Methodology

How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.

12 min read0 figures13 tables14 notesNR-SECTOR-ENERGY-GLOBAL-2026-BASELINE

విషయసూచిక
  1. ·Edition home
  2. ·Executive summary
  3. 1Energy is where the systems meet
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Fuel supply shock under a hot, high-demand season
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. AMethodology
    1. A.1 Methods
    2. A.2 Model card, Energy Sector Model v0
    3. A.3 The baseline evidence cut
    4. A.4 Evidence age and coverage
    5. A.5 Evidence cards, two anchor sources
    6. A.6 Publication acceptance record
    7. A.7 Status words
    8. A.8 How the edition is made, released and corrected
    9. A.9 Glossary and abbreviations
    10. A.10 Technical annex
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

A.1పద్ధతులు

The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.

Table A.1Methods
No.DerivationCalculationఫలితం
(1)Electricity growth against energy growth, 2025≈3 ÷ 1.3≈2.3 times
(2)Share of 2025 growth in energy demand from solar (lower bound)reported as more than 25%more than 25%
(3)Renewables lead over coal in generation, 202510,730 − 10,476 TWh254 TWh
(4)Growth in data-centre electricity, 2024 to 2030, base case945 ÷ 415≈2.3 times
Table A.2Coupling strength scale (matrix and model card)
StrengthDefinition
STRONGa disruption in the source system has historically changed the target system’s service or output within one season, in more than one region
MODERATEan effect is documented but buffered or slower
WEAKan effect is plausible but not documented at global scale
Table A.3Status grammar
లేబుల్Rule
నివేదించబడిందిvalue as issued by its source, with year
Inferredreasoned from cited evidence; never a measurement
అంచనాNexus analytical value with stated method
దృశ్యంconditional on stated assumptions
Expert inputstructured editorial judgement awaiting evidence

A.2Model card, Energy Sector Model v0

Model ID
MDL-GS02-ENERGY · v0.1
Purpose
represent the global energy system and its couplings to water, food, health and biodiversity
Family
graph-based system of systems
Inputs
the cited sources of this edition; no proprietary data
పద్ధతి
expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
ధ్రువీకరణ
none yet, first validation against federation evidence in 2027
అనిశ్చితి
qualitative; strengths are hypotheses, not measurements
Domain of validity
global scale; not for asset-, site- or country-level use
Reproducibility
strength table and sources published in this edition
20couplings

typed in v0

4strong

documented within one season

7moderate

documented, buffered

9weak

plausible, undocumented

A.3The baseline evidence cut

Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.

Cut ID
DC-SECTOR-ENERGY-GLOBAL-2026-B0
రకం
baseline documentary cut
Resolution policy
pinned · as of 30 September 2026
Sources pinned
47 cited sources, each at the edition and access date in the references
Model runs
none at baseline, analytical values are stated with their method
Digest
computed at freeze and recorded in the publication record
Supersedes
nothing, first cut of the series
Superseded by
the 2027 energy annual cut

వంశావళి

  1. 01

    source edition

  2. 02

    pinned citation

  3. 03

    finding

  4. 04

    page

  5. 05

    publication record

Table A.4From the baseline cut to the federation cut
ElementBaseline 20262027 global annual
మూలాలుcited global publications, pinned by editionnational, regional and sector cuts through one graph
Analysisstated methods and editorial estimatestyped analysis specifications
ModelsEnergy Sector Model v0 specificationmodel runs with receipts
Findingstwelve baseline findingsfindings re-bound to federation evidence
సమీక్షfive passes scheduledfive passes on the exact digest

A.4Evidence age and coverage

A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.

Table A.5Evidence age and coverage
IndicatorపరిశీలించినదిReleasedCadenceNext release
Energy demand and emissions2025May 2026 revisedannualnext Global Energy Review
Electricity generation shares20252026annualnext Electricity Review
Investment estimate2026eMay 2026annualnext investment report
Access to electricity and cooking20242026annualnext SDG 7 report
Data-centre electricity20242025one-offnext IEA update
Hormuz oil flows2026Sep 2026monthlymonthly
LNG capacity and outage2025 to 2026Q4 2025 and Q2 2026quarterlynext Gas Market Report
Critical minerals refining2025revised Jul 2026annual2027
Primary energy2025Jun 2026annual2027
Iberian blackout causes2025Mar 2026one-offfollow-up reports
Table A.6Coverage by system at baseline
వ్యవస్థకవరేజ్Thinnest dimension
Demand and supplyGOODregional drivers of growth
ElectricityGOODgrid-level constraints
Fuel marketsPARTIALposition after evidence close
MineralsGOODequipment-level dependence
ప్రాప్యతGOODservice quality and affordability
InvestmentPARTIALsplit by technology and region
Water for energyTHINvolumes by region and technology
ResiliencePARTIALtested capabilities beyond oil stocks
Table A.7Designed empty states: what is not bound, what would fill it and why
క్షేత్రంSource that would fill itBlocker
Fuel-market position on 1 November 2026IEA Oil Market Report for October and November 202611; EIA Short-Term Energy Outlook of Novemberreleases after the evidence close and not retrieved; the EIA September outlook47 is the baseline source; the October outlook10 is post-close, context only
Hormuz flow volumes before and during the conflict, from a primary documentIEA Oil Market Reports1112the March and June 2026 public reports were opened (pre-conflict flows of nearly 20 mb/d; transits below 10% of pre-crisis levels in March); the September report was not retrievable, so later monthly volumes are not bound
Clean and fossil split of the 2026 investment estimateIEA World Energy Investment 2026 full report17the full report was opened after the first review: about USD 2.2 trillion to clean energy and USD 1.2 trillion to fossil fuels in 2026; the split is not yet carried into a finding
Capacity added in 2025, on one basisIEA, IRENA and Ember series2147the series use different methods; not reconciled in this edition
Transformer, cable and interconnection-queue constraintsIEA grids work22; national operatorsthe 2023 grids report was opened for context only; no current constraint figures were retrieved
Energy-sector water use by regionIEA and national statistics officesno consolidated global series found at evidence close
Heat-wave effects on power systems in 2026operator reports; weather servicesnot retrieved
Cyber and physical incidents on energy infrastructureoperators and national authoritiesincident data are not published on a common basis
Winter gas storage at the start of the heating seasonGas Infrastructure Europe; operatorsnot retrieved
Energy support for poor households, by countrynational ministries; World Banknot consolidated; capability rung stays LISTED
Energy employment and skills gapIEA World Energy Employment 202523report opened; skilled-worker shortages are reported qualitatively; no figure used
Data-centre electricity by country after 2024IEA, national regulators, operatorslater series use a different baseline; not mixed with the 415 TWh figure
Capability rungs beyond emergency stocksoperators, regulators, ministriesnot reviewed

A.5Evidence cards, two anchor sources

Issued by the International Energy Agency (revised May 2026) from energy balances, market data and technology tracking. Annual. Role: binds ENE-001, ENE-002 and CLI-004.

EVD-GS02-001

IEA Global Energy Review 20262

Compiled by UN DESA from custodian storylines as of 30 April 2026. Annual. Role: binds HLT-007 and the access tiles. Figures differ slightly from the main report text.

EVD-GS02-002

SDG 7 Extended Report 20268

Table A.8Quality dimensions at baseline
DimensionEVD-GS02-001EVD-GS02-002
Completenessall fuels and technologies; modelled where national data are missingcountry coverage uneven; cooking estimate is a range
Timelinessabout 5 months after the yearabout 16 months after the year
Revisionrevised version issued May 2026storylines updated up to the report date
Method transparencymethodology publishedindicator metadata published
External validationcompared with national statisticscustodian review

Evidence cards to follow in 2027

  • Ember7: generation shares by country and sector
  • ENTSO-E9: data tables behind the final report
  • IEA critical minerals3: country shares by mineral
  • IEA Gas Market Report13: LNG outage duration

A.6Publication acceptance record

Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.

Table A.9Publication acceptance record
సమూహంప్రాంతంItemsPassN/APending
D1Identity and scope8800
D2Source and data12912
D3Analysis and models12381
D4Findings and claims9801
D5Figures, tables, maps10622
D6Editorial and citations10802
D7Review and approval130013
D8Artefact and design12705
D9Registry and release9009

Publication gate

Conditions met
14 of 23 at evidence close
Blocking problems
none recorded
Open conditions
reviews, approval of the exact digest, deposit, registry pointer

Not applicable at baseline

Model runs
first runs in Q1 2027
మ్యాప్‌లు
plates in Q2 2027
Waivers
none

A.7Status words

Table A.10The status every value carries
స్థితిదీని అర్థం ఏమిటి
పరిశీలించినదిMeasured directly and published by the source.
నివేదించబడిందిPublished statistics of an official or institutional source.
DeclaredStated by the body concerned; not independently measured.
అంచనాA Nexus estimate from cited evidence, with its method in Annex A.
నమూనా ఆధారితంProduced by a stated model from cited inputs.
InferredReasoned from cited evidence; not measured.
ForecastA projection by the cited source.
SimulatedA simulation result under stated assumptions.
దృశ్యంA conditional statement under stated assumptions; never a prediction.
Expert inputExpert judgement, recorded with its basis.
CandidateProposed for a later edition; not yet evidence.
Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject.

A.8How the edition is made, released and corrected

Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.

దశWhat happensమూలం
01 Evidence arrives from the pillarsFoundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s.
02 The cut is sealedOn the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on.
03 The edition is assembledThe edition is drafted from its template and content pack. Agents may draft; they never publish and never decide.
04 The keys turnAt the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward.
05 The gate opensA named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit.
06 Signed and depositedThe PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI.
07 Published on its desk’s siteOnly then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part.
08 Corrections go to StandardsMethod and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut.

A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).

Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.

A.9Glossary and abbreviations

Table A.11Series terms
TermMeaning
Baseline Editionthe inaugural annual edition that fixes the reference state for the series
WEFH+Benergy, energy, food, health and biodiversity, the national nexus core
అనుసంధానంa typed dependency through which one system transmits to another
Protection gapthe share of losses not covered by insurance
Capability ladderLISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED
EQLevidence-quality level, 1–5
Evidence cuta frozen resolution of exact sources and versions
NNC · NLC · NWGNational Nexus Consortium · National Leadership Council · National Working Groups
Table A.12Abbreviations used in this edition
AbbreviationExpansion
bcmbillion cubic metres
EJexajoule
ENTSO-EEuropean Network of Transmission System Operators for Electricity
GWgigawatt
IEAInternational Energy Agency
IRENAInternational Renewable Energy Agency
LNGliquefied natural gas
Mtpamillion tonnes per annum
SDG 7Sustainable Development Goal 7: affordable and clean energy
STEOShort-Term Energy Outlook
TWhterawatt-hour
TFECtotal final energy consumption

A.10Technical annex

Table A.13Technical annex
ItemAnnexవిషయసూచికస్థితి
A.1Indicator definitionsthe global indicator set, with units and sourcesIN THIS EDITION
A.2Coupling strengthsthe twenty-cell matrix and its rationaleIN THIS EDITION
A.3Scenario specificationSCN-GS02-LNG-01 assumptions and signpostsIN THIS EDITION
A.4Capability placementsrung evidence for fifteen functionsIN THIS EDITION
A.5Model diagnosticsfirst runs and validation2027
A.6Sensitivity analysesinfluence of coupling strengths2027
A.7Grid and route notescards for the major shared grids and fuel routesWITH REGIONAL EDITIONS
A.8Review statementspass-by-pass review recordAT RELEASE

A.1 · indicator definition: access to electricity

Construct
share and number of people living in households with access to electricity
Unit
share and number of people
పద్ధతి
custodian indicator based on national surveys and models
మూలం
SDG 7 Extended Report 20268
అనిశ్చితి
modelled where survey data are missing
Known limits
binary measure; does not capture reliability, capacity or affordability

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 11IEA (ed.), Oil Market Report, June 2026 (17 June 2026, public version; May 2026 world oil output 13.6 mb/d below pre-conflict levels, Gulf exports 14.8 mb/d below February levels and exports via the Strait of Hormuz from known origins at 1.9 mb/d). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  2. 47US Energy Information Administration (ed.), Short-Term Energy Outlook, September 2026 (Brent about USD 91 a barrel in the fourth quarter of 2026; Middle East oil flows assumed constrained through the fourth quarter of 2026). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
  3. 10POST-CLOSE, context only: US Energy Information Administration (ed.), Short-Term Energy Outlook, October 2026 (released 6 October 2026, after the 30 September evidence close; post-close, context only, supports no baseline claim). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
  4. 12IEA (ed.), Oil Market Report, March 2026 (12 March 2026), including the box on the collective action agreed by the 32 IEA member countries on 11 March 2026 to make 400 million barrels of emergency oil stocks available, described as unprecedented; flows through the Strait of Hormuz of nearly 20 mb/d in 2025 and transits at less than 10% of pre-crisis levels. International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  5. 17IEA (ed.), World Energy Investment 2026, full report (revised version, June 2026; total energy investment USD 3.4 trillion in 2026, about USD 2.2 trillion to clean energy and USD 1.2 trillion to oil, gas and coal, electricity supply and infrastructure USD 1.6 trillion). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  6. 2IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  7. 14IRENA (ed.), Renewable Capacity Statistics 2026 (692 GW of renewable capacity added in 2025; 5,149 GW installed at the end of 2025). International Renewable Energy Agency, Abu Dhabi, 2026. Observation year 2025. Accessed 2026-11-05.back
  8. 7Ember (ed.), Global Electricity Review 2026: 2025 in review (generation, demand, solar, coal). Ember, London. Observation year 2025. Accessed 2026-11-03.back
  9. 22IEA (ed.), Electricity Grids and Secure Energy Transitions. International Energy Agency, Paris, October 2023. Observation year 2023. Accessed 2026-11-05.back
  10. 23IEA (ed.), World Energy Employment 2025 (shortages of skilled workers reported across the energy sector). International Energy Agency, Paris, 2025. Observation year 2024. Accessed 2026-11-05.back
  11. 8UN DESA Statistics Division (ed.), The Sustainable Development Goals Extended Report 2026, Goal 7 indicator storylines (inputs as of 30 April 2026). United Nations, New York. Observation year 2024. Accessed 2026-11-03.back
  12. 9ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
  13. 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  14. 13IEA (ed.), Gas Market Report, Q2-2026 (April 2026; Qatar halted LNG production on 2 March 2026 and Qatari and UAE output, about 20% of global LNG supply, was isolated from the market). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back

Downloads

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Print

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF106 pages917 KBTagged, with bookmarks

      SHA-256 0128599eeaec07e930d6f4fd6a5fcb6f240b79edb240972139328d659951a14e

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF113 pages929 KBTagged, with bookmarks

      SHA-256 7b93d4d0eddb6e27a5d099cfa05daa1f7359532e35da6a2331495c2a94391baf

  • Web edition

  • Data bundle

    • Indicators, CSV

      18 indicators with unit, year, status and source

      NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 cccb448a15c89805c3f8f5b74e25a41c3123b2a645833d5e83f129eddef1c6bc

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 8f31fe94a576cdb1e5c4ccf370061209393184710cb65f6e9da261cdc92bbfc3

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 216ade8ec8974a1472221ccdcb27621697c29039449f0b098173a15e59846ee5

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 357f5db0cbc15b74c76a67b3100ec65f27b6d4b155911346a325a336805ecf58

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 b3e28bba32c9b54a929f95757cefc24e9808488fb9b3405cfe197d5d4c9af2cd

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 1f819d179b88a4c7464fd54ab5c78b76392706e19d1bd421c4b0844ffc14c600

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Cite this annex

Valadbaygi, S. (Ed.). (2026). Annex A: Methodology. In Global Energy Risk and Resilience Report 2026: Baseline Edition, The State of the World’s Energy System. (Baseline Edition 2026, Report No. NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

నివేదికలుసహకరించండి

Send evidence or a correction on Global Energy.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems Evidence deskGlobal Sector Risk and Resilience
Contribution form · reports.contribution.gcri

వ్యక్తిగత డేటా, సున్నితమైన మౌలిక సదుపాయాల వివరాలు లేదా పంచుకునే హక్కు మీకు లేని దేనినీ ఎప్పుడూ పంపవద్దు. సహకారం ఉపయోగానికి ముందు సమీక్షించబడుతుంది; దానిని పంపడం వల్ల రచయిత్వం లేదా సంపాదకీయ హక్కులు లభించవు, మరియు స్పాన్సర్‌షిప్ ఎప్పుడూ ఒక నిర్ధారణను కొనలేదు.

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

రంగ సంతకం

The sectors behind Global Energy.

A reading aid: the sectors the findings run through and how strongly they depend on each other.

మూలలను ఎంచుకోండి · రేఖలపై హోవర్ చేయండి6 / 15 సంబంధాలు

సంతకం

శక్తి మరియు దాని భాగస్వాములు

శక్తి మౌలిక సదుపాయాలకు రవాణా మరియు టెలికాం విద్యుత్‌ను (0.8), నీటికి పంపింగ్ మరియు శుద్ధిని (0.5) మరియు ఆహారానికి ఎరువులు, యంత్రాలు మరియు శీతల గొలుసులను (0.5) అందిస్తుంది.

W · E · I · F · H · B

రంగాలు
4 6లో
సంబంధాలు
6 15లో
అనుసంధానం
0.46 మొత్తంలో వాటా

అమలులో ఉన్న బలమైన సంబంధాలు

  • Energy → Infrastructure · power for transport and telecoms0.8
  • Water → Energy · cooling water and hydropower0.6
  • నీరు → ఆహారం · నీటిపారుదల0.8
  • మౌలిక సదుపాయాలు → నీరు · పైపులు, ఆనకట్టలు మరియు శుద్ధి కేంద్రాలు0.6
సాధారణ నగర-ప్రాంతానికి బోధనా విలువలు, ఏ ప్రదేశానికీ కొలతలు కావు. అనుసంధానం అంటే అమలులో ఉన్న సంబంధాల మొత్తం బలం, మొత్తం పదిహేను సంబంధాలలో వాటాగా.