designs). National Academy of Sciences, Washington. Observation year 2022. Accessed 2026-11-03.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • 인쇄

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF115 pages1.1 MBTagged, with bookmarks

      SHA-256 22ffedb7adb2ae8c3d6966ed0c87a77d27eee4bf97895c2eba205ae25581bd16

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF119 pages1.1 MBTagged, with bookmarks

      SHA-256 8f561371af6b3081a346c773cd6cff47801df3fd8edf4915ae1ebe504666f0a1

  • Web edition

  • 데이터 번들

    • Indicators, CSV

      16 indicators with unit, year, status and source

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 2ef816eb3345ec1ab90c3f78b56b59a22175c40aad1aca3fce650f72d8a47fbf

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 57737fec22e1c477892b03fc0ec9432254e46383f037fb23be5ac4975f64c703

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 90075a1b41fcbbc2d060c85b92b0fd6a969ac555e9e9937575ceb361e05da55c

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 92bc45d19e6305960d5ce961686c384f254f45b4e13fc12e5dc38c4c8ed4045b

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 c78d832647aaa2c07f4823182505accb83be04d82211f9ca68349f6a8891e5c0

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-XTECH-FISSION-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 27c7c9d6f1ee785004ff642c4407431ee5e5883e3ddfec1295791f69925ba4d9

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 3: Systems and sectors at baseline. In Exponential Technology Report 2026: Advanced Nuclear and Next-Generation Fission (Baseline Edition 2026, Report No. NR-XTECH-FISSION-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

보고서기여하기

Send evidence or a correction on Advanced Nuclear and Next-Generation Fission.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI 시스템 증거 담당 부서기하급수 기술

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Your role here

What you can do from this page.

  • ReaderFound an error? Every correction is public.Corrections log
  • ContributorSend evidence, data or a correction to this desk.Contribute
  • ReviewerReview for this desk; verified reviews are credited.Become a reviewer
  • Editor, steward or boardQueues, decisions and production are in the workspace.My workspace