Skip to content

Draft, not yet released. In stewardship review. Not indexed until the first approved release.

  • Отчёты
  • Базовый выпуск 2026
  • Complete edition

Global Energy Risk and Resilience Report 2026: Baseline Edition, The State of the World’s Energy System.

The designed PDF, A4 or US Letter, is under Downloads below. To print this page instead, choose the paper in the print dialog. Review copies: the PDF with its DOI is issued at release.

Global Energy 2026

Imprint

Редактор
Saeed Valadbaygi, Chief Steward and Managing Editor, the Global Centre for Risk and Innovation (GCRI)
Официальный издатель
The Global Centre for Risk and Innovation (GCRI) for the Nexus Consortium, Toronto
Report number
NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE
Закрытие доказательной базы
30 September 2026, cut DC-SECTOR-ENERGY-GLOBAL-2026-B0
Статус
Draft under stewardship review; not yet released
DOI and UNI
Issued at deposit
Лицензия
CC BY 4.0 for Nexus-authored text, tables and figures; third-party material keeps its own licence
Cite as
Valadbaygi, S. (Ed.). (2026). Global Energy Risk and Resilience Report 2026: Baseline Edition, The State of the World’s Energy System. (Baseline Edition 2026, Report No. NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI). https://therisk.global/nexus-reports/editions/gs-02/

Содержание

  1. ·

    Executive summary

  2. 1

    Chapter 1. Energy is where the systems meet

  3. 2

    Chapter 2. Key findings

  4. 3

    Chapter 3. Systems and sectors at baseline

  5. 4

    Chapter 4. Risks and capability

  6. 5

    Chapter 5. Fuel supply shock under a hot, high-demand season

  7. 6

    Chapter 6. Readings from the other desks

  8. 7

    Chapter 7. The 2027 agenda

  9. 8

    Chapter 8. Systems in depth

  10. A

    Annex A. Methodology

  11. B

    Annex B. Data appendix

  12. C

    Annex C. References and record

Загрузки

Draft, not yet releasedReview copies of a draft in stewardship review. The released edition carries its DOI and replaces them.

  • Печать

    • PDF, A4

      The designed print edition, A4: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF106 pages917 KBTagged, with bookmarks

      SHA-256 0128599eeaec07e930d6f4fd6a5fcb6f240b79edb240972139328d659951a14e

    • PDF, US Letter

      The designed print edition, US Letter: cover, imprint and licence, how to cite, contents with page numbers, every chapter, figure, table and annex.

      PDF113 pages929 KBTagged, with bookmarks

      SHA-256 7b93d4d0eddb6e27a5d099cfa05daa1f7359532e35da6a2331495c2a94391baf

  • Web edition

  • Data bundle

    • Indicators, CSV

      18 indicators with unit, year, status and source

      NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE-indicators.csv1 KB

      SHA-256 cccb448a15c89805c3f8f5b74e25a41c3123b2a645833d5e83f129eddef1c6bc

    • Indicators, JSON

      The same indicators with the edition’s identity and licence

      NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE-indicators.json2 KB

      SHA-256 8f31fe94a576cdb1e5c4ccf370061209393184710cb65f6e9da261cdc92bbfc3

    • Findings, CSV

      12 findings with status, evidence-quality level and references

      NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE-findings.csv3 KB

      SHA-256 216ade8ec8974a1472221ccdcb27621697c29039449f0b098173a15e59846ee5

  • Citation files

    • Citation, BibTeX

      For LaTeX and reference managers

      NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE.bib1 KB

      SHA-256 357f5db0cbc15b74c76a67b3100ec65f27b6d4b155911346a325a336805ecf58

    • Citation, RIS

      For Zotero, EndNote and Mendeley

      NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE.ris1 KB

      SHA-256 b3e28bba32c9b54a929f95757cefc24e9808488fb9b3405cfe197d5d4c9af2cd

    • Citation, CITATION.cff

      Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues

      NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE.cff1 KB

      SHA-256 1f819d179b88a4c7464fd54ab5c78b76392706e19d1bd421c4b0844ffc14c600

Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.

Executive summary

The edition on a few pages: the abstract, the key messages, the headline finding and what each steward reads in it.

5 min read1 figure0 tables9 notesNR-SECTOR-ENERGY-GLOBAL-2026-BASELINE

S.1Abstract

The world enters 2027 with an energy system that is growing, electrifying and under strain at the same time. Global energy demand grew 1.3% in 2025 and electricity demand grew nearly 3%, more than twice as fast2. Solar supplied more than a quarter of the growth in energy demand, and renewables (33.8%) edged ahead of coal (33.0%) in global electricity generation for the first time27. Energy-related CO2 emissions still reached a record of more than 38 Gt2. Investment is estimated at USD 3.4 trillion in 2026, with about USD 1.6 trillion in electricity supply and infrastructure1. Access is unfinished: 655 million people lacked electricity in 2024 and about 2.0 billion relied mainly on polluting fuels for cooking8. Security of supply is the sharpest pressure. The Middle East conflict that began on 28 February 2026 cut flows through the Strait of Hormuz, IEA members made a record emergency oil release, and EIA assumes flows stay constrained through the fourth quarter of 2026471112. Critical minerals add a second chokepoint: refining is concentrated and export controls have spread3. Data centres are a fast-growing load, about 415 TWh in 2024 and about 945 TWh by 2030 in the IEA base case4. This baseline sets out what the evidence supports and where it is thin. It ranks no country and recommends no policy.

S.2Key messages

Six readings that frame the energy baseline, and the eight questions this edition answers, each with its status and source.

  1. Energy demand grew 1.3% in 2025 and electricity nearly 3%.2

    How fast is energy demand growing?Reported

  2. Solar led growth; renewables edged past coal in generation.27

    What is changing in supply?Reported

  3. No. Energy CO2 reached a record above 38 Gt, up about 0.4%.2

    Are emissions falling?Reported

  4. About USD 3.4 trillion in 2026, with electricity supply and infrastructure at USD 1.6 trillion.1

    Where is the money going?Reported

  5. 655 million without electricity and about 2.0 billion cooking with polluting fuels.8

    Who still lacks energy?Reported

  6. Hormuz flows were cut from March 2026 and remain constrained in the EIA outlook.4711

    How secure is fuel supply?Reported

  7. Refining is concentrated and export controls have tripled in scope.3

    Do minerals add risk?Reported

  8. A fuel shock that coincides with heat and grid stress. SCN-GS02-LNG-01

    What will 2027 test first?Expert input

S.3Headline finding

ReportedEQL 5NRF-SECTOR-ENERGY-GLOBAL-2026-BASELINE-HLT-007

In 2024, 655 million people lacked electricity and about 2.0 billion people relied mainly on polluting fuels for cooking.

Figure S.1People without services, 2024 (million)
ПозицияBar, scaled to the largest valueЗначение
Without electricity655
Relying on polluting cooking fuels2,000

Source: SDG 7 custodian agencies, Extended Report 20268.

The access gap is now concentrated in Sub-Saharan Africa, which holds 563 million of the people without electricity and 970 million of those without clean cooking. Affordability is a binding constraint: only about 22% of households without access can afford the monthly payments for a basic solar home system8.

S.4At a glance

1.3%

growth in energy demand, 20252

≈3%

growth in electricity demand, 20252

33.8%

renewables in global electricity7

3.4USD trillion

investment, 2026e1

655million

without electricity, 20248

945TWh

data centres by 2030, base case4

S.5What each steward reads in it

GCRI · KEY T

Technical Truth

The evidence supports reading energy as the coupling layer of the WEFH+B system.

GRF · KEY M

Public Meaning

For most people energy risk arrives as a power cut, a higher bill or a cooking fire.

GRA · KEY F

Capital Meaning

Readiness implications only. Investment is high, price volatility has risen and public finance for minerals is growing.

NEXUS

Синтез

The energy system is well measured at the level of demand and generation and thinly measured at the level of equipment, constraints and water.

S.6What this edition is, and is not

What this edition is

A baseline: the 2026 state of the world’s energy system and the couplings through which it carries risk into other systems. It synthesises published evidence and ranks no country, company or asset.

What it is not

Not an energy-security ranking, a forecast of prices, a supply recommendation or an assessment of any utility, regulator, producer or government. Energy policy, markets and operations rest with national authorities, system operators and companies.

What comes next

National, regional and sector evidence feeds the 2027 energy edition through the federation. Each edition reports what changed against this baseline: observations, source revisions, method changes, scenario updates and corrections.

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 2IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  2. 7Ember (ed.), Global Electricity Review 2026: 2025 in review (generation, demand, solar, coal). Ember, London. Observation year 2025. Accessed 2026-11-03.back
  3. 1IEA (ed.), World Energy Investment 2026, launch presentation, Paris, 28 May 2026. International Energy Agency, Paris. Observation year 2026 (estimates, with 2025 data). Accessed 2026-11-03.back
  4. 8UN DESA Statistics Division (ed.), The Sustainable Development Goals Extended Report 2026, Goal 7 indicator storylines (inputs as of 30 April 2026). United Nations, New York. Observation year 2024. Accessed 2026-11-03.back
  5. 47US Energy Information Administration (ed.), Short-Term Energy Outlook, September 2026 (Brent about USD 91 a barrel in the fourth quarter of 2026; Middle East oil flows assumed constrained through the fourth quarter of 2026). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
  6. 11IEA (ed.), Oil Market Report, June 2026 (17 June 2026, public version; May 2026 world oil output 13.6 mb/d below pre-conflict levels, Gulf exports 14.8 mb/d below February levels and exports via the Strait of Hormuz from known origins at 1.9 mb/d). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  7. 12IEA (ed.), Oil Market Report, March 2026 (12 March 2026), including the box on the collective action agreed by the 32 IEA member countries on 11 March 2026 to make 400 million barrels of emergency oil stocks available, described as unprecedented; flows through the Strait of Hormuz of nearly 20 mb/d in 2025 and transits at less than 10% of pre-crisis levels. International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  8. 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  9. 4IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back

Energy is where the systems meet

Part I describes systems and their couplings. It ranks no country or operator and assesses no authority.

6 min read2 figures2 tables11 notesNR-SECTOR-ENERGY-GLOBAL-2026-BASELINE

1.1The questions this part answers

Key questions

  • Where is energy risk concentrated?
  • Which couplings carry energy shocks into other systems?
  • Which energy capabilities hold under compound stress?
  • What must 2027 evidence measure first?

In this part

  • Narrative
  • Headline finding
  • Lead figure
  • Five coupling chapters
  • Twelve-domain reading
  • Sector screens
  • Dependency matrix
  • Risk objects
  • Capability ladder
  • Сценарий
  • Three lenses
  • Портфель

1.2The argument

Energy is usually reported as a sector: fuels, power, prices. The 2026 evidence reads it as the medium through which almost every other system’s risk travels. Water pumping and cooling, fertiliser and cold chains, clinics and cooking, and the digital economy all rest on it834.

The supply side is changing at the margin. Solar was the largest source of growth in energy demand in 2025, and renewables edged past coal in global generation27. Yet fossil fuels still supplied about 86% of primary energy15, and energy-related CO2 reached a record above 38 Gt2.

Security is the sharpest pressure. After the conflict began on 28 February 2026, flows through the Strait of Hormuz fell sharply, IEA members made a record emergency oil release and EIA assumes flows stay constrained through the fourth quarter471112. The same shock reached LNG, aluminium and sulphur markets313.

Electricity is the common thread. It grew more than twice as fast as energy demand in 20252, data centres are an increasing share of it4, and the grids that carry it fail in ways that are only now understood, as the Iberian blackout shows9. Access remains unfinished for 655 million people8.

Figure 1.1How far is the world from universal energy access? People without services, 2024 (million)

The cooking gap is about three times the electricity gap. Both are concentrated in the same places, so they compound each other’s effects on health and time use8.

ПозицияBar, scaled to the largest valueЗначение
Polluting cooking fuels2000
Without electricity655

Source: as cited in the note to this figure. Year 2024.

Figure ID FIG-SECTOR-ENERGY-GLOBAL-2026-BASELINE-01-003

563million

without electricity in Sub-Saharan Africa8

970million

cooking with polluting fuels in Sub-Saharan Africa8

22%

of unserved households can afford a basic solar home system8

300million

Mission 300 target for Africa by 20308

1.3The six-sector nexus: twenty couplings across five assessed sectors

The energy-centred matrix types the twenty couplings between the five core systems, read for their energy content. Strengths are Nexus estimates (ESTIMATED) from the cited evidence and analogue events; they set the graph that 2027 evidence will test.

Figure 1.2Couplings across the six sectors

Each line is one coupling from one sector to another, drawn by the strength the edition assigns. Strengths are Nexus estimates from the cited evidence and analogue events. Infrastructure: not assessed in this edition’s coupling matrix, so it is drawn hollow with no couplings. The hexagon is the estate doctrine: six sectors and fifteen relations.

  • Strong
  • Умеренные
  • Weak
  • Not assessed in this edition

Source: this edition’s coupling matrix (Table 1.1); status Estimated. Hexagon: the estate doctrine (Signature).

Table 1.1Coupling matrix: from the row system to the column system
From, toWATENEFOOHLTBIO
WAT Вода·STRONG
hydro · cooling water
MODERATE
irrigation pumping load
WEAK
supply and treatment
MODERATE
reservoir flows
ENE ЭнергетикаSTRONG
pumping · treatment · desalination
·STRONG
fuel · fertiliser · cold chain
STRONG
clean cooking · clinics · cooling
MODERATE
mining · land use
FOO ПродовольствиеWEAK
withdrawals
MODERATE
bioenergy · diesel pumping
·WEAK
питание
MODERATE
land for biofuel
HLT ЗдравоохранениеWEAK
workforce
WEAK
workforce
WEAK
labour
·WEAK
residues
BIO БиоразнообразиеMODERATE
catchments
MODERATE
biomass · hydrology
WEAK
pollination
WEAK
zoonoses
·
Strength: strong, moderate or weak; a Nexus estimate (status Estimated) from cited evidence and analogue events. The scale is defined in Annex A.

Transmission paths

  1. 01

    CLI → ENE → HLT

    A heat wave raises cooling demand while supply is short; clinics and homes lose power.

    Inferred 2022 Europe and Asia heat; 2025 blackout9

  2. 02

    ENE → FOO

    Fuel, fertiliser and acid price shocks reach farms and food prices.

    Reported 2026 sulphur and fertiliser disruption3

  3. 03

    MIN → ENE

    Export controls on minerals slow power equipment and batteries.

    Reported 2025 rare-earth and graphite controls3

  4. 04

    TRD → ENE → FIN

    A chokepoint closure lifts prices and strains importers’ budgets.

    Reported 2026 Hormuz closure4711

  5. 05

    AIC → ENE

    Clustered data-centre load tightens local grids.

    Reported US growth in 202524

1.4Reinforcing loops

A shock entering either system of a loop can return amplified through the other.

Table 1.2Pairs of systems where both directions are rated strong
LoopFirst directionSecond direction
WAT and ENEWater to energy: hydro · cooling waterEnergy to water: pumping · treatment · desalination
A causal-loop reading of the matrix (Sterman, Business Dynamics, 2000): structural, from estimated strengths, not a measured feedback.

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 8UN DESA Statistics Division (ed.), The Sustainable Development Goals Extended Report 2026, Goal 7 indicator storylines (inputs as of 30 April 2026). United Nations, New York. Observation year 2024. Accessed 2026-11-03.back
  2. 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  3. 4IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back
  4. 2IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  5. 7Ember (ed.), Global Electricity Review 2026: 2025 in review (generation, demand, solar, coal). Ember, London. Observation year 2025. Accessed 2026-11-03.back
  6. 15DieselNet (ed.), Energy Institute releases 2026 Statistical Review of World Energy, news item of 2 July 2026, reporting the Energy Institute, Statistical Review of World Energy 2026, 75th edition (fossil fuels 86% of total energy supply in 2025, hydropower 2.7% of primary energy, electricity demand up 3%); the Review itself refused access. DieselNet, Brampton. Observation year 2025. Accessed 2026-11-05.back
  7. 47US Energy Information Administration (ed.), Short-Term Energy Outlook, September 2026 (Brent about USD 91 a barrel in the fourth quarter of 2026; Middle East oil flows assumed constrained through the fourth quarter of 2026). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
  8. 11IEA (ed.), Oil Market Report, June 2026 (17 June 2026, public version; May 2026 world oil output 13.6 mb/d below pre-conflict levels, Gulf exports 14.8 mb/d below February levels and exports via the Strait of Hormuz from known origins at 1.9 mb/d). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  9. 12IEA (ed.), Oil Market Report, March 2026 (12 March 2026), including the box on the collective action agreed by the 32 IEA member countries on 11 March 2026 to make 400 million barrels of emergency oil stocks available, described as unprecedented; flows through the Strait of Hormuz of nearly 20 mb/d in 2025 and transits at less than 10% of pre-crisis levels. International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  10. 13IEA (ed.), Gas Market Report, Q2-2026 (April 2026; Qatar halted LNG production on 2 March 2026 and Qatari and UAE output, about 20% of global LNG supply, was isolated from the market). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  11. 9ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back

Key findings

Twelve findings carry the energy baseline. They are grouped by coupling and never ranked. Each resolves to its source or, where Nexus analysis is involved, to its stated method.

5 min read1 figure0 tables14 notesNR-SECTOR-ENERGY-GLOBAL-2026-BASELINE

2.1Headline finding

ReportedEQL 5NRF-SECTOR-ENERGY-GLOBAL-2026-BASELINE-HLT-007

In 2024, 655 million people lacked electricity and about 2.0 billion people relied mainly on polluting fuels for cooking.

Figure 2.1People without services, 2024 (million)
ПозицияBar, scaled to the largest valueЗначение
Without electricity655
Relying on polluting cooking fuels2,000

Source: SDG 7 custodian agencies, Extended Report 20268.

Implication

The access gap is now concentrated in Sub-Saharan Africa, which holds 563 million of the people without electricity and 970 million of those without clean cooking. Affordability is a binding constraint: only about 22% of households without access can afford the monthly payments for a basic solar home system8.

What would move it

The next SDG 7 report, the pace of Mission 300 connections and the affordability of off-grid solar would each move this finding.

2.2Энергетика

  1. ReportedEQL 5NRF-SECTOR-ENERGY-GLOBAL-2026-BASELINE-ENE-001

    Global energy demand grew 1.3% (8 EJ) in 2025, down from 2% in 2024, and electricity demand grew nearly 3%, more than twice as fast.215

  2. ReportedEQL 4NRF-SECTOR-ENERGY-GLOBAL-2026-BASELINE-ENE-002

    Solar PV met more than 25% of the growth in global energy demand in 2025, and low-emissions sources together met nearly 60%.2

  3. ReportedEQL 4NRF-SECTOR-ENERGY-GLOBAL-2026-BASELINE-ENE-003

    Renewables supplied 33.8% of global electricity in 2025 and coal 33.0%; fossil generation fell 38 TWh, the first annual fall since 2020.7

  4. ReportedEQL 3NRF-SECTOR-ENERGY-GLOBAL-2026-BASELINE-ENE-009

    Qatar’s Ras Laffan LNG complex has been offline since early March 2026, removing nearly a fifth of global LNG supply, after a build-out of about 300 bcm a year of new LNG capacity was expected by 2030.513

2.3Climate forcing

  1. ReportedEQL 4NRF-SECTOR-ENERGY-GLOBAL-2026-BASELINE-CLI-004

    Energy-related CO2 emissions rose about 0.4% in 2025 to a record of more than 38 Gt.215

2.4Финансы

  1. ReportedEQL 4NRF-SECTOR-ENERGY-GLOBAL-2026-BASELINE-FIN-005

    Global energy investment is estimated at USD 3.4 trillion in 2026, against USD 2.6 trillion in 2015, with electricity supply and infrastructure at about USD 1.6 trillion.117

2.5AIC

  1. ReportedEQL 4NRF-SECTOR-ENERGY-GLOBAL-2026-BASELINE-AIC-006

    Data centres used about 415 TWh in 2024, about 1.5% of global electricity, and the IEA base case reaches about 945 TWh by 2030.42

2.6Здравоохранение

  1. ReportedEQL 5NRF-SECTOR-ENERGY-GLOBAL-2026-BASELINE-HLT-007

    655 million people lacked electricity in 2024 and about 2.0 billion relied mainly on polluting fuels for cooking.8

2.7Управление

  1. ReportedEQL 4NRF-SECTOR-ENERGY-GLOBAL-2026-BASELINE-GOV-008

    Oil flows through the Strait of Hormuz fell sharply after 28 February 2026; IEA members released a record 400 million barrels, and EIA assumes flows stay constrained through the fourth quarter of 2026.471112

2.8Минералы

  1. ReportedEQL 4NRF-SECTOR-ENERGY-GLOBAL-2026-BASELINE-MIN-010

    The top refining country’s average share of key energy minerals rose to 72% in 2025 from 70% in 2023, excluding rare earths, and the mineral tariff codes under Chinese export controls tripled since 2023.3

2.9Инфраструктура

  1. ReportedEQL 4NRF-SECTOR-ENERGY-GLOBAL-2026-BASELINE-INF-011

    The Iberian blackout of 28 April 2025 came from interacting factors, including voltage control gaps, oscillations and generator disconnections, according to the ENTSO-E final report of 20 March 2026.9

2.10Системные риски

  1. Expert inputEQL 2NRF-SECTOR-ENERGY-GLOBAL-2026-BASELINE-SYS-012

    The leading compound pathway for 2027 testing is a fuel supply shock that coincides with a hot, high-demand season and a stressed grid. § scenario

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 8UN DESA Statistics Division (ed.), The Sustainable Development Goals Extended Report 2026, Goal 7 indicator storylines (inputs as of 30 April 2026). United Nations, New York. Observation year 2024. Accessed 2026-11-03.back
  2. 2IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  3. 15DieselNet (ed.), Energy Institute releases 2026 Statistical Review of World Energy, news item of 2 July 2026, reporting the Energy Institute, Statistical Review of World Energy 2026, 75th edition (fossil fuels 86% of total energy supply in 2025, hydropower 2.7% of primary energy, electricity demand up 3%); the Review itself refused access. DieselNet, Brampton. Observation year 2025. Accessed 2026-11-05.back
  4. 7Ember (ed.), Global Electricity Review 2026: 2025 in review (generation, demand, solar, coal). Ember, London. Observation year 2025. Accessed 2026-11-03.back
  5. 5IEA (ed.), Gas 2025: Analysis and forecasts to 2030 (Gas Market Report, Q4-2025). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  6. 13IEA (ed.), Gas Market Report, Q2-2026 (April 2026; Qatar halted LNG production on 2 March 2026 and Qatari and UAE output, about 20% of global LNG supply, was isolated from the market). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  7. 1IEA (ed.), World Energy Investment 2026, launch presentation, Paris, 28 May 2026. International Energy Agency, Paris. Observation year 2026 (estimates, with 2025 data). Accessed 2026-11-03.back
  8. 17IEA (ed.), World Energy Investment 2026, full report (revised version, June 2026; total energy investment USD 3.4 trillion in 2026, about USD 2.2 trillion to clean energy and USD 1.2 trillion to oil, gas and coal, electricity supply and infrastructure USD 1.6 trillion). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  9. 4IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back
  10. 47US Energy Information Administration (ed.), Short-Term Energy Outlook, September 2026 (Brent about USD 91 a barrel in the fourth quarter of 2026; Middle East oil flows assumed constrained through the fourth quarter of 2026). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
  11. 11IEA (ed.), Oil Market Report, June 2026 (17 June 2026, public version; May 2026 world oil output 13.6 mb/d below pre-conflict levels, Gulf exports 14.8 mb/d below February levels and exports via the Strait of Hormuz from known origins at 1.9 mb/d). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  12. 12IEA (ed.), Oil Market Report, March 2026 (12 March 2026), including the box on the collective action agreed by the 32 IEA member countries on 11 March 2026 to make 400 million barrels of emergency oil stocks available, described as unprecedented; flows through the Strait of Hormuz of nearly 20 mb/d in 2025 and transits at less than 10% of pre-crisis levels. International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  13. 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  14. 9ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back

Systems and sectors at baseline

5 min read0 figures2 tables10 notesNR-SECTOR-ENERGY-GLOBAL-2026-BASELINE

3.1Where each system stood at evidence close

ENE · Energy

Growth in global energy demand

1.3%

8 EJ; 2% in 2024.

Сообщённые данные2025IEA2

ENE · Electricity

Renewables share of generation

33.8%

Coal 33.0%.

Reported2025Ember7

CLI · Climate

Energy-related CO2 emissions

>38Gt

up about 0.4%; a new record.

Сообщённые данные2025IEA2

FIN · Finance

Global energy investment

3.4USD trillion

estimate; USD 2.6 trillion in 2015.

Reported2026eIEA1

HLT · Health

People without electricity

655million

and about 2.0 billion cook with polluting fuels.

Reported2024SDG 78

SYS · Cross-system

Brent crude, fourth-quarter average (forecast)

91USD a barrel

EIA September outlook assumes Middle East flows stay constrained.

Сценарий2026EIA47

3.2Domain posture

Each of the twelve coupled domains is read through energy, in words, not scored. The coupling column names the dependency that carries energy risk into each domain.

Table 3.1Each domain read in words, not scored
ДоменPosture at baselineВзаимосвязиСтатус
WATPumping, treatment and desalination need power; hydropower and cooling depend on flows. Volumes of energy-sector water use are not consolidated here.ENE ↔ WATInferred EQL 2
ENEDemand up 1.3%, electricity nearly 3%; solar led growth; renewables 33.8% of generation; fuel security under strain.the core systemReported EQL 5
FOOFertiliser and acid supply chains were hit by the Hormuz closure; cold chains and irrigation depend on power.ENE → FOOReported EQL 3
HLT655 million without electricity; about 2.0 billion cook with polluting fuels; heat raises cooling demand.ENE → HLTReported EQL 4
BIOMining, hydropower and land for supply chains press on nature; the evidence is not consolidated here.ENE → BIOExpert input EQL 2
CLIEnergy CO2 at a record above 38 Gt; weather swings demand for heating and cooling.ENE → CLIReported EQL 5
INFGrids, pipelines, ports and shipping lanes carry the system; the Iberian blackout shows how voltage control failures cascade.ENE ↔ INFReported EQL 4
FINUSD 3.4 trillion of annual investment; price spikes and volatility from the 2026 fuel shock.ENE → FINReported EQL 4
DATGrid operators and regulators publish operational data; global coverage is uneven.DAT → ENEExpert input EQL 2
AICData centres about 415 TWh in 2024, 945 TWh by 2030 in the base case; clusters concentrate load.AIC → ENEReported EQL 4
MINRefining of energy minerals is concentrated; export controls have tripled in scope; copper deficit projected to 2035.MIN → ENEReported EQL 4
TRDSeaborne oil and LNG trade passes chokepoints; US LNG exports grow; sulphur, aluminium and helium were disrupted.ENE ↔ TRDReported EQL 4

3.3Sector screens

All sixteen sectors are screened for their dependence on energy, on the same grammar as every national edition. The evidence column describes coverage of the baseline evidence, not the performance of the sector.

Table 3.2Sectors: baseline evidence and the exposure to watch
КодСекторBaseline evidenceExposure to watchEvidence coverage
GS-00Cross-systemenergy couples every other system83fuel shock under heatPARTIAL
GS-01Водаpumping, cooling and hydropower depend on each otherdrought and heatTHIN
GS-02Энергетикаdemand 1.3%, electricity nearly 3%2fuel shock; grid stressGOOD
GS-03Продовольствиеfertiliser and sulphur supply disrupted3fuel and acid price shockPARTIAL
GS-04Здравоохранение655 million without electricity8cooling and clinic supplyGOOD
GS-05ФинансыUSD 3.4 trillion of investment1price volatilityPARTIAL
GS-06Разработка2.0 billion cook with polluting fuels8affordability of accessGOOD
GS-07Климатrecord energy CO2 above 38 Gt2weather-driven demandGOOD
GS-08Бедствиеblackout of 28 April 20259cascading outagesPARTIAL
GS-09Инфраструктураgrids, pipelines and ports carry the system1equipment lead timesTHIN
GS-10Городаelectrified heat and transport raise loadpeak demandTHIN
GS-11Биоразнообразиеmining and hydropower pressuresland and flow alterationTHIN
GS-12«Наблюдение Земли»weather and satellite data support operationscontinuity of missionsTHIN
GS-13Кибербезопасность и цифровые технологииcontrol systems of utilities35attacks on energy systemsTHIN
GS-14Политикаmarket design and security instruments34emergency measuresPARTIAL
GS-15Наукаstrong energy-system modelling43grid and minerals dataPARTIAL

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 2IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  2. 7Ember (ed.), Global Electricity Review 2026: 2025 in review (generation, demand, solar, coal). Ember, London. Observation year 2025. Accessed 2026-11-03.back
  3. 1IEA (ed.), World Energy Investment 2026, launch presentation, Paris, 28 May 2026. International Energy Agency, Paris. Observation year 2026 (estimates, with 2025 data). Accessed 2026-11-03.back
  4. 8UN DESA Statistics Division (ed.), The Sustainable Development Goals Extended Report 2026, Goal 7 indicator storylines (inputs as of 30 April 2026). United Nations, New York. Observation year 2024. Accessed 2026-11-03.back
  5. 47US Energy Information Administration (ed.), Short-Term Energy Outlook, September 2026 (Brent about USD 91 a barrel in the fourth quarter of 2026; Middle East oil flows assumed constrained through the fourth quarter of 2026). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
  6. 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  7. 9ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
  8. 35Commission Delegated Regulation (EU) 2024/1366 of 11 March 2024 supplementing Regulation (EU) 2019/943 by establishing a network code on sector-specific rules for cybersecurity aspects of cross-border electricity flows. Official Journal of the European Union, L series, 2024. Observation year 2024. Accessed 2026-11-05.back
  9. 34Regulation (EU) 2024/1747 of the European Parliament and of the Council of 13 June 2024 amending Regulations (EU) 2019/942 and (EU) 2019/943 as regards improving the Union’s electricity market design. Official Journal of the European Union, L series, 2024. Observation year 2024. Accessed 2026-11-05.back
  10. 43Davis, S.J. et al., Net-zero emissions energy systems, Science 360(6396), eaas9793, 2018. American Association for the Advancement of Science. Observation year 2018. Accessed 2026-11-05.back

Risks and capability

Four energy risk objects open the portfolio. Order carries no rank. Each is read across driver, exposure, vulnerability, capacity, cascade and consequence.

5 min read0 figures1 table16 notesNR-SECTOR-ENERGY-GLOBAL-2026-BASELINE

4.1Risk objects

Each risk is read across the chain from hazard to consequence, with its status and evidence-quality level.

  1. ReportedEQL 4RSK-GS02-ENE-001

    Seaborne oil and LNG chokepoint disruption

    Движущая сила
    conflict-related closure or damage affecting Hormuz flows and Qatari LNG1113
    Подверженность
    importing economies, refiners, power systems burning gas or oil
    Уязвимость
    thin spare capacity; limited bypass routes
    Мощность
    emergency stocks; bypass pipelines; demand response12
    Каскад
    ENE → FIN, FOO, HLT
    Горизонт
    1 to 3 years
  2. InferredEQL 3RSK-GS02-INF-002

    Power-system stability with high inverter-based supply

    Движущая сила
    rapid change in the generation mix and voltage control gaps9
    Подверженность
    synchronous grids and large cities
    Уязвимость
    uneven stabilisation capability; coordination gaps
    Мощность
    reactive power requirements; grid-forming equipment; operator coordination
    Каскад
    ENE → HLT, WAT, INF
    Горизонт
    1 to 5 years
  3. ReportedEQL 4RSK-GS02-MIN-003

    Critical-mineral export controls and refining concentration

    Движущая сила
    export controls and concentrated refining3
    Подверженность
    batteries, grid equipment, magnets, solar supply chains
    Уязвимость
    single dominant refiners; thin stockpiles
    Мощность
    diversification projects; strategic stockpiles; recycling3
    Каскад
    MIN → ENE, INF
    Горизонт
    1 to 10 years
  4. InferredEQL 3RSK-GS02-AIC-004

    Concentrated data-centre load on local grids

    Движущая сила
    rapid growth of AI and digital services4
    Подверженность
    local grids in a few clusters; nearly half of US capacity sits in five clusters4
    Уязвимость
    long lead times for connections and equipment
    Мощность
    flexible load; on-site supply; planning and tariffs
    Каскад
    AIC → ENE → FIN, HLT
    Горизонт
    1 to 5 years

4.2Capability ladder

Existence is not readiness. Each of the fifteen capability functions is placed on the ladder by the strongest public evidence for energy at the global level.

Table 4.1Capabilities on the ladder of evidence: listed, exists, demonstrated, tested
ФункцияRungУровеньStrongest public evidence at baseline
Prevention and mitigationEXISTSefficiency and reliability standards widespread; implementation uneven2436
Monitoring and observationADEQUATEmarket and operational data strong in advanced grids; thin elsewhere79
Раннее предупреждениеEXISTSweather-linked demand forecasts and grid alerts; fuel-market early warning is partial
Preparedness and planningEXISTSadequacy assessments published for several grids30
Redundancy and reservesDEMONSTRATEDrecord coordinated oil stock release in March 202612
РеагированиеDEMONSTRATEDemergency measures and demand response used in 2022 and 202612
Continuity of critical servicesEXISTSpriority supply for hospitals and water works in many systems; testing uneven
ВосстановлениеDEMONSTRATEDIberian system restored after the 2025 blackout; reasons studied in a final report9
AdaptationEXISTSstorage, flexibility and diversified supply growing27
Социальная защитаLISTEDenergy support for poor households documented but not consolidated
Финансы и страхованиеEXISTSinvestment of USD 3.4 trillion; public finance for minerals rising13
Institutional coordinationEXISTSIEA collective action; network codes in the EU1235
Technical infrastructureEXISTSgrids ageing in places; equipment lead times a constraint22
WorkforceLISTEDskills gaps reported across the energy sector23
Research capacityADEQUATEstrong energy-system science; data access uneven43
A capability listed in policy is not a tested one; each rung is the strongest public evidence at baseline.

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 11IEA (ed.), Oil Market Report, June 2026 (17 June 2026, public version; May 2026 world oil output 13.6 mb/d below pre-conflict levels, Gulf exports 14.8 mb/d below February levels and exports via the Strait of Hormuz from known origins at 1.9 mb/d). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  2. 13IEA (ed.), Gas Market Report, Q2-2026 (April 2026; Qatar halted LNG production on 2 March 2026 and Qatari and UAE output, about 20% of global LNG supply, was isolated from the market). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  3. 12IEA (ed.), Oil Market Report, March 2026 (12 March 2026), including the box on the collective action agreed by the 32 IEA member countries on 11 March 2026 to make 400 million barrels of emergency oil stocks available, described as unprecedented; flows through the Strait of Hormuz of nearly 20 mb/d in 2025 and transits at less than 10% of pre-crisis levels. International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  4. 9ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
  5. 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  6. 4IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back
  7. 24IEA (ed.), Energy Efficiency 2025. International Energy Agency, Paris, November 2025. Observation year 2025. Accessed 2026-11-05.back
  8. 36ISO (ed.), ISO 50001:2018, Energy management systems: Requirements with guidance for use, edition 2. International Organization for Standardization, Geneva, August 2018. Observation year 2018. Accessed 2026-11-05.back
  9. 7Ember (ed.), Global Electricity Review 2026: 2025 in review (generation, demand, solar, coal). Ember, London. Observation year 2025. Accessed 2026-11-03.back
  10. 30NERC (ed.), 2025 Long-Term Reliability Assessment (published January 2026; 13 of 23 assessment areas face resource adequacy challenges over the next ten years). North American Electric Reliability Corporation, Atlanta. Observation year 2025. Accessed 2026-11-05.back
  11. 2IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  12. 1IEA (ed.), World Energy Investment 2026, launch presentation, Paris, 28 May 2026. International Energy Agency, Paris. Observation year 2026 (estimates, with 2025 data). Accessed 2026-11-03.back
  13. 35Commission Delegated Regulation (EU) 2024/1366 of 11 March 2024 supplementing Regulation (EU) 2019/943 by establishing a network code on sector-specific rules for cybersecurity aspects of cross-border electricity flows. Official Journal of the European Union, L series, 2024. Observation year 2024. Accessed 2026-11-05.back
  14. 22IEA (ed.), Electricity Grids and Secure Energy Transitions. International Energy Agency, Paris, October 2023. Observation year 2023. Accessed 2026-11-05.back
  15. 23IEA (ed.), World Energy Employment 2025 (shortages of skilled workers reported across the energy sector). International Energy Agency, Paris, 2025. Observation year 2024. Accessed 2026-11-05.back
  16. 43Davis, S.J. et al., Net-zero emissions energy systems, Science 360(6396), eaas9793, 2018. American Association for the Advancement of Science. Observation year 2018. Accessed 2026-11-05.back

Fuel supply shock under a hot, high-demand season

A conditional statement under stated assumptions, never a prediction.

2 min read0 figures0 tables2 notesNR-SECTOR-ENERGY-GLOBAL-2026-BASELINE

5.1Допущения

Scenario SCN-GS02-LNG-01: what is assumed, and what is held constant.

Базовый уровень
the 2026 reference state in this edition
Движущие факторы
a disruption to seaborne oil and LNG supply that coincides with a heat wave and high cooling demand in several importing regions
Analogues
2022 energy crisis; the 2026 Hormuz disruption4711
Interventions
none modelled: the specification describes the unmitigated case
Run state
narrative specification; quantified run scheduled for 2027

5.2The cascade, step by step

  1. 1

    TRD → ENE

    seaborne oil and LNG supply falls; spot prices rise

    2022 · 2026

  2. 2

    CLI → ENE

    heat raises cooling demand while hydro and thermal output are limited

    2022

  3. 3

    ENE → INF

    voltage and frequency control tighten; outage risk rises

    2025

  4. 4

    ENE → FOO

    fuel and fertiliser costs reach farms and food prices

    2022 · 2026

  5. 5

    ENE → HLT

    rationing and outages affect clinics, cooling and cold chains

    2025

  6. 6

    ENE → FIN

    import bills and subsidies strain public budgets

    2022

5.3The scenario as a table of steps

How the shock in scenario SCN-GS02-LNG-01 would travel through Global Energy’s coupled systems, step by step, under the assumptions the edition states.

ШагЧто происходитИсточник
01 Trade to energySeaborne oil and LNG supply falls; spot prices rise. Analogue or source: 2022 · 2026.Edition GS-02, scenario SCN-GS02-LNG-01, step 1
02 Climate to energyHeat raises cooling demand while hydro and thermal output are limited. Analogue or source: 2022.Edition GS-02, scenario SCN-GS02-LNG-01, step 2
03 Energy to infrastructureVoltage and frequency control tighten; outage risk rises. Analogue or source: 2025.Edition GS-02, scenario SCN-GS02-LNG-01, step 3
04 Energy to foodFuel and fertiliser costs reach farms and food prices. Analogue or source: 2022 · 2026.Edition GS-02, scenario SCN-GS02-LNG-01, step 4
05 Energy to healthRationing and outages affect clinics, cooling and cold chains. Analogue or source: 2025.Edition GS-02, scenario SCN-GS02-LNG-01, step 5
06 Energy to financeImport bills and subsidies strain public budgets. Analogue or source: 2022.Edition GS-02, scenario SCN-GS02-LNG-01, step 6

A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Global Energy 2026, scenario SCN-GS02-LNG-01 (2026); Global Energy 2026, references (NR-CIT-1) (2026).

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 47US Energy Information Administration (ed.), Short-Term Energy Outlook, September 2026 (Brent about USD 91 a barrel in the fourth quarter of 2026; Middle East oil flows assumed constrained through the fourth quarter of 2026). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
  2. 11IEA (ed.), Oil Market Report, June 2026 (17 June 2026, public version; May 2026 world oil output 13.6 mb/d below pre-conflict levels, Gulf exports 14.8 mb/d below February levels and exports via the Strait of Hormuz from known origins at 1.9 mb/d). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back

Readings from the other desks

The energy baseline is read through each steward’s lens, then once as a whole. Each lens is a projection of reviewed findings, not a separate argument. The other desks’ own editions of this subject are listed first, as cross-references, not copies.

15 min read0 figures8 tables43 notesNR-SECTOR-ENERGY-GLOBAL-2026-BASELINE

6.1The other desks’ editions of this subject

Federation: each desk writes its own edition for the subjects in its remit. Until a desk releases, its edition shows its frame and the reading this edition printed for it.

БюроВыпускСтатусИдентификатор
GCRI Systems EvidenceSystems Evidence: Energy 2026Drafted, in stewardship reviewNR-SECTOR-ENERGY-GLOBAL-2026-BASELINE-v1.0.0
GRF Public DeliberationOutside this desk’s remitNot in remit
GRA Capital ReadinessCapital Readiness: Energy 2026В подготовкеNR-GRA-GS-02-2026-BASELINE (reserved)
Standards ProgressStandards Progress: Energy 2026В подготовкеNR-NXS-GS-02-2026-BASELINE (reserved)
Academy CapabilityCapability: Energy 2026В подготовкеNR-RA-GS-02-2026-BASELINE (reserved)
Index MeasurementOutside this desk’s remitNot in remit

6.2Three lenses

One edition, read by each steward. The lens of this site comes first.

GCRI · KEY T

Technical Truth

The evidence supports reading energy as the coupling layer of the WEFH+B system. Demand and electrification are rising, supply is changing fastest at the margin, and security of supply is the sharpest pressure. Evidence is strongest for demand and generation, and weakest for grid constraints and energy-sector water use.

ENE-001 · ENE-003 · GOV-008 · SYS-012

GRF · KEY M

Public Meaning

For most people energy risk arrives as a power cut, a higher bill or a cooking fire. The baseline asks that public debate treat energy as shared infrastructure for health, food and water, and keep the 655 million without electricity in view alongside the security story.

HLT-007 · GOV-008 · ENE-001

GRA · KEY F

Capital Meaning

Readiness implications only. Investment is high, price volatility has risen and public finance for minerals is growing13. These show where finance-readiness evidence will matter. Nothing here is advice, a rating or an approval.

FIN-005 · MIN-010

NEXUS

Синтез

The energy system is well measured at the level of demand and generation and thinly measured at the level of equipment, constraints and water. The 2027 programme should bind regional grid evidence, test the fuel shock under heat, and map mineral chokepoints before they become delays.

SYS-012 · E-01 · E-04

6.3Standards, Academy and steward contributions

How the Nexus Standards drafts, the Risk Academy and the three stewards feed each quarterly edition for energy. The standards are a preparatory working draft (2026) and are cited as drafts, never as adopted standards.

Table 6.1The quarterly rhythm every edition follows
QuarterВыпускВопросГраница
Q1State and AgendaЧто важно в этом году и какова исходная позиция?observed baseline stays distinct from planned work
Q2Evidence and BuildWhat new evidence and capability exist?a configured capability is not a validated result
Q3Стресс-тест и готовностьWhat do scenarios and tests show?simulated loss or performance is not observed impact
Q4Annual Synthesis and RenewalWhat changed in the year, and what renews?release follows review, not event publicity deadlines
Table 6.2Who contributes what each quarter
Steward or bodyРольContribution route
GCRI CanadaLead Institution and Consortium Secretariat; publisher of record; technical truth (key T)science and practice communities · GCRI gateway
Глобальный форум по рискам (The Global Risks Forum, GRF)leadership, dialogue and the Universe programme; public meaning (key M)policy, Universe and national adoption · GRF gateway
Глобальный альянс по рискам (The Global Risks Alliance, GRA)finance, insurance and development readiness; capital meaning (key F)finance and insurance · GRA gateway
Указатель Nexus Standardspreparatory drafts on vocabulary, hazards, indicators and methodsStandards site · working groups HAZ, IND, MTH, FIN, AI
Академия рисковlearning pathways tied to the agenda questionsAcademy gateway · learning by review
Reports sector desksenergy chapter inputs: GCRI evidence, GRA readiness, NXS standards, RA capabilitysector editorial board

Standards drafts used in this edition

  • Risk vocabulary NRS-C1 (424 terms) for terms in the glossary
  • Hazard atlas NHS-1 1.1.0 (905 hazards in 120 families) for risk objects
  • Seven risk classes: global, catastrophic, existential, emerging, planetary, exponential, frontier-tech

Standards calendar to watch

  • Founding calls from 20 October 2026; working groups meet from 5 November 2026
  • Inaugural Global Standards Council session, 12 January 2027
  • Quarterly reviews in March, June, September and December, aligned with each edition

6.4GCRI reading: the model card

GCRI’s reading of this edition is its model card: what the national model is, what it computes and where it stops. It is printed in full in Annex A, with the methods it belongs to. Annex A, methodology

6.5Global Risks Forum reading: editorial essays

Four signed essays by the Reports editorial team set out the positions this edition takes. They are interpretation, labelled as such; the evidence they draw on is in the findings register.

Every energy shock this decade has been a water event, a food event and a health event at once. Treating energy as a utility market understates how it carries risk between systems. This edition asks where an energy shock goes next.

EDITORIAL ESSAY · 01

Energy is a coupling, not a sector

The 2026 disruption began in oil and LNG and reached aluminium, sulphur and helium within weeks. Security of supply now spans fuels, minerals and equipment. Measuring the whole chain is the first adaptation.

EDITORIAL ESSAY · 02

Security is wider than oil

Electricity grew more than twice as fast as energy demand. Risk moves with it: from fuel tankers to voltage control, equipment queues and data-centre clusters. The Iberian blackout is an early lesson, not a verdict on any technology.

EDITORIAL ESSAY · 03

Electrification moves the risk to the grid

The 655 million without electricity and the 2.0 billion cooking with polluting fuels sit outside most security debates. Closing the gaps is not separate from resilience; it is part of it.

EDITORIAL ESSAY · 04

Access is the unfinished half

6.6Global Risks Alliance reading: 2027 energy readiness pack

The registers that open the 2027 global cycle. At baseline each is initialised from this edition.

Table 6.32027 energy readiness pack
ПозицияРеестрState at baselineFirst 2027 entry
E1Energy risk state deltabaseline set by this editionchanges against the baseline
E2WEFH+B state deltafive global system readings setindicator updates and freshness
E3Agenda and Portfolio movementeight agenda items · 6 proposed objectsadmission decisions
E4Federation delivery registernational chapters in preparationnational chapters
E5Consortium capability registernational consortia formingfirst contributions
E6Leadership questions and challengesпока нетfirst challenge log
E7Foundry technical statenational environments preparedfirst federation cut
E8Publication candidatestwelve findings carried forwardPUBLISH · HOLD dispositions
E9Universe readinessone candidate missionadmission and role spine
E10Correction registerнетfirst federation-wide cycle

Publication dispositions

  • Опубликовать
  • Hold
  • Needs evidence
  • Ограниченный доступ
  • Заменено

6.7Nexus Standards reading: standards and regulatory watch

Instruments and published guidance that shape the systems in this edition, by status on the retrieval date. The edition assesses no one’s compliance.

  • IN FORCE
  • ПРИНЯТ
  • PUBLISHED · GUIDANCE
  • PUBLISHED · VOLUNTARY
Table 6.4Standards and regulatory watch
ИнструментОрганОхватСтатусАктуальность
Global Stocktake decision (tripling renewables, transition away from fossil fuels)20UNFCCCglobalADOPTED 2023targets
Акт о критически важном сырье33Европейский союзEUIN FORCEminerals
Electricity market design regulation34Европейский союзEUIN FORCEmarkets
Network code on electricity cybersecurity35Европейский союзEUIN FORCEcyber
ISO 50001 energy management36ISOglobalPUBLISHED · VOLUNTARYefficiency
IEC 62443 control-system security37IECglobalPUBLISHED · VOLUNTARYcyber
IEA collective action on emergency oil stocks12IEA members32 membersUSED MARCH 2026oil security

Changed since 2024

  • The IEA made its largest-ever coordinated oil stock release in March 202612
  • Chinese export controls on rare earths were expanded and then suspended until November 20263
  • The ENTSO-E final report on the Iberian blackout was published on 20 March 20269

To watch in 2027

  • Expiry or renewal of the suspension of expanded Chinese rare-earth controls in November 20263
  • Implementation of the EU network code on cybersecurity35
  • National plans to track the global tripling of renewables2028

6.8Risk Academy reading: literature and evidence review, science and assessments

The review behind this edition covers energy assessments, peer-reviewed science and the institutional reports that bind its findings. Systematic reviews for each agenda item begin in 2027.

Review protocol

Вопрос
What does the published evidence establish about the world’s energy system and its couplings?
Sources searched
agency flagships; regulator and operator reports; peer-reviewed energy-system literature; statistics
Период
releases available at evidence close, 30 September 2026
Отбор
sources that bind or contextualise a finding in this edition
Следующий шаг
systematic reviews for agenda items 01 to 05 in 2027
Table 6.5Peer-reviewed science and assessments
СправкаТипГодРольUsed for
Davis et al.43journal article2018IRGChard-to-decarbonise sectors
Creutzig et al.44journal article2018contextdemand-side options
Ueckerdt et al.45journal article2021contextelectro-fuels
Zscheischler et al.46journal article2018IRGCcompound events
IPCC AR6 Working Group III19assessment2022contextmitigation pathways
Net Zero Roadmap, 2023 update21assessment2023contextpathway benchmark
UNEP Emissions Gap Report31assessment2025contextemissions trajectory
Production Gap Report32assessment2023contextfossil supply plans
Table 6.6Institutional flagships
СправкаIssuerГодРольUsed for
Global Energy Review 20262IEA2026supportsdemand, emissions
World Energy Investment 20261IEA2026supportsinvestment
Global Critical Minerals Outlook 20263IEA2026supportsminerals
Energy and AI4IEA2025supportsdata centres
World Energy Outlook 20256IEA2025contextscenarios
Renewables 202539IEA2025contextcapacity outlook
Global Hydrogen Review 202540IEA2025contextlow-emissions fuels
Global Methane Tracker 202541IEA2025contextmethane from energy
Energy Technology Perspectives 202442IEA2024contextclean-tech supply chains
Table 6.7Statistics, access and markets
СправкаIssuerГодРольUsed for
SDG Extended Report, Goal 78UN DESA2026supportsaccess
Global Electricity Review 20267Ember2026supportsgeneration
Statistical Review 202615Energy Institute2026contextprimary energy
Renewable capacity statistics14IRENA2026contextcapacity
Short-Term Energy Outlook47EIA2026supportsprices and flows
Electricity Mid-Year Update 202616IEA2026contextdemand outlook
World Energy Transitions Outlook 202427IRENA2024contexttransition pathway
Table 6.8Minerals, grids, investment and standards
СправкаIssuerГодРольUsed for
Iberian blackout final report9ENTSO-E2026supportsотказа энергосети
Electricity Grids and Secure Energy Transitions22IEA2023contextgrid needs
Long-Term Reliability Assessment30NERC2025contextadequacy
Gas Market Report513IEA2025 to 2026supportsLNG
Oil Market Report11IEA2026supportsoil flows
Акт о критически важном сырье33Европейский союз2024contextminerals policy
US data centre energy report18Berkeley Lab2024contextload growth
Oil 202525 and Electricity 202526IEA2025contextoutlooks
Nuclear power estimates to 205029IAEA2025contextnuclear
Climate Resilience for Energy Security38IEA2022contextresilience

Where the evidence agrees

  • Solar is the largest single source of growth in supply27
  • Electricity demand grows faster than energy demand26
  • Refining of key minerals is concentrated3

Where it is unsettled

  • How fast data-centre demand grows after 20304
  • How long the 2026 fuel disruption lasts4711
  • How much generation and capacity were added in 2025: the IEA, Ember and IRENA series differ by method2714

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 1IEA (ed.), World Energy Investment 2026, launch presentation, Paris, 28 May 2026. International Energy Agency, Paris. Observation year 2026 (estimates, with 2025 data). Accessed 2026-11-03.back
  2. 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  3. 20UNFCCC (ed.), Decision 1/CMA.5, Outcome of the first global stocktake (adopted December 2023; paragraph 28 calls for tripling renewable energy capacity globally by 2030 and transitioning away from fossil fuels in energy systems), in FCCC/PA/CMA/2023/16/Add.1, 15 March 2024. UNFCCC, Bonn. Observation year 2023. Accessed 2026-11-05.back
  4. 33Regulation (EU) 2024/1252 of the European Parliament and of the Council of 11 April 2024 establishing a framework for ensuring a secure and sustainable supply of critical raw materials (Critical Raw Materials Act). Official Journal of the European Union, L series, 2024. Observation year 2024. Accessed 2026-11-05.back
  5. 34Regulation (EU) 2024/1747 of the European Parliament and of the Council of 13 June 2024 amending Regulations (EU) 2019/942 and (EU) 2019/943 as regards improving the Union’s electricity market design. Official Journal of the European Union, L series, 2024. Observation year 2024. Accessed 2026-11-05.back
  6. 35Commission Delegated Regulation (EU) 2024/1366 of 11 March 2024 supplementing Regulation (EU) 2019/943 by establishing a network code on sector-specific rules for cybersecurity aspects of cross-border electricity flows. Official Journal of the European Union, L series, 2024. Observation year 2024. Accessed 2026-11-05.back
  7. 36ISO (ed.), ISO 50001:2018, Energy management systems: Requirements with guidance for use, edition 2. International Organization for Standardization, Geneva, August 2018. Observation year 2018. Accessed 2026-11-05.back
  8. 37IEC (ed.), IEC 62443 series, Security for industrial automation and control systems, including IEC 62443-4-1:2018, Part 4-1: Secure product development lifecycle requirements. International Electrotechnical Commission, Geneva, 2018. Observation year 2018. Accessed 2026-11-05.back
  9. 12IEA (ed.), Oil Market Report, March 2026 (12 March 2026), including the box on the collective action agreed by the 32 IEA member countries on 11 March 2026 to make 400 million barrels of emergency oil stocks available, described as unprecedented; flows through the Strait of Hormuz of nearly 20 mb/d in 2025 and transits at less than 10% of pre-crisis levels. International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  10. 9ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
  11. 28IRENA (ed.), Tracking COP28 outcomes: Tripling renewable power capacity by 2030. International Renewable Energy Agency, Abu Dhabi, March 2024 (the IRENA page refused access; title, date and the 11 TW requirement by 2030 confirmed from the PV Tech report of 19 March 2024). Observation year 2024. Accessed 2026-11-05.back
  12. 43Davis, S.J. et al., Net-zero emissions energy systems, Science 360(6396), eaas9793, 2018. American Association for the Advancement of Science. Observation year 2018. Accessed 2026-11-05.back
  13. 44Creutzig, F. et al., Towards demand-side solutions for mitigating climate change, Nature Climate Change 8, 260 to 263, 2018. Springer Nature. Observation year 2018. Accessed 2026-11-05.back
  14. 45Ueckerdt, F. et al., Potential and risks of hydrogen-based e-fuels in climate change mitigation, Nature Climate Change 11, 384 to 393, 2021. Springer Nature. Observation year 2021. Accessed 2026-11-05.back
  15. 46Zscheischler, J. et al., Future climate risk from compound events, Nature Climate Change 8, 469 to 477, 2018. Springer Nature. Observation year 2018. Accessed 2026-11-05.back
  16. 19Shukla, P.R. et al. (eds.), Climate Change 2022: Mitigation of Climate Change, Contribution of Working Group III to the Sixth Assessment Report of the Intergovernmental Panel on Climate Change. IPCC, Geneva, 2022; Cambridge University Press, Cambridge, 2023. Observation year 2022. Accessed 2026-11-05.back
  17. 21IEA (ed.), Net Zero Roadmap: A Global Pathway to Keep the 1.5 °C Goal in Reach, 2023 Update. International Energy Agency, Paris, September 2023. Observation year 2023. Accessed 2026-11-05.back
  18. 31UNEP (ed.), Emissions Gap Report 2025: Off Target, Continued collective inaction puts global temperature goal at risk. United Nations Environment Programme, Nairobi, November 2025. Observation year 2025. Accessed 2026-11-05.back
  19. 32SEI, Climate Analytics, E3G, IISD and UNEP (eds.), The Production Gap Report 2023: Phasing down or phasing up? Top fossil fuel producers plan even more extraction despite climate promises. Stockholm Environment Institute, Stockholm, 8 November 2023. Observation year 2023. Accessed 2026-11-05.back
  20. 2IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  21. 4IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back
  22. 6IEA (ed.), World Energy Outlook 2025, launch presentation, Paris, 12 November 2025. International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  23. 39IEA (ed.), Renewables 2025: Analysis and forecast to 2030. International Energy Agency, Paris, October 2025. Observation year 2025. Accessed 2026-11-05.back
  24. 40IEA (ed.), Global Hydrogen Review 2025. International Energy Agency, Paris, September 2025. Observation year 2024. Accessed 2026-11-05.back
  25. 41IEA (ed.), Global Methane Tracker 2025 (revised version, May 2025). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05.back
  26. 42IEA (ed.), Energy Technology Perspectives 2024, executive summary. International Energy Agency, Paris, October 2024. Observation year 2024. Accessed 2026-11-05.back
  27. 8UN DESA Statistics Division (ed.), The Sustainable Development Goals Extended Report 2026, Goal 7 indicator storylines (inputs as of 30 April 2026). United Nations, New York. Observation year 2024. Accessed 2026-11-03.back
  28. 7Ember (ed.), Global Electricity Review 2026: 2025 in review (generation, demand, solar, coal). Ember, London. Observation year 2025. Accessed 2026-11-03.back
  29. 15DieselNet (ed.), Energy Institute releases 2026 Statistical Review of World Energy, news item of 2 July 2026, reporting the Energy Institute, Statistical Review of World Energy 2026, 75th edition (fossil fuels 86% of total energy supply in 2025, hydropower 2.7% of primary energy, electricity demand up 3%); the Review itself refused access. DieselNet, Brampton. Observation year 2025. Accessed 2026-11-05.back
  30. 14IRENA (ed.), Renewable Capacity Statistics 2026 (692 GW of renewable capacity added in 2025; 5,149 GW installed at the end of 2025). International Renewable Energy Agency, Abu Dhabi, 2026. Observation year 2025. Accessed 2026-11-05.back
  31. 47US Energy Information Administration (ed.), Short-Term Energy Outlook, September 2026 (Brent about USD 91 a barrel in the fourth quarter of 2026; Middle East oil flows assumed constrained through the fourth quarter of 2026). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
  32. 16IEA (ed.), Electricity Mid-Year Update 2026 (23 July 2026; global electricity demand forecast to grow 3.6% in 2026 and 3.8% in 2027, after 3% in 2025); no figure from it is used in a finding. International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  33. 27IRENA (ed.), World Energy Transitions Outlook 2024: 1.5°C Pathway. International Renewable Energy Agency, Abu Dhabi, November 2024. Observation year 2024. Accessed 2026-11-05.back
  34. 22IEA (ed.), Electricity Grids and Secure Energy Transitions. International Energy Agency, Paris, October 2023. Observation year 2023. Accessed 2026-11-05.back
  35. 30NERC (ed.), 2025 Long-Term Reliability Assessment (published January 2026; 13 of 23 assessment areas face resource adequacy challenges over the next ten years). North American Electric Reliability Corporation, Atlanta. Observation year 2025. Accessed 2026-11-05.back
  36. 5IEA (ed.), Gas 2025: Analysis and forecasts to 2030 (Gas Market Report, Q4-2025). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  37. 13IEA (ed.), Gas Market Report, Q2-2026 (April 2026; Qatar halted LNG production on 2 March 2026 and Qatari and UAE output, about 20% of global LNG supply, was isolated from the market). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  38. 11IEA (ed.), Oil Market Report, June 2026 (17 June 2026, public version; May 2026 world oil output 13.6 mb/d below pre-conflict levels, Gulf exports 14.8 mb/d below February levels and exports via the Strait of Hormuz from known origins at 1.9 mb/d). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  39. 18Shehabi, A., Smith, S.J., Hubbard, A. et al., 2024 United States Data Center Energy Usage Report, LBNL-2001637. Lawrence Berkeley National Laboratory, Berkeley, 19 December 2024; no figure is used. Observation year 2023. Accessed 2026-11-05.back
  40. 25IEA (ed.), Oil 2025: Analysis and forecast to 2030. International Energy Agency, Paris, June 2025. Observation year 2025. Accessed 2026-11-05.back
  41. 26IEA (ed.), Electricity 2025: Analysis and forecast to 2027. International Energy Agency, Paris, February 2025. Observation year 2024. Accessed 2026-11-05.back
  42. 29IAEA (ed.), Energy, Electricity and Nuclear Power Estimates for the Period up to 2050, Reference Data Series No. 1, 2025 edition. International Atomic Energy Agency, Vienna, September 2025. Observation year 2025. Accessed 2026-11-05.back
  43. 38IEA (ed.), Climate Resilience for Energy Security. International Energy Agency, Paris, November 2022. Observation year 2022. Accessed 2026-11-05.back

The 2027 agenda

Eight bounded questions open the 2027 energy agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 energy edition.

5 min read0 figures6 tables4 notesNR-SECTOR-ENERGY-GLOBAL-2026-BASELINE

7.1Questions for the operational series

  1. E-01

    How would a fuel supply shock that coincides with a hot season and grid stress travel through power, food and health at once?

    INI-GS02-FSH-01 · fuel shock under heat; first output: concurrency analysis for six regions.

  2. E-02

    Where do grid equipment and interconnection constraints limit the connection of new supply and load?

    INI-GS02-GRD-02 · grid constraints; first output: constraint register by region.

  3. E-03

    How much water do energy supply and data centres need by 2030, and where?

    INI-GS02-WEN-03 · water for energy and compute; first output: regional demand estimates.

  4. E-04

    Which critical minerals and refining steps are single points of failure for power equipment?

    INI-GS02-MIN-04 · mineral chokepoints; first output: dependence map.

  5. E-05

    Where do energy access gaps coincide with weak service quality, and what is the cost of closing them?

    INI-GS02-ACC-05 · access and service quality; first output: service-tier table.

  6. E-06

    Which shared grids and fuel routes lack operational contingency arrangements?

    To be admitted in 2027; first output: arrangement overlay.

  7. E-07

    How do heat waves change peak demand and supply together?

    To be admitted in 2027; first output: scoping note.

  8. E-08

    Which energy capabilities have been tested in real shortfalls, and which are only planned?

    Energy capability register; first output: rung evidence for 15 functions.

7.2Portfolio proposed for the Q1 2027 alignment

Five initiatives and one Universe mission candidate are proposed for the 2027 energy portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.

Table 7.1Objects proposed for the first operational quarter
IDОбъектВидВопросСтатус
INI-GS02-FSH-01Fuel shock under heatInitiativeE-01ПРЕДЛОЖЕН
INI-GS02-GRD-02Grid and interconnection constraintsInitiativeE-02ПРЕДЛОЖЕН
INI-GS02-WEN-03Water for energy and computeInitiativeE-03ПРЕДЛОЖЕН
INI-GS02-MIN-04Mineral chokepointsInitiativeE-04ПРЕДЛОЖЕН
INI-GS02-ACC-05Access and service qualityInitiativeE-05ПРЕДЛОЖЕН
MSN-GS02-2027-01Fuel shock under heat Universe missionМиссияE-01Кандидат

7.3The pathway

The energy edition reads national energy chapters, regional grid and fuel evidence and the global edition through one governed evidence graph. At baseline the federation is designed; the Canada and global energy chapters are drafted. This page states what exists today and what comes next.

  1. 01

    National energy chapters

    energy system of each national edition

    DRAFTED · further national baselines

  2. 02

    Grid and fuel evidence

    shared grids, pipelines and sea routes

    PLANNED · regional Baseline Editions

  3. 03

    Energy sector model

    the global energy system of systems

    v0 SPECIFIED · v1 with federation evidence

  4. 04

    Global and strategic links

    GLB · SR-02 Critical Infrastructure and Lifeline Systems · SR-04 Critical Minerals and Strategic Materials

    PLANNED · strategic baselines

  5. 05

    Вселенная

    annual proving environment

    CANDIDATE MISSION · mandate in 2027

  6. 06

    Global Energy Report

    this series

    BASELINE DRAFT · 2027 annual edition

  7. 07

    Evidence and correction

    one graph, many projections

    OPEN · first correction cycle in 2027

7.4Universe 2027: evidence pack for the energy candidate mission

  1. 01

    Мандат

  2. 02

    Core Build · 1 month

  3. 03

    Action · 1 week

  4. 04

    Evidence seal

  5. 05

    Portfolio correction

  6. 06

    Следующий мандат

Table 7.2Universe 2027: evidence pack for the energy candidate mission
ПозицияЗаписьСтатусСроки
F1Annual mandate recordPLANNEDafter the Q2 2027 alignment
F2Core Build recordPLANNEDone month before the exercise
F3Данные ученийPLANNEDduring the Action week
F4Decision packetsPLANNEDexercise state only
F5Proof receiptsPLANNEDscoped to each recorded check
F6After-action reportPLANNEDwithin one quarter
F7Upgrade docketPLANNEDrouted to the Portfolio
F8Portfolio renewalPLANNED2027 global annual edition
F9Public synthesisPLANNEDpublic-safe extracts only

Миссия

ID
MSN-GS02-2027-01 · Fuel shock under heat Universe mission
Role spine
Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
Receiving actors
to be identified with the mandate

7.5Handoffs and routing

Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.

Table 7.3Handoffs and routing
ВыводПередаётся вЦельКласс
ENE-001 · demandпубличная записьreference for the 2027 seriesPUBLIC
ENE-003 · electricityINI-GS02-GRD-02grid constraintsPUBLIC
AIC-006 · data centresINI-GS02-WEN-03water for energy and computePUBLIC
HLT-007 · accessINI-GS02-ACC-05access and service qualityPUBLIC
GOV-008 · fuel flowsINI-GS02-FSH-01 · key F reviewfuel shock under heatPUBLIC
MIN-010 · mineralsINI-GS02-MIN-04mineral chokepointsPUBLIC
INF-011 · grid failureregional consortiagrid constraint overlayPUBLIC
SYS-012 · compound pathwayMSN-GS02-2027-01Universe candidateCONSORTIUM
Table 7.4Routing rules by publication class
КлассWhere it goesWho can see it
PUBLICthe published edition and its evidence bundleanyone
CONSORTIUMgoverned rooms of the federationconsortium members under agreement
CONTROLLEDneed-to-know channelsnamed competent actors only

7.6Feeds and signal register

Table 7.5Feeds watched from 2027
FeedProducerLatencyFeeds into
Electricity data and the Global Electricity ReviewEmberежегодноENE-003
Oil and gas market reportsIEAmonthly and quarterlyGOV-008
Short-Term Energy OutlookUS Energy Information AdministrationежемесячноGOV-008
Transparency platform for the continental gridENTSO-EежечасноINF-011
Critical minerals outlookIEAежегодноMIN-010
SDG 7 tracking databaseWorld Bank, IEA, IRENA, UNSD, WHOежегодноHLT-007
Renewable capacity statisticsIRENAежегодноENE-002

Escalation routes

  • none · keep monitoring
  • research question
  • project
  • risk object
  • annual publication
  • signal report
Table 7.6Signals at baseline
IDSignalCorroborationСистемнаяМаршрут
SIG-GS02-001Oil flows through Hormuz fell from March 20264711CORROBORATEDENE · FINresearch question E-01
SIG-GS02-002Mineral export controls tripled in scope since 20233CORROBORATEDMIN · ENEinitiative E-04
SIG-GS02-003Data-centre load growth in clusters4PARTIALAIC · ENEresearch question E-03

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 47US Energy Information Administration (ed.), Short-Term Energy Outlook, September 2026 (Brent about USD 91 a barrel in the fourth quarter of 2026; Middle East oil flows assumed constrained through the fourth quarter of 2026). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
  2. 11IEA (ed.), Oil Market Report, June 2026 (17 June 2026, public version; May 2026 world oil output 13.6 mb/d below pre-conflict levels, Gulf exports 14.8 mb/d below February levels and exports via the Strait of Hormuz from known origins at 1.9 mb/d). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  3. 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  4. 4IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back

Systems in depth

One section per system: its state at evidence close, its exposures and what the operational series will watch.

7 min read0 figures5 tables13 notesNR-SECTOR-ENERGY-GLOBAL-2026-BASELINE

8.1Энергия и вода

Energy uses water and water uses energy. Hydropower and thermal cooling make power supply sensitive to drought and heat; pumping, treatment and desalination make water supply sensitive to power.

2025analogue

an early, strong monsoon cut coal power demand in India2

2.7%

hydropower share of primary energy, 202515

415TWh

data-centre electricity, 20244

Table 8.1State at baseline
КомпонентСтатусДоказательная базаСтатус
Hydropoweroutput follows river flows; strong hydro and an early monsoon cut fossil generation in India in 202572Сообщённые данные
Thermal coolingcurtailment risk in heat and low flows; volumes not consolidated here2Inferred
Water for computecooling demand rising; volumes not consolidated4Expert input
Energy for waterpumping, treatment and desalination add load6Inferred

Взаимосвязи

  • WAT → ENE hydro and cooling
  • ENE → WAT pumping and desalination
  • AIC → WAT data-centre cooling

Evidence to bind in 2027

  • energy-sector water use by region
  • hydro exposure to multi-year drought

Related editions

  • GLB Global Systems
  • GS-01 Water
  • GS-03 Food and Agrifood Systems
  • GS-04 Health and One Health
  • GS-11 Biodiversity and Ecosystems
  • SR-02 Critical Infrastructure and Lifeline Systems

8.2Energy and food

Food depends on energy for fertiliser, irrigation, processing and cold chains. The 2026 Hormuz disruption showed that the link runs through sulphur and acid as well as fuel.

≈25%

of global sulphur supplied from the Middle East3

50%

of seaborne sulphur trade passes through Hormuz3

2026analogue

China curbed sulphuric acid exports in May 20263

Table 8.2State at baseline
КомпонентСтатусДоказательная базаСтатус
Fertiliser inputssulphur and sulphuric acid supply disrupted; Chinese acid export curbs from May 20263Сообщённые данные
Fuel costshigher oil and gas prices pass through to farms47Inferred
Cold chainsdepend on reliable power; no consolidated series here8Expert input
Bioenergycompetes with food for land6Inferred

Взаимосвязи

  • ENE → FOO fuel and fertiliser
  • MIN → FOO acid and sulphur
  • TRD → ENE → FOO price transmission

Evidence to bind in 2027

  • fertiliser price pass-through by region
  • cold-chain power reliability

Related editions

  • GLB Global Systems
  • GS-01 Water
  • GS-03 Food and Agrifood Systems
  • GS-04 Health and One Health
  • GS-11 Biodiversity and Ecosystems
  • SR-02 Critical Infrastructure and Lifeline Systems

8.3Energy and health

Energy access shapes health: clean cooking, clinic power, cooling and refrigeration. Outages and heat make the link visible.

655million

without electricity, 20248

2.0billion

cooking with polluting fuels, 20248

449million

served by off-grid solar tiers 1 and 28

Table 8.3State at baseline
КомпонентСтатусДоказательная базаСтатус
Electricity access92% of people; 86% of the unserved are in Sub-Saharan Africa8Сообщённые данные
Clean cooking75% have access; 1.8 billion projected to lack it in 20308Сообщённые данные
Cooling demandlower cooling demand cut growth in 2025 in India and Southeast Asia2Сообщённые данные
Clinic powernot consolidated here8Expert input

Взаимосвязи

  • ENE → HLT access and cooking
  • CLI → ENE → HLT heat and outage
  • AIC → ENE → HLT local grid load

Evidence to bind in 2027

  • power reliability in health facilities
  • heat-wave effects on supply

Related editions

  • GLB Global Systems
  • GS-01 Water
  • GS-03 Food and Agrifood Systems
  • GS-04 Health and One Health
  • GS-11 Biodiversity and Ecosystems
  • SR-02 Critical Infrastructure and Lifeline Systems

8.4Energy and nature

Energy transitions need minerals, land and water, and energy emissions still press on climate. Nature is the unmeasured side of the energy ledger in this edition.

>38Gt

energy-related CO2, 20252

3Gt

CO2 avoided each year by clean technology since 20192

35EJ

fossil demand avoided in 2025 by clean technology2

Table 8.4State at baseline
КомпонентСтатусДоказательная базаСтатус
Emissionsrecord above 38 Gt in 2025, up about 0.4%2Сообщённые данные
Miningcopper, lithium, cobalt and rare-earth supply growing; effects on land and water not consolidated3Expert input
Hydropoweralters river flows; not consolidated here15Inferred
Mitigation pathwaysassessed in the IPCC literature19Inferred

Взаимосвязи

  • ENE → BIO mining and land
  • ENE → CLI emissions
  • MIN → BIO extraction

Evidence to bind in 2027

  • ecosystem effects of mineral extraction
  • land use of energy supply

Related editions

  • GLB Global Systems
  • GS-01 Water
  • GS-03 Food and Agrifood Systems
  • GS-04 Health and One Health
  • GS-11 Biodiversity and Ecosystems
  • SR-02 Critical Infrastructure and Lifeline Systems

8.5Energy security, grids and extremes

Security of supply now spans fuels, minerals and grids. Chokepoints, concentrated refining and voltage control failures are the three channels the 2025 and 2026 evidence shows.

<10%

of pre-conflict Hormuz export volume at the low point, March 202612

72%

average top-refiner share, key minerals, 20253

20March 2026

ENTSO-E final report on the Iberian blackout9

Table 8.5State at baseline
КомпонентСтатусДоказательная базаСтатус
Fuel chokepointsHormuz flows cut from March 2026; EIA assumes constraint through the fourth quarter4711Сообщённые данные
LNGRas Laffan offline since early March 202613Сообщённые данные
Минералыrefining concentration rising; export controls tripled in scope3Сообщённые данные
Grid stabilityblackout from interacting factors9Сообщённые данные

Взаимосвязи

  • TRD → ENE chokepoints
  • MIN → ENE equipment
  • INF → ENE grid stability

Evidence to bind in 2027

  • fuel-market position after evidence close
  • grid equipment lead times

Related editions

  • GLB Global Systems
  • GS-01 Water
  • GS-03 Food and Agrifood Systems
  • GS-04 Health and One Health
  • GS-11 Biodiversity and Ecosystems
  • SR-02 Critical Infrastructure and Lifeline Systems

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 2IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  2. 15DieselNet (ed.), Energy Institute releases 2026 Statistical Review of World Energy, news item of 2 July 2026, reporting the Energy Institute, Statistical Review of World Energy 2026, 75th edition (fossil fuels 86% of total energy supply in 2025, hydropower 2.7% of primary energy, electricity demand up 3%); the Review itself refused access. DieselNet, Brampton. Observation year 2025. Accessed 2026-11-05.back
  3. 4IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back
  4. 7Ember (ed.), Global Electricity Review 2026: 2025 in review (generation, demand, solar, coal). Ember, London. Observation year 2025. Accessed 2026-11-03.back
  5. 6IEA (ed.), World Energy Outlook 2025, launch presentation, Paris, 12 November 2025. International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  6. 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  7. 47US Energy Information Administration (ed.), Short-Term Energy Outlook, September 2026 (Brent about USD 91 a barrel in the fourth quarter of 2026; Middle East oil flows assumed constrained through the fourth quarter of 2026). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
  8. 8UN DESA Statistics Division (ed.), The Sustainable Development Goals Extended Report 2026, Goal 7 indicator storylines (inputs as of 30 April 2026). United Nations, New York. Observation year 2024. Accessed 2026-11-03.back
  9. 19Shukla, P.R. et al. (eds.), Climate Change 2022: Mitigation of Climate Change, Contribution of Working Group III to the Sixth Assessment Report of the Intergovernmental Panel on Climate Change. IPCC, Geneva, 2022; Cambridge University Press, Cambridge, 2023. Observation year 2022. Accessed 2026-11-05.back
  10. 12IEA (ed.), Oil Market Report, March 2026 (12 March 2026), including the box on the collective action agreed by the 32 IEA member countries on 11 March 2026 to make 400 million barrels of emergency oil stocks available, described as unprecedented; flows through the Strait of Hormuz of nearly 20 mb/d in 2025 and transits at less than 10% of pre-crisis levels. International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  11. 9ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
  12. 11IEA (ed.), Oil Market Report, June 2026 (17 June 2026, public version; May 2026 world oil output 13.6 mb/d below pre-conflict levels, Gulf exports 14.8 mb/d below February levels and exports via the Strait of Hormuz from known origins at 1.9 mb/d). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  13. 13IEA (ed.), Gas Market Report, Q2-2026 (April 2026; Qatar halted LNG production on 2 March 2026 and Qatari and UAE output, about 20% of global LNG supply, was isolated from the market). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back

Методология

How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.

12 min read0 figures13 tables14 notesNR-SECTOR-ENERGY-GLOBAL-2026-BASELINE

A.1Методы

The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.

Table A.1Methods
Нет.DerivationCalculationРезультат
(1)Electricity growth against energy growth, 2025≈3 ÷ 1.3≈2.3 times
(2)Share of 2025 growth in energy demand from solar (lower bound)reported as more than 25%more than 25%
(3)Renewables lead over coal in generation, 202510,730 − 10,476 TWh254 TWh
(4)Growth in data-centre electricity, 2024 to 2030, base case945 ÷ 415≈2.3 times
Table A.2Coupling strength scale (matrix and model card)
StrengthОпределение
STRONGa disruption in the source system has historically changed the target system’s service or output within one season, in more than one region
MODERATEan effect is documented but buffered or slower
WEAKan effect is plausible but not documented at global scale
Table A.3Status grammar
МеткаПравило
Сообщённые данныеvalue as issued by its source, with year
Inferredreasoned from cited evidence; never a measurement
ОценкаNexus analytical value with stated method
Сценарийconditional on stated assumptions
Expert inputstructured editorial judgement awaiting evidence

A.2Model card, Energy Sector Model v0

Model ID
MDL-GS02-ENERGY · v0.1
Цель
represent the global energy system and its couplings to water, food, health and biodiversity
Семейство
graph-based system of systems
Исходные данные
the cited sources of this edition; no proprietary data
Метод
expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
Валидация
none yet, first validation against federation evidence in 2027
Неопределённость
qualitative; strengths are hypotheses, not measurements
Domain of validity
global scale; not for asset-, site- or country-level use
Воспроизводимость
strength table and sources published in this edition
20couplings

typed in v0

4strong

documented within one season

7moderate

documented, buffered

9weak

plausible, undocumented

A.3The baseline evidence cut

Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.

Cut ID
DC-SECTOR-ENERGY-GLOBAL-2026-B0
Тип
baseline documentary cut
Resolution policy
pinned · as of 30 September 2026
Sources pinned
47 cited sources, each at the edition and access date in the references
Model runs
none at baseline, analytical values are stated with their method
Digest
computed at freeze and recorded in the publication record
Supersedes
nothing, first cut of the series
Superseded by
the 2027 energy annual cut

Происхождение

  1. 01

    source edition

  2. 02

    pinned citation

  3. 03

    finding

  4. 04

    page

  5. 05

    publication record

Table A.4From the baseline cut to the federation cut
ЭлементBaseline 20262027 global annual
Источникиcited global publications, pinned by editionnational, regional and sector cuts through one graph
Analysisstated methods and editorial estimatestyped analysis specifications
МоделиEnergy Sector Model v0 specificationmodel runs with receipts
Выводыtwelve baseline findingsfindings re-bound to federation evidence
Рецензированиеfive passes scheduledfive passes on the exact digest

A.4Evidence age and coverage

A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.

Table A.5Evidence age and coverage
ИндикаторНаблюдаемые данныеВыпущеноПериодичностьNext release
Energy demand and emissions2025May 2026 revisedежегодноnext Global Energy Review
Electricity generation shares20252026ежегодноnext Electricity Review
Investment estimate2026eмай 2026ежегодноnext investment report
Access to electricity and cooking20242026ежегодноnext SDG 7 report
Data-centre electricity20242025one-offnext IEA update
Hormuz oil flows2026Sep 2026ежемесячноежемесячно
LNG capacity and outage2025 to 2026Q4 2025 and Q2 2026ежеквартальноnext Gas Market Report
Critical minerals refining2025revised Jul 2026ежегодно2027
Primary energy2025Jun 2026ежегодно2027
Iberian blackout causes2025Mar 2026one-offfollow-up reports
Table A.6Coverage by system at baseline
СистемнаяОхватThinnest dimension
Demand and supplyGOODregional drivers of growth
ЭлектроэнергияGOODgrid-level constraints
Fuel marketsPARTIALposition after evidence close
МинералыGOODequipment-level dependence
ДоступGOODservice quality and affordability
ИнвестицииPARTIALsplit by technology and region
Вода для энергетикиTHINvolumes by region and technology
УстойчивостьPARTIALtested capabilities beyond oil stocks
Table A.7Designed empty states: what is not bound, what would fill it and why
ОбластьSource that would fill itBlocker
Fuel-market position on 1 November 2026IEA Oil Market Report for October and November 202611; EIA Short-Term Energy Outlook of Novemberreleases after the evidence close and not retrieved; the EIA September outlook47 is the baseline source; the October outlook10 is post-close, context only
Hormuz flow volumes before and during the conflict, from a primary documentIEA Oil Market Reports1112the March and June 2026 public reports were opened (pre-conflict flows of nearly 20 mb/d; transits below 10% of pre-crisis levels in March); the September report was not retrievable, so later monthly volumes are not bound
Clean and fossil split of the 2026 investment estimateIEA World Energy Investment 2026 full report17the full report was opened after the first review: about USD 2.2 trillion to clean energy and USD 1.2 trillion to fossil fuels in 2026; the split is not yet carried into a finding
Capacity added in 2025, on one basisIEA, IRENA and Ember series2147the series use different methods; not reconciled in this edition
Transformer, cable and interconnection-queue constraintsIEA grids work22; national operatorsthe 2023 grids report was opened for context only; no current constraint figures were retrieved
Energy-sector water use by regionIEA and national statistics officesno consolidated global series found at evidence close
Heat-wave effects on power systems in 2026operator reports; weather servicesnot retrieved
Cyber and physical incidents on energy infrastructureoperators and national authoritiesincident data are not published on a common basis
Winter gas storage at the start of the heating seasonGas Infrastructure Europe; operatorsnot retrieved
Energy support for poor households, by countrynational ministries; World Banknot consolidated; capability rung stays LISTED
Energy employment and skills gapIEA World Energy Employment 202523report opened; skilled-worker shortages are reported qualitatively; no figure used
Data-centre electricity by country after 2024IEA, national regulators, operatorslater series use a different baseline; not mixed with the 415 TWh figure
Capability rungs beyond emergency stocksoperators, regulators, ministriesnot reviewed

A.5Evidence cards, two anchor sources

Issued by the International Energy Agency (revised May 2026) from energy balances, market data and technology tracking. Annual. Role: binds ENE-001, ENE-002 and CLI-004.

EVD-GS02-001

IEA Global Energy Review 20262

Compiled by UN DESA from custodian storylines as of 30 April 2026. Annual. Role: binds HLT-007 and the access tiles. Figures differ slightly from the main report text.

EVD-GS02-002

SDG 7 Extended Report 20268

Table A.8Quality dimensions at baseline
DimensionEVD-GS02-001EVD-GS02-002
Completenessall fuels and technologies; modelled where national data are missingcountry coverage uneven; cooking estimate is a range
Timelinessabout 5 months after the yearabout 16 months after the year
Revisionrevised version issued May 2026storylines updated up to the report date
Method transparencymethodology publishedindicator metadata published
External validationcompared with national statisticscustodian review

Evidence cards to follow in 2027

  • Ember7: generation shares by country and sector
  • ENTSO-E9: data tables behind the final report
  • IEA critical minerals3: country shares by mineral
  • IEA Gas Market Report13: LNG outage duration

A.6Publication acceptance record

Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.

Table A.9Publication acceptance record
ГруппаНаправлениеЭлементыПролётN/AОжидается
D1Identity and scope8800
D2Source and data12912
D3Analysis and models12381
D4Findings and claims9801
D5Figures, tables, maps10622
D6Editorial and citations10802
D7Review and approval130013
D8Artefact and design12705
D9Registry and release9009

Рубеж публикации

Conditions met
14 of 23 at evidence close
Blocking problems
none recorded
Open conditions
reviews, approval of the exact digest, deposit, registry pointer

Not applicable at baseline

Model runs
first runs in Q1 2027
Карты
plates in Q2 2027
Waivers
нет

A.7Status words

Table A.10The status every value carries
СтатусЧто это значит
Наблюдаемые данныеMeasured directly and published by the source.
Сообщённые данныеPublished statistics of an official or institutional source.
ОбъявленоStated by the body concerned; not independently measured.
ОценкаA Nexus estimate from cited evidence, with its method in Annex A.
СмоделированоProduced by a stated model from cited inputs.
InferredReasoned from cited evidence; not measured.
ПрогнозA projection by the cited source.
SimulatedA simulation result under stated assumptions.
СценарийA conditional statement under stated assumptions; never a prediction.
Expert inputExpert judgement, recorded with its basis.
КандидатProposed for a later edition; not yet evidence.
Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject.

A.8How the edition is made, released and corrected

Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.

ШагЧто происходитИсточник
01 Evidence arrives from the pillarsFoundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s.
02 The cut is sealedOn the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on.
03 The edition is assembledThe edition is drafted from its template and content pack. Agents may draft; they never publish and never decide.
04 The keys turnAt the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward.
05 The gate opensA named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit.
06 Signed and depositedThe PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI.
07 Published on its desk’s siteOnly then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part.
08 Corrections go to StandardsMethod and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut.

A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).

Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.

A.9Glossary and abbreviations

Table A.11Series terms
ТерминЗначение
Baseline Editionthe inaugural annual edition that fixes the reference state for the series
WEFH+Benergy, energy, food, health and biodiversity, the national nexus core
Взаимосвязиa typed dependency through which one system transmits to another
Разрыв в защитеthe share of losses not covered by insurance
Capability ladderLISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED
EQLevidence-quality level, 1–5
Срез доказательствa frozen resolution of exact sources and versions
NNC · NLC · NWGNational Nexus Consortium · National Leadership Council · National Working Groups
Table A.12Abbreviations used in this edition
AbbreviationExpansion
bcmbillion cubic metres
EJexajoule
ENTSO-EEuropean Network of Transmission System Operators for Electricity
GWgigawatt
IEAМеждународное энергетическое агентство
IRENAInternational Renewable Energy Agency
LNGliquefied natural gas
Mtpamillion tonnes per annum
SDG 7Sustainable Development Goal 7: affordable and clean energy
STEOShort-Term Energy Outlook
TWhterawatt-hour
TFECtotal final energy consumption

A.10Technical annex

Table A.13Technical annex
ПозицияAnnexСодержаниеСтатус
A.1Indicator definitionsthe global indicator set, with units and sourcesIN THIS EDITION
A.2Coupling strengthsthe twenty-cell matrix and its rationaleIN THIS EDITION
A.3Scenario specificationSCN-GS02-LNG-01 assumptions and signpostsIN THIS EDITION
A.4Capability placementsrung evidence for fifteen functionsIN THIS EDITION
A.5Model diagnosticsfirst runs and validation2027
A.6Sensitivity analysesinfluence of coupling strengths2027
A.7Grid and route notescards for the major shared grids and fuel routesWITH REGIONAL EDITIONS
A.8Review statementspass-by-pass review recordAT RELEASE

A.1 · indicator definition: access to electricity

Construct
share and number of people living in households with access to electricity
Единица
share and number of people
Метод
custodian indicator based on national surveys and models
Источник
SDG 7 Extended Report 20268
Неопределённость
modelled where survey data are missing
Известные ограничения
binary measure; does not capture reliability, capacity or affordability

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 11IEA (ed.), Oil Market Report, June 2026 (17 June 2026, public version; May 2026 world oil output 13.6 mb/d below pre-conflict levels, Gulf exports 14.8 mb/d below February levels and exports via the Strait of Hormuz from known origins at 1.9 mb/d). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  2. 47US Energy Information Administration (ed.), Short-Term Energy Outlook, September 2026 (Brent about USD 91 a barrel in the fourth quarter of 2026; Middle East oil flows assumed constrained through the fourth quarter of 2026). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
  3. 10POST-CLOSE, context only: US Energy Information Administration (ed.), Short-Term Energy Outlook, October 2026 (released 6 October 2026, after the 30 September evidence close; post-close, context only, supports no baseline claim). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
  4. 12IEA (ed.), Oil Market Report, March 2026 (12 March 2026), including the box on the collective action agreed by the 32 IEA member countries on 11 March 2026 to make 400 million barrels of emergency oil stocks available, described as unprecedented; flows through the Strait of Hormuz of nearly 20 mb/d in 2025 and transits at less than 10% of pre-crisis levels. International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  5. 17IEA (ed.), World Energy Investment 2026, full report (revised version, June 2026; total energy investment USD 3.4 trillion in 2026, about USD 2.2 trillion to clean energy and USD 1.2 trillion to oil, gas and coal, electricity supply and infrastructure USD 1.6 trillion). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
  6. 2IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  7. 14IRENA (ed.), Renewable Capacity Statistics 2026 (692 GW of renewable capacity added in 2025; 5,149 GW installed at the end of 2025). International Renewable Energy Agency, Abu Dhabi, 2026. Observation year 2025. Accessed 2026-11-05.back
  8. 7Ember (ed.), Global Electricity Review 2026: 2025 in review (generation, demand, solar, coal). Ember, London. Observation year 2025. Accessed 2026-11-03.back
  9. 22IEA (ed.), Electricity Grids and Secure Energy Transitions. International Energy Agency, Paris, October 2023. Observation year 2023. Accessed 2026-11-05.back
  10. 23IEA (ed.), World Energy Employment 2025 (shortages of skilled workers reported across the energy sector). International Energy Agency, Paris, 2025. Observation year 2024. Accessed 2026-11-05.back
  11. 8UN DESA Statistics Division (ed.), The Sustainable Development Goals Extended Report 2026, Goal 7 indicator storylines (inputs as of 30 April 2026). United Nations, New York. Observation year 2024. Accessed 2026-11-03.back
  12. 9ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
  13. 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  14. 13IEA (ed.), Gas Market Report, Q2-2026 (April 2026; Qatar halted LNG production on 2 March 2026 and Qatari and UAE output, about 20% of global LNG supply, was isolated from the market). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back

Data appendix

The indicator set with its sources, the source registers, the licences of every kind of material and the formats of the edition.

8 min read0 figures8 tables12 notesNR-SECTOR-ENERGY-GLOBAL-2026-BASELINE

B.1The indicator set

Table B.1Global baseline indicator set
ИндикаторЗначениеЕдиницаГодСтатусИсточник
Growth in global energy demand1.3%2025Сообщённые данные2
Growth in electricity demand≈3%2025Сообщённые данные2
Growth in electricity demand (Ember)2.8%2025Сообщённые данные7
Solar generation2,778TWh2025Сообщённые данные7
Renewables share of generation33.8%2025Сообщённые данные7
Coal share of generation33.0%2025Сообщённые данные7
Fossil generation change−38TWh2025Сообщённые данные7
Renewable capacity added (IEA)800GW2025Сообщённые данные2
Battery storage added≈110GW2025Сообщённые данные2
Energy-related CO2>38Gt2025Сообщённые данные2
Global energy investment3.4USD trillion2026eСообщённые данные1
Electricity supply and infrastructure investment1.6USD trillion2026eСообщённые данные1
Data-centre electricity415TWh2024Сообщённые данные4
Data-centre electricity, base case945TWh2030Сценарий4
People without electricity655million2024Сообщённые данные8
People cooking with polluting fuels2.0billion2024Сообщённые данные8
Top refiner share, key minerals excluding rare earths72%2025Сообщённые данные3
Brent, fourth-quarter 2026 (forecast)91USD a barrel2026Сценарий47

B.2Global source register

The governed source set behind this edition. Each source keeps its authority, coverage, cadence and role; categories describe origin, not truth.

Domains bound by the register

  • ENE
  • CLI
  • FIN
  • HLT
  • MIN
  • INF
  • AIC
  • TRD
  • WAT
  • FOO
Table B.3Global source register
ИсточникКатегорияОхватPeriodПериодичностьРоль
IEA Global Energy Review 20262intergovernmental agencyglobal2025ежегодноdemand, emissions
IEA World Energy Investment 20261intergovernmental agencyglobal2026eежегодноinvestment
IEA Critical Minerals Outlook 20263intergovernmental agencyglobal2025ежегодноminerals
IEA Energy and AI4intergovernmental agencyglobal2024one-offdata centres
IEA Gas Market Report5intergovernmental agencyglobal2025ежеквартальноgas, LNG
Ember Global Electricity Review7think tank, open dataglobal2025ежегодноgeneration
SDG 7 Extended Report8Агентства ООНglobal2024ежегодноaccess
ENTSO-E blackout report9operators’ associationContinental Europe2025one-offотказа энергосети
EIA Short-Term Energy Outlook47national statistics agencyUS and global2026ежемесячноprices, flows
EIA Short-Term Energy Outlook, October 202610national statistics agencyUS and global2026ежемесячноpost-close, context only
IRENA capacity statistics14intergovernmental agencyglobal2025ежегодноcapacity

B.3Regional reading: energy across ten clusters

Map plates follow with the regional Baseline Editions, when boundary sources and public-safe resolutions are bound. This page gives the regional reading in table form and ranks no region.

Table B.4Regional reading: energy across ten clusters
РегионPrincipal hazardsSystems most exposedBaseline evidence
Северная Америкаdata-centre load; winter cold; gas-to-coal switchingpower, gas, industryUS energy demand and coal use2
Южная Америкаhydropower dependence in dry yearspower, citiesregional statistics (not bound)
Европаgas import dependence; grid stabilitypower, heating, industryblackout report9; solar and wind 30% of EU generation2
Eurasiaexport flows and sanctionsgas, oilIEA gas report5
Ближний Восток и Северная АфрикаHormuz and LNG exposureoil, gas, aluminium, sulphurminerals outlook3; EIA47
Африкаaccess gaps; clean cookinghouseholds, healthSDG 78
Южная Азияimport dependence; monsoon and heatpower, fertiliserIEA Global Energy Review2
Восточная АзияLNG and oil import dependence; clean-tech supplypower, industryкритически важных минералов3
ASEANrising demand; LNG importspower, citiesIEA gas report5
Oceania-Pacificsmall island fuel imports; export mineralspower, portsregional statistics (not bound)

B.4Grid card: Continental Europe synchronous area

  • grid
  • synchronous
  • interconnected
  • cross-border
Systems in view
power, heating, industry, cities
Defining events
blackout in Spain and Portugal on 28 April 20259
Взаимосвязи
ENE → HLT outages; ENE → INF voltage; ENE → FIN prices
Capability evidence
restoration and a published expert final report9
Пробелы
cross-border flow detail; reactive power coverage
Пункты повестки
E-01 · E-02

The final report names gaps in voltage and reactive power control and differences in practice across areas as interacting factors [9].

GRID

Voltage control

A synchronous grid shares its stability across borders, so a local failure can propagate.

SECURITY

Взаимозависимость

The report is an expert analysis of causes and recommendations, not an attribution of liability [9].

LEARNING

Public final report

B.5How countries appear in the energy edition

Countries enter the energy edition through the energy chapters of their own national editions, on one card grammar. They are read against peer distributions and thresholds, never ranked.

Table B.5How countries appear in the energy edition
Card fieldЧто он показываетИсточник
WEFH+B stateeach core system against peer distribution bandsnational edition
Взаимосвязиthe national dependency matrixnational edition
Risk objectsthe national risk portfolionational edition
Capability rungsthe national capability laddernational edition
Evidence ageoldest and newest source datesnational source register

Editions in the 2026 Baseline programme

26национальный

countries and unions

10regional

clusters

16global

flagship and sector

14strategic

системы отчёты

20frontier

technology reports

How to read a country card

  • Each system is shown against the distribution of its peers, with thresholds where they exist
  • Couplings and risk objects come from the country’s own national edition
  • Capability rungs record evidence, not a judgement of institutions
  • Evidence age is printed, so older national data are visible as such
Table B.6National Baseline Editions in the 2026 programme
ВолнаCountries and unionsСтатус
W0КанадаISSUED
W1United States, United Kingdom, France, Germany, Italy, Japan, European Union, SwitzerlandPLANNED
W2Mexico, Brazil, Argentina, Türkiye, Russian Federation, Saudi Arabia, United Arab Emirates, South Africa, Senegal, Kenya, African Union, India, China, Republic of Korea, Indonesia, Singapore, AustraliaPLANNED

B.6Лицензии

Table B.7Licences of each kind of material
МатериалЛицензия
TextCC BY 4.0
Данныеon the licence of each source; Nexus tables CC BY 4.0
ЦифрыNexus figures CC BY 4.0; third-party as credited
Картыboundary source and licence printed on each plate
МетаданныеCC0 1.0, as Zenodo publishes it
Third-party data, figures and textThe source’s own licence, credited where it is used; never relicensed
Nexus-authored text, tables and figures: CC BY 4.0 (SPDX CC-BY-4.0). Map plates print their boundary source and licence.

B.7Formats and provenance

Table B.8This edition in every format
ФорматВидСтатусЧто это такоеИдентификатор
Web editionHTMLНа этом сайтеDraft in stewardship review; every value resolves to its source.NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE-v1.0.0
Print editionPDFAt releaseA4 portrait · screen, print and archival PDF, signed with the web edition at release.NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE-v1.0.0
Indicator dataCSV · JSONНа этом сайте18 indicators with unit, year, status and source; the machine-readable copy ships with the evidence bundle at release.NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE data release v1
ЦифрыSVG · PNGНа этом сайте4 on the web edition: headline figure, figure 1.3, coupling instrument, capability ladder.FIG-SECTOR-ENERGY-GLOBAL-2026-BASELINE-*
SlidesPDFНе зафиксированоNo slide deck is recorded for this edition.
Аналитическая справкаHTML · PDFНе зафиксированоNo evidence brief is recorded for this edition.
Dataset with DOIDataCiteAt releaseConcept and version DOI are minted at deposit; none is recorded yet.

Происхождение

Edition pack
The edition’s content pack (JSON), from which the print and web editions are built
Срез доказательств
DC-SECTOR-ENERGY-GLOBAL-2026-B0, closed 30 September 2026
Воспроизводимость
sourced values cited; analytical values reproducible from stated parameters
Self-check
14 of 23 at evidence close; a fail on any item blocks release
Рецензирование
five passes scheduled before release (in Annex C)
Официальный издатель
GCRI for the Nexus Consortium
Исправления
Registry correction pathway; upheld corrections are published as notices with a new version

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 2IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  2. 7Ember (ed.), Global Electricity Review 2026: 2025 in review (generation, demand, solar, coal). Ember, London. Observation year 2025. Accessed 2026-11-03.back
  3. 1IEA (ed.), World Energy Investment 2026, launch presentation, Paris, 28 May 2026. International Energy Agency, Paris. Observation year 2026 (estimates, with 2025 data). Accessed 2026-11-03.back
  4. 4IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back
  5. 8UN DESA Statistics Division (ed.), The Sustainable Development Goals Extended Report 2026, Goal 7 indicator storylines (inputs as of 30 April 2026). United Nations, New York. Observation year 2024. Accessed 2026-11-03.back
  6. 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  7. 47US Energy Information Administration (ed.), Short-Term Energy Outlook, September 2026 (Brent about USD 91 a barrel in the fourth quarter of 2026; Middle East oil flows assumed constrained through the fourth quarter of 2026). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
  8. 15DieselNet (ed.), Energy Institute releases 2026 Statistical Review of World Energy, news item of 2 July 2026, reporting the Energy Institute, Statistical Review of World Energy 2026, 75th edition (fossil fuels 86% of total energy supply in 2025, hydropower 2.7% of primary energy, electricity demand up 3%); the Review itself refused access. DieselNet, Brampton. Observation year 2025. Accessed 2026-11-05.back
  9. 5IEA (ed.), Gas 2025: Analysis and forecasts to 2030 (Gas Market Report, Q4-2025). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  10. 9ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03.back
  11. 10POST-CLOSE, context only: US Energy Information Administration (ed.), Short-Term Energy Outlook, October 2026 (released 6 October 2026, after the 30 September evidence close; post-close, context only, supports no baseline claim). EIA, Washington. Observation year 2026. Accessed 2026-11-03.back
  12. 14IRENA (ed.), Renewable Capacity Statistics 2026 (692 GW of renewable capacity added in 2025; 5,149 GW installed at the end of 2025). International Renewable Energy Agency, Abu Dhabi, 2026. Observation year 2025. Accessed 2026-11-05.back

References and record

Every source the edition rests on, the publication record, the corrections log and the open record.

13 min read0 figures1 table0 notesNR-SECTOR-ENERGY-GLOBAL-2026-BASELINE

C.147 sources

NR-CIT-1, editor first. A DOI is linked where the source has one; Nexus records carry a UNI once the catalogue allocates it (NS-1).

  1. 1IEA (ed.), World Energy Investment 2026, launch presentation, Paris, 28 May 2026. International Energy Agency, Paris. Observation year 2026 (estimates, with 2025 data). Accessed 2026-11-03. Cited in the summary, chapter 2, chapter 3, chapter 4, chapter 6
  2. 2IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  3. 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 7, chapter 8
  4. 4IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 4, chapter 6, chapter 7, chapter 8
  5. 5IEA (ed.), Gas 2025: Analysis and forecasts to 2030 (Gas Market Report, Q4-2025). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03. Cited in chapter 2, chapter 6
  6. 6IEA (ed.), World Energy Outlook 2025, launch presentation, Paris, 12 November 2025. International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03. Cited in chapter 6, chapter 8
  7. 7Ember (ed.), Global Electricity Review 2026: 2025 in review (generation, demand, solar, coal). Ember, London. Observation year 2025. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  8. 8UN DESA Statistics Division (ed.), The Sustainable Development Goals Extended Report 2026, Goal 7 indicator storylines (inputs as of 30 April 2026). United Nations, New York. Observation year 2024. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 6, chapter 8
  9. 9ENTSO-E (ed.), 28 April 2025 Iberian blackout: final report of the expert panel (publication page; report dated 20 March 2026). ENTSO-E, Brussels. Observation year 2025. Accessed 2026-11-03. Cited in chapter 1, chapter 2, chapter 3, chapter 4, chapter 6, chapter 8
  10. 10POST-CLOSE, context only: US Energy Information Administration (ed.), Short-Term Energy Outlook, October 2026 (released 6 October 2026, after the 30 September evidence close; post-close, context only, supports no baseline claim). EIA, Washington. Observation year 2026. Accessed 2026-11-03.
  11. 11IEA (ed.), Oil Market Report, June 2026 (17 June 2026, public version; May 2026 world oil output 13.6 mb/d below pre-conflict levels, Gulf exports 14.8 mb/d below February levels and exports via the Strait of Hormuz from known origins at 1.9 mb/d). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05. Cited in the summary, chapter 1, chapter 2, chapter 4, chapter 5, chapter 6, chapter 7, chapter 8
  12. 12IEA (ed.), Oil Market Report, March 2026 (12 March 2026), including the box on the collective action agreed by the 32 IEA member countries on 11 March 2026 to make 400 million barrels of emergency oil stocks available, described as unprecedented; flows through the Strait of Hormuz of nearly 20 mb/d in 2025 and transits at less than 10% of pre-crisis levels. International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05. Cited in the summary, chapter 1, chapter 2, chapter 4, chapter 6, chapter 8
  13. 13IEA (ed.), Gas Market Report, Q2-2026 (April 2026; Qatar halted LNG production on 2 March 2026 and Qatari and UAE output, about 20% of global LNG supply, was isolated from the market). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05. Cited in chapter 1, chapter 2, chapter 4, chapter 6, chapter 8
  14. 14IRENA (ed.), Renewable Capacity Statistics 2026 (692 GW of renewable capacity added in 2025; 5,149 GW installed at the end of 2025). International Renewable Energy Agency, Abu Dhabi, 2026. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  15. 15DieselNet (ed.), Energy Institute releases 2026 Statistical Review of World Energy, news item of 2 July 2026, reporting the Energy Institute, Statistical Review of World Energy 2026, 75th edition (fossil fuels 86% of total energy supply in 2025, hydropower 2.7% of primary energy, electricity demand up 3%); the Review itself refused access. DieselNet, Brampton. Observation year 2025. Accessed 2026-11-05. Cited in chapter 1, chapter 2, chapter 6, chapter 8
  16. 16IEA (ed.), Electricity Mid-Year Update 2026 (23 July 2026; global electricity demand forecast to grow 3.6% in 2026 and 3.8% in 2027, after 3% in 2025); no figure from it is used in a finding. International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05. Cited in chapter 6
  17. 17IEA (ed.), World Energy Investment 2026, full report (revised version, June 2026; total energy investment USD 3.4 trillion in 2026, about USD 2.2 trillion to clean energy and USD 1.2 trillion to oil, gas and coal, electricity supply and infrastructure USD 1.6 trillion). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05. Cited in chapter 2
  18. 18Shehabi, A., Smith, S.J., Hubbard, A. et al., 2024 United States Data Center Energy Usage Report, LBNL-2001637. Lawrence Berkeley National Laboratory, Berkeley, 19 December 2024; no figure is used. Observation year 2023. Accessed 2026-11-05. Cited in chapter 6
  19. 19Shukla, P.R. et al. (eds.), Climate Change 2022: Mitigation of Climate Change, Contribution of Working Group III to the Sixth Assessment Report of the Intergovernmental Panel on Climate Change. IPCC, Geneva, 2022; Cambridge University Press, Cambridge, 2023. Observation year 2022. Accessed 2026-11-05. Cited in chapter 6, chapter 8
  20. 20UNFCCC (ed.), Decision 1/CMA.5, Outcome of the first global stocktake (adopted December 2023; paragraph 28 calls for tripling renewable energy capacity globally by 2030 and transitioning away from fossil fuels in energy systems), in FCCC/PA/CMA/2023/16/Add.1, 15 March 2024. UNFCCC, Bonn. Observation year 2023. Accessed 2026-11-05. Cited in chapter 6
  21. 21IEA (ed.), Net Zero Roadmap: A Global Pathway to Keep the 1.5 °C Goal in Reach, 2023 Update. International Energy Agency, Paris, September 2023. Observation year 2023. Accessed 2026-11-05. Cited in chapter 6
  22. 22IEA (ed.), Electricity Grids and Secure Energy Transitions. International Energy Agency, Paris, October 2023. Observation year 2023. Accessed 2026-11-05. Cited in chapter 4, chapter 6
  23. 23IEA (ed.), World Energy Employment 2025 (shortages of skilled workers reported across the energy sector). International Energy Agency, Paris, 2025. Observation year 2024. Accessed 2026-11-05. Cited in chapter 4
  24. 24IEA (ed.), Energy Efficiency 2025. International Energy Agency, Paris, November 2025. Observation year 2025. Accessed 2026-11-05. Cited in chapter 4
  25. 25IEA (ed.), Oil 2025: Analysis and forecast to 2030. International Energy Agency, Paris, June 2025. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  26. 26IEA (ed.), Electricity 2025: Analysis and forecast to 2027. International Energy Agency, Paris, February 2025. Observation year 2024. Accessed 2026-11-05. Cited in chapter 6
  27. 27IRENA (ed.), World Energy Transitions Outlook 2024: 1.5°C Pathway. International Renewable Energy Agency, Abu Dhabi, November 2024. Observation year 2024. Accessed 2026-11-05. Cited in chapter 6
  28. 28IRENA (ed.), Tracking COP28 outcomes: Tripling renewable power capacity by 2030. International Renewable Energy Agency, Abu Dhabi, March 2024 (the IRENA page refused access; title, date and the 11 TW requirement by 2030 confirmed from the PV Tech report of 19 March 2024). Observation year 2024. Accessed 2026-11-05. Cited in chapter 6
  29. 29IAEA (ed.), Energy, Electricity and Nuclear Power Estimates for the Period up to 2050, Reference Data Series No. 1, 2025 edition. International Atomic Energy Agency, Vienna, September 2025. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  30. 30NERC (ed.), 2025 Long-Term Reliability Assessment (published January 2026; 13 of 23 assessment areas face resource adequacy challenges over the next ten years). North American Electric Reliability Corporation, Atlanta. Observation year 2025. Accessed 2026-11-05. Cited in chapter 4, chapter 6
  31. 31UNEP (ed.), Emissions Gap Report 2025: Off Target, Continued collective inaction puts global temperature goal at risk. United Nations Environment Programme, Nairobi, November 2025. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  32. 32SEI, Climate Analytics, E3G, IISD and UNEP (eds.), The Production Gap Report 2023: Phasing down or phasing up? Top fossil fuel producers plan even more extraction despite climate promises. Stockholm Environment Institute, Stockholm, 8 November 2023. Observation year 2023. Accessed 2026-11-05. Cited in chapter 6
  33. 33Regulation (EU) 2024/1252 of the European Parliament and of the Council of 11 April 2024 establishing a framework for ensuring a secure and sustainable supply of critical raw materials (Critical Raw Materials Act). Official Journal of the European Union, L series, 2024. Observation year 2024. Accessed 2026-11-05. Cited in chapter 6
  34. 34Regulation (EU) 2024/1747 of the European Parliament and of the Council of 13 June 2024 amending Regulations (EU) 2019/942 and (EU) 2019/943 as regards improving the Union’s electricity market design. Official Journal of the European Union, L series, 2024. Observation year 2024. Accessed 2026-11-05. Cited in chapter 3, chapter 6
  35. 35Commission Delegated Regulation (EU) 2024/1366 of 11 March 2024 supplementing Regulation (EU) 2019/943 by establishing a network code on sector-specific rules for cybersecurity aspects of cross-border electricity flows. Official Journal of the European Union, L series, 2024. Observation year 2024. Accessed 2026-11-05. Cited in chapter 3, chapter 4, chapter 6
  36. 36ISO (ed.), ISO 50001:2018, Energy management systems: Requirements with guidance for use, edition 2. International Organization for Standardization, Geneva, August 2018. Observation year 2018. Accessed 2026-11-05. Cited in chapter 4, chapter 6
  37. 37IEC (ed.), IEC 62443 series, Security for industrial automation and control systems, including IEC 62443-4-1:2018, Part 4-1: Secure product development lifecycle requirements. International Electrotechnical Commission, Geneva, 2018. Observation year 2018. Accessed 2026-11-05. Cited in chapter 6
  38. 38IEA (ed.), Climate Resilience for Energy Security. International Energy Agency, Paris, November 2022. Observation year 2022. Accessed 2026-11-05. Cited in chapter 6
  39. 39IEA (ed.), Renewables 2025: Analysis and forecast to 2030. International Energy Agency, Paris, October 2025. Observation year 2025. Accessed 2026-11-05. Cited in chapter 6
  40. 40IEA (ed.), Global Hydrogen Review 2025. International Energy Agency, Paris, September 2025. Observation year 2024. Accessed 2026-11-05. Cited in chapter 6
  41. 41IEA (ed.), Global Methane Tracker 2025 (revised version, May 2025). International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-05. Cited in chapter 6
  42. 42IEA (ed.), Energy Technology Perspectives 2024, executive summary. International Energy Agency, Paris, October 2024. Observation year 2024. Accessed 2026-11-05. Cited in chapter 6
  43. 43Davis, S.J. et al., Net-zero emissions energy systems, Science 360(6396), eaas9793, 2018. American Association for the Advancement of Science. Observation year 2018. Accessed 2026-11-05. Cited in chapter 3, chapter 4, chapter 6
  44. 44Creutzig, F. et al., Towards demand-side solutions for mitigating climate change, Nature Climate Change 8, 260 to 263, 2018. Springer Nature. Observation year 2018. Accessed 2026-11-05. Cited in chapter 6
  45. 45Ueckerdt, F. et al., Potential and risks of hydrogen-based e-fuels in climate change mitigation, Nature Climate Change 11, 384 to 393, 2021. Springer Nature. Observation year 2021. Accessed 2026-11-05. Cited in chapter 6
  46. 46Zscheischler, J. et al., Future climate risk from compound events, Nature Climate Change 8, 469 to 477, 2018. Springer Nature. Observation year 2018. Accessed 2026-11-05. Cited in chapter 6
  47. 47US Energy Information Administration (ed.), Short-Term Energy Outlook, September 2026 (Brent about USD 91 a barrel in the fourth quarter of 2026; Middle East oil flows assumed constrained through the fourth quarter of 2026). EIA, Washington. Observation year 2026. Accessed 2026-11-03. Cited in the summary, chapter 1, chapter 2, chapter 3, chapter 5, chapter 6, chapter 7, chapter 8

C.2Publication record

Публикация

Название
Global Energy Risk & Resilience Report 2026: Baseline Edition
Серия
Reports · Global Sector Series GS-02
Выпуск
Baseline Edition 2026 · inaugural annual
Версия
v1.0.0 · draft for stewardship review
Publication ID
NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE-v1.0.0
Закрытие доказательной базы
30 September 2026
Publication date
Октябрь 2026
DOI
concept and version DOI at deposit

Издатель

Официальный издатель
The Global Centre for Risk and Innovation (GCRI), for the Nexus Consortium
Место
Toronto
Редактор
Saeed Valadbaygi, Chief Steward and Managing Editor
Управляющие
GCRI · technical truth · GRF · public meaning · GRA · capital meaning
Лицензия
text CC BY 4.0; data on the terms of each source
Copyright
© 2026 GCRI · Nexus Consortium
Язык
English (en-GB) source edition
Correspondence
Registry correction pathway · editorial office

Colophon

Формат
A4 portrait · screen, print and archival PDF
Typefaces
Space Grotesk (display) · Geist (text) · IBM Plex Sans Italic (standfirsts) · IBM Plex Mono (data)
Design standard
Reports Foundational Edition, Volume I, Part VII
Доступность
tagged PDF and HTML targets; text alternatives for every figure
Производство
Reports editorial team, GCRI

Release path for this version

Table C.1Release path for this version
ШагЧто происходитКогда
Проектeditorial self-check complete at evidence closeОктябрь 2026
Steward reviewfive passes on the exact draft (keys T · M · F · N)Q4 2026
Утверждениеpublication authority approves the exact digestbefore release
Depositconcept and version DOI minted; registry pointer setat release
Преемственностьthe 2027 energy edition reports changes against this baseline2027
Current version
v1.0.0 draft, stewardship review
Previous edition
none, first edition of the series
Next edition
NR-SECTOR-ENERGY-GLOBAL-2027-v1.0.0
Latest version
resolve the concept DOI or the registry record
Correction route
Registry correction pathway
Notice types
erratum · addendum · supersession · withdrawal

C.3Журнал исправлений

0correction notices. No edition has been released yet, so none can be corrected; the log below lists each edition’s current version.

ВыпускВерсияДатаСтатусИзменениеУведомление
GS-02NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE-v1.0.0Октябрь 2026ПроектBaseline Edition 2026, inaugural annual edition,Нет

Notice types: erratum, addendum, supersession, withdrawal. A correction is a new version with a published notice; the earlier version stays resolvable, and no edition is ever edited in silence.

C.4Открытая запись

This edition’s open record

Publication ID
NR-SECTOR-ENERGY-GLOBAL-2026-BASELINE-v1.0.0
Desk identifier and series alias
NR-GCRI-GS-02-2026-BASELINE-v1.0.0 · NR-SEC-GS-02-2026-BL
Collection
NR-COL-2026-BASELINE (IsPartOf at deposit)
DOI
Concept and version DOI at deposit, on Zenodo with DataCite metadata
Versions
Each correction is a new version (isNewVersionOf); the concept DOI resolves to the latest
Bundle
RO-Crate 1.2 with CITATION.cff, CodeMeta and PROV-O provenance; a signed manifest
Лицензия
CC BY 4.0 (SPDX CC-BY-4.0) for original material; metadata CC0 1.0

Credit and identity

ORCID
Your iD in the deposit and the contribution record; DataCite can then add the work to your ORCID record
ROR
Your organisation by its ROR identifier, never by a typed name alone
CRediT
Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualisation, Writing, review and editing
Учётная запись
None needed to contribute; never a password

Find and follow

Search the open indexes for Global Energy; software is cited by its SWHID from Software Heritage, and a quantified scenario run is preregistered on OSF before it is run. Annotation is your choice: Hypothesis opens this page in its own viewer.

Mirrors and harvest

The DOI is canonical. At release each signed bundle is also given an IPFS content identifier and a bloxberg anchor as mirrors; both are listed in the record once they exist. Zenodo exposes every record over OAI-PMH, and reviews and endorsements can arrive through COAR Notify where the repository supports it.

InvenioRDM metadata for a contribution on Global Energy, prefilled from this page
{
  "metadata": {
    "resource_type": {
      "id": "dataset"
    },
    "title": "Evidence on Global Energy for Nexus Reports",
    "publication_date": "YYYY-MM-DD",
    "creators": [
      {
        "person_or_org": {
          "type": "personal",
          "family_name": "Your family name",
          "given_name": "Your given name",
          "identifiers": [
            {
              "scheme": "orcid",
              "identifier": "0000-0000-0000-0000"
            }
          ]
        },
        "affiliations": [
          {
            "id": "ROR identifier of your organisation"
          }
        ]
      }
    ],
    "description": "What it is, where its record is kept and how it bears on Global Energy Risk and Resilience Report 2026: Baseline Edition, The State of the World’s Energy System..",
    "rights": [
      {
        "id": "cc-by-4.0"
      }
    ],
    "subjects": [
      {
        "subject": "Nexus Reports"
      },
      {
        "subject": "Global Energy"
      },
      {
        "subject": "Global Sector Report · GS-02"
      }
    ],
    "related_identifiers": [
      {
        "identifier": "https://therisk.global/nexus-reports/editions/gs-02/",
        "scheme": "url",
        "relation_type": {
          "id": "issupplementto"
        },
        "resource_type": {
          "id": "publication-report"
        }
      }
    ],
    "version": "1.0.0"
  },
  "custom_fields": {},
  "access": {
    "record": "public",
    "files": "public"
  },
  "files": {
    "enabled": true
  },
  "parent": {
    "communities": {
      "default": "nexusreports"
    }
  }
}

C.5Where this edition sits among the six pillars

Foundry seals the evidence and Universe tests it; Reports publishes it; Standards takes its corrections and Academy teaches from it.

  1. F03 Sealed observations and indicator series Foundry Sealed observations and indicator series behind a profile (closeout).
  2. F04 After-action and scenario findings for Universe After-action and scenario findings for chapters 10 and 13 (after action review).
  3. F05 National Portfolio movement for chapter Foundry National Portfolio movement for chapter 11 (after action review).
  4. Applied in editions Standards Nexus Standards: applied in editions.
  5. GS-02 edition Reports Global Energy 2026, published in every format with its sources, citation and corrections.
  6. F06 Method and correction findings as change Standards Method and correction findings as change proposals (correction).
  7. F12 Q4 synthesis informs the next-year Universe Q4 synthesis informs the next-year mandate (renewal).
  8. Taught in the open Academy Risk Academy: taught in the open.

What Foundry and Universe hand to this edition, and what it hands to Standards, Universe and Academy. From the programme spine; GS-02 is a drafted Baseline Edition, so these handoffs run from its first operational quarter.

ПередачаBetweenWhat crosses, and when
F03Foundry to ReportsSealed observations and indicator series behind a profile (closeout).
F04Universe to ReportsAfter-action and scenario findings for chapters 10 and 13 (after action review).
F05Foundry to ReportsNational Portfolio movement for chapter 11 (after action review).
RingNexus Standards to ReportsNexus Standards: applied in editions.
F06Reports to Nexus StandardsMethod and correction findings as change proposals (correction).
F12Reports to UniverseQ4 synthesis informs the next-year mandate (renewal).
RingReports to Risk AcademyRisk Academy: taught in the open.
ОтчётыВнести вклад

Send evidence or a correction on Global Energy.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the GCRI Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

Служба GCRI «Системы и доказательная база»Глобальные отраслевые риски и устойчивость
Contribution form · reports.contribution.gcri

Никогда не отправляйте персональные данные, сведения о чувствительной инфраструктуре или то, чем вы не вправе делиться. Материал проходит рассмотрение перед использованием; его отправка не дает авторских или редакционных прав, а спонсорство никогда не покупает выводы.

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

Отраслевая сигнатура

The sectors behind Global Energy.

A reading aid: the sectors the findings run through and how strongly they depend on each other.

Выберите углы · наведите на линии6 из 15 связей

Подпись

Энергетика и её партнёры

Энергетика обеспечивает электроэнергией транспорт и телекоммуникации в инфраструктуре (0,8), перекачку и очистку в воде (0,5) и удобрения, технику и холодовые цепи в продовольствии (0,5).

W · E · I · F · H · B

Отрасли
4 из 6
Связи
6 из 15
Взаимосвязи
0.46 доля от общего числа

Самые сильные задействованные связи

  • Энергетика → инфраструктура · электропитание транспорта и телекоммуникаций0.8
  • Вода → энергия · охлаждающая вода и гидроэнергетика0.6
  • Вода → продовольствие · орошение0.8
  • Инфраструктура → вода · трубопроводы, плотины и очистные сооружения0.6
Учебные значения для типичного города-региона, а не измерения для какого-либо места. Связность это суммарная сила задействованных связей как доля всех пятнадцати.