- 1Cloud is shared infrastructure with a physical footprint
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Shared control-plane fault with diverging sovereignty rules
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
A.1पद्धती
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | निकाल |
|---|---|---|---|
| (1) | Growth of Microsoft electricity consumed within the organisation, FY2023 to FY2024 | 29,829,540 ÷ 23,567,502 − 1 | 26.6% |
| (2) | Share of the three largest providers, and the remainder, Q2 2026 | 28 + 20 + 15; 100 − 63 | 63%; 37% |
| (3) | Duration of the AWS event, 11:48 PM to 2:20 PM PDT | 14 h 32 min = 14.53 h | ≈ 14.5 hours |
| (4) | Microsoft electricity consumed, FY2024 against FY2020 | 29,829,540 ÷ 10,770,714 | about 2.8 times |
| Strength | Definition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| लेबल | Rule |
|---|---|
| नोंदवलेले | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| अंदाजित | Nexus analytical value with stated method |
| परिदृश्य | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, Cloud System Model v0
- Model ID
- MDL-XT08-CLOUD · v0.1
- Purpose
- represent cloud, edge and distributed computing as infrastructure coupled to electricity, cooling water, finance, workforce and cyber resilience
- Family
- graph-based system of systems
- Inputs
- the cited sources of this edition; no proprietary data
- पद्धत
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- प्रमाणीकरण
- none yet, first validation against federation evidence in 2027
- अनिश्चितता
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- global scale; not for asset-, site- or country-level use
- Reproducibility
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-XTECH-CLOUD-GLOBAL-2026-B0
- प्रकार
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 43 cited sources, each at the edition and access date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 cloud annual cut
वंशावळ
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Element | Baseline 2026 | 2027 global annual |
|---|---|---|
| स्रोत | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Models | Cloud System Model v0 specification | model runs with receipts |
| Findings | twelve baseline findings | findings re-bound to federation evidence |
| पुनरावलोकन | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicator | निरीक्षित | Released | Cadence | Next release |
|---|---|---|---|---|
| US data centre report | 2023 | Dec 2024 | periodic | next national update |
| Global electricity report | 2024 | 2025 | periodic | next IEA update |
| Irish metered electricity | 2024 | June 2025 | annual | next CSO release |
| Operator environmental reports | 2024 | 2025 | annual | next annual reports |
| Cloud market release | Q2 2026 | July 2026 | quarterly | next quarter |
| UK competition decision | 2025 | July 2025 | one-off | strategic market status outcome |
| EU DMA investigations | 2025 | Nov 2025 | per release | designation decision |
| AWS event report | 2025 | Oct 2025 | per event | next post-event report |
| प्रणाली | व्याप्ती | Thinnest dimension |
|---|---|---|
| Electricity | PARTIAL | site-level load on a common basis |
| पाणी | THIN | comparable water metrics |
| Market and law | GOOD | outcomes of reviews and proposals |
| Resilience | PARTIAL | dependence of public services |
| Efficiency | PARTIAL | common PUE baseline |
| Edge | THIN | deployment and energy data |
| Skills | THIN | workforce numbers |
| Hardware and minerals | THIN | supply dependence |
| क्षेत्र | Source that would fill it | Blocker |
|---|---|---|
| Site-level electricity, cooling and water use on a common basis | operators, regulators under EU reporting rules, national laboratories | operator reports use different boundaries and years; EU reported data not retrieved1935 |
| IEA Energy and AI figures from the report itself | IEA Energy and AI report1 | the main report pages returned access errors; the figures are read in an IEA report that restates them1 |
| Uptime Institute survey figures from the report itself | Uptime Institute Global Data Center Survey 20259 | survey report opened: weighted average PUE 1.54 and power 45% of impactful outages in 2025; a respondent sample, not used in findings |
| Outcome of the UK strategic market status process for Microsoft and AWS | UK CMA and Digital Markets Unit publications1139 | the case page read gives a Q1 2026 decision point; the outcome was not retrieved |
| Commission preliminary findings on AWS and Azure under the DMA | European Commission press release1214 | the Commission press release of 25 June 2026 gives the preliminary view only14; the findings text and any final designation were not retrieved |
| Text of the proposed Cloud and AI Development Act | European Commission proposal18 | proposal read through a press report; target years differ across secondary sources |
| Designation of critical ICT third-party providers under DORA | European Supervisory Authorities1738 | the page read lists no designations; not retrieved |
| Dependence of public services on a few providers | national audit bodies, regulators, operators | no consolidated series found |
| Customer impact of the 2025 events | operators, customers, regulators202122 | incident reports state causes and times, not customer counts |
| Edge computing sites, devices and energy use | telecom operators, industry bodies30 | specifications read; no deployment figures retrieved |
| Grid connection queues and load forecasts for new facilities | grid operators and regulators | not retrieved |
| Hardware, chip and mineral dependence of data centres | industry and trade statistics | not retrieved; see the semiconductors edition for the chip layer |
| Cloud and data centre workforce size and skills gaps | national statistics, industry surveys | not retrieved; capability rung stays LISTED |
| Share of data centre electricity due to AI workloads | IEA, operators, national laboratories12 | not split in the sources read here |
A.5Evidence cards, two anchor sources
Published by Amazon Web Services. One-off post-event summary. Role: binds INF-011 and the resilience tiles. Coverage: one region, services listed with start and end times.
EVD-XT08-001
AWS summary of the us-east-1 event of 19 and 20 October 202520
Published by Lawrence Berkeley National Laboratory on 19 December 2024 and summarised by the US Department of Energy. Periodic. Role: binds ENE-002. Coverage: United States, 2014 to 2023 with a scenario range to 2028.
EVD-XT08-002
| Dimension | EVD-XT08-001 | EVD-XT08-002 |
|---|---|---|
| Completeness | services and times listed for one region | national total with a scenario range |
| Timeliness | about one week after the event | about one year after the data year |
| Revision | later revisions not checked | single edition read |
| Method transparency | cause described in prose | method in the full report, not opened |
| External validation | operator-reported only | laboratory report; peer review not stated |
Evidence cards to follow in 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| गट | क्षेत्र | Items | Pass | N/A | Pending |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- नकाशे
- plates in Q2 2027
- Waivers
- none
A.7Status words
| स्थिती | याचा अर्थ काय |
|---|---|
| निरीक्षित | Measured directly and published by the source. |
| नोंदवलेले | Published statistics of an official or institutional source. |
| Declared | Stated by the body concerned; not independently measured. |
| अंदाजित | A Nexus estimate from cited evidence, with its method in Annex A. |
| प्रारूपित | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Forecast | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| परिदृश्य | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| पायरी | What happens | स्रोत |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Term | Meaning |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| जोडणी | a typed dependency through which one system transmits to another |
| Protection gap | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| CADA | Cloud and AI Development Act |
| CMA | Competition and Markets Authority |
| DMA | Digital Markets Act |
| DNS | Domain Name System |
| DORA | Digital Operational Resilience Act |
| EDGE | computing at or near the data source |
| FY | fiscal year |
| MEC | Multi-access Edge Computing |
| ML | megalitre |
| PUE | power usage effectiveness |
| TWh | terawatt-hour |
| WUE | water use effectiveness |
A.10Technical annex
| Item | Annex | अनुक्रमणिका | स्थिती |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-XT08-DEP-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Cluster notes | cards for the major data centre and cloud region clusters | 2027 |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: power usage effectiveness
- Construct
- ratio of total facility energy to the energy used by IT equipment
- Unit
- ratio, 1.0 or higher
- पद्धत
- continuous metering at the facility, as described by one operator5
- स्रोत
- operator environmental reports57; definition in ISO/IEC 30134-241
- अनिश्चितता
- boundaries differ by operator; reported industry averages range from 1.25 to 1.56
- Known limits
- says nothing about water, carbon or the useful work done
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 19European Commission (ed.), Energy Efficiency Directive (policy page; states a data centre energy efficiency package planned for the third quarter of 2026 and links to reporting of data centre energy consumption; no threshold or dates on the page). Directorate-General for Energy, Brussels. Observation year 2026. Accessed 2026-11-03.back
- 35Directive (EU) 2023/1791 of the European Parliament and of the Council of 13 September 2023 on energy efficiency and amending Regulation (EU) 2023/955 (recast), Official Journal of the European Union L 231, 20 September 2023 (Article 12: from 15 May 2024 and yearly, operators of data centres with installed IT power demand of at least 500 kW publish the Annex VII information, including energy consumption, power utilisation, waste heat utilisation, water usage and renewable energy use). Publications Office of the European Union, Luxembourg. Observation year 2023. Accessed 2026-11-05.back
- 1IEA (ed.), Energy and AI in East Asia, revised version April 2026, prepared with the Korea Energy Economics Institute (PDF; restates the base case of the IEA report Energy and AI of April 2025: data centres about 415 TWh in 2024, 1.5% of global electricity consumption, more than doubling to about 945 TWh by 2030, about 3% of global demand; the main report pages returned access errors, so the figures are read in this IEA report). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05.back
- 9Uptime Institute (ed.), Uptime Institute Global Data Center Survey 2025, UII Keynote Report 180, July 2025 (PDF; respondents’ annual PUE a weighted average of 1.54 in 2025, the sixth year with little change; power the top cause of impactful outages at 45% of incidents in 2025; respondent survey). Uptime Institute, New York. Observation year 2025. Accessed 2026-11-05.back
- 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
- 39UK Competition and Markets Authority (ed.), Cloud services market investigation: Summary of final decision, 31 July 2025, and Final decision report, 1 August 2025 (summary opened; competition not working well; recommends that the CMA prioritise strategic market status investigations to consider designating Microsoft and AWS; UK customers spent GBP 10.5 billion on cloud services in 2024). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-05.back
- 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 14European Commission (ed.), Commission reaches preliminary position that Amazon’s and Microsoft’s market leading cloud services should be designated under the DMA, press release IP/26/1444 of 25 June 2026 (Amazon and Microsoft informed of the preliminary view that AWS and Azure should be designated as gatekeepers for cloud computing services although they do not meet the quantitative thresholds; findings do not prejudge the outcome; six months to comply if designated). European Commission, Brussels. Observation year 2026. Accessed 2026-11-05.back
- 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
- 17European Securities and Markets Authority (ed.), Digital Operational Resilience Act (page; applies from 17 January 2025; lists materials on critical ICT third-party provider designation; no designations on the page). ESMA, Paris. Observation year 2025. Accessed 2026-11-03.back
- 38Regulation (EU) 2022/2554 of the European Parliament and of the Council of 14 December 2022 on digital operational resilience for the financial sector (DORA), Official Journal of the European Union L 333, 27 December 2022 (applies from 17 January 2025; Article 31 on designation of critical ICT third-party service providers by the European Supervisory Authorities). Publications Office of the European Union, Luxembourg. Observation year 2022. Accessed 2026-11-05.back
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
- 30ETSI (ed.), Multi-access Edge Computing (technology page; industry specification group; news item of 31 October 2025 on Phase 4 specifications and a white paper; no counts on the page). European Telecommunications Standards Institute, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03.back
- 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
- 3US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (20 December 2024; about 4.4% of US electricity in 2023; 6.7 to 12% projected for 2028; 58 TWh in 2014 and 176 TWh in 2023). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
- 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
- 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
- 41ISO and IEC (eds.), ISO/IEC 30134-2:2026 Information technology, data centres key performance indicators, part 2, power usage effectiveness (PUE), second edition, 16 January 2026, replacing the 2016 edition (ISO open data deliverables record). International Organization for Standardization, Geneva. Observation year 2026. Accessed 2026-11-05.back