- Global Energy 2026
- Annex A
Methodology
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
अनुक्रमणिका
- ·Edition home
- ·Executive summary
- 1Energy is where the systems meet
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Fuel supply shock under a hot, high-demand season
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
A.1पद्धती
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | निकाल |
|---|---|---|---|
| (1) | Electricity growth against energy growth, 2025 | ≈3 ÷ 1.3 | ≈2.3 times |
| (2) | Share of 2025 growth in energy demand from solar (lower bound) | reported as more than 25% | more than 25% |
| (3) | Renewables lead over coal in generation, 2025 | 10,730 − 10,476 TWh | 254 TWh |
| (4) | Growth in data-centre electricity, 2024 to 2030, base case | 945 ÷ 415 | ≈2.3 times |
| Strength | Definition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| लेबल | Rule |
|---|---|
| नोंदवलेले | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| अंदाजित | Nexus analytical value with stated method |
| परिदृश्य | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, Energy Sector Model v0
- Model ID
- MDL-GS02-ENERGY · v0.1
- Purpose
- represent the global energy system and its couplings to water, food, health and biodiversity
- Family
- graph-based system of systems
- Inputs
- the cited sources of this edition; no proprietary data
- पद्धत
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- प्रमाणीकरण
- none yet, first validation against federation evidence in 2027
- अनिश्चितता
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- global scale; not for asset-, site- or country-level use
- Reproducibility
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-SECTOR-ENERGY-GLOBAL-2026-B0
- प्रकार
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 47 cited sources, each at the edition and access date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 energy annual cut
वंशावळ
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Element | Baseline 2026 | 2027 global annual |
|---|---|---|
| स्रोत | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Models | Energy Sector Model v0 specification | model runs with receipts |
| Findings | twelve baseline findings | findings re-bound to federation evidence |
| पुनरावलोकन | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicator | निरीक्षित | Released | Cadence | Next release |
|---|---|---|---|---|
| Energy demand and emissions | 2025 | May 2026 revised | annual | next Global Energy Review |
| Electricity generation shares | 2025 | 2026 | annual | next Electricity Review |
| Investment estimate | 2026e | May 2026 | annual | next investment report |
| Access to electricity and cooking | 2024 | 2026 | annual | next SDG 7 report |
| Data-centre electricity | 2024 | 2025 | one-off | next IEA update |
| Hormuz oil flows | 2026 | Sep 2026 | monthly | monthly |
| LNG capacity and outage | 2025 to 2026 | Q4 2025 and Q2 2026 | quarterly | next Gas Market Report |
| Critical minerals refining | 2025 | revised Jul 2026 | annual | 2027 |
| Primary energy | 2025 | Jun 2026 | annual | 2027 |
| Iberian blackout causes | 2025 | Mar 2026 | one-off | follow-up reports |
| प्रणाली | व्याप्ती | Thinnest dimension |
|---|---|---|
| Demand and supply | GOOD | regional drivers of growth |
| Electricity | GOOD | grid-level constraints |
| Fuel markets | PARTIAL | position after evidence close |
| Minerals | GOOD | equipment-level dependence |
| प्रवेश | GOOD | service quality and affordability |
| Investment | PARTIAL | split by technology and region |
| Water for energy | THIN | volumes by region and technology |
| Resilience | PARTIAL | tested capabilities beyond oil stocks |
| क्षेत्र | Source that would fill it | Blocker |
|---|---|---|
| Fuel-market position on 1 November 2026 | IEA Oil Market Report for October and November 202611; EIA Short-Term Energy Outlook of November | releases after the evidence close and not retrieved; the EIA September outlook47 is the baseline source; the October outlook10 is post-close, context only |
| Hormuz flow volumes before and during the conflict, from a primary document | IEA Oil Market Reports1112 | the March and June 2026 public reports were opened (pre-conflict flows of nearly 20 mb/d; transits below 10% of pre-crisis levels in March); the September report was not retrievable, so later monthly volumes are not bound |
| Clean and fossil split of the 2026 investment estimate | IEA World Energy Investment 2026 full report17 | the full report was opened after the first review: about USD 2.2 trillion to clean energy and USD 1.2 trillion to fossil fuels in 2026; the split is not yet carried into a finding |
| Capacity added in 2025, on one basis | IEA, IRENA and Ember series2147 | the series use different methods; not reconciled in this edition |
| Transformer, cable and interconnection-queue constraints | IEA grids work22; national operators | the 2023 grids report was opened for context only; no current constraint figures were retrieved |
| Energy-sector water use by region | IEA and national statistics offices | no consolidated global series found at evidence close |
| Heat-wave effects on power systems in 2026 | operator reports; weather services | not retrieved |
| Cyber and physical incidents on energy infrastructure | operators and national authorities | incident data are not published on a common basis |
| Winter gas storage at the start of the heating season | Gas Infrastructure Europe; operators | not retrieved |
| Energy support for poor households, by country | national ministries; World Bank | not consolidated; capability rung stays LISTED |
| Energy employment and skills gap | IEA World Energy Employment 202523 | report opened; skilled-worker shortages are reported qualitatively; no figure used |
| Data-centre electricity by country after 2024 | IEA, national regulators, operators | later series use a different baseline; not mixed with the 415 TWh figure |
| Capability rungs beyond emergency stocks | operators, regulators, ministries | not reviewed |
A.5Evidence cards, two anchor sources
Issued by the International Energy Agency (revised May 2026) from energy balances, market data and technology tracking. Annual. Role: binds ENE-001, ENE-002 and CLI-004.
EVD-GS02-001
IEA Global Energy Review 20262
Compiled by UN DESA from custodian storylines as of 30 April 2026. Annual. Role: binds HLT-007 and the access tiles. Figures differ slightly from the main report text.
EVD-GS02-002
SDG 7 Extended Report 20268
| Dimension | EVD-GS02-001 | EVD-GS02-002 |
|---|---|---|
| Completeness | all fuels and technologies; modelled where national data are missing | country coverage uneven; cooking estimate is a range |
| Timeliness | about 5 months after the year | about 16 months after the year |
| Revision | revised version issued May 2026 | storylines updated up to the report date |
| Method transparency | methodology published | indicator metadata published |
| External validation | compared with national statistics | custodian review |
Evidence cards to follow in 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| गट | क्षेत्र | Items | Pass | N/A | Pending |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- नकाशे
- plates in Q2 2027
- Waivers
- none
A.7Status words
| स्थिती | याचा अर्थ काय |
|---|---|
| निरीक्षित | Measured directly and published by the source. |
| नोंदवलेले | Published statistics of an official or institutional source. |
| Declared | Stated by the body concerned; not independently measured. |
| अंदाजित | A Nexus estimate from cited evidence, with its method in Annex A. |
| प्रारूपित | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Forecast | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| परिदृश्य | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| पायरी | What happens | स्रोत |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Term | Meaning |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | energy, energy, food, health and biodiversity, the national nexus core |
| जोडणी | a typed dependency through which one system transmits to another |
| Protection gap | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| bcm | billion cubic metres |
| EJ | exajoule |
| ENTSO-E | European Network of Transmission System Operators for Electricity |
| GW | gigawatt |
| IEA | International Energy Agency |
| IRENA | International Renewable Energy Agency |
| LNG | liquefied natural gas |
| Mtpa | million tonnes per annum |
| SDG 7 | Sustainable Development Goal 7: affordable and clean energy |
| STEO | Short-Term Energy Outlook |
| TWh | terawatt-hour |
| TFEC | total final energy consumption |
A.10Technical annex
| Item | Annex | अनुक्रमणिका | स्थिती |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-GS02-LNG-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Grid and route notes | cards for the major shared grids and fuel routes | WITH REGIONAL EDITIONS |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: access to electricity
- Construct
- share and number of people living in households with access to electricity
- Unit
- share and number of people
- पद्धत
- custodian indicator based on national surveys and models
- स्रोत
- SDG 7 Extended Report 20268
- अनिश्चितता
- modelled where survey data are missing
- Known limits
- binary measure; does not capture reliability, capacity or affordability
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 11IEA (ed.), Oil Market Report, June 2026 (17 June 2026, public version; May 2026 world oil output 13.6 mb/d below pre-conflict levels, Gulf exports 14.8 mb/d below February levels and exports via the Strait of Hormuz from known origins at 1.9 mb/d). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
- 47US Energy Information Administration (ed.), Short-Term Energy Outlook, September 2026 (Brent about USD 91 a barrel in the fourth quarter of 2026; Middle East oil flows assumed constrained through the fourth quarter of 2026). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
- 10POST-CLOSE, context only: US Energy Information Administration (ed.), Short-Term Energy Outlook, October 2026 (released 6 October 2026, after the 30 September evidence close; post-close, context only, supports no baseline claim). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
- 12IEA (ed.), Oil Market Report, March 2026 (12 March 2026), including the box on the collective action agreed by the 32 IEA member countries on 11 March 2026 to make 400 million barrels of emergency oil stocks available, described as unprecedented; flows through the Strait of Hormuz of nearly 20 mb/d in 2025 and transits at less than 10% of pre-crisis levels. International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
- 17IEA (ed.), World Energy Investment 2026, full report (revised version, June 2026; total energy investment USD 3.4 trillion in 2026, about USD 2.2 trillion to clean energy and USD 1.2 trillion to oil, gas and coal, electricity supply and infrastructure USD 1.6 trillion). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
- 2IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 14IRENA (ed.), Renewable Capacity Statistics 2026 (692 GW of renewable capacity added in 2025; 5,149 GW installed at the end of 2025). International Renewable Energy Agency, Abu Dhabi, 2026. Observation year 2025. Accessed 2026-11-05.back
- 7Ember (ed.), Global Electricity Review 2026: 2025 in review (generation, demand, solar, coal). Ember, London. Observation year 2025. Accessed 2026-11-03.back
- 22IEA (ed.), Electricity Grids and Secure Energy Transitions. International Energy Agency, Paris, October 2023. Observation year 2023. Accessed 2026-11-05.back
- 23IEA (ed.), World Energy Employment 2025 (shortages of skilled workers reported across the energy sector). International Energy Agency, Paris, 2025. Observation year 2024. Accessed 2026-11-05.back
- 8UN DESA Statistics Division (ed.), The Sustainable Development Goals Extended Report 2026, Goal 7 indicator storylines (inputs as of 30 April 2026). United Nations, New York. Observation year 2024. Accessed 2026-11-03.back
- 9ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 13IEA (ed.), Gas Market Report, Q2-2026 (April 2026; Qatar halted LNG production on 2 March 2026 and Qatari and UAE output, about 20% of global LNG supply, was isolated from the market). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back