Mbinu
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
Contents
- ·Edition home
- ·Executive summary
- 1Money meets risk
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5A loss year that meets tight public budgets
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMbinu
- A.1 Methods
- A.2 Model card, Resilience Investment Model v0
- A.3 The baseline evidence cut
- A.4 Evidence age and coverage
- A.5 Evidence cards, two anchor sources
- A.6 Publication acceptance record
- A.7 Status words
- A.8 How the edition is made, released and corrected
- A.9 Glossary and abbreviations
- A.10 Technical annex
- BData appendix
- CReferences and record
- ·Complete edition, for print
A.1Mbinu
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | Result |
|---|---|---|---|
| (1) | Insured share of overall disaster losses, 2025 | 108 ÷ 224 | ≈ 48% |
| (2) | Share of loss and damage fund pledges received | 397.74 ÷ 790.24 | ≈ 50% |
| (3) | 2025 cat bond issuance relative to year-end outstanding (not a growth rate) | 25.6 ÷ 61.3 | ≈ 42% |
| (4) | Average commitment per resilience facility arrangement | 10.3 ÷ 27 | ≈ 0.38 SDR billion |
| Strength | Definition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| Label | Rule |
|---|---|
| Reported | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| Imekadiriwa | Nexus analytical value with stated method |
| Hali tarajiwa | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, Resilience Investment Model v0
- Model ID
- MDL-SR14-INVESTMENT · v0.1
- Madhumuni
- represent resilience investment as a connected system and the mechanisms by which money, losses and cover move between energy, infrastructure, adaptation and recovery
- Familia
- graph-based system of systems
- Inputs
- the cited sources of this edition; no proprietary data
- Mbinu
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- Validation
- none yet, first validation against federation evidence in 2027
- Kutokuwa na uhakika
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- global scale; not for asset-, site- or country-level use
- Reproducibility
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-STRATEGIC-INVESTMENT-GLOBAL-2026-B0
- Type
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 44 cited sources, each at the edition and access date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 resilience investment annual cut
Lineage
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Element | Baseline 2026 | 2027 global annual |
|---|---|---|
| Vyanzo | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Models | Resilience Investment Model v0 specification | model runs with receipts |
| Matokeo ya uchunguzi | twelve baseline findings | findings re-bound to federation evidence |
| Mapitio | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicator | Imeonekana | Released | Cadence | Next release |
|---|---|---|---|---|
| Energy investment | 2026 estimate | May 2026 | annual | 2027 |
| US asset condition | 2025 | Mar 2025 | four-yearly | 2029 |
| Disaster losses | 2025 | Jan to Mar 2026 | annual | 2027 |
| Cat bond market | 2025 | early 2026 | quarterly | next quarterly report |
| Climate finance landscape | 2023 | Jun 2025 | biennial | 2027 |
| Climate finance decision | 2024 | Nov 2024 | one-off | none scheduled |
| Loss and damage fund | Sep 2025 | Nov 2025 | per meeting | next Board report |
| IMF resilience facility | to Feb 2026 | Mar 2026 | annual | 2027 |
| US grant round | 2026 | Sep 2026 | per round | selection results |
| National plans | 2023 to 2026 | 2025 to 2026 | per plan | not scheduled |
| Mfumo | Coverage | Thinnest dimension |
|---|---|---|
| Nishati | GOOD | grid and storage detail |
| Miundombinu | PARTIAL | condition outside the US |
| Disaster losses | GOOD | comparability of series |
| Uhawilishaji wa hatari | PARTIAL | public cover data |
| Climate finance | PARTIAL | private adaptation finance |
| Recovery funds | THIN | payment speed |
| Jalada za kitaifa | THIN | common basis |
| Multilateral lending | PARTIAL | country-level use |
| Nyanja | Source that would fill it | Blocker |
|---|---|---|
| Resilience share of national investment on a common basis | national budget offices and statistics offices | not published on a common basis; no consolidated series |
| Split between upkeep and new build in national portfolios | national infrastructure plans | not retrieved; plans use different categories |
| Grid investment detail from the full IEA World Energy Investment 2026 report | IEA World Energy Investment 202636 | the full report was opened at verification; it puts network spending at around USD 550 billion in 2026 and battery spending above USD 100 billion; not yet bound in this edition |
| Adaptation finance needs and gap from the UNEP Adaptation Gap Report 2025 | UNEP Adaptation Gap Report 202535 | the report was opened at verification; its need and gap tables are not yet bound in this edition |
| Disaster cost and return figures from the UNDRR GAR 2025 itself | UNDRR GAR 202523 | the report was opened at verification; its cost and return figures are not yet bound in this edition |
| Swiss Re Institute sigma 1/2026 text and protection gap | Swiss Re Institute sigma 1/202625 | the sigma was opened at verification and matches the trade report4; its protection gap tables are not yet bound in this edition |
| Ten-year funding total of the UK infrastructure strategy | UK Infrastructure: A 10 Year Strategy1428 | the publication page read gives no total; the parliamentary statement, opened at verification, states at least GBP 725 billion; not yet bound in this edition |
| Size and term of the German special fund from official text | Basic Law, Article 143h29 | the Finance Ministry page returned a service error; the constitutional text, opened at verification, gives up to EUR 500 billion over twelve years; not yet bound in this edition |
| Japan five-year plan details from the Cabinet Secretariat | Cabinet Secretariat plan documents17 | only a press report gave the total; the plan page read states a review cycle but no amount |
| Australian Disaster Ready Fund audit results | Australian National Audit Office, Auditor-General Report No. 35 2024-25 (not opened) | the audit pages returned service errors; the fund’s governing Act30 was read instead |
| Private adaptation finance by country | Climate Policy Initiative full report6 | the full report exceeded the size the fetch tool accepts; the landing page gives no private figure |
| Envelope of the EU competitiveness fund | European Commission proposal2031 | sources differ in scope: EUR 234.3 billion20 excludes Horizon Europe and EUR 409.3 billion31 includes it; the Commission page returned an error |
A.5Evidence cards, two anchor sources
Issued by the International Energy Agency. Annual. Role: binds ENE-001. Coverage: global. The 11-page launch presentation was read; the full report was not opened.
EVD-SR14-001
IEA World Energy Investment 2026 launch presentation1
Issued by the UN climate process. Per Board meeting. Role: binds CLI-008. Resources as at 23 September 2025.
EVD-SR14-002
Report of the Board of the Fund for responding to Loss and Damage8
| Dimension | EVD-SR14-001 | EVD-SR14-002 |
|---|---|---|
| Completeness | slides only; sector detail partly in charts | status of resources stated in full |
| Timeliness | about 5 months into the year | about 7 weeks after the reporting date |
| Revision | estimates for 2026 will be revised | figures change at each Board meeting |
| Method transparency | method sits in the full report, not opened | trustee reporting stated |
| External validation | agency review | trustee and Board review |
Evidence cards to follow in 2027
- IEA36: grid and storage tables in the full report
- UNEP35: need and gap tables
- UNDRR23: investment and return chapters
- Swiss Re Institute25: protection gap section
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| Group | Area | Items | Pass | N/A | Pending |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- Ramani
- plates in Q2 2027
- Waivers
- none
A.7Status words
| Hali | What it means |
|---|---|
| Imeonekana | Measured directly and published by the source. |
| Reported | Published statistics of an official or institutional source. |
| Declared | Stated by the body concerned; not independently measured. |
| Imekadiriwa | A Nexus estimate from cited evidence, with its method in Annex A. |
| Modelled | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Forecast | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| Hali tarajiwa | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| Step | What happens | Chanzo |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Istilahi | Meaning |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| Muunganiko | a typed dependency through which one system transmits to another |
| Protection gap | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| ASCE | American Society of Civil Engineers |
| CPI | Climate Policy Initiative |
| EIB | European Investment Bank |
| GAO | US Government Accountability Office |
| GAR | Global Assessment Report on Disaster Risk Reduction |
| IEA | International Energy Agency |
| IMF | International Monetary Fund |
| NCQG | new collective quantified goal on climate finance |
| RSF | Resilience and Sustainability Facility |
| SDR | special drawing right |
| UNDRR | United Nations Office for Disaster Risk Reduction |
| UNEP | United Nations Environment Programme |
A.10Technical annex
| Item | Annex | Contents | Hali |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-SR14-PRT-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Regional notes | regional investment cards | WITH REGIONAL EDITIONS |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: adaptation finance
- Construct
- finance tracked as supporting adaptation to climate change, from public and private sources
- Unit
- USD billion a year
- Mbinu
- bottom-up tracking of public, private and multilateral flows
- Chanzo
- Climate Policy Initiative landscape6
- Kutokuwa na uhakika
- the tracker calls its figure likely an underestimate
- Known limits
- tracking gaps, domestic flows and private flows differ by region
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 36IEA (ed.), World Energy Investment 2026 (full report, 260 pages, Paris, 28 May 2026, revised version June 2026; free PDF from the IEA file store read; executive summary p. 9: spending on networks around USD 550 billion in 2026, up nearly 20% year-on-year, and spending on batteries for the power sector above USD 100 billion; grids section p. 95: grid spending rose USD 45 billion in 2025 to nearly USD 450 billion and is projected to grow a further 17% in 2026). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-05.back
- 35UNEP (ed.), Adaptation Gap Report 2025: Running on empty. The world is gearing up for climate resilience, without the money to get there (2025; ISBN 978-92-807-4237-4; developing country needs USD 310 to 365 billion a year by 2035; international public adaptation finance USD 26 billion in 2023; debt instruments 58% on average in 2022 to 2023). United Nations Environment Programme, Nairobi. doi:10.59117/20.500.11822/48798. Observation year 2025. Accessed 2026-11-05. doi:10.59117/20.500.11822/48798back
- 23UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025: Resilience Pays: Financing and Investing for our Future (report, 2025; PDF ISBN 9789211576740; cost and return chapters not bound in this edition). United Nations Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-05.back
- 25Swiss Re Institute (ed.), Natural catastrophes in 2025: the persistent rise of wildfire and storm risk, sigma No 1/2026 (March 2026; insured losses USD 107 billion; economic losses USD 220 billion, about 49% insured; secondary perils 92% of insured losses; 80 to 90% of losses still uninsured in emerging economies). Swiss Re Management Ltd, Zurich. Observation year 2025. Accessed 2026-11-05.back
- 4Artemis (ed.), report on the Swiss Re Institute sigma 1/2026 natural catastrophe figures for 2025 (insured losses USD 107 billion; overall losses USD 220 billion; about 49% insured; 92% of insured losses from secondary perils; 80 to 90% of losses typically uninsured in emerging economies). Read in this trade report, not in the sigma itself. Artemis, Bermuda. Observation year 2025. Accessed 2026-11-03.back
- 14HM Treasury and NISTA (eds.), UK Infrastructure: A 10 Year Strategy (publication page; published 19 June 2025; no funding total on the page). UK Government, London. Observation year 2025. Accessed 2026-11-03.back
- 28UK Parliament (ed.), UK Infrastructure: A 10 Year Strategy, written statement HCWS717 by the Chief Secretary to the Treasury, 19 June 2025 (strategy laid as CP 1344; funding of at least GBP 725 billion for infrastructure over the next decade). House of Commons, London. Observation year 2025. Accessed 2026-11-05.back
- 29Federal Ministry of Justice (ed.), Basic Law for the Federal Republic of Germany, Article 143h, as amended in March 2025 (special fund for additional investment in infrastructure and in climate neutrality by 2045 of up to EUR 500 billion; investments approved within a twelve-year term; EUR 100 billion to the Climate and Transformation Fund; EUR 100 billion for investment by the states). Consolidated text, Berlin. Observation year 2025. Accessed 2026-11-05.back
- 17Cabinet Secretariat of Japan (ed.), Fundamental Plan for National Resilience (English page; the plan is reviewed about every five years; no five-year amount on the page read). Cabinet Secretariat, Tokyo. Observation year 2023. Accessed 2026-11-03.back
- 30Commonwealth of Australia (ed.), Disaster Ready Fund Act 2019 (compilation in force when read on the Federal Register of Legislation; establishes the Disaster Ready Fund and its special accounts and provides for publication, annual reporting and review of arrangements and grants). Office of Parliamentary Counsel, Canberra. Replaces the ANAO audit of the fund (Auditor-General Report No. 35 2024-25), whose pages and report file did not respond. No figure used. Accessed 2026-11-05.back
- 6Climate Policy Initiative (ed.), Global Landscape of Climate Finance 2025 (publication page, 23 June 2025; global climate finance USD 1.9 trillion in 2023; adaptation finance USD 65 billion, likely an underestimate; international flows to emerging and developing economies USD 196 billion, 78% public). Climate Policy Initiative, London. Observation year 2023. Accessed 2026-11-03.back
- 20European Parliament (ed.), European Competitiveness Fund, legislative observatory summary (proposed envelope EUR 234.3 billion for 2028 to 2034; multiannual financial framework described as a EUR 2 trillion budget). European Parliament, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 31I. Hallak, European competitiveness fund, EU Legislation in Progress briefing PE 779.225 (November 2025; indicative allocation EUR 362.2 billion in 2025 prices, EUR 409.3 billion in current prices, including EUR 175 billion in current prices for Horizon Europe and excluding the Innovation Fund). European Parliamentary Research Service, Brussels. Observation year 2025. Accessed 2026-11-05.back
- 1IEA (ed.), World Energy Investment 2026, launch presentation (11 pages, Paris, 28 May 2026; global energy investment USD 3.4 trillion in 2026 estimate against USD 2.6 trillion in 2015; electricity supply and infrastructure USD 1.6 trillion). International Energy Agency, Paris. Observation year 2026. Accessed 2026-11-03.back
- 8UNFCCC (ed.), Report of the Board of the Fund for responding to Loss and Damage, addendum FCCC/CP/2025/10/Add.1, 10 November 2025 (pledges USD 790.24 million and amount received USD 397.74 million at 23 September 2025; 27 contributors). United Nations Framework Convention on Climate Change, Bonn. Observation year 2025. Accessed 2026-11-03.back